Vision Statement
We aim to provide a superior quality of
life to the common man by continuous
improvement of core infrastructure.
Corporate Values
Vision Statement
Mission Statement
To continuously strive to develop superior
infrastructure meeting the highest standards
of engineering excellence, efficiency, quality,
and economy without compromising on our
corporate social and environmental
responsibilities.
Mission Statement
Corporate Values
Corporate Values
Values
 Belief in Teamwork
 Respect for Emerging Ideas
 Passion for Learning & Innovation
 Focus on Safety
About MEIL
Key Points
 Established in 1989.
 An Engineering & Infrastructure major.
 Headquartered in Hyderabad, A.P., India.
 Executing projects in more than 15 states
across India.
 Operating in the Global Market with over
25 years of experience in the
manufacturing and infrastructure sectors.
About MEIL
Network of Offices
About MEIL
Project Spread
About MEIL
BOOT Projects
List of BOOT Projects
• Lambadaug Hydro Power Project,
Himachal Pradesh
• WUPPTCL, Uttar Pradesh
• Bhubaneswar Bulk WSS, Odisha
• HKR Roadways, Telangana
• MGPL Solar Plant, Andhra
Pradesh
• MEIL PURA, Andhra Pradesh
• CGD, Krishna District, Andhra
Pradesh
• CGD, Belgaum District, Karnataka
• CGD, Tumkur District, Karnataka
• Tuticorin Thermal Power Project,
Tamil Nadu
• Nagai Power Pvt. Ltd., Tamil Nadu
About MEIL
Organizational Strengths
 Legacy and industry experience of more than 25
years
 Pan-India presence
 7000+ specialized employee base
 Strong backward integration through pipe
manufacturing and customized fabrication facilities
 Financial strength
 Independent designs wing
 Diversification strategies to minimize sector-specific
risk
 Most preferred EPC contractor in many states like
AP, Telangana, Karnataka, Madhya Pradesh, Gujarat,
Rajasthan etc.
 Quality certifications
 Large fleet of vehicles & heavy equipment
About MEIL
Brief History & Timeline
 1989 – MEIL started as Megha Engineering Enterprises (MEE) – a small fabrication unit located
in Hyderabad.
 Mid 90s – MEE, in a role of a contractor, started taking up small projects in irrigation and
drinking water sectors.
 2000-2006 – Started executing projects in new states like Rajasthan and Karnataka
 2006 – MEE evolved into MEIL, a private limited company.
 2006-10 – turnover crossed INR 1000 crore towards end of decade; established MFGIL and set-
up Spiral Mill Unit; expanded operations with the support of its manufacturing units.
 2010-15 – diversified into new sectors; entered new states and countries; turnover crossed
USD 1 billion; set-up HDPE pipes division
Financial Standing
Performance
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
261
1152
2318 2345
2901 3095
4753 5127
6491
8756
Annual
Turnover
Financial Year
MEIL’s Annual Turnover in INR Crore
Financial Standing
Performance
0
200
400
600
800
1000
1200
1400
39
172
347 351
434 463
711
767
971
1310
Annual
Turnover
Financial Year
MEIL’s Annual Turnover in Million USD
Presence in India
Project Spread
About MEIL
BOOT Projects
List of BOOT Projects
• Lambadaug Hydro Power
Project, Himachal Pradesh
• WUPPTCL, Uttar Pradesh
• Bhubaneswar Bulk WSS, Odisha
• HKR Roadways, Telangana
• MGPL Solar Plant, Andhra
Pradesh
• MEIL PURA, Andhra Pradesh
• CGD, Krishna District, Andhra
Pradesh
• CGD, Belgaum District,
Karnataka
• CGD, Tumkur District, Karnataka
• Tuticorin Thermal Power
Project, Tamil Nadu
• Nagai Power Pvt. Ltd., Tamil
Nadu
MEIL Group
Business Units
 Megha Engineering & Infrastructures Ltd.
 Megha Fibre Glass Industries Ltd.
 Western U. P. Power Transmission Co. Ltd.
 SEPC Power Private Ltd.
 Koya & Company Construction Ltd.
 JCE Engg. & Management Services Pvt. Ltd.
 MEIL Holdings Ltd.
 MEIL Foundation
Nation Building
Major Projects Completed
S.
No.
Project Title State/
Country
Vertical COD
01 ONGC – Assam
Renewal Project
Assam Hydrocarbons 30.05.16
02 Pattisam Project Andhra Pradesh Irrigation 28.03.16
03 GLIS Phase-3 Pkg. 1 Telangana Irrigation 28.05.16
04 GDWSSB Pkg. 2 Telangana Drinking Water 19.08.16
05 Sauni Yojana Links 1&3 Gujarat Irrigation 20.05.16
06 GDWSSB Pkg. 1 Telangana Drinking Water 19.11.15
07 50 MW CSP, Anantapur Andhra Pradesh Power 09.05.14
08 HNSS Ph-1 Stage-1 Andhra Pradesh Irrigation 31.03.14
09 Khargone LIS Madhya Pradesh Irrigation 28.02.16
10 50 MW Solar PV, Sakri Maharashtra Power 31.03.13
11 Gajwel Water Grid Telangana Drinking Water 01.07.16
12 HNSS Ph-1 Stage-2 Andhra Pradesh Irrigation 31.03.14
Nation Building
Major Projects Completed
S.
No.
Project Title State/
Country
Vertical COD
13 Kutch Water Grid NC28 Gujarat Drinking Water 04.11.14
14 NKSL Project Madhya Pradesh Irrigation 04.11.13
15 Dar-el-Salam, Tanzania Tanzania Drinking Water 24.07.16
16 Indira Sagar (Pkg. 22) Telangana Irrigation 22.01.12
17 Rajiv Sagar (Pkg. 32) Telangana Irrigation 17.02.12
18 KDWSS Phase-III Pkg.1 Telangana Drinking Water 27.03.14
19 Kutch Water Grid NC33 Gujarat Drinking Water 04.11.14
20 Ramthal Drip Irrigation Karnataka Irrigation 30.06.15
21 400 kV Suryapet-
Nandiwanaparthi
Telangana Power 02.02.15
22 ESI Hospital,
Aiyanavaram
Tamil Nadu Buildings 30.06.16
23 PADA-LI-1 Andhra Pradesh Irrigation 17.05.14
24 KDWSS Ph. 3 Pkg. 9 Telangana Drinking Water 21.04.14
Nation Building
Major Projects Completed
S.
No.
Project Title State/
Country
Vertical COD
25 PADA-LI-5 Andhra Pradesh Irrigation 17.05.14
26 Dantiwada-Changa S-1 Gujarat Drinking Water 15.12.13
27 Dantiwada-Rampura S-3 Gujarat Drinking Water 15.12.13
28 Indira Sagar Pkg. 31 Telangana Irrigation 05.02.12
29 Mulwad LIS Pkg. 1 Karnataka Irrigation 01.10.16
30 Indira Sagar (Pkg. 21) Telangana Irrigation 17.01.12
31 Kamareddy RWS Telangana Drinking Water 30.12.14
32 RWS&S Warangal
(Devadula-GLIS)
Telangana Drinking Water 30.01.14
33 Kadem LIS Telangana Irrigation 19.02.16
34 Tenali PH Andhra Pradesh Drinking Water 17.06.14
35 Dantewada Rampura S-3 Gujarat Drinking Water 15.12.13
36 Yeddumailaram 400 kV
DC Line
Telangana Power 19.12.14
Projects
Key Verticals
 Irrigation
 Water Management
 Power
 Hydrocarbons
 Transportation
 Buildings
 Industrial Infrastructure
 Airways
IRRIGATION
Project Expertise
Irrigation
 Investigation, design, engineering and construction of
dams, spillways, reservoirs, canals including
distribution systems.
 Investigation, design and execution of minor and
major lift irrigation projects.
 Design, engineering and execution of water
transmission mains.
 Design, engineering and execution of micro irrigation
projects (e.g. Ramthal Drip Irrigation Project)
 Design, engineering and execution of piped irrigation
canal system (e.g. Khargone Project, SSNNL Project)
 Design, engineering and execution of Hydraulic
Tunnels and Underground pump houses for major
irrigation projects (e.g. PCLIS Pkgs. 8, 11 & 12)
Irrigation
Pattisam Project
• In a critical state of affairs in the sector, where even a single irrigation project
was not finished on time, Megha Engineering & Infrastructures Limited
achieved a rare distinction of completing the Pattisam Project within the
stipulated time and budget.
• Though the project constitutes critical civil works like diaphragm wall, MEIL has
completed these works with local technological expertise.
• From a technological perspective, Pattisam project has entered history books as
the largest project executed in Asia, and in the irrigation sector it is the first
such project completed in India.
Irrigation
Accolades in Official Website, WRD, AP
 Pattisam Project Featured In Success Stories Of
Water Resources Department’s Official Website
Project Highlights
Irrigation
Snapshot
Tunneling Work in progress at PCLIS Project
Irrigation
Snapshot
Outer view of PS-1, HNSS Project, Andhra Pradesh
Irrigation
NKSL Project
Pipe Diameter: 1800 mm
Thickness: Ranging from 12 mm to 14 mm
Length of Pipeline: 46.00 km. (26.00 Km in forest)
Total Head: 490 M (in 4 stages)
Discharge: 5.00 Cumecs
The project was completed in 14 months including
construction of 4 Pumping Stations with 24 Nos.
of Pumps.
Irrigation
Snapshot
NKSL Project: Pipeline in hilly terrain
Irrigation
Snapshot
HNSS Phase-I scheme operates with 130 number of pumps with a
power requirement of 416.47 MW.
Irrigation
Snapshot
HNSS Phase-I – View of Pumping Station 9
Irrigation
Snapshot
Manthani LIS – Sukravaram Peta Tank
Kaddem Lift Irrigation Scheme
Irrigation
Snapshot
Irrigation
Snapshot
Khargone LIS - Reservoir
Irrigation
Snapshot
KBC Lifts Project (Gujarat) – PS 2
Irrigation
Snapshot
A view of pumps and motors at Dantewada-Sipu LIS Project
Irrigation
Snapshot
Outside view of the pumphouse at Dantewada-Sipu LIS Project
Irrigation
Snapshot
Aerial view of Alambur LIS (Stage-I pump house)
Irrigation
GLIS Project
GLIS (JCR Devadula LIS)
• By executing Phase-III Package.1 of
this mega project MEIL has brought
Godavari water to Warangal district,
Telangana.
• The Scheme is designed to lift 49.60
Cumecs of Water from river Godavari
to feed Bheemghanpur tank in
Warangal District to benefit 3.50 lakh
acres in upland areas of Warangal &
Nalgonda Districts.
Irrigation
Snapshot
ALBC Pipeline Arrangement at Chimmalgi LIS, Karnataka
Irrigation
Snapshot
KBC Project – Main Canal
Irrigation
Snapshots
Upstream Gated Structure Forebay
KBC Lifts – PS-2
Irrigation
Snapshots
Diaphragm Wall work at Saurashtra Branch Canal – PS-1
Irrigation
Snapshots
Sauni Yojana L1P3
Pipe Line Laying @ Ch. 9.650 Km Pipe Line Laying @ From Ch.9.820 To 10.100 Km
Irrigation
Snapshot
Air Vessels (18 mtr. Length, 3 mtr. Dia.) at GLIS Phase-III Pkg-I Project
Irrigation
Snapshot
Ramthal Drip Irrigation Scheme – the largest drip irrigation scheme in Asia
Irrigation
Snapshots
Use of heavy equipment like Kelly guided hydraulic grab (left) and trench
cutter (right) at Pattisam Lift Irrigation Scheme (Andhra Pradesh)
HNSS Project
Project Highlights
 HNSS Project: This project is one of the biggest lift irrigation schemes in India that
has been successfully completed and commissioned by MEIL. It is the largest EPC
package completed in Andhra Pradesh.
 Highly satisfied with the performance of the company, clients in states like Gujarat
and M.P. have recognized MEIL as the most preferred company.
DRINKING WATER
 Raw/treated water pumping stations on rivers,
reservoirs, and clear water sumps
 Major water treatment plants
 Engineering and execution of multi-town/village
intranet potable water distribution system
 Village stand-posts/Household connections
 Emergency water pumping projects
Project Expertise
Drinking Water
Drinking Water
GDWSS Project
Godavari Drinking Water Supply Scheme (GDWSS)
 MEIL executed the prestigious GDWSS Scheme to bring Godavari Waters to
Hyderabad.
 The 735 MLD water treatment plant located at Mallaram (shown in above image)
is the largest STP built in Asia.
 The project is designed to bring 735 MLD of Godavari water to Provide drinking
water facility to twin cities of Hyderabad.
 The scheme was commissioned on 24th Nov, 2015, providing drinking water supply
to 30 Lakhs population of North Western parts of Hyderabad.
Drinking Water
Snap Shot
735 MLD WTP at Mallaram, GDWSS, Telangana
Drinking Water
Snap Shot
Filter Beds, GDWSS, Telangana
Drinking Water
Snapshot
Clariflocculator, Kamareddy RWS, Telangana
Drinking Water
Snapshot
Surge Vessels, Krishna Drinking Water Supply Project, Telangana
Snapshot
23 MLD STP, Rajendra Nagar WS & SI Scheme (Telangana)
– the largest STP taken up by MEIL
Water Management
Drinking Water
Snapshot
Clariflocculator, Tenali Scheme, Andhra Pradesh
Snapshot
Clariflocculator, TTD Water Supply Scheme, Andhra Pradesh
Drinking Water
Drinking Water
Snap Shot
Clariflocculator (L) and Intake Structure (R), Surpura Project, Rajasthan
Drinking Water
Snap Shot
Clariflocculator filled for hydro testing, Kota WSP, Rajasthan
Drinking Water
Snap Shot
3170 KL CWR, Bhilwara, Rajasthan
Drinking Water
Snapshot
Varanasi Water Supply Project (Uttar Pradesh); on completion the project will
supply drinking water to more than five lakh locals and pilgrims.
Drinking Water
Snapshots
Varanasi Water Supply Project, Uttar Pradesh
Aktha 1500KL Kadipur 2000 KL Pandeypur 1900KL
Snapshot
Head works, Hiriyur-Challakere WSS, Karnataka
Drinking Water
Snapshot
Micro Fiber Filters, Arasikere WSS Pkg. II, Karnataka
Drinking Water
Snapshot
Water Treatment Plant, Banahatti WSS, Karnataka
Drinking Water
Snapshot
WTP, Idapaddy WSS, Tamil Nadu
Drinking Water
HYDROCARBONS
Scope of activities in offshore and onshore
Technologies include design, procurement and
construction of :
 Separation facilities
 Crude distillation and desalting facilities
 Gas dehydration facilities
 Gas compression facilities
 Laying of trunk pipelines
 Gas power generation
 Hydrocarbon effluent treatment
 Storage tanks
 Structural and process plant piping
 Shut-down maintenance & revamping works
Project Expertise
Hydrocarbons
Hydrocarbons
Projects
 Assam Renewal Project – a flagship project executed
by MEIL for the client ONGC.
 ONGC Navagam - Ahmedabad – Desalter.
 ONGC – Nazira – Assam.
 Jamuna Fertilizer Company, Bangladesh.
 Re-networking of Pipe Lines, Desalter Unit & Power
Stations etc.
 Construction of ETPs and laying of associated
pipelines at Rajahmundry Asset.
 GLPUP, CAIRN India Ltd.
 Heat Exchangers, MODEC, Singapore
 Six Pipeline Replacement Project, Assam Asset
Hydrocarbons
Projects
 Laying, Building, Operating or Expanding City or
Local Natural Gas Distribution Network in Krishna
District (A.P.) and Belgaum and Tumkur Districts
(Karnataka)
 Five Pipeline Replacement Project, Mehsana Asset
 Two Pipeline Project, Cauvery Asset
 KNPC Al-Zour Refinery Project, Kuwait
(Project Value: more than USD 200 million)
Hydrocarbons
Engineering Design
The Hydrocarbon Division of MEIL is ably
supported by the technical expertise of JCE
Company, which is a recent acquisition of MEIL.
Established in 1987, JCE is a leading
engineering consultancy with profound
experience in the fields of Oil & Gas processing,
terminals and pipelines projects. The
engineering services of JCE include basic
engineering & detailed engineering, and
inspection services.
Hydrocarbons
Assam Renewal Project
Assam Renewal Project
ARP is a prestigious project which is being executed for
the client ONGC. The value of the project is about USD
600 million. This is a revamping project of one of
India’s largest onshore oil & gas field facilities for
ONGC-Assam Lakwa fields on EPC basis.
The objectives of the project are to strengthen the
operational grid of the facility for the next 3 decades,
develop & setup automated production facilities that
minimize the need for human intervention, engineer
state-of-the-art remote connectivity facilities that
include well monitoring systems, wireless HART, wimax
and triple play solutions, and reduce the carbon
footprint of Assam Asset by reducing emissions &
enabling carbon savings.
The project is in an advanced stage of completion.
Hydrocarbons
City Gas Distribution Network
Belgaum (Karnataka) Krishna (Andhra pradesh) Tumkur (Karnataka)
The Hydrocarbons division of MEIL is strategically investing into the Business of Natural Gas as
an authorized entity of City Gas Distribution Networks.
This investment is the second largest private investment in CGD Network Business in India.
City Gas Distribution network normally comprises of following major facilities:
• Laying of steel grid pipeline
• Laying of MDPE pipeline
• City Gate Station
• Mother Station
• CNG filling stations
• PNG Connections
Hydrocarbons
KNPC Al-Zour Refinery Project
Project Details
The scope of work involves fabrication,
erection and painting works to be done
for 66 tanks.
• 78m to 60m dia. Tanks – 49 nos
• 54m to 27m dia. Tanks – 13 nos
• Below 20m dia. Tanks – 04 nos
Awarded Month: March 2016
Contract Duration: 30 months
Hydrocarbons
Snapshot
Mehsana Project, Gujarat
Hydrocarbons
Snap Shot
Treated Water Tank, Mehsana ETPS, Gujarat
Hydrocarbons
Snap Shot
Rajahmundry ETPS, Andhra Pradesh
Hydrocarbons
Snapshot
Inlet Manifold Area, GGS-VIII, ARP, Assam
Hydrocarbons
Snapshot
Gas Compressor Plant, ARP, Assam
Hydrocarbons
Snapshot
Group Gathering Station – IV, a critical component of the prestigious
ARP project, was inaugurated in November 2013.
Hydrocarbons
Snapshots
Gas Turbines Gas Dehydration Unit
GGS-IX, ARP, Assam
Hydrocarbons
Snapshots
Elevated Flare Suction KOD Piping
GGS-IX, ARP, Assam
Hydrocarbons
Snapshots
Tank Farm Area, GGS-III, ARP, Assam
Hydrocarbons
Snapshots
Heater Treater, GGS-III, ARP Lakwa, Assam
Hydrocarbons
Snapshots
Box Flare Module Gas Flaring inside the Box Flare Module
ARP, Assam
Hydrocarbons
City Gas Distribution Network
POWER
Power
Project Expertise
Design, Engineering & Execution of:
 Generation
 Thermal
 Hydel
 Solar PV & Solar Thermal
 Transmission
 765, 400 kV Lines
 Switch Yard including GIS
 Distribution
 Rural Electrification
Power Sector
Major Sub-segments in T&D
The three major sub-segments of MEIL’s conventional power business are transmission, distribution
and substations.
Transmission
 MEIL has successfully commissioned more than 300 circuit Km. of 765/400 kV transmission lines.
Currently, more than 800 circuit km. of 765/400/220 kV transmission line works are under progress
across India. The successful completion of these projects has enhanced MEIL’s reputation as a
significant player in the power transmission sector.
Distribution
 MEIL electrified over 3000 villages on turnkey basis.
MEIL is a key player in powering rural electrification in a big way in India. We electrify the entire village
by providing cost-effective and quality solutions on turnkey basis. The scope of work include 33/11 kV
HT lines, LT lines with cables, 33/11kV substations and installation of distribution transformers.
Substations
 MEIL has successfully commissioned one 765 kV Complete Substation, three 400 kV substations
and more than ten 400 kV Bay Extension works.
MEIL has expertise in design, engineering and construction of substations up to capacities ranging
from 33kV/11kV to 765 kV. We undertake construction of substations on turnkey basis from survey to
conducting of pre-commissioning test and commissioning of stations. MEIL also undertakes renovation
and modernization of existing substations with the least power outage.
T&D Business
WUPPTCL Project
The technical specifications of this project include
7 air-insulated and gas-insulated substations of
765 kV and 400 kV capacity, and transmission lines
adding up to 1116 circuit kilometers.
The tremendous leadership and ownership skills
displayed by every member of the team led to the
prestigious commissioning of Phase-I of the
project in March 2016. This is the biggest 765KV
AIS Substation constructed & commissioned in
India by a private developer.
Power
Snapshots
220 KV Transmission Line 400 KV Transmission Line
765 KV Transmission Line 400 KV Substation
Power
Snapshots
JSEB – 220 KV Transmission Line GETCO – 220 KV Transmission Line
Power
Snapshot
Mainpuri – Hapur 765 KV Single Circuit Bersimis Quad Line, WUPPTCL Project, Uttar Pradesh
Power
Snapshot
Gas Insulated Line WUPPTCL Project, Uttar Pradesh
Power Expertise
Solar Power
 50 MW Solar project at Anantapur on BOO
basis - developed by MEIL Green Power.
 MAHAGENCO 50 MW solar PV Project at Sakri,
Maharashtra - EPC contract.
 2 MW Solar PV order from MAHAGENCO at
Chandrapur, Maharashtra.
 SSNNL – 10 MW canal top solar project, Baroda.
Solar Power - PV
Snapshot
Field view of the photovoltaic solar panels installed at the 50 MW Solar
Project in Sakri, Maharashtra
Solar Power - PV
Snapshot
A view of the 10 MW Canal-top Project at Vadodara, Gujarat – the project was
hailed by KPMG as Top 100 innovative projects in the world for the year 2014. It
was one of the six Indian projects to be selected by KPMG.
Solar Power - CSP
Snapshot
The 50MW Concentrated Solar Power Project at Anantapur, Andhra Pradesh is
based on parabolic trough technology. The project is the first of its kind in South
India to become operational.
Thermal Power
Tuticorin Project
About the Project:
• Captioned as: Tuticorin Thermal Power Project Stage IV – 1X525 MW (Unit 1)
• Imported Coal Based (1.44 Million MT/Year)
• Implemented as an Independent Power Project (IPP) of TANGEDCO (formerly
TNEB)
• Adjacent to existing 5 X 210 MW Tuticorin Thermal Power Station of TANGEDCO
implemented in 3 Stages
• Located within VO Chidambaranar Port Trust (formerly Tuticorin Port Trust)
Thermal Power
Nagai Power Project
About the Project
• Project Name: Nagai Power Project – 1x150 MW
• Project Company: Nagai Power Private Limited (NPPL) is a Special Purpose Vehicle
promoted by KVK and MEIL jointly
• Plant Capacity: The Phase-I of the proposed project will consist of one (1) no. of
Steam Turbine , Generator (STG) set of 150 MW and one (1) no. of Pulverized Coal
Fired Steam Generator and associated balance of plant.
• Plant Location: The Project Site is located near Nannilam taluk Village,
Nagapattinam District, Tamil Nadu
Hydel Power
Lambadaug Project
Lambdug Hydro Power Project – 3x8.33 MW
The project scope includes weir, head race tunnel, surge
shaft, penstocks, power house, tail race channel and
associated equipment etc.
Thermal Power
Nagai Power Project
TRANSPORTATION
Project Expertise
Transportation - Roads
MEIL has been entrusted with the execution of the
massive 4-laned and 6-laned highway across the
country on BOT basis. The major features of the
projects being executed are :
 Lengths of 200 kms and above
 Major Bridges of lengths of more than 1000 m.
 Viaducts of more than 700 m. length
 Flyovers, ROB & RUB at major junctions
Transportation - Roads
Snapshot
MEIL, in the role of a developer for roads and railways, has successfully executed
the 4-laning of H-K-R Road Project in Telangana
Transportation - Roads
Snapshot
Flyover at H-K-R Road Project
Transportation - Roads
Snapshot
Solar lighting at truck lay-by portion on a segment of HKR Road Project
Transportation - Roads
Snapshot
Toll Plaza, HKR Road Project, Telangana
Project Expertise
Transportation (Railways)
MEIL is executing a project that consists of a railway formation work involving
blanketing, minor bridges, P. Way linking works and other related works in
Chakradharpur Division of S. E. Railway.
Project Expertise
Transportation (Railways)
BUILDINGS
Project Expertise
Buildings
MEIL covers the entire spectrum of the building
services engineering industry, including design,
installation, commissioning, operation and
maintenance of services in buildings.
Project: Construction of the ESI Hospital
Building at Ayanavaram, Chennai.
ESIC, Ayanavaram
Snapshot
View of the electrical building at the project site.
ESIC, Ayanavaram
Snapshot
View of 24x7 & OPD block front elevation
ESIC, Ayanavaram
Snapshot
AIRWAYS
Diversification
Airways
Turbo Megha Airways
MEIL has spread its wings into wider horizons by
entering the Indian airline industry. The
following are some of the details:
 Branding under the name Trujet
 ATR 72-500 aircraft
 Regional airline
 Operations connect major cities in South
India – 10 destinations and growing.
ATR 72-500 aircraft with Trujet branding
Trujet
Snapshot
Cabin Crew, Trujet Airways
Cabin Crew
Snapshot
Flag-off ceremony of Trujet Airways at RGIA, Hyderabad
Trujet Flag-off Ceremony
Snapshot
International Presence
Project Spread
 Jamuna Fertilizers,
Bangladesh
 Pre-fabricated Health
Posts, Zambia
 Upper Ruvu-Kimara
Water Transmission
Line Project, Tanzania
 KNPC Al-Zour
Refinery Project,
Kuwait
Zambia Project
Snapshots
Munyamabisi site in Monze district
Kabbillo Site, Southern Province
Lusaka Province Site
Kasima Site
Tanzania Project
Snapshot
FASTEST FIVE
Fastest Five
Introduction
In the first quarter of this financial year, MEIL has dedicated four prestigious projects
to the nation. MEIL has completed Sauni Yojana, Tanzania project, Mission
Bhagiratha (Gajwel water grid), and Pattisam lift irrigation scheme within the time
stipulated by the respective clients.
Additionally, in the power sector, the team has successfully commissioned 400 KV
substation at NP Kunta in Andhra Pradesh.
By completing these projects, MEIL reached milestones that it had set for itself with
regards to quality standards and completion timelines.
Fastest Five
Sauni Yojana Project
On August 30th 2016, Prime Minister Sri Narendra
Modi dedicated the Sauni Yojana Project (SYP-1)
located in Gujarat to the nation. MEIL completed
this project before the completion date.
Some of the major components of the project
involve vertical turbine pumps which were installed
with an objective to lift water to a height of 20
meters with 88% capacity.
This project will irrigate 20000 acres of farmlands in
the districts of Rajkot, Jamnagar and Morbi districts
of Gujarat.
Fastest Five
Pattisam Project
In India, no irrigation project has ever been
completed on time. Usually, once the project crosses
the completion date, it is accorded multiple
extensions with regards to timelines and budgets. In
such a situation, MEIL has completed Pattisam
project in West Godavari district of Andhra Pradesh
before the stipulated completion date.
Though the completion date of Pattisam lift
irrigation project was March 28th 2016, MEIL
completed the project on March 20th 2016. From a
technological perspective, this is the largest lift
irrigation project completed in Asia.
Fastest Five
Mission Bhagiratha (Gajwel)
On August 7th 2016, Gajwel water grid was started
by the prime minister. This is the first drinking water
project in the country to be completed before the
completion date.
The project is designed to provide drinking water to
67000 households. To meet this objective, pipelines
have been laid for a length of 1200 km.
MEIL has also taken up the operation and
maintenance of this project for a period of 10 years.
Fastest Five
Tanzania Project
MEIL has successfully completed a drinking water
project (construction of Upper Ruvu-Kimara Water
Transmission and Kidamba Reservoir) in Tanzania,
Africa.
In a bid to complete this project in 18 months, MEIL
entered into an agreement with the Tanzanian
government department, DAWASA, Dar-e-salaam.
Through this project, 70 million liters of drinking
water will be provided to a town located 50 km.
away.
This project was designed to cater to a population of
18 lakh people. The project scope also includes
supply pipelines of 1600 km. along with the
construction of 24 reservoirs of various capacities.
Fastest Five
NP Kunta Project
The project scope includes construction of
220/400 kV substation at NP Kunta, Anantapur, AP,
for external evacuation of power from solar park
under AUMSP 1500 MW. The project client is
Power Grid Corporation of India.
MEIL completed the project in 8 months, which
was much before the stipulated timeline of 12
months. MEIL was honored with the ‘Best
Debutant Award’ by the client for the successful
completion of the project.
MANUFACTURING
 Pressure Vessels
 Water Hammer Control Devices
 Pipe Specials and Joints
 GRP Pipes
 GRE Pipes
 Spiral Arc Welded (SAW) Pipes
 Rolled Welded Pipes
 HDPE Pipes
Manufacturing
Capabilities & Expertise
Manufacturing
Pressure Vessel Division
Pressure Vessel Division
 Workshop is ISO 9001:2008 certified with
‘R’ stamp and ‘U’ stamp
 Large Scale Fabrication works
 Computerized Surge Analysis
 Proprietary Water Hammer Control Devices
o PSLC Valves (patented)
o QRDA Valves (patented)
o Surge Tanks and Stand pipes
Pressure Vessel Division
Snapshot
Pipe Bridge for 3000 dia. pipe built for GDWSS Project manufactured at Pressure Vessel
Division. The length of the pipe is 60 meters.
Pressure Vessel Division
Sample Products
PSLC Valves with size varies from
ø250 mm to ø2350 mm.
QRDA Valves with size varies from
ø100 mm to ø350 mm
The Pressure Vessel Division has
also contributed to the
commissioning and new site
establishment of projects like:
• SBC Project
• Pattisam LIS project
• GDWSS
• KDWSS
• NSP 15 LIS
• Pulichintala LIS Etc.,
• Zambia Health Posts
• Tanzania Water Projects
Pressure Vessel Division
Scope of Operations
Manufacturing
Spiral Mill Division
Spiral Mill Division
 API X80-grade certified
 World class online ultrasonic & radiography
testing (UT & RT).
 Major consumption: irrigation, drinking water,
hydrocarbon sectors
 Major customers: government & private sectors
 Capacity: 400 mm to 3500 mm dia., 5 mm to 25
mm thickness, pipe lengths of 6 m to 13.5 m.
 Capacity: 1.5 lac metric tons per annum
 Internal and external coating plant
Spiral Mill Division
Facilities
• Spiral Pipe Mill – I
• Spiral Pipe Mill - II
• 3LPE Coating
• Internal Liquid Epoxy Coating
• Internal & External Painting
• Manual Pipe Fabrication
• Internal CML & External Guniting
• Pressure Vessels fabrication
• Fabrication (PSLC valves & Misc. requirements)
• Section Forming Line
• HDPE pipe lines
Spiral Mill Division
Coating Facility
The external coating facility of the plant reinforces the plant with anti-
corrosive coating like 3LPE/3LPP/FBE/DFBE. The internal coating facility
includes epoxy coating and polyurethane coating that guarantees corrosion
control and smooth flow of liquids, semi-liquids and gases.
Manufacturing
HDPE Pipes
HDPE Pipe Production Facility
 HDPE production facility was set up in MEIL’s Spiral
Mill Division, Gowdavelli, Hyderabad, to cater to
the increasing demand for the pipes in the current
market.
 The first line of production was commissioned in
September 2015.
 Two lines of production have been proposed at the
HDPE facility with a provision for a third line.
 Line 1 is equipped to handle a production capacity
of 450 kg/hr. with pipe ranges between 25 DN and
250 DN for pressure ratings between Pn 2.5 and Pn
16.
 Line 2 will be able to handle a capacity of 900 kg/hr.
with pipe ranges between 160 DN and 400 DN for
pressure ratings from Pn 4 to Pn 16.
Manufacturing
HDPE Pipes
PE (polyethylene) pipes are rapidly replacing ERW (Electric Resistance
Welded) pipes because of better suitability and a host of other advantages
Manufacturing
MFGIL
Megha Fibre Glass Industries Limited
 Produces GRP and GRE Pipes
 Diameter :
o GRP Pipes: 300 mm to 2600 mm
o GRE Pipes: 50mm to 300mm
 Pressure Ratings : 6 to 15 kg /cm2
 Pipe Length : up to 12 m
 State-of-the-art quality testing equipment
and processes
GRP & GRE Pipes
Characteristics
 Excellent corrosion resistance
 Very good strength to weight ratio
 Very light weight
 Customized electrical properties: though
GRP and GRE pipes are non-conductive,
conductivity can be introduced during
manufacturing.
 Dimensional stability
 Zero-maintenance cost
GRP & GRE Pipes
Sample Products
True-WYEE (2050mmx1800mm): manufactured & supplied for Bangladesh
power plant; products of this profile and size are manufactured in India for the
first time.
GRP & GRE Pipes
Resin Plant
Resin Plant located in MGFIL premises
Support Department
Designs Wing
 The Design Wing boasts of a valuable pool of
in-house expertise specialized in Civil and
Mechanical Designs helpful in executing all
kinds of Projects.
 Acquired JCE, New Delhi, for expertise in
Hydrocarbon Sector engineering.
Support Department
Designs Wing
 MEIL’s design engineers are equipped with state-of-the-art design tools
in a broad range of activities like project execution, simulation, civil
engineering analysis, finite element analysis, and real time system
simulations.
 The strength of the designs team adds a cutting edge to every project
executed and delivered by MEIL.
Support Department
Designs Wing
On an average, the Designs Wing of MEIL submits more than 8000 drawings
every year. Seen in the image above is the drawing of Pattisam LIS, A.P.
Support Department
Designs Wing
Saurashtra Branch Canal: Bird’s eye view of the pump house after
construction from upstream side.
Support Department
Human Resources
• The Human Capital of MEIL has crossed 7000 employees (2016).
• MEIL has been handling projects in the toughest terrains in the country
because of the strength of its efficient work force.
• For the year 2015-16 alone, MEIL recruited 2786 candidates, which is
almost 85% increase in recruitments compared to the previous year.
• The management ensures that the employees receive compensation and
benefits comparable to the best in the industry.
MEIL Foundation
CSR Activities
MEIL has set up MEIL Foundation to formulate a built-in , self-regulating platform to achieve
its Corporate Social Responsibility (CSR) goals. The current activities taken up by MEIL
Foundation are:
• Bhojanamrita Program: Partnered with ‘Hare Krishna Movement’ to provide free lunch
to patients’ attendants at Government Hospitals in Andhra Pradesh & Telangana.
• Saddimoota Program: Partnered with ‘Hare Krishna Movement’ to provide subsidized
meals to hamaalis and laborers in various market yards across Telangana.
• Providing specialized meals for children undergoing treatment at MNJ Cancer Hospital,
Hyderabad.
• Village Adoption Programs in A. P. and Telangana
MEIL Credentials
Certifications
 ISO 9001:2008 QMS
 BS OHSAS 18001:2007 for MFGIL
 BS EN ISO 9001:2008 for MFGIL
 BS EN ISO 14001:2004 for MFGIL
 ISO 9001:2007
 QMS Certification under ISO/TS 29001
 BIS Certification under IS 3589-2001 for Spiral Mill
 BS OHSAS 18001:2007 for Spiral Mill
 BIS Certification as per IS 12709-1994 for MFGIL
 ASME ‘U’ Stamp Certification
 ASME ‘R’ Stamp Certification
Thank you for your time
Visit us at www.meil.in

More Related Content

What's hot

16319859 Indian Logistics Industry
16319859 Indian Logistics Industry16319859 Indian Logistics Industry
16319859 Indian Logistics Industry
Sunil Singh
 
Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)
Gurparvesh kaur
 
safexpress report - 2016
safexpress report - 2016safexpress report - 2016
safexpress report - 2016
Arudhra N
 

What's hot (20)

16319859 Indian Logistics Industry
16319859 Indian Logistics Industry16319859 Indian Logistics Industry
16319859 Indian Logistics Industry
 
Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report Hydrogen Super Highway - Seminar Report
Hydrogen Super Highway - Seminar Report
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)Dfccil(dedicated freight corridor)
Dfccil(dedicated freight corridor)
 
Flipkart | Inventory Management | Supply chain and distribution
Flipkart | Inventory Management | Supply chain and distributionFlipkart | Inventory Management | Supply chain and distribution
Flipkart | Inventory Management | Supply chain and distribution
 
BEML Bharath Earth Movers Limited
BEML Bharath Earth Movers Limited BEML Bharath Earth Movers Limited
BEML Bharath Earth Movers Limited
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 
ICD,CFS and Deep Water port
ICD,CFS and Deep Water port ICD,CFS and Deep Water port
ICD,CFS and Deep Water port
 
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
 
DESIGN AND MANUFATURE OF METRO CAR BODY
DESIGN AND MANUFATURE OF METRO CAR BODYDESIGN AND MANUFATURE OF METRO CAR BODY
DESIGN AND MANUFATURE OF METRO CAR BODY
 
Indian logistics
Indian logisticsIndian logistics
Indian logistics
 
Shipping In Logistics And Supply Chain
Shipping In Logistics And Supply ChainShipping In Logistics And Supply Chain
Shipping In Logistics And Supply Chain
 
Cfs & icd
Cfs & icd Cfs & icd
Cfs & icd
 
Warehouse and distribution footprint
Warehouse and distribution footprintWarehouse and distribution footprint
Warehouse and distribution footprint
 
Safe Express
Safe ExpressSafe Express
Safe Express
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
Containerization
ContainerizationContainerization
Containerization
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 
safexpress report - 2016
safexpress report - 2016safexpress report - 2016
safexpress report - 2016
 
Smart grid
Smart  gridSmart  grid
Smart grid
 

Similar to MEIL_Corporate_Presentation.ppsx

Similar to MEIL_Corporate_Presentation.ppsx (20)

Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
internship report
internship reportinternship report
internship report
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
WET IC brochure
WET IC brochureWET IC brochure
WET IC brochure
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
Resume
ResumeResume
Resume
 
Economic cooperation
Economic cooperationEconomic cooperation
Economic cooperation
 
Small
SmallSmall
Small
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Ashvanee_resume
Ashvanee_resumeAshvanee_resume
Ashvanee_resume
 
Project report
Project reportProject report
Project report
 
Sustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hpSustainibility assessment in hydropower project a case study of nyadi hp
Sustainibility assessment in hydropower project a case study of nyadi hp
 
TCExpression Sep'11
TCExpression Sep'11TCExpression Sep'11
TCExpression Sep'11
 
Tnl design
Tnl designTnl design
Tnl design
 
3378PELCorpPPT.ppsx
3378PELCorpPPT.ppsx3378PELCorpPPT.ppsx
3378PELCorpPPT.ppsx
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 

Recently uploaded

Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
ogawka
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Recently uploaded (20)

Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 

MEIL_Corporate_Presentation.ppsx

  • 1.
  • 2. Vision Statement We aim to provide a superior quality of life to the common man by continuous improvement of core infrastructure. Corporate Values Vision Statement
  • 3. Mission Statement To continuously strive to develop superior infrastructure meeting the highest standards of engineering excellence, efficiency, quality, and economy without compromising on our corporate social and environmental responsibilities. Mission Statement Corporate Values
  • 4. Corporate Values Values  Belief in Teamwork  Respect for Emerging Ideas  Passion for Learning & Innovation  Focus on Safety
  • 5. About MEIL Key Points  Established in 1989.  An Engineering & Infrastructure major.  Headquartered in Hyderabad, A.P., India.  Executing projects in more than 15 states across India.  Operating in the Global Market with over 25 years of experience in the manufacturing and infrastructure sectors.
  • 8. About MEIL BOOT Projects List of BOOT Projects • Lambadaug Hydro Power Project, Himachal Pradesh • WUPPTCL, Uttar Pradesh • Bhubaneswar Bulk WSS, Odisha • HKR Roadways, Telangana • MGPL Solar Plant, Andhra Pradesh • MEIL PURA, Andhra Pradesh • CGD, Krishna District, Andhra Pradesh • CGD, Belgaum District, Karnataka • CGD, Tumkur District, Karnataka • Tuticorin Thermal Power Project, Tamil Nadu • Nagai Power Pvt. Ltd., Tamil Nadu
  • 9. About MEIL Organizational Strengths  Legacy and industry experience of more than 25 years  Pan-India presence  7000+ specialized employee base  Strong backward integration through pipe manufacturing and customized fabrication facilities  Financial strength  Independent designs wing  Diversification strategies to minimize sector-specific risk  Most preferred EPC contractor in many states like AP, Telangana, Karnataka, Madhya Pradesh, Gujarat, Rajasthan etc.  Quality certifications  Large fleet of vehicles & heavy equipment
  • 10. About MEIL Brief History & Timeline  1989 – MEIL started as Megha Engineering Enterprises (MEE) – a small fabrication unit located in Hyderabad.  Mid 90s – MEE, in a role of a contractor, started taking up small projects in irrigation and drinking water sectors.  2000-2006 – Started executing projects in new states like Rajasthan and Karnataka  2006 – MEE evolved into MEIL, a private limited company.  2006-10 – turnover crossed INR 1000 crore towards end of decade; established MFGIL and set- up Spiral Mill Unit; expanded operations with the support of its manufacturing units.  2010-15 – diversified into new sectors; entered new states and countries; turnover crossed USD 1 billion; set-up HDPE pipes division
  • 11. Financial Standing Performance 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 261 1152 2318 2345 2901 3095 4753 5127 6491 8756 Annual Turnover Financial Year MEIL’s Annual Turnover in INR Crore
  • 12. Financial Standing Performance 0 200 400 600 800 1000 1200 1400 39 172 347 351 434 463 711 767 971 1310 Annual Turnover Financial Year MEIL’s Annual Turnover in Million USD
  • 14. About MEIL BOOT Projects List of BOOT Projects • Lambadaug Hydro Power Project, Himachal Pradesh • WUPPTCL, Uttar Pradesh • Bhubaneswar Bulk WSS, Odisha • HKR Roadways, Telangana • MGPL Solar Plant, Andhra Pradesh • MEIL PURA, Andhra Pradesh • CGD, Krishna District, Andhra Pradesh • CGD, Belgaum District, Karnataka • CGD, Tumkur District, Karnataka • Tuticorin Thermal Power Project, Tamil Nadu • Nagai Power Pvt. Ltd., Tamil Nadu
  • 15. MEIL Group Business Units  Megha Engineering & Infrastructures Ltd.  Megha Fibre Glass Industries Ltd.  Western U. P. Power Transmission Co. Ltd.  SEPC Power Private Ltd.  Koya & Company Construction Ltd.  JCE Engg. & Management Services Pvt. Ltd.  MEIL Holdings Ltd.  MEIL Foundation
  • 16. Nation Building Major Projects Completed S. No. Project Title State/ Country Vertical COD 01 ONGC – Assam Renewal Project Assam Hydrocarbons 30.05.16 02 Pattisam Project Andhra Pradesh Irrigation 28.03.16 03 GLIS Phase-3 Pkg. 1 Telangana Irrigation 28.05.16 04 GDWSSB Pkg. 2 Telangana Drinking Water 19.08.16 05 Sauni Yojana Links 1&3 Gujarat Irrigation 20.05.16 06 GDWSSB Pkg. 1 Telangana Drinking Water 19.11.15 07 50 MW CSP, Anantapur Andhra Pradesh Power 09.05.14 08 HNSS Ph-1 Stage-1 Andhra Pradesh Irrigation 31.03.14 09 Khargone LIS Madhya Pradesh Irrigation 28.02.16 10 50 MW Solar PV, Sakri Maharashtra Power 31.03.13 11 Gajwel Water Grid Telangana Drinking Water 01.07.16 12 HNSS Ph-1 Stage-2 Andhra Pradesh Irrigation 31.03.14
  • 17. Nation Building Major Projects Completed S. No. Project Title State/ Country Vertical COD 13 Kutch Water Grid NC28 Gujarat Drinking Water 04.11.14 14 NKSL Project Madhya Pradesh Irrigation 04.11.13 15 Dar-el-Salam, Tanzania Tanzania Drinking Water 24.07.16 16 Indira Sagar (Pkg. 22) Telangana Irrigation 22.01.12 17 Rajiv Sagar (Pkg. 32) Telangana Irrigation 17.02.12 18 KDWSS Phase-III Pkg.1 Telangana Drinking Water 27.03.14 19 Kutch Water Grid NC33 Gujarat Drinking Water 04.11.14 20 Ramthal Drip Irrigation Karnataka Irrigation 30.06.15 21 400 kV Suryapet- Nandiwanaparthi Telangana Power 02.02.15 22 ESI Hospital, Aiyanavaram Tamil Nadu Buildings 30.06.16 23 PADA-LI-1 Andhra Pradesh Irrigation 17.05.14 24 KDWSS Ph. 3 Pkg. 9 Telangana Drinking Water 21.04.14
  • 18. Nation Building Major Projects Completed S. No. Project Title State/ Country Vertical COD 25 PADA-LI-5 Andhra Pradesh Irrigation 17.05.14 26 Dantiwada-Changa S-1 Gujarat Drinking Water 15.12.13 27 Dantiwada-Rampura S-3 Gujarat Drinking Water 15.12.13 28 Indira Sagar Pkg. 31 Telangana Irrigation 05.02.12 29 Mulwad LIS Pkg. 1 Karnataka Irrigation 01.10.16 30 Indira Sagar (Pkg. 21) Telangana Irrigation 17.01.12 31 Kamareddy RWS Telangana Drinking Water 30.12.14 32 RWS&S Warangal (Devadula-GLIS) Telangana Drinking Water 30.01.14 33 Kadem LIS Telangana Irrigation 19.02.16 34 Tenali PH Andhra Pradesh Drinking Water 17.06.14 35 Dantewada Rampura S-3 Gujarat Drinking Water 15.12.13 36 Yeddumailaram 400 kV DC Line Telangana Power 19.12.14
  • 19. Projects Key Verticals  Irrigation  Water Management  Power  Hydrocarbons  Transportation  Buildings  Industrial Infrastructure  Airways
  • 21. Project Expertise Irrigation  Investigation, design, engineering and construction of dams, spillways, reservoirs, canals including distribution systems.  Investigation, design and execution of minor and major lift irrigation projects.  Design, engineering and execution of water transmission mains.  Design, engineering and execution of micro irrigation projects (e.g. Ramthal Drip Irrigation Project)  Design, engineering and execution of piped irrigation canal system (e.g. Khargone Project, SSNNL Project)  Design, engineering and execution of Hydraulic Tunnels and Underground pump houses for major irrigation projects (e.g. PCLIS Pkgs. 8, 11 & 12)
  • 22. Irrigation Pattisam Project • In a critical state of affairs in the sector, where even a single irrigation project was not finished on time, Megha Engineering & Infrastructures Limited achieved a rare distinction of completing the Pattisam Project within the stipulated time and budget. • Though the project constitutes critical civil works like diaphragm wall, MEIL has completed these works with local technological expertise. • From a technological perspective, Pattisam project has entered history books as the largest project executed in Asia, and in the irrigation sector it is the first such project completed in India.
  • 23. Irrigation Accolades in Official Website, WRD, AP  Pattisam Project Featured In Success Stories Of Water Resources Department’s Official Website Project Highlights
  • 24. Irrigation Snapshot Tunneling Work in progress at PCLIS Project
  • 25. Irrigation Snapshot Outer view of PS-1, HNSS Project, Andhra Pradesh
  • 26. Irrigation NKSL Project Pipe Diameter: 1800 mm Thickness: Ranging from 12 mm to 14 mm Length of Pipeline: 46.00 km. (26.00 Km in forest) Total Head: 490 M (in 4 stages) Discharge: 5.00 Cumecs The project was completed in 14 months including construction of 4 Pumping Stations with 24 Nos. of Pumps.
  • 28. Irrigation Snapshot HNSS Phase-I scheme operates with 130 number of pumps with a power requirement of 416.47 MW.
  • 29. Irrigation Snapshot HNSS Phase-I – View of Pumping Station 9
  • 30. Irrigation Snapshot Manthani LIS – Sukravaram Peta Tank
  • 31. Kaddem Lift Irrigation Scheme Irrigation Snapshot
  • 34. Irrigation Snapshot A view of pumps and motors at Dantewada-Sipu LIS Project
  • 35. Irrigation Snapshot Outside view of the pumphouse at Dantewada-Sipu LIS Project
  • 36. Irrigation Snapshot Aerial view of Alambur LIS (Stage-I pump house)
  • 37. Irrigation GLIS Project GLIS (JCR Devadula LIS) • By executing Phase-III Package.1 of this mega project MEIL has brought Godavari water to Warangal district, Telangana. • The Scheme is designed to lift 49.60 Cumecs of Water from river Godavari to feed Bheemghanpur tank in Warangal District to benefit 3.50 lakh acres in upland areas of Warangal & Nalgonda Districts.
  • 38. Irrigation Snapshot ALBC Pipeline Arrangement at Chimmalgi LIS, Karnataka
  • 40. Irrigation Snapshots Upstream Gated Structure Forebay KBC Lifts – PS-2
  • 41. Irrigation Snapshots Diaphragm Wall work at Saurashtra Branch Canal – PS-1
  • 42. Irrigation Snapshots Sauni Yojana L1P3 Pipe Line Laying @ Ch. 9.650 Km Pipe Line Laying @ From Ch.9.820 To 10.100 Km
  • 43. Irrigation Snapshot Air Vessels (18 mtr. Length, 3 mtr. Dia.) at GLIS Phase-III Pkg-I Project
  • 44. Irrigation Snapshot Ramthal Drip Irrigation Scheme – the largest drip irrigation scheme in Asia
  • 45. Irrigation Snapshots Use of heavy equipment like Kelly guided hydraulic grab (left) and trench cutter (right) at Pattisam Lift Irrigation Scheme (Andhra Pradesh)
  • 46. HNSS Project Project Highlights  HNSS Project: This project is one of the biggest lift irrigation schemes in India that has been successfully completed and commissioned by MEIL. It is the largest EPC package completed in Andhra Pradesh.  Highly satisfied with the performance of the company, clients in states like Gujarat and M.P. have recognized MEIL as the most preferred company.
  • 48.  Raw/treated water pumping stations on rivers, reservoirs, and clear water sumps  Major water treatment plants  Engineering and execution of multi-town/village intranet potable water distribution system  Village stand-posts/Household connections  Emergency water pumping projects Project Expertise Drinking Water
  • 49. Drinking Water GDWSS Project Godavari Drinking Water Supply Scheme (GDWSS)  MEIL executed the prestigious GDWSS Scheme to bring Godavari Waters to Hyderabad.  The 735 MLD water treatment plant located at Mallaram (shown in above image) is the largest STP built in Asia.  The project is designed to bring 735 MLD of Godavari water to Provide drinking water facility to twin cities of Hyderabad.  The scheme was commissioned on 24th Nov, 2015, providing drinking water supply to 30 Lakhs population of North Western parts of Hyderabad.
  • 50. Drinking Water Snap Shot 735 MLD WTP at Mallaram, GDWSS, Telangana
  • 51. Drinking Water Snap Shot Filter Beds, GDWSS, Telangana
  • 53. Drinking Water Snapshot Surge Vessels, Krishna Drinking Water Supply Project, Telangana
  • 54. Snapshot 23 MLD STP, Rajendra Nagar WS & SI Scheme (Telangana) – the largest STP taken up by MEIL Water Management
  • 56. Snapshot Clariflocculator, TTD Water Supply Scheme, Andhra Pradesh Drinking Water
  • 57. Drinking Water Snap Shot Clariflocculator (L) and Intake Structure (R), Surpura Project, Rajasthan
  • 58. Drinking Water Snap Shot Clariflocculator filled for hydro testing, Kota WSP, Rajasthan
  • 59. Drinking Water Snap Shot 3170 KL CWR, Bhilwara, Rajasthan
  • 60. Drinking Water Snapshot Varanasi Water Supply Project (Uttar Pradesh); on completion the project will supply drinking water to more than five lakh locals and pilgrims.
  • 61. Drinking Water Snapshots Varanasi Water Supply Project, Uttar Pradesh Aktha 1500KL Kadipur 2000 KL Pandeypur 1900KL
  • 62. Snapshot Head works, Hiriyur-Challakere WSS, Karnataka Drinking Water
  • 63. Snapshot Micro Fiber Filters, Arasikere WSS Pkg. II, Karnataka Drinking Water
  • 64. Snapshot Water Treatment Plant, Banahatti WSS, Karnataka Drinking Water
  • 65. Snapshot WTP, Idapaddy WSS, Tamil Nadu Drinking Water
  • 67. Scope of activities in offshore and onshore Technologies include design, procurement and construction of :  Separation facilities  Crude distillation and desalting facilities  Gas dehydration facilities  Gas compression facilities  Laying of trunk pipelines  Gas power generation  Hydrocarbon effluent treatment  Storage tanks  Structural and process plant piping  Shut-down maintenance & revamping works Project Expertise Hydrocarbons
  • 68. Hydrocarbons Projects  Assam Renewal Project – a flagship project executed by MEIL for the client ONGC.  ONGC Navagam - Ahmedabad – Desalter.  ONGC – Nazira – Assam.  Jamuna Fertilizer Company, Bangladesh.  Re-networking of Pipe Lines, Desalter Unit & Power Stations etc.  Construction of ETPs and laying of associated pipelines at Rajahmundry Asset.  GLPUP, CAIRN India Ltd.  Heat Exchangers, MODEC, Singapore  Six Pipeline Replacement Project, Assam Asset
  • 69. Hydrocarbons Projects  Laying, Building, Operating or Expanding City or Local Natural Gas Distribution Network in Krishna District (A.P.) and Belgaum and Tumkur Districts (Karnataka)  Five Pipeline Replacement Project, Mehsana Asset  Two Pipeline Project, Cauvery Asset  KNPC Al-Zour Refinery Project, Kuwait (Project Value: more than USD 200 million)
  • 70. Hydrocarbons Engineering Design The Hydrocarbon Division of MEIL is ably supported by the technical expertise of JCE Company, which is a recent acquisition of MEIL. Established in 1987, JCE is a leading engineering consultancy with profound experience in the fields of Oil & Gas processing, terminals and pipelines projects. The engineering services of JCE include basic engineering & detailed engineering, and inspection services.
  • 71. Hydrocarbons Assam Renewal Project Assam Renewal Project ARP is a prestigious project which is being executed for the client ONGC. The value of the project is about USD 600 million. This is a revamping project of one of India’s largest onshore oil & gas field facilities for ONGC-Assam Lakwa fields on EPC basis. The objectives of the project are to strengthen the operational grid of the facility for the next 3 decades, develop & setup automated production facilities that minimize the need for human intervention, engineer state-of-the-art remote connectivity facilities that include well monitoring systems, wireless HART, wimax and triple play solutions, and reduce the carbon footprint of Assam Asset by reducing emissions & enabling carbon savings. The project is in an advanced stage of completion.
  • 72. Hydrocarbons City Gas Distribution Network Belgaum (Karnataka) Krishna (Andhra pradesh) Tumkur (Karnataka) The Hydrocarbons division of MEIL is strategically investing into the Business of Natural Gas as an authorized entity of City Gas Distribution Networks. This investment is the second largest private investment in CGD Network Business in India. City Gas Distribution network normally comprises of following major facilities: • Laying of steel grid pipeline • Laying of MDPE pipeline • City Gate Station • Mother Station • CNG filling stations • PNG Connections
  • 73. Hydrocarbons KNPC Al-Zour Refinery Project Project Details The scope of work involves fabrication, erection and painting works to be done for 66 tanks. • 78m to 60m dia. Tanks – 49 nos • 54m to 27m dia. Tanks – 13 nos • Below 20m dia. Tanks – 04 nos Awarded Month: March 2016 Contract Duration: 30 months
  • 75. Hydrocarbons Snap Shot Treated Water Tank, Mehsana ETPS, Gujarat
  • 79. Hydrocarbons Snapshot Group Gathering Station – IV, a critical component of the prestigious ARP project, was inaugurated in November 2013.
  • 80. Hydrocarbons Snapshots Gas Turbines Gas Dehydration Unit GGS-IX, ARP, Assam
  • 81. Hydrocarbons Snapshots Elevated Flare Suction KOD Piping GGS-IX, ARP, Assam
  • 84. Hydrocarbons Snapshots Box Flare Module Gas Flaring inside the Box Flare Module ARP, Assam
  • 86. Power Project Expertise Design, Engineering & Execution of:  Generation  Thermal  Hydel  Solar PV & Solar Thermal  Transmission  765, 400 kV Lines  Switch Yard including GIS  Distribution  Rural Electrification
  • 87. Power Sector Major Sub-segments in T&D The three major sub-segments of MEIL’s conventional power business are transmission, distribution and substations. Transmission  MEIL has successfully commissioned more than 300 circuit Km. of 765/400 kV transmission lines. Currently, more than 800 circuit km. of 765/400/220 kV transmission line works are under progress across India. The successful completion of these projects has enhanced MEIL’s reputation as a significant player in the power transmission sector. Distribution  MEIL electrified over 3000 villages on turnkey basis. MEIL is a key player in powering rural electrification in a big way in India. We electrify the entire village by providing cost-effective and quality solutions on turnkey basis. The scope of work include 33/11 kV HT lines, LT lines with cables, 33/11kV substations and installation of distribution transformers. Substations  MEIL has successfully commissioned one 765 kV Complete Substation, three 400 kV substations and more than ten 400 kV Bay Extension works. MEIL has expertise in design, engineering and construction of substations up to capacities ranging from 33kV/11kV to 765 kV. We undertake construction of substations on turnkey basis from survey to conducting of pre-commissioning test and commissioning of stations. MEIL also undertakes renovation and modernization of existing substations with the least power outage.
  • 88. T&D Business WUPPTCL Project The technical specifications of this project include 7 air-insulated and gas-insulated substations of 765 kV and 400 kV capacity, and transmission lines adding up to 1116 circuit kilometers. The tremendous leadership and ownership skills displayed by every member of the team led to the prestigious commissioning of Phase-I of the project in March 2016. This is the biggest 765KV AIS Substation constructed & commissioned in India by a private developer.
  • 89. Power Snapshots 220 KV Transmission Line 400 KV Transmission Line 765 KV Transmission Line 400 KV Substation
  • 90. Power Snapshots JSEB – 220 KV Transmission Line GETCO – 220 KV Transmission Line
  • 91. Power Snapshot Mainpuri – Hapur 765 KV Single Circuit Bersimis Quad Line, WUPPTCL Project, Uttar Pradesh
  • 92. Power Snapshot Gas Insulated Line WUPPTCL Project, Uttar Pradesh
  • 93. Power Expertise Solar Power  50 MW Solar project at Anantapur on BOO basis - developed by MEIL Green Power.  MAHAGENCO 50 MW solar PV Project at Sakri, Maharashtra - EPC contract.  2 MW Solar PV order from MAHAGENCO at Chandrapur, Maharashtra.  SSNNL – 10 MW canal top solar project, Baroda.
  • 94. Solar Power - PV Snapshot Field view of the photovoltaic solar panels installed at the 50 MW Solar Project in Sakri, Maharashtra
  • 95. Solar Power - PV Snapshot A view of the 10 MW Canal-top Project at Vadodara, Gujarat – the project was hailed by KPMG as Top 100 innovative projects in the world for the year 2014. It was one of the six Indian projects to be selected by KPMG.
  • 96. Solar Power - CSP Snapshot The 50MW Concentrated Solar Power Project at Anantapur, Andhra Pradesh is based on parabolic trough technology. The project is the first of its kind in South India to become operational.
  • 97. Thermal Power Tuticorin Project About the Project: • Captioned as: Tuticorin Thermal Power Project Stage IV – 1X525 MW (Unit 1) • Imported Coal Based (1.44 Million MT/Year) • Implemented as an Independent Power Project (IPP) of TANGEDCO (formerly TNEB) • Adjacent to existing 5 X 210 MW Tuticorin Thermal Power Station of TANGEDCO implemented in 3 Stages • Located within VO Chidambaranar Port Trust (formerly Tuticorin Port Trust)
  • 98. Thermal Power Nagai Power Project About the Project • Project Name: Nagai Power Project – 1x150 MW • Project Company: Nagai Power Private Limited (NPPL) is a Special Purpose Vehicle promoted by KVK and MEIL jointly • Plant Capacity: The Phase-I of the proposed project will consist of one (1) no. of Steam Turbine , Generator (STG) set of 150 MW and one (1) no. of Pulverized Coal Fired Steam Generator and associated balance of plant. • Plant Location: The Project Site is located near Nannilam taluk Village, Nagapattinam District, Tamil Nadu
  • 99. Hydel Power Lambadaug Project Lambdug Hydro Power Project – 3x8.33 MW The project scope includes weir, head race tunnel, surge shaft, penstocks, power house, tail race channel and associated equipment etc.
  • 100. Thermal Power Nagai Power Project TRANSPORTATION
  • 101. Project Expertise Transportation - Roads MEIL has been entrusted with the execution of the massive 4-laned and 6-laned highway across the country on BOT basis. The major features of the projects being executed are :  Lengths of 200 kms and above  Major Bridges of lengths of more than 1000 m.  Viaducts of more than 700 m. length  Flyovers, ROB & RUB at major junctions
  • 102. Transportation - Roads Snapshot MEIL, in the role of a developer for roads and railways, has successfully executed the 4-laning of H-K-R Road Project in Telangana
  • 103. Transportation - Roads Snapshot Flyover at H-K-R Road Project
  • 104. Transportation - Roads Snapshot Solar lighting at truck lay-by portion on a segment of HKR Road Project
  • 105. Transportation - Roads Snapshot Toll Plaza, HKR Road Project, Telangana
  • 106. Project Expertise Transportation (Railways) MEIL is executing a project that consists of a railway formation work involving blanketing, minor bridges, P. Way linking works and other related works in Chakradharpur Division of S. E. Railway.
  • 108. Project Expertise Buildings MEIL covers the entire spectrum of the building services engineering industry, including design, installation, commissioning, operation and maintenance of services in buildings. Project: Construction of the ESI Hospital Building at Ayanavaram, Chennai.
  • 109. ESIC, Ayanavaram Snapshot View of the electrical building at the project site.
  • 110. ESIC, Ayanavaram Snapshot View of 24x7 & OPD block front elevation
  • 112. Diversification Airways Turbo Megha Airways MEIL has spread its wings into wider horizons by entering the Indian airline industry. The following are some of the details:  Branding under the name Trujet  ATR 72-500 aircraft  Regional airline  Operations connect major cities in South India – 10 destinations and growing.
  • 113. ATR 72-500 aircraft with Trujet branding Trujet Snapshot
  • 114. Cabin Crew, Trujet Airways Cabin Crew Snapshot
  • 115. Flag-off ceremony of Trujet Airways at RGIA, Hyderabad Trujet Flag-off Ceremony Snapshot
  • 116. International Presence Project Spread  Jamuna Fertilizers, Bangladesh  Pre-fabricated Health Posts, Zambia  Upper Ruvu-Kimara Water Transmission Line Project, Tanzania  KNPC Al-Zour Refinery Project, Kuwait
  • 117. Zambia Project Snapshots Munyamabisi site in Monze district Kabbillo Site, Southern Province Lusaka Province Site Kasima Site
  • 120. Fastest Five Introduction In the first quarter of this financial year, MEIL has dedicated four prestigious projects to the nation. MEIL has completed Sauni Yojana, Tanzania project, Mission Bhagiratha (Gajwel water grid), and Pattisam lift irrigation scheme within the time stipulated by the respective clients. Additionally, in the power sector, the team has successfully commissioned 400 KV substation at NP Kunta in Andhra Pradesh. By completing these projects, MEIL reached milestones that it had set for itself with regards to quality standards and completion timelines.
  • 121. Fastest Five Sauni Yojana Project On August 30th 2016, Prime Minister Sri Narendra Modi dedicated the Sauni Yojana Project (SYP-1) located in Gujarat to the nation. MEIL completed this project before the completion date. Some of the major components of the project involve vertical turbine pumps which were installed with an objective to lift water to a height of 20 meters with 88% capacity. This project will irrigate 20000 acres of farmlands in the districts of Rajkot, Jamnagar and Morbi districts of Gujarat.
  • 122. Fastest Five Pattisam Project In India, no irrigation project has ever been completed on time. Usually, once the project crosses the completion date, it is accorded multiple extensions with regards to timelines and budgets. In such a situation, MEIL has completed Pattisam project in West Godavari district of Andhra Pradesh before the stipulated completion date. Though the completion date of Pattisam lift irrigation project was March 28th 2016, MEIL completed the project on March 20th 2016. From a technological perspective, this is the largest lift irrigation project completed in Asia.
  • 123. Fastest Five Mission Bhagiratha (Gajwel) On August 7th 2016, Gajwel water grid was started by the prime minister. This is the first drinking water project in the country to be completed before the completion date. The project is designed to provide drinking water to 67000 households. To meet this objective, pipelines have been laid for a length of 1200 km. MEIL has also taken up the operation and maintenance of this project for a period of 10 years.
  • 124. Fastest Five Tanzania Project MEIL has successfully completed a drinking water project (construction of Upper Ruvu-Kimara Water Transmission and Kidamba Reservoir) in Tanzania, Africa. In a bid to complete this project in 18 months, MEIL entered into an agreement with the Tanzanian government department, DAWASA, Dar-e-salaam. Through this project, 70 million liters of drinking water will be provided to a town located 50 km. away. This project was designed to cater to a population of 18 lakh people. The project scope also includes supply pipelines of 1600 km. along with the construction of 24 reservoirs of various capacities.
  • 125. Fastest Five NP Kunta Project The project scope includes construction of 220/400 kV substation at NP Kunta, Anantapur, AP, for external evacuation of power from solar park under AUMSP 1500 MW. The project client is Power Grid Corporation of India. MEIL completed the project in 8 months, which was much before the stipulated timeline of 12 months. MEIL was honored with the ‘Best Debutant Award’ by the client for the successful completion of the project.
  • 127.  Pressure Vessels  Water Hammer Control Devices  Pipe Specials and Joints  GRP Pipes  GRE Pipes  Spiral Arc Welded (SAW) Pipes  Rolled Welded Pipes  HDPE Pipes Manufacturing Capabilities & Expertise
  • 128. Manufacturing Pressure Vessel Division Pressure Vessel Division  Workshop is ISO 9001:2008 certified with ‘R’ stamp and ‘U’ stamp  Large Scale Fabrication works  Computerized Surge Analysis  Proprietary Water Hammer Control Devices o PSLC Valves (patented) o QRDA Valves (patented) o Surge Tanks and Stand pipes
  • 129. Pressure Vessel Division Snapshot Pipe Bridge for 3000 dia. pipe built for GDWSS Project manufactured at Pressure Vessel Division. The length of the pipe is 60 meters.
  • 130. Pressure Vessel Division Sample Products PSLC Valves with size varies from ø250 mm to ø2350 mm. QRDA Valves with size varies from ø100 mm to ø350 mm
  • 131. The Pressure Vessel Division has also contributed to the commissioning and new site establishment of projects like: • SBC Project • Pattisam LIS project • GDWSS • KDWSS • NSP 15 LIS • Pulichintala LIS Etc., • Zambia Health Posts • Tanzania Water Projects Pressure Vessel Division Scope of Operations
  • 132. Manufacturing Spiral Mill Division Spiral Mill Division  API X80-grade certified  World class online ultrasonic & radiography testing (UT & RT).  Major consumption: irrigation, drinking water, hydrocarbon sectors  Major customers: government & private sectors  Capacity: 400 mm to 3500 mm dia., 5 mm to 25 mm thickness, pipe lengths of 6 m to 13.5 m.  Capacity: 1.5 lac metric tons per annum  Internal and external coating plant
  • 133. Spiral Mill Division Facilities • Spiral Pipe Mill – I • Spiral Pipe Mill - II • 3LPE Coating • Internal Liquid Epoxy Coating • Internal & External Painting • Manual Pipe Fabrication • Internal CML & External Guniting • Pressure Vessels fabrication • Fabrication (PSLC valves & Misc. requirements) • Section Forming Line • HDPE pipe lines
  • 134. Spiral Mill Division Coating Facility The external coating facility of the plant reinforces the plant with anti- corrosive coating like 3LPE/3LPP/FBE/DFBE. The internal coating facility includes epoxy coating and polyurethane coating that guarantees corrosion control and smooth flow of liquids, semi-liquids and gases.
  • 135. Manufacturing HDPE Pipes HDPE Pipe Production Facility  HDPE production facility was set up in MEIL’s Spiral Mill Division, Gowdavelli, Hyderabad, to cater to the increasing demand for the pipes in the current market.  The first line of production was commissioned in September 2015.  Two lines of production have been proposed at the HDPE facility with a provision for a third line.  Line 1 is equipped to handle a production capacity of 450 kg/hr. with pipe ranges between 25 DN and 250 DN for pressure ratings between Pn 2.5 and Pn 16.  Line 2 will be able to handle a capacity of 900 kg/hr. with pipe ranges between 160 DN and 400 DN for pressure ratings from Pn 4 to Pn 16.
  • 136. Manufacturing HDPE Pipes PE (polyethylene) pipes are rapidly replacing ERW (Electric Resistance Welded) pipes because of better suitability and a host of other advantages
  • 137. Manufacturing MFGIL Megha Fibre Glass Industries Limited  Produces GRP and GRE Pipes  Diameter : o GRP Pipes: 300 mm to 2600 mm o GRE Pipes: 50mm to 300mm  Pressure Ratings : 6 to 15 kg /cm2  Pipe Length : up to 12 m  State-of-the-art quality testing equipment and processes
  • 138. GRP & GRE Pipes Characteristics  Excellent corrosion resistance  Very good strength to weight ratio  Very light weight  Customized electrical properties: though GRP and GRE pipes are non-conductive, conductivity can be introduced during manufacturing.  Dimensional stability  Zero-maintenance cost
  • 139. GRP & GRE Pipes Sample Products True-WYEE (2050mmx1800mm): manufactured & supplied for Bangladesh power plant; products of this profile and size are manufactured in India for the first time.
  • 140. GRP & GRE Pipes Resin Plant Resin Plant located in MGFIL premises
  • 141. Support Department Designs Wing  The Design Wing boasts of a valuable pool of in-house expertise specialized in Civil and Mechanical Designs helpful in executing all kinds of Projects.  Acquired JCE, New Delhi, for expertise in Hydrocarbon Sector engineering.
  • 142. Support Department Designs Wing  MEIL’s design engineers are equipped with state-of-the-art design tools in a broad range of activities like project execution, simulation, civil engineering analysis, finite element analysis, and real time system simulations.  The strength of the designs team adds a cutting edge to every project executed and delivered by MEIL.
  • 143. Support Department Designs Wing On an average, the Designs Wing of MEIL submits more than 8000 drawings every year. Seen in the image above is the drawing of Pattisam LIS, A.P.
  • 144. Support Department Designs Wing Saurashtra Branch Canal: Bird’s eye view of the pump house after construction from upstream side.
  • 145. Support Department Human Resources • The Human Capital of MEIL has crossed 7000 employees (2016). • MEIL has been handling projects in the toughest terrains in the country because of the strength of its efficient work force. • For the year 2015-16 alone, MEIL recruited 2786 candidates, which is almost 85% increase in recruitments compared to the previous year. • The management ensures that the employees receive compensation and benefits comparable to the best in the industry.
  • 146. MEIL Foundation CSR Activities MEIL has set up MEIL Foundation to formulate a built-in , self-regulating platform to achieve its Corporate Social Responsibility (CSR) goals. The current activities taken up by MEIL Foundation are: • Bhojanamrita Program: Partnered with ‘Hare Krishna Movement’ to provide free lunch to patients’ attendants at Government Hospitals in Andhra Pradesh & Telangana. • Saddimoota Program: Partnered with ‘Hare Krishna Movement’ to provide subsidized meals to hamaalis and laborers in various market yards across Telangana. • Providing specialized meals for children undergoing treatment at MNJ Cancer Hospital, Hyderabad. • Village Adoption Programs in A. P. and Telangana
  • 147. MEIL Credentials Certifications  ISO 9001:2008 QMS  BS OHSAS 18001:2007 for MFGIL  BS EN ISO 9001:2008 for MFGIL  BS EN ISO 14001:2004 for MFGIL  ISO 9001:2007  QMS Certification under ISO/TS 29001  BIS Certification under IS 3589-2001 for Spiral Mill  BS OHSAS 18001:2007 for Spiral Mill  BIS Certification as per IS 12709-1994 for MFGIL  ASME ‘U’ Stamp Certification  ASME ‘R’ Stamp Certification
  • 148. Thank you for your time Visit us at www.meil.in