Delaware Riverkeeper Letter to DRBC Requesting Intervention to Stop PennEast ...Marcellus Drilling News
A letter authored by THE Delaware Riverkeeper herself, Maya van Rossum, petitioning the Delaware River Basin Commission to interject itself into the permitting process of the PennEast Pipeline that is slated to run from Wilkes-Barre, PA all the way to Trenton, NJ, carrying abundant, cheap Marcellus Shale natural gas.
KWA Kerala Water Authority Internship Project ReportAravind N Kumar
Summer Intern at Kerala Water Authority(KWA) KOOLIMADU pumping station-Controlled by govt. of Kerala
• Learnt the process of municipal water distribution
• Stages involved in water purification
• Electrical installations involved in pumping & boosting water at various levels of
distribution
• Submitted a report on the installations
• A chance to work closely with the electrical maintenance team
Delaware Riverkeeper Letter to DRBC Requesting Intervention to Stop PennEast ...Marcellus Drilling News
A letter authored by THE Delaware Riverkeeper herself, Maya van Rossum, petitioning the Delaware River Basin Commission to interject itself into the permitting process of the PennEast Pipeline that is slated to run from Wilkes-Barre, PA all the way to Trenton, NJ, carrying abundant, cheap Marcellus Shale natural gas.
KWA Kerala Water Authority Internship Project ReportAravind N Kumar
Summer Intern at Kerala Water Authority(KWA) KOOLIMADU pumping station-Controlled by govt. of Kerala
• Learnt the process of municipal water distribution
• Stages involved in water purification
• Electrical installations involved in pumping & boosting water at various levels of
distribution
• Submitted a report on the installations
• A chance to work closely with the electrical maintenance team
IVRCL Limited (www.ivrcl.com), founded over 25 years ago in India, is a leading EPC and Infrastucture public limited company listed on the Bombay and National Stock Exchanges of India.
IVRCL is the largest water company in India and we take pride in building & owning India’s 1st and largest desalination plant at Minjur (near Chennai) with capacity of 100MLD.
IVRCL is present across the length and breath of India with its major offices in metro cities such as New Delhi(NCR-National Capital Region), Mumbai, Chennai,Kolkata, Hyderbad, Pune, Bangalore, Ahmedabad and Guwahati. They have also made our global footprints with operations in Sri Lanka and Africa.
IVRCl is a diversified group and its core areas of work include Value Chain across sectors such as:
Water & Environment
Irrigation
Transportation
Power Distribution & Transmission
This is one of the biggest drinking water project of Nepal for Kathmandu valley. We have included the brief description of all the updates that have been done, so far in this project along with how the project is funded. It also includes the recent photographs and maps of reservoir and tunnel showing the progress of the projects.
This internship report offers an in-depth description of my hands-on experience and insights gained while working on a Jackwell cum Pump House project during my internship at KBJNL Narayanpur dam site.
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictLokeswar
River linking is a project linking 2 or more rivers by creating a network of manually created canals and providing water to the land areas that don’t have river water access and reducing the flow of water to sea using this means.
It is based on the assumption that surplus water in some rivers can be diverted to deficit rivers by creating a network of canals to interconnect the rivers.
In this paper, we have taken Andhra Pradesh state as a Case study and mention the alignments and links going on in the A.P and also In this paper we taken Kadapa District as a case study which is suffering from water crisis and going to give an analytical solution about on divert the Kundu flood water and the project going on the Kundu river
Summer internship Project on Sangam barrage working procedure,PANEM SRINIVASULU
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Water issues of Mumbai city from the perspective of the local municipal authority in charges of supply and distribution to the city. Challenges and solutions to meeting the increasing demand for water and dealing with distribution losses among other problems.
IVRCL Limited (www.ivrcl.com), founded over 25 years ago in India, is a leading EPC and Infrastucture public limited company listed on the Bombay and National Stock Exchanges of India.
IVRCL is the largest water company in India and we take pride in building & owning India’s 1st and largest desalination plant at Minjur (near Chennai) with capacity of 100MLD.
IVRCL is present across the length and breath of India with its major offices in metro cities such as New Delhi(NCR-National Capital Region), Mumbai, Chennai,Kolkata, Hyderbad, Pune, Bangalore, Ahmedabad and Guwahati. They have also made our global footprints with operations in Sri Lanka and Africa.
IVRCl is a diversified group and its core areas of work include Value Chain across sectors such as:
Water & Environment
Irrigation
Transportation
Power Distribution & Transmission
This is one of the biggest drinking water project of Nepal for Kathmandu valley. We have included the brief description of all the updates that have been done, so far in this project along with how the project is funded. It also includes the recent photographs and maps of reservoir and tunnel showing the progress of the projects.
This internship report offers an in-depth description of my hands-on experience and insights gained while working on a Jackwell cum Pump House project during my internship at KBJNL Narayanpur dam site.
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictLokeswar
River linking is a project linking 2 or more rivers by creating a network of manually created canals and providing water to the land areas that don’t have river water access and reducing the flow of water to sea using this means.
It is based on the assumption that surplus water in some rivers can be diverted to deficit rivers by creating a network of canals to interconnect the rivers.
In this paper, we have taken Andhra Pradesh state as a Case study and mention the alignments and links going on in the A.P and also In this paper we taken Kadapa District as a case study which is suffering from water crisis and going to give an analytical solution about on divert the Kundu flood water and the project going on the Kundu river
Summer internship Project on Sangam barrage working procedure,PANEM SRINIVASULU
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Water issues of Mumbai city from the perspective of the local municipal authority in charges of supply and distribution to the city. Challenges and solutions to meeting the increasing demand for water and dealing with distribution losses among other problems.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Explore our most comprehensive guide on lookback analysis at SafePaaS, covering access governance and how it can transform modern ERP audits. Browse now!
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
1. Project Management ofProject Management of
Water Supply ProjectWater Supply Project
Capacity: 93 MLD Cost: USD 80 MillionCapacity: 93 MLD Cost: USD 80 Million
Chandra DissanayakeChandra Dissanayake
Senior Resident EngineerSenior Resident Engineer
Tokyo Engineering Consultants Co Ltd
Pattuvam Scheme, Kerala, IndiaPattuvam Scheme, Kerala, India
February 2010February 2010
2. The state has been able to provide water to 79% of the urban and
59% of the rural population and efforts are being made to cover the
rest of the population.
Accordingly a very ambitious project known as Kerala Water
Supply Project (KWSP) was derived with support of International
Corporation - Japan International Corporation Agency (JICA). Five
Schemes under KWSP:
•Trivandrum
•Meenard
•Cherthala (Kollam)
•Kozhikode (Calicut)
•Pattuvam (in Kannur District)
KERALA WATER SUPPLY PROJECT
(KWSP) & PATTUVAM SCHEME
3. KERALA WATER SUPPLY
PROJECT (KWSP)
• The Government of India is the borrower and the Kerala Water
Authority is the executing Agency. This Project aims at rehabilitating
and augmenting the water supply systems of two urban regions
namely Kozhikode and Thiruvananthapuram and to construct new
water supply systems for three rural regions namely, Pattuvam of
Kannur district, Cherthala of Alappuzha district and Meenad of
Kollam district. Pattuvam Scheme is the north most beneficial area
from this massive project.
• The international consultants M/s TEC consortium (with Black &
Veatch, GKW, STC, CED) led by M/s Tokyo Engineering
Consultants Company Ltd (TEC). Japan has been selected by the
KWA to manage the implementation of the project.
4. Pattuvam
Scheme
KERALA WATER SUPPLY
PROJECT (KWSP) & PATTUVAM
SCHEME
Kerala is a state located in
southwestern India. Neighboring
states include Karnataka to the
north and Tamil Nadu to the south
and east, and the Arabian Sea is to
the west. Major cities include the
state capital of Trivandrum
(Thiruvanaputhram), Kollam,
Cochin, Calicut (Kozhikode) and
Kannur (Cannore).
Kozhikode
Scheme
Cherthala
Scheme
Meenard
Scheme
Trivandrum
Scheme
5.
6. The Pattuvam Scheme is in Kannur District is the northern most
area benefits with the KWSP. The objective of the scheme is to
supply safe and potable water to 530,000 consumers in 10 villages,
7 semi-urban areas and 1 municipality in the Kannur District by
constructing new facilities. Facilities include technical components
for water abstraction, raw water transmission, water treatment,
treated water transmission, storage reservoirs and distribution
networks.
The project area covers 350 km2 and the water demand of the area
is estimated as 93 MLD. The source is at Pazhassi Barrage at
Valapattanam River at Kuiloor and the method of extraction is by
intake well. The raw water is boosted through steel pipe of 1100
mm diameter for a length of 11 km, to the Treatment Plant. The
capacity of the Treatment Plant located at Peruvalathuparamba is
93 millions liters per day.
PATTUVAM SCHEME
7. Pattuvam Scheme Packages
Package Description Contractor Cost
Ind Rs
Million
Cost
USD
Million
1 Intake, Raw Water
Main, WTP
Kiriloskar Brothers,
Pune
1,109 28
2 Transmission Main &
Associated Work
SPML, Bangalore 1,219 27
3 Distribution Systems KRKCPL,
Hydarbard
650 17
4 Service Reservoirs IVRCL, Hydrabard 395 8
Overall 3,349 80
8. PROJECT MANAGEMENT
The Client, Kerala Water Authority has appointed Tokyo
Engineering Consultants Co Ltd (TEC) as the leading consultant –
The Engineer – to implement the project. The Pattuvam Scheme is
led by highly experienced Senior Resident Engineer (SRE),
Chandra Dissanayake who acts as Engineer’s Representative. He is
supported by a project team of 36 personnel including four
experienced Site Engineers. The SRE is responsible for managing
the day-to-day work of the project:
Construction supervision, project management, progress
monitoring and reporting, quality control, verification of
contractor’s invoices etc.
Lead the construction supervision team set for the package.
Liaison with the Consultant’s main office (Project Manager),
Contractors and Client for the performance of the assigned
contract package.
9. Site Engineer
Package 1
Site Engineer
Package 1
Site Engineer
Package 2
Site Engineer
Package 2
Site Engineer
Package 3
Site Engineer
Package 3
Site Engineer
Package 4
Site Engineer
Package 4
Junior
Inspectors
4
Junior
Inspectors
4
Senior
Inspector
Senior
Inspector
Junior
Inspectors
4
Junior
Inspectors
4
Senior
Inspector
Senior
Inspector
Junior
Inspectors
4
Junior
Inspectors
4
Senior
Inspector
Senior
Inspector
Junior
Inspectors
4
Junior
Inspectors
4
Senior
Inspector
Senior
Inspector
Admin & Support Staff
Office Manager
Computer Assistant – 2 Nos
Office Assistant – 2 Nos
Office Attendant– 2 Nos
Drivers – 5 Nos
Admin & Support Staff
Office Manager
Computer Assistant – 2 Nos
Office Assistant – 2 Nos
Office Attendant– 2 Nos
Drivers – 5 Nos
Senior Resident Engineer
Chandra Dissanayake
Senior Resident Engineer
Chandra Dissanayake
Project Management Structure
Tokyo Engineering Consultants Co., Ltd. Japan
10. Project Highlights
• About 1,000,000 cubic meters of earthwork; 720 kilometres of
pipelines; 25,000 cubic meters of concrete and 2000 tonnes of steel.
Total project value is USD80 Million.
• The project is unique in its nature and complexities, characterised by
its spread across a large area. In view of the massiveness of the
project and the complexities in the nature of the work components, it is
a challenge and however essential and important for the Senior
Resident Engineer to put in place a comprehensive project
management, supervision, quality assurance and control during the
implementation.
• The Project is being executed following a fast track approach.
11. Pattuvam Scheme
ST1 ST2 SHT
FILTER
FH
WW
H
OHT
CB
KoonamT
ank I
KoonamT
ank II
CWT
CCT
P3
P2
P1
P4
C
F
1200 dia MS pipe 22km
INTAKE
TRANSMISSION MAIN 80 km
DISTRIBUTION SYSTEM
SERVICE
RESERVOIRS
SL
PB 1PB 2
1100 dia MS pipe 22km
630 Km pipelines
WTP 93 MLD
Pazhassi Dam
A
Serve for population of 530,000
Reservoir Capacity - 27 ML
12. Package 1
Component Details
Intake Pump-well, Intake-well, Connecting
pipeline & Buildings
Raw Water Main (supply &
laying)
11 km 1118 mm dia MS Pipeline
WTP Various treatment structures & staff
buildings
13. Intake
Intake well & intake house
Foot bridge
Pump well & pump house
Conduits for intake
Raw water pumps, surge vessel & piping
Staff housing
Sub station for intake
22. Water treatment Plant Structures
Structure Name
Raw water Inlet/Cascade Aerator & Magnetic flow meter chamber
Lamella Clarifiers& Flocculators
Rapid Gravity Sand Filters
Filter control building
Used wash water holding tank
Chlorine contact tank & Treated Water Reservoir
Treated water pumping station
Balancing reservoir
Chemical Building
Chlorine building
Sludge balancing tank & pump house
MCC
Sludge Thickener
Sludge Lagoons
Roads, Compound, Landscaping
Staff housing
35. Package 2
Transmission Main & Associated Work
From the Clear Water Reservoir at the WTP the water flows
by gravity to the Master Balancing Reservoir at Koonam
from where it flows to 7 zonal reservoirs and through 2
booster pumping stations to 5 zonal reservoirs. The total
length of transmission main is 82 km.
36. Package 2
Description Quantity
MS pipeline 25km
DI pipeline 50km
uPVC & PE pipeline 6km
Pipe bridges 4nos
Buildings & Associated
Works
37. KOONAM MBR
W.T.P. + BPT
Paddy field-below ground pipes
VALAKAI RIVER
POOMANGALAM
RIVER
MS PIPESTWTM-
TALIPARAMBA-IRIKKUR
KSTP ROAD
MS 1219mm OD
MS 1118mm&1067mm OD
MALPPATTAM
SREEKANDAPURAM
IRIKKUR
MALAPPATTAM ROAD
POKKUNDU
CHENGALAI RIVER
CHENGALAI BRIDGE
VALAKAI BRIDGE
1
0
2
7
5
4
3
9
8
6
10
11
12
13
1415
16
17
18
19
20
21
POOMANGALAM BRIDGE
MS
PIPE LAID
FSL-158.80
MWL-138.90
LWL-150.90
LWL-135.00
PACKAGE II-
25.1
Length(KM) Laid(KM)
24.07
KANJIRANGADU
JN. .
13m13m
18.20m 19.30m
24.00m24.00m24.00m
Gap 1
WTP- KSTP Road
Gap 2
Test gap
Gap 3
KSTP-Kaniyar vayal
road crossing
Test gap
Gap 4
Gap 5
PKM College
Road crossing +
above ground
Gap 6
Chengalai bridge
Gap 7
Cherankunnu-Narikkal
breaking
Gap 8
KSTP Road+ Valakkai
road crossing
Gap 9
Above Ground + Below
ground Valakkai
Gap 10
74.4m on hold due to the
dispute at Pokkundu
Gap 11
Koonam MBR Inlet
Gap 12
Above grounfd- Below ground
Poomangalam Bridge
Stream
On pedestals
Below ground
119m
486m
Gap 9
89 AG
82 BG
40m
Gap 5
96m
22m 21m
WTP to Koonam MBR
Koonam to Kanjirangad
Total
Balance(KM)
4.4
20.7
4.33
19.74 0.96
0.1
1.03
45. Package 3
The project area has been divided in to 21 major
distribution zones to be served by 1 Master
Balancing Reservoir (MBR) and 12 zonal
reservoirs. The total length of distribution
network is 625 km.
– DI pipeline of 150-500mm dia 56 km
– uPVC pipes of 75-280mm dia 428 km.
– PE pipes 90 &110mm dia 139km
50. Package 4
From Master Balancing Reservoir at
Koonam water flows to 7 zonal reservoirs
and through 2 booster pumping stations to
5 zonal reservoirs.
– Over Head Service Reservoirs 12
– Ground Level Service Reservoirs 1