BUSINESS PLAN – YEAR 2022
Sales Figures 2021
 Valves – 1.21 Million USD
 Spares – 1. 89 Million USD
 VAC Services – 0.045 Million USD
 Total – 3.145 Million USD
Major Milestones 2021
 Awarded 6 orders from Oxy for supplying ESD Valves from VAC facility.
 Awarded 5 years control valve maintenance contract for all OQ sites.
 Got into PDO AVME for IPF Category / Refurbishment of pipeline valves
 43 IPF Valves automation successfully completed for PDO at VAC Facility.
 Profit margin 44%
Sales Target 2022
 TRADING SALES INCLUDING AUTOMATION – 6 Million
 VAC – Automation and Testing 150000 USD + OQ Contract 500000 usd +
Other clients +Site support jobs 100000 usd + Internal jobs and warranty
jobs 50000 USD
Action Plan
 Regular Client visits for Supply, service and automation requirements
 More requests for Site surveys
 Explore VAC strength and capability for all type of industries (Oil and Gas
and General Industries)
 Market intelligence data collection for better pricing strategies
 More aggressive pricing strategy to be followed for valves packages on
need basis to increase the installed base.
Other Objectives
 Approval of Limitorque actuators and CNV Valves under IPF Category in
PDO
 Approval of Flowserve Bangalore in OGC / OQ Vendor list
 Establishing more machinery and equipment for VAC ( Painting ,Blasting,
Welding for supporting on-time delivery and price advantage for
shutdown jobs)
 Full fledged mobile workshop facility .
 Participating in exhibitions like OGWA.
 Explore advantages of doing control valve assembly and testing in VAC .
 Revisit all the existing supply contracts (BP, OQ etc ) for improving business
opportunities.
Major Projects
 Various PDO projects with contractors which were on hold for last 2 years
are getting floated now for control valves.
 PDO long term contract for supplying Control / ESD/ On-off / IPF valves is
expected to be floated.
 Oxy Safah North B Shuaiba Development Project for 240 ESD Valves
 OGC Central Rich and Lean Project for Control Valves
 Oxy 7 years Service Valves Maintenance and service contract
 Site Acceptance Testing on Valves during commissioning at Duqm
refinery
Remarks / Threats / Bottlenecks
 The current pricing levels at Flowserve are not competitive enough to
secure OLB orders .
 Non participation of Valbart for ESD packages due to their higher price
levels.
 Non availability of special equipment/services at VAC which in turn
increase our costing & lead time.
mexican.pptx

More Related Content

Similar to mexican.pptx

Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
Saif Ali
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
Bhupat Kanani
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
Hisham Hegab
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
sonutyagi20
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
William Robb
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
Vinoth Kumar
 
RFQ -WELDING
RFQ -WELDING RFQ -WELDING
RFQ -WELDING
Julian Kalac P.Eng
 
BMR_July_Operations
BMR_July_OperationsBMR_July_Operations
BMR_July_Operations
Mehul Shah
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
Regu Mkc
 
M Imran
M ImranM Imran
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf
KSLDESIGN
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
Elugbe Ambrose
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
AJITH KUMAR
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
AJITH KUMAR
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015
Mahesh Handigol
 
Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016
Wade Striemer
 
CGE Profile
CGE ProfileCGE Profile
CGE Profile
Nauman Farooqi
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
Billy Robb
 

Similar to mexican.pptx (20)

Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
RFQ -WELDING
RFQ -WELDING RFQ -WELDING
RFQ -WELDING
 
BMR_July_Operations
BMR_July_OperationsBMR_July_Operations
BMR_July_Operations
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
M Imran
M ImranM Imran
M Imran
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015
 
Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016
 
CGE Profile
CGE ProfileCGE Profile
CGE Profile
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
 

Recently uploaded

Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
Global Landscapes Forum (GLF)
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
vijaykumar292010
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
Global Landscapes Forum (GLF)
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 

Recently uploaded (20)

Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 

mexican.pptx

  • 1. Nadhira Enterprise LLC Control & Automation Division / VAC Services BUSINESS PLAN – YEAR 2022
  • 2. Sales Figures 2021  Valves – 1.21 Million USD  Spares – 1. 89 Million USD  VAC Services – 0.045 Million USD  Total – 3.145 Million USD
  • 3. Major Milestones 2021  Awarded 6 orders from Oxy for supplying ESD Valves from VAC facility.  Awarded 5 years control valve maintenance contract for all OQ sites.  Got into PDO AVME for IPF Category / Refurbishment of pipeline valves  43 IPF Valves automation successfully completed for PDO at VAC Facility.  Profit margin 44%
  • 4. Sales Target 2022  TRADING SALES INCLUDING AUTOMATION – 6 Million  VAC – Automation and Testing 150000 USD + OQ Contract 500000 usd + Other clients +Site support jobs 100000 usd + Internal jobs and warranty jobs 50000 USD
  • 5. Action Plan  Regular Client visits for Supply, service and automation requirements  More requests for Site surveys  Explore VAC strength and capability for all type of industries (Oil and Gas and General Industries)  Market intelligence data collection for better pricing strategies  More aggressive pricing strategy to be followed for valves packages on need basis to increase the installed base.
  • 6. Other Objectives  Approval of Limitorque actuators and CNV Valves under IPF Category in PDO  Approval of Flowserve Bangalore in OGC / OQ Vendor list  Establishing more machinery and equipment for VAC ( Painting ,Blasting, Welding for supporting on-time delivery and price advantage for shutdown jobs)  Full fledged mobile workshop facility .  Participating in exhibitions like OGWA.  Explore advantages of doing control valve assembly and testing in VAC .  Revisit all the existing supply contracts (BP, OQ etc ) for improving business opportunities.
  • 7. Major Projects  Various PDO projects with contractors which were on hold for last 2 years are getting floated now for control valves.  PDO long term contract for supplying Control / ESD/ On-off / IPF valves is expected to be floated.  Oxy Safah North B Shuaiba Development Project for 240 ESD Valves  OGC Central Rich and Lean Project for Control Valves  Oxy 7 years Service Valves Maintenance and service contract  Site Acceptance Testing on Valves during commissioning at Duqm refinery
  • 8. Remarks / Threats / Bottlenecks  The current pricing levels at Flowserve are not competitive enough to secure OLB orders .  Non participation of Valbart for ESD packages due to their higher price levels.  Non availability of special equipment/services at VAC which in turn increase our costing & lead time.