briefing                                                                                  Portals, Content and Collaboration




Microsoft
SharePoint 2013
Preview


Early insights on the upcoming release
of Microsoft SharePoint
During July 2012, Microsoft                              As with earlier versions of SharePoint, the
                                                                                                                What else is in Microsoft
publically shared details about                          platform can be used on its own as an
                                                                                                                Office 2013?
Microsoft SharePoint 2013 for the                        enterprise content management solution or
                                                                                                                Microsoft SharePoint 2013 is one
first time. Coinciding with its                          web content management solution, but
                                                                                                                member of Microsoft Office 2013,
announcements around Office 2013,                        even greater value can be derived through              which comprises several desktop and
Microsoft also released beta                             its integration with the other applications            server-based applications. All of these
software, including that for                             in the Microsoft Office range, and the other           products – including Outlook, Word,
SharePoint 2013. While no release                        enterprise applications (such as the                   Excel, PowerPoint, Project and
                                                         Dynamics ERP and CRM solutions) that will              OneNote – are receiving updates,
date was given, we can expect the
                                                                                                                and on the server-side, both Lync and
final version of Office, including                       take advantage of its capabilities over time.
                                                                                                                Exchange are being refreshed.
SharePoint, towards the end of 2012.
                                                         Intergen has already been working with                 While all of these solutions will each
Microsoft SharePoint 2013 contains a                     SharePoint 2013 for over six months as part            receive updates, there are some
significant number of improvements to                    of the early beta programs. This means                 consistent changes: user interfaces are
previous versions of SharePoint, in key                  we’ve already seen it in action in an                  streamlined to allow for better touch
                                                         enterprise setting and can advise you on               support on mobile and desktop
areas such as mobility, productivity and
                                                                                                                devices; Office will be more closely
social. We recommend that if you’re                      the best way to move forward with this
                                                                                                                integrated with the cloud and, in
considering a new SharePoint                             new technology.                                        particular, Microsoft’s SkyDrive online
deployment or upgrading from a                                                                                  storage service, allowing access and
                                                         This paper provides a high-level overview of
previous version, then now is the time                                                                          collaboration from multiple devices;
                                                         the key improvements in Microsoft
to understand the new features on                                                                               and social experiences will be more
                                                         SharePoint 2013 and what benefits these                closely tied into all of the applications.
offer and use this as the basis of any
                                                         provide organisations.
assessment you might make.                                                                                      Most updates are expected to be
                                                                                                                available in late 2012.

Disclaimer: The information contained in this document is based on pre-release software and is subject to
change without notice. If you have specific questions about SharePoint 2013 please contact us.


                                                                                                                                                             1
briefing MICROSOFT SharePoint 2013 PREVIEW




    Social for the Enterprise
    Compared with SharePoint 2007,
    SharePoint 2010 took a big step
    forward in the Social space, with rich
    My Sites and some micro-blogging
    capabilities. SharePoint 2013 goes
    well beyond 2010 and brings the
    capabilities of Yammer, Twitter and
    LinkedIn to the enterprise space. The
    main benefits of these capabilities are
    information sharing and connectivity
    between staff in order to reduce silos
    and speed up knowledge transfer. Key
    capabilities of Social include:
    »» Rich micro-blogging with ‘@’ and
       ‘#’ tags and replies allowing staff
       to quickly communicate with a
       small or broad audience.
    »» A full activity feed allowing users
       to see all activity in one place and   Mobility
       stay in the loop on key events or
                                              SharePoint 2013 on iPad
       communications.
                                              The user interface for SharePoint 2013 is almost exclusively
    »» The ability for users to follow
                                              written in HTML5, and in addition to the standard client
       people, sites, tags and documents
                                              support options, full support is also planned for the Safari
       and get updates in their activity
                                              browser on the Apple iPad. Users can browse, contribute and
       feed.
                                              edit documents directly from iPads. There is also a new
    »» New Community Sites (think             Channels capability which allows easy mapping of pages and
       fully-featured discussion boards)      web parts to devices, allowing the experience to be tailored
       with experts, badges and               for different devices.
       reputation points. Perfect for
       special interest groups, new staff     The vast majority of organisations have iPads in their
       or general communications and          ecosystem and are considering mobile experiences for web
       collaboration.                         content. These capabilities are a huge benefit for mobile
                                              access, and in many cases they eliminate the need for complex
    With Yammer, the enterprise micro-
                                              development or the use (and additional cost) of third party
    blogging service, now owned by
                                              applications. We think
    Microsoft, Microsoft has signalled that
                                              that native iOS support
    it will aggressively evolve the
                                              will be a key driver for
    SharePoint solution – with Yammer –
                                              organisations
    to ensure the “social enterprise” will
                                              considering moving
    become a reality. While details of how
                                              quickly to upgrade
    Yammer and SharePoint might be
                                              from SharePoint 2010
    packaged and integrated are yet to be
                                              to the new version.
    disclosed, Microsoft is well-positioned
    to become a leader in workplace
    social software.




2
Portals, Content and Collaboration




Search
With so many versions to choose from – Foundation, Standard,                       The App Store
Express, FAST – the range of search options from Microsoft has
                                                                                   Apps are here in a big way and Microsoft has
always been challenging to understand. Now there is only one version
                                                                                   fully embraced this concept in SharePoint 2013.
of search, and it is amazing! The best capabilities of all products have
                                                                                   A full-featured enterprise app store is now
been combined into one. Think search suggestions, document
                                                                                   provided, allowing staff to access company-
previews, continuous crawl, recommendations, social distance ranking,
                                                                                   built, purchased or externally available
deep refinement, auto identification of company names, advanced
                                                                                   applications. There are lots of options to control
analytics, even more integration, easy customisation and you are
                                                                                   how this works, but essentially you can think of
getting close to what the new search capabilities provide.
                                                                                   the app store as a highly organised and
What does all this mean? A highly engaging search experience for                   controlled way to manage add-on features
end users that provides the fastest, most accurate results ever seen               which business areas might want to leverage.
in SharePoint.




Productivity
Accessing knowledge and enabling               »» A new area in My Sites rolls up a          »» A new Share feature allows users to
collaboration have been cornerstones of           user’s tasks across the entire                easily share sites and content with
Microsoft SharePoint since its first release      SharePoint environment as well as             each other rather than dealing with
in 2001. There are a number of                    Microsoft Project Server and                  complex permissions.
improvements in this space which take             Microsoft Exchange. This creates a         »» There a number of new and well-
SharePoint to the next level:                     proverbial “one-stop shop” for users          designed collaboration templates
                                                  instead of going to tasks lists across        available, delivering organisations
»» Users have a folder on their desktop
                                                  the platform. This delivers a huge            great value from SharePoint 2013
   which syncs directly to their My Site.
                                                  productivity boost!                           straight out of the box.
   Companies use this instead of
   personal drives, making it easy for         »» There are a number of general user         »» Access Services has been completely
   staff to store documents within their          interface improvements such as easy           rebuilt and now exists as a
   own space, conforming to templates             list creation, searching and editing          standalone solution, separate from
   and enterprise metadata. Essentially           and drag and drop document                    SharePoint. Access now has far more
   this provides Dropbox-type-simplicity          uploading. You’ll be surprised at how         capabilities for rich forms and reports
   with full enterprise level control at          much easier SharePoint is to use and          now than were provided in
   the back end; the best of both worlds.         user adoption and training will               SharePoint 2010.
                                                  benefit from these improvements.



                                                                                                                                          3
Portals, Content and Collaboration




Websites
SharePoint 2010 provided some great functionality for             »» Digital asset management has greatly improved, with much
intranet, extranet and public-facing websites. The capabilities      better handling of images and video content. For example
in SharePoint 2013 have raised the bar and positioned                you can select the thumbnail used for a video just through
SharePoint well and truly as a leader in the web content             the browser, display YouTube videos and manage multiple
management space. Features that are new to SharePoint                renditions of digital assets.
2013 include:                                                     »» Search Engine Optimisation has been implemented, with
»» A new Product Catalogue capability allows site navigation         friendly URLs and auto sitemap generation.
   to be defined using metadata. Product pages then               »» A new Design Manager puts all the branding aspects of the
   aggregate content from a number of sources onto the page          site in one place with the ability to import non-SharePoint
   using the new Content by Search web part. This powerful           HTML from a designer and apply to a site and a much
   capability allows eCommerce and knowledge-based sites to          simpler theming engine. Designs can also be easily
   be quickly developed and to adapt over time as product            exported and imported. Overall these capabilities make
   categories and taxonomy changes. Site collection                  designing websites much easier.
   boundaries are no longer an issue for publishing content!




Next steps
Microsoft SharePoint 2013 provides many additional features to those discussed in this paper. SharePoint also provides a range
of additional features including full support for running 2010 sites (to allow easy migration), improvements in eDiscovery
(allowing full search across SharePoint and Exchange, including export capabilities), and versioning that now stores only the
differences instead of the full document each time a new version is checked in.
Contact us if you would like to better understand these new features and how they could help your organisation.




AUCKLAND CHRISTCHURCH DUNEDIN PERTH REDMOND SYDNEY WELLINGTON

Microsoft SharePoint 2013 Preview

  • 1.
    briefing Portals, Content and Collaboration Microsoft SharePoint 2013 Preview Early insights on the upcoming release of Microsoft SharePoint During July 2012, Microsoft As with earlier versions of SharePoint, the What else is in Microsoft publically shared details about platform can be used on its own as an Office 2013? Microsoft SharePoint 2013 for the enterprise content management solution or Microsoft SharePoint 2013 is one first time. Coinciding with its web content management solution, but member of Microsoft Office 2013, announcements around Office 2013, even greater value can be derived through which comprises several desktop and Microsoft also released beta its integration with the other applications server-based applications. All of these software, including that for in the Microsoft Office range, and the other products – including Outlook, Word, SharePoint 2013. While no release enterprise applications (such as the Excel, PowerPoint, Project and Dynamics ERP and CRM solutions) that will OneNote – are receiving updates, date was given, we can expect the and on the server-side, both Lync and final version of Office, including take advantage of its capabilities over time. Exchange are being refreshed. SharePoint, towards the end of 2012. Intergen has already been working with While all of these solutions will each Microsoft SharePoint 2013 contains a SharePoint 2013 for over six months as part receive updates, there are some significant number of improvements to of the early beta programs. This means consistent changes: user interfaces are previous versions of SharePoint, in key we’ve already seen it in action in an streamlined to allow for better touch enterprise setting and can advise you on support on mobile and desktop areas such as mobility, productivity and devices; Office will be more closely social. We recommend that if you’re the best way to move forward with this integrated with the cloud and, in considering a new SharePoint new technology. particular, Microsoft’s SkyDrive online deployment or upgrading from a storage service, allowing access and This paper provides a high-level overview of previous version, then now is the time collaboration from multiple devices; the key improvements in Microsoft to understand the new features on and social experiences will be more SharePoint 2013 and what benefits these closely tied into all of the applications. offer and use this as the basis of any provide organisations. assessment you might make. Most updates are expected to be available in late 2012. Disclaimer: The information contained in this document is based on pre-release software and is subject to change without notice. If you have specific questions about SharePoint 2013 please contact us. 1
  • 2.
    briefing MICROSOFT SharePoint2013 PREVIEW Social for the Enterprise Compared with SharePoint 2007, SharePoint 2010 took a big step forward in the Social space, with rich My Sites and some micro-blogging capabilities. SharePoint 2013 goes well beyond 2010 and brings the capabilities of Yammer, Twitter and LinkedIn to the enterprise space. The main benefits of these capabilities are information sharing and connectivity between staff in order to reduce silos and speed up knowledge transfer. Key capabilities of Social include: »» Rich micro-blogging with ‘@’ and ‘#’ tags and replies allowing staff to quickly communicate with a small or broad audience. »» A full activity feed allowing users to see all activity in one place and Mobility stay in the loop on key events or SharePoint 2013 on iPad communications. The user interface for SharePoint 2013 is almost exclusively »» The ability for users to follow written in HTML5, and in addition to the standard client people, sites, tags and documents support options, full support is also planned for the Safari and get updates in their activity browser on the Apple iPad. Users can browse, contribute and feed. edit documents directly from iPads. There is also a new »» New Community Sites (think Channels capability which allows easy mapping of pages and fully-featured discussion boards) web parts to devices, allowing the experience to be tailored with experts, badges and for different devices. reputation points. Perfect for special interest groups, new staff The vast majority of organisations have iPads in their or general communications and ecosystem and are considering mobile experiences for web collaboration. content. These capabilities are a huge benefit for mobile access, and in many cases they eliminate the need for complex With Yammer, the enterprise micro- development or the use (and additional cost) of third party blogging service, now owned by applications. We think Microsoft, Microsoft has signalled that that native iOS support it will aggressively evolve the will be a key driver for SharePoint solution – with Yammer – organisations to ensure the “social enterprise” will considering moving become a reality. While details of how quickly to upgrade Yammer and SharePoint might be from SharePoint 2010 packaged and integrated are yet to be to the new version. disclosed, Microsoft is well-positioned to become a leader in workplace social software. 2
  • 3.
    Portals, Content andCollaboration Search With so many versions to choose from – Foundation, Standard, The App Store Express, FAST – the range of search options from Microsoft has Apps are here in a big way and Microsoft has always been challenging to understand. Now there is only one version fully embraced this concept in SharePoint 2013. of search, and it is amazing! The best capabilities of all products have A full-featured enterprise app store is now been combined into one. Think search suggestions, document provided, allowing staff to access company- previews, continuous crawl, recommendations, social distance ranking, built, purchased or externally available deep refinement, auto identification of company names, advanced applications. There are lots of options to control analytics, even more integration, easy customisation and you are how this works, but essentially you can think of getting close to what the new search capabilities provide. the app store as a highly organised and What does all this mean? A highly engaging search experience for controlled way to manage add-on features end users that provides the fastest, most accurate results ever seen which business areas might want to leverage. in SharePoint. Productivity Accessing knowledge and enabling »» A new area in My Sites rolls up a »» A new Share feature allows users to collaboration have been cornerstones of user’s tasks across the entire easily share sites and content with Microsoft SharePoint since its first release SharePoint environment as well as each other rather than dealing with in 2001. There are a number of Microsoft Project Server and complex permissions. improvements in this space which take Microsoft Exchange. This creates a »» There a number of new and well- SharePoint to the next level: proverbial “one-stop shop” for users designed collaboration templates instead of going to tasks lists across available, delivering organisations »» Users have a folder on their desktop the platform. This delivers a huge great value from SharePoint 2013 which syncs directly to their My Site. productivity boost! straight out of the box. Companies use this instead of personal drives, making it easy for »» There are a number of general user »» Access Services has been completely staff to store documents within their interface improvements such as easy rebuilt and now exists as a own space, conforming to templates list creation, searching and editing standalone solution, separate from and enterprise metadata. Essentially and drag and drop document SharePoint. Access now has far more this provides Dropbox-type-simplicity uploading. You’ll be surprised at how capabilities for rich forms and reports with full enterprise level control at much easier SharePoint is to use and now than were provided in the back end; the best of both worlds. user adoption and training will SharePoint 2010. benefit from these improvements. 3
  • 4.
    Portals, Content andCollaboration Websites SharePoint 2010 provided some great functionality for »» Digital asset management has greatly improved, with much intranet, extranet and public-facing websites. The capabilities better handling of images and video content. For example in SharePoint 2013 have raised the bar and positioned you can select the thumbnail used for a video just through SharePoint well and truly as a leader in the web content the browser, display YouTube videos and manage multiple management space. Features that are new to SharePoint renditions of digital assets. 2013 include: »» Search Engine Optimisation has been implemented, with »» A new Product Catalogue capability allows site navigation friendly URLs and auto sitemap generation. to be defined using metadata. Product pages then »» A new Design Manager puts all the branding aspects of the aggregate content from a number of sources onto the page site in one place with the ability to import non-SharePoint using the new Content by Search web part. This powerful HTML from a designer and apply to a site and a much capability allows eCommerce and knowledge-based sites to simpler theming engine. Designs can also be easily be quickly developed and to adapt over time as product exported and imported. Overall these capabilities make categories and taxonomy changes. Site collection designing websites much easier. boundaries are no longer an issue for publishing content! Next steps Microsoft SharePoint 2013 provides many additional features to those discussed in this paper. SharePoint also provides a range of additional features including full support for running 2010 sites (to allow easy migration), improvements in eDiscovery (allowing full search across SharePoint and Exchange, including export capabilities), and versioning that now stores only the differences instead of the full document each time a new version is checked in. Contact us if you would like to better understand these new features and how they could help your organisation. AUCKLAND CHRISTCHURCH DUNEDIN PERTH REDMOND SYDNEY WELLINGTON