SlideShare a Scribd company logo
THOMAS A. HERZMAN
tomherzman@yahoo.com Phone: (760)692-8403
______________________________________________________________
Skills
______________________________________________________________
Accomplishments
Awarded monetary recognitionsforgenerating money forpreviouscompanies
Extensivebackground in construction,second generation
Formally trained staff up to ProjectManagers,Owners,SeniorPartnersin realworld costestimations
• Proficientin reading and interpreting civil, structuraland architecturalplans& MEP's
• Workwith city inspectors& familiar with all local and state codes;per ADA & Title 24 requirements
• Workwith 3rd partyinspectors
• Coordinateand monitorsubcontractorson a daily basis
• Read,understand and implementspecificsectionsof specifications,drawingsand plans.Organize,
prepareand monitortechnical proposalbid processes
• Experiencewith managing severalbuildingssimultaneously
•projectschedules& budgets
• Ableto write and administersubcontracts
• Reviewand handleshop drawingsand processRFIs
• Main pointof contactfor projectinquiries and responsibilitiesfromoverall projectperspective
• Organizesand coordinatestheworkof workersemployeeson construction projects
• Keepscostrecords on workperformed and materials
• responsibleforthecontrol of costsin materialsand wages
• Exercisescontrol overrate of construction progressin order to complete construction projectwithin
time limits & problemsolving
• Inspectsconstruction workto enforceconformity to specifications
• Conductand documentweekly sub meetingsand safety meetings
• Required to maintain daily reports,phonelogsand transmittals
JOBS HELD
• ProjectManagement • General Superintendent • Estimates
• Plansand Permits • Design Build/T&I • Quality control
TERRY ADAMS INC/SUPERINTENDENT 2015 to2016 COMPLETE CONSTRUCTIONALL
AREA OF INPROVEMENTTO HAND HANDOVER TO OWNERSFINALS T&I
LENSCRAFTERSANSSUNGLASSHUTS BOSTON ,.VIRGINIAAND SD CA
D2C CONSTRUCTIONCURRENTSUPERINTENDENT /PM 2014 to 20015
NixsonWatchStore new TI Outlet at the Bourder SD CA O'Neill RidersStrore new TI Outlet
at the Bourder SD CA complete all areas threw hand over to owners take a lookon the
internet
Land Developer /Evergreen Realestate 1979 to 2012
Herzman Construction,FallbrookCa 1979 to date
$300,000,000. In constructionprojects from*sitework grading*landscape*hardscape*customtracts*
car dealerships*road improvements*retail*parkinglot,*largecondo projects*apartmentsover 2000
unit* FHA housingproject.** Estimating*qualitycontrol project *management,*financeproblem
solving*hospital*medical build*customremodels*restaurant*insurancerepair* fire water *branch 2
and 3 WDO pest control fieldinspector*control blueprints*permit*completeconsultantcontrol
*Wall street journal builderofthe year standardinsurance
General Superintendent/ Project Manager 2007 to2008
SauersConstruction,LakeForrestCa
In chargeof entire construction of Mossy Toyota cardealership,ground up 40,000 sq.ft.bay servicearea,
showroomcomputerstations,30TV stations,elevator,carwash projectcost$26,000,000.00 Managed
entire construction *Bob Miller Toyotacar dealership,ground up
ground up 60,000 sq.ft.50 bay service area,showroomcomputerstations,22TV stations,elevator,car
wash .projectcost$ $42,000,000.00
Zigman/ShieldsGeneral Contractors ( justfinisedVistaMedical Plaza 7/26/2016) LAST JOB FINISHED
construction on the San Diego Korean United Presbyterian Church nearRosecransand Evergreen in
PointLoma.The 10,000-square-footrenovation/addition projectconsistsof thedemolition of theexisting
classroombuilding,renovation of existing fellowship hall,and theconstruction of a new two-story
education centeralong with substantialassociated sitework.
The design teamconsistsof JamesPJArchitects of Poway,CMN Engineersof Encinitasforstructural,
Pedro Medina & Associatesof San Diego,and Environsof San Diego for landscape.
The contractor'steamincludesBud Coberly asprojectmanager,TomHerzman assuperintendentand
Debbie Van Eyckas coordinator.Theprojectbrokeground in November2005, and is scheduled for
completion in April 2006.review on line
________________________________________________________
PROJECTS
_________________________________________________________
*MILLS AT CORTEZ HILLS CONDO* KOREAN PRESBYTERIAN CHURCH *805
HIGHWAY LANDSCAPE IMPROVEMENTS SAN
DIEGO, CA
*MOSSY TOYOTA SUPER STORE* GRAND ST LIFE GUARD STATION* *SPAWARS
PACIFIC BEACH CA.
*WESLLSOW *CHEROLET &*HONDA SAN JAUN CAPISTRANO CA
*BOB MILLER TOYOTA. *CUSTOM ESTATES *OLIVE GARDEN
NEWPORT BEACH CA.
*MORGAN HILLS ELIMENTRY SCHOOL * WONDERBREAD FACTORY *CUSTOM
ESTATES TEMECULA CA.
*ESTATE HOMES*BROOK HILLS*RANCHO FALLBROOK *SARATOGA ESTATES *
APARTMENTS FALLBROOK CA.
*KAISER MEDICAL*LARGE CONDO PROJECTS* PLANED COMMUNITYS
YUCAPA CA.
*CONDOS *APARTMENTS *COMERCAIL *RETAIL , *ESTATES
OCEANSIDE CA.
*MEDOW CREST SUBDIVISION FHA *APARTMENT * SIZZLERS
MEDFORD OR.
*PROJECTS ALSO INCLUED *COUNTY *STATE
____________________________________________________________
BACKGROUND
_____________________________________________________________
* THOMAS HERZMAN CONSTRUCTION & DEVELOPMENT
*(STATE QUAILFIED) B-1 373096 FOR 10 YEAR IN FIELD- *CONCRETE, *FRAMING,
*FINISHES ,*ALL TRADES
(1979 TO 1989)
*HERZMAN CONSTRUCTION & DEVLOPMENT
*(STATE QUAILFIED) B-1 523009 GENERAL CONTRACTOR
(1989 TO 2002)
*THOMAS HERZMAN FIELD INSPECTOR
*(STATE LIC.) 48175 BRANCH 2 AND 3 FEILD REP
*(DOJ AND FBI BACKGROUNDCLEARANCE)*(LIVESCANECLEARANCE)
(2012 TO 2015)
_______________________________________________________________
*H.O.A. ARCHITECTIAL PRESIDENT OF THESE ESTATES
______________________________________________________________
*BROOKHILLS ESTATE PLANNIG BOARD, FALLBROOK CA.
*SARATOGA ESTATE PLANNING BOARD, BONSALL CA.
*RANCHO FALLBROOK PLANNIG BOARD, FALLBROOK CA.
______________________________________________________________
REFERANCES
______________________________________________________________
CONSTRUCTION D2C RICKY 949-650-9992
SAUERS CONSTRUCTION SEAN SAUERS 949-795-0170
JAPA ARCHITECTS CHARIES LEE 858-414-0856
ROW CONSTRUCTION SCOTT ROW 858-229-7645
PACIFIC STRUCTURE ANDY 760-497-8698
TOYOTA CORP. CAROLYN CARPENTER 949-927-2755
_____________________________________________________________
WAGES & BENEFIT AS AGREED
______________________________________________________________
MILLS AT CORTEZ AT CORTEZ HILLS
SKANDIA CONSTRUCTION
MOSSYTOYOTA
SAUERS CONSTRUCTION
BOB MILLER NEWPORTBEACH TOYOTA
SAUERS CONSTRUCTION
WESELOH HONDA
WESELLE CONSTRUCTION
WESELOH CHEROLET
WESELLE CONSTRUCTION
UNITED KOREAN PRESBYTERIAN CHURCH ZIGMAM/SHEILDS
CONSTRUCTION
4627 RAMONA CR ,BROOK HILLS ESTAES,FALLBROOK CA.
HERZMAN CONSTRUCTION DEVELOPMENT $1,100,000.00
2580S SWEETGRASS CT, BONSALL CA.
HERZMAN CONSTRUCTION DEVELOPMENT $995,000.00
1836 QUEENSWAY ,VISTA CA
HERZMAN CONSTRUCTION DEVELOPMENT $895,000.00
4641 RAMONA DR , FALLBROOK ESTATES,FALLBROOK CA
•
•
HERZMAN CONSTRUCTIONDEVELOPMENT $1,000,000.00
4481 FALLSBRSE ,BROOKHILLS ESATEE,FALLBROOK CA.
HERZMAN CONSTRUCTION & DEVELOPMENT $1,500,000.00
4455 FALLSBRSE DR, BROOK HILLS ESTATES,FALLBROOK CA.
HERZMAN CONSTRUCTION & DEVELOPMENT $2,200,000.00
6657 CAMINO DEL REY SARATOGA ESTAES
HERZMAN CONSTRUCTION & DEVELOPMENT $800,000.00 LAWRACE
WELK
714 THE STRAIN ,OCEANSIDE CA
HERZMAN CONSTRUCTION & DEVELOPMENT $3,266,993.00
resume3[1] (3) (2) (7) (3) (5) (1)

More Related Content

Similar to resume3[1] (3) (2) (7) (3) (5) (1)

Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
mayas43
 
Resume
ResumeResume
Resume
Tom Brackett
 
Com Redd Flyer Package
Com Redd Flyer PackageCom Redd Flyer Package
Com Redd Flyer Package
comredd
 
2017 Altus Cost Guide (FINAL)
2017 Altus Cost Guide (FINAL)2017 Altus Cost Guide (FINAL)
2017 Altus Cost Guide (FINAL)
David Crane, MRICS, PQS
 
Joseph John Kish, Master 2016
Joseph John Kish, Master 2016Joseph John Kish, Master 2016
Joseph John Kish, Master 2016
Joseph Kish
 
Design Report
Design ReportDesign Report
Design Report
Ryan Maidrand
 
Long (3.24.15)
Long (3.24.15)Long (3.24.15)
Long (3.24.15)
Ken Samuelson
 
ALTA Land Title Survey
ALTA Land Title Survey ALTA Land Title Survey
ALTA Land Title Survey
Smith-Roberts National Survey
 
Virtual Building Design Request for Proposals
Virtual Building Design Request for ProposalsVirtual Building Design Request for Proposals
Virtual Building Design Request for Proposals
Webster City Economic Development
 
willem cv
willem cvwillem cv
willem cv
Willem steenkamp
 
Resume
ResumeResume
Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)
ahcitycouncil
 
Keith Mott.2015
Keith Mott.2015Keith Mott.2015
Keith Mott.2015
Keith Mott
 
David Bone Resume
David Bone ResumeDavid Bone Resume
David Bone Resume
David D. Bone
 
Construction site management
Construction site managementConstruction site management
Construction site management
rajlaxmipardeshi
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Process
iratequarrel2587
 
Real Estate Entrepreneur
Real Estate EntrepreneurReal Estate Entrepreneur
Real Estate Entrepreneur
Rahul Hankare
 
DW-constr-res2
DW-constr-res2DW-constr-res2
DW-constr-res2
David Wheeler
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
Asmaa Gouda
 
Mark Ritayik Resume.wps
Mark Ritayik Resume.wpsMark Ritayik Resume.wps
Mark Ritayik Resume.wps
Mark Ritayik
 

Similar to resume3[1] (3) (2) (7) (3) (5) (1) (20)

Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
 
Resume
ResumeResume
Resume
 
Com Redd Flyer Package
Com Redd Flyer PackageCom Redd Flyer Package
Com Redd Flyer Package
 
2017 Altus Cost Guide (FINAL)
2017 Altus Cost Guide (FINAL)2017 Altus Cost Guide (FINAL)
2017 Altus Cost Guide (FINAL)
 
Joseph John Kish, Master 2016
Joseph John Kish, Master 2016Joseph John Kish, Master 2016
Joseph John Kish, Master 2016
 
Design Report
Design ReportDesign Report
Design Report
 
Long (3.24.15)
Long (3.24.15)Long (3.24.15)
Long (3.24.15)
 
ALTA Land Title Survey
ALTA Land Title Survey ALTA Land Title Survey
ALTA Land Title Survey
 
Virtual Building Design Request for Proposals
Virtual Building Design Request for ProposalsVirtual Building Design Request for Proposals
Virtual Building Design Request for Proposals
 
willem cv
willem cvwillem cv
willem cv
 
Resume
ResumeResume
Resume
 
Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)
 
Keith Mott.2015
Keith Mott.2015Keith Mott.2015
Keith Mott.2015
 
David Bone Resume
David Bone ResumeDavid Bone Resume
David Bone Resume
 
Construction site management
Construction site managementConstruction site management
Construction site management
 
A Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction ProcessA Look Inside The Commercial Construction Process
A Look Inside The Commercial Construction Process
 
Real Estate Entrepreneur
Real Estate EntrepreneurReal Estate Entrepreneur
Real Estate Entrepreneur
 
DW-constr-res2
DW-constr-res2DW-constr-res2
DW-constr-res2
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
Mark Ritayik Resume.wps
Mark Ritayik Resume.wpsMark Ritayik Resume.wps
Mark Ritayik Resume.wps
 

resume3[1] (3) (2) (7) (3) (5) (1)

  • 1. THOMAS A. HERZMAN tomherzman@yahoo.com Phone: (760)692-8403 ______________________________________________________________ Skills ______________________________________________________________ Accomplishments Awarded monetary recognitionsforgenerating money forpreviouscompanies Extensivebackground in construction,second generation Formally trained staff up to ProjectManagers,Owners,SeniorPartnersin realworld costestimations • Proficientin reading and interpreting civil, structuraland architecturalplans& MEP's • Workwith city inspectors& familiar with all local and state codes;per ADA & Title 24 requirements • Workwith 3rd partyinspectors • Coordinateand monitorsubcontractorson a daily basis • Read,understand and implementspecificsectionsof specifications,drawingsand plans.Organize, prepareand monitortechnical proposalbid processes • Experiencewith managing severalbuildingssimultaneously •projectschedules& budgets • Ableto write and administersubcontracts • Reviewand handleshop drawingsand processRFIs • Main pointof contactfor projectinquiries and responsibilitiesfromoverall projectperspective • Organizesand coordinatestheworkof workersemployeeson construction projects • Keepscostrecords on workperformed and materials • responsibleforthecontrol of costsin materialsand wages • Exercisescontrol overrate of construction progressin order to complete construction projectwithin time limits & problemsolving • Inspectsconstruction workto enforceconformity to specifications • Conductand documentweekly sub meetingsand safety meetings • Required to maintain daily reports,phonelogsand transmittals JOBS HELD • ProjectManagement • General Superintendent • Estimates • Plansand Permits • Design Build/T&I • Quality control
  • 2. TERRY ADAMS INC/SUPERINTENDENT 2015 to2016 COMPLETE CONSTRUCTIONALL AREA OF INPROVEMENTTO HAND HANDOVER TO OWNERSFINALS T&I LENSCRAFTERSANSSUNGLASSHUTS BOSTON ,.VIRGINIAAND SD CA D2C CONSTRUCTIONCURRENTSUPERINTENDENT /PM 2014 to 20015 NixsonWatchStore new TI Outlet at the Bourder SD CA O'Neill RidersStrore new TI Outlet at the Bourder SD CA complete all areas threw hand over to owners take a lookon the internet Land Developer /Evergreen Realestate 1979 to 2012 Herzman Construction,FallbrookCa 1979 to date $300,000,000. In constructionprojects from*sitework grading*landscape*hardscape*customtracts* car dealerships*road improvements*retail*parkinglot,*largecondo projects*apartmentsover 2000 unit* FHA housingproject.** Estimating*qualitycontrol project *management,*financeproblem solving*hospital*medical build*customremodels*restaurant*insurancerepair* fire water *branch 2 and 3 WDO pest control fieldinspector*control blueprints*permit*completeconsultantcontrol *Wall street journal builderofthe year standardinsurance General Superintendent/ Project Manager 2007 to2008 SauersConstruction,LakeForrestCa In chargeof entire construction of Mossy Toyota cardealership,ground up 40,000 sq.ft.bay servicearea, showroomcomputerstations,30TV stations,elevator,carwash projectcost$26,000,000.00 Managed entire construction *Bob Miller Toyotacar dealership,ground up ground up 60,000 sq.ft.50 bay service area,showroomcomputerstations,22TV stations,elevator,car wash .projectcost$ $42,000,000.00 Zigman/ShieldsGeneral Contractors ( justfinisedVistaMedical Plaza 7/26/2016) LAST JOB FINISHED construction on the San Diego Korean United Presbyterian Church nearRosecransand Evergreen in PointLoma.The 10,000-square-footrenovation/addition projectconsistsof thedemolition of theexisting classroombuilding,renovation of existing fellowship hall,and theconstruction of a new two-story education centeralong with substantialassociated sitework. The design teamconsistsof JamesPJArchitects of Poway,CMN Engineersof Encinitasforstructural, Pedro Medina & Associatesof San Diego,and Environsof San Diego for landscape.
  • 3. The contractor'steamincludesBud Coberly asprojectmanager,TomHerzman assuperintendentand Debbie Van Eyckas coordinator.Theprojectbrokeground in November2005, and is scheduled for completion in April 2006.review on line ________________________________________________________ PROJECTS _________________________________________________________ *MILLS AT CORTEZ HILLS CONDO* KOREAN PRESBYTERIAN CHURCH *805 HIGHWAY LANDSCAPE IMPROVEMENTS SAN DIEGO, CA *MOSSY TOYOTA SUPER STORE* GRAND ST LIFE GUARD STATION* *SPAWARS PACIFIC BEACH CA. *WESLLSOW *CHEROLET &*HONDA SAN JAUN CAPISTRANO CA *BOB MILLER TOYOTA. *CUSTOM ESTATES *OLIVE GARDEN NEWPORT BEACH CA. *MORGAN HILLS ELIMENTRY SCHOOL * WONDERBREAD FACTORY *CUSTOM ESTATES TEMECULA CA. *ESTATE HOMES*BROOK HILLS*RANCHO FALLBROOK *SARATOGA ESTATES * APARTMENTS FALLBROOK CA. *KAISER MEDICAL*LARGE CONDO PROJECTS* PLANED COMMUNITYS YUCAPA CA. *CONDOS *APARTMENTS *COMERCAIL *RETAIL , *ESTATES OCEANSIDE CA. *MEDOW CREST SUBDIVISION FHA *APARTMENT * SIZZLERS MEDFORD OR. *PROJECTS ALSO INCLUED *COUNTY *STATE ____________________________________________________________
  • 4. BACKGROUND _____________________________________________________________ * THOMAS HERZMAN CONSTRUCTION & DEVELOPMENT *(STATE QUAILFIED) B-1 373096 FOR 10 YEAR IN FIELD- *CONCRETE, *FRAMING, *FINISHES ,*ALL TRADES (1979 TO 1989) *HERZMAN CONSTRUCTION & DEVLOPMENT *(STATE QUAILFIED) B-1 523009 GENERAL CONTRACTOR (1989 TO 2002) *THOMAS HERZMAN FIELD INSPECTOR *(STATE LIC.) 48175 BRANCH 2 AND 3 FEILD REP *(DOJ AND FBI BACKGROUNDCLEARANCE)*(LIVESCANECLEARANCE) (2012 TO 2015) _______________________________________________________________ *H.O.A. ARCHITECTIAL PRESIDENT OF THESE ESTATES ______________________________________________________________ *BROOKHILLS ESTATE PLANNIG BOARD, FALLBROOK CA. *SARATOGA ESTATE PLANNING BOARD, BONSALL CA. *RANCHO FALLBROOK PLANNIG BOARD, FALLBROOK CA. ______________________________________________________________ REFERANCES ______________________________________________________________
  • 5. CONSTRUCTION D2C RICKY 949-650-9992 SAUERS CONSTRUCTION SEAN SAUERS 949-795-0170 JAPA ARCHITECTS CHARIES LEE 858-414-0856 ROW CONSTRUCTION SCOTT ROW 858-229-7645 PACIFIC STRUCTURE ANDY 760-497-8698 TOYOTA CORP. CAROLYN CARPENTER 949-927-2755 _____________________________________________________________ WAGES & BENEFIT AS AGREED ______________________________________________________________ MILLS AT CORTEZ AT CORTEZ HILLS SKANDIA CONSTRUCTION
  • 7. BOB MILLER NEWPORTBEACH TOYOTA SAUERS CONSTRUCTION
  • 10. UNITED KOREAN PRESBYTERIAN CHURCH ZIGMAM/SHEILDS CONSTRUCTION
  • 11. 4627 RAMONA CR ,BROOK HILLS ESTAES,FALLBROOK CA.
  • 13. 2580S SWEETGRASS CT, BONSALL CA. HERZMAN CONSTRUCTION DEVELOPMENT $995,000.00
  • 16. 4641 RAMONA DR , FALLBROOK ESTATES,FALLBROOK CA •
  • 18. 4481 FALLSBRSE ,BROOKHILLS ESATEE,FALLBROOK CA.
  • 19.
  • 20. HERZMAN CONSTRUCTION & DEVELOPMENT $1,500,000.00 4455 FALLSBRSE DR, BROOK HILLS ESTATES,FALLBROOK CA.
  • 21. HERZMAN CONSTRUCTION & DEVELOPMENT $2,200,000.00 6657 CAMINO DEL REY SARATOGA ESTAES
  • 22.
  • 23. HERZMAN CONSTRUCTION & DEVELOPMENT $800,000.00 LAWRACE WELK 714 THE STRAIN ,OCEANSIDE CA
  • 24.
  • 25.
  • 26. HERZMAN CONSTRUCTION & DEVELOPMENT $3,266,993.00