turnkey solutions for
urban and rural water supply
A pumphouse at Tataguni near Bangalore
Master Balancing Reservoir for Tirupur Water Supply Scheme
West Godavari WSS
L&T - Fulfilling
a Vital Human
Need
As India’s largest engineering, technology, construction
and manufacturing organization, Larsen & Toubro (L&T),
has been at the forefront in creating infrastructure for a
water-surplus, energy-secure and green world.
L&T Construction, the construction arm of L&T, is India’s
largest construction organisation and ranked 28th globally
among the top 225 contractors by Engineering News
Record in 2013. The Company’s capabilities span the entire
gamut of construction - civil, mechanical, electrical and
instrumentation engineering and its services extend to all
core sector industries and infrastructure projects.
Supply, clarification, desalination and distribution projects
constitute a vital thrust area for L&T Construction in the
water sector. Through its dedicated business group - Water
& Effluent Treatment Strategic Business Group (WET SBG),
L&T Construction, offers total solutions right from concept
to commissioning of urban and rural water supply, water
treatment plants, waste water treatment and network,
industrial and water effluent treatment and lift irrigation
projects.
Adopting state-of-the-art technologies, WSD BU enables
access to clean and safe drinking water thereby fulfilling a
vital human need.
By associating with Government and private organizations,
WSD BU is playing a pivotal part in reaching water across
the length and breadth of the country thereby providing
succour to millions.
WSD BU has been consistently delivering turnkey
water supply and distribution projects with single point
responsibility and precision. Leveraging on its domain
expertise, it undertakes composite works for water
infrastructure specialising in intake structures, water
treatment plants, pump houses, transmission and storage
structures, distribution networks including house service
connections.
Making Every
Drop Count
Water! The very source of life and a vital agent that
sustains socio-economic development and biodiversity.
However, today’s burgeoning population, massive
urbanization and relentless industrialisation have
gravely diminished water resources leading to severe
water scarcity across regions. Estimates indicate that
the world could face a 40 percent shortfall between
forecasted demand and available supply by 2030. With
greater realization and recognition for importance of
water, there has been an increasingly sharper focus on
its economical use and better management to meet the
growing demand across sectors.
Landmark Water
Supply Schemes
Sri Sathya Sai Water Supply Project
For the Sri Sathya Sai Central Trust in Andhra Pradesh,
L&T executed a mega water supply scheme covering
more than 1000 villages that provides water to more
than 2 million people. Considered one of the most
successful water infrastructure ventures set up in the
country, this scheme is operated and maintained by
L&T for more than 15 years since its inception. The
project involved laying of various types of pipelines
ranging up to 600 mm dia across a span of 2000 Km.
Barmer Lift Water Supply Project
For the Government of Rajasthan, L&T executed
a massive water supply scheme that supplies
water to 691 villages spanning a distance of more
than 200 Km in the arid zone of Barmer. The EPC
contract involved execution of 172 MLD water
treatment plant, 3845 ML raw water reservoir and
26 ML master balancing reservoir pipelines and pump
houses.
Underground water storage reservoir and pump house at Tirumala Water Treatment Plant at Haiderpur
Bisalpur-Jaipur WSS
Clariflocculators at Barmer
Sri Sathya Sai WSS
Bisalpur - Jaipur Water Supply Project
India’s largest integrated water supply project supplying
water to more than 3 million people of Jaipur in
Rajasthan was executed by L&T on an EPC basis. The
turnkey contract involved design, supply, construction,
operation and maintenance of water supply, treatment
and transmission system from the intake point at
Bisalpur dam to the reservoir at Balawala on the
periphery of Jaipur city.
Tirumala - Tirupathi Water Supply
Project
A fast track project executed on EPC basis in 77 days
enabling lifting of 4.5 million litres of water per day up
the Tirumala hills in two stages, over a total head of
763m water column defying gravity and steep gradients.
Projects for Delhi Jal Board
L&T has executed a complete value chain of water
infrastructure for the Delhi Jal Board (DJB) that
provides water for 15 million people every single
day! Commencing with the Sonia Vihar Clear Water
Transmission project in 2001,L&T has executed 13 mega
water supply and distribution projects for DJB over the
past decade which is a testimony of their confidence
in L&T’s performance, quality and strict adherence to
time lines.
Tapping the
Gift of Life
Intake Structures
All water infrastructure projects begin to flow from
the tapping point. A well-established intake structure
seamlessly facilitates the distribution network.
Different kinds of water bodies like lakes, rivers and
reservoirs need different kinds of intake structures.
WSD BU has pioneered several intake structures such
as intake wells, jack wells, water channels, and collector
wells along with infiltration gallery at the major water
sources.
Significant intake structures executed by WSD BU
•  1760 MLD capacity at river Godavari
•  423 MLD capacity at (VIWSCO) Vizag Industrial
Water Supply Company
•  33m high with 10m dia for Neelakantapuram WSS
•  Collector well with radial arms for Melur WSS
•  Intake with infiltration gallery for Bankura WSS
•  Intake jetty at Sahebgunj and Garden Reach WSS
Jack well at Tumkur WSS
Pumping Main at Nagercoil
West Godavari WSSIntake well for Rishivandhiyam WSS, Villupuram22m Dia Intake Well at Godavari
Satara WSS
Bagheri Ka Naka WSS - Rajasthan
Water Treatment Plants
Redefining the Purification Process
Over the years, LT has gained the expertise and mastered the processing technology for the removal of all
types of contaminants and harmful microorganisms from raw water sources to provide potable quality drinking
water. With an array of end-to-end customized solutions, the water treatment provided by WSD BU has been
consistently superior. State-of-the-art processes engaged in water treatment include flat bottom clarifier, Lamella
clarifier, tube settlers and high rate solid contact clarifier.
Significant Water Treatment Plants
Bisalpur Jaipur WSS - Rajasthan	 400 MLD
South 24 Paraganas WSS - West Bengal	 297 MLD
Garden Reach WSS - West Bengal	 239 MLD
Vellore WSS - Tamil Nadu	 181 MLD
Barmer WSS - Rajasthan	 172 MLD
Dhanbad WSS - Jharkhand	 143 MLD
Major Refurbishment of Water Treatment Plants
Bhagirathi WTP at Delhi 	 450 MLD
Kilpauk WTP at Chennai	 270 MLD
Bisalpur Jaipur WSS
Cascade aerator at Ananthapur WSS Filter House at Hubli Dharwad WSS
Pollachi WSS
TWAD Vellore
Customized Electro -
Mechanical Solutions
Pumping Stations
Safe Channels for
Seamless Flow
Transmission and
Distribution Network
LT has vast experience in the fabrication, supply and
laying of critical pipeline networks by maintaining
high quality and safety standards within stipulated
time frame. Irrespective of whether it is above ground,
underground or involves laying of pipelines on rugged
hilly terrains over long distances, LT’s cutting edge
technology ensures a safe and reliable network. Various
types of pipelines in different sizes up to 3000mm dia
have been executed by LT covering large geographical
areas.Electro-mechanical components play a crucial part in
water infrastructure projects. WSD BU possesses the
experience and expertise to implement complicated
and challenging pumping systems with precision
providing customized design solutions, adopting state-
of-the-art technology that enhances the efficiency and
performance of the electro-mechanical components
across projects.
The Bisalpur – Jaipur Water Supply Scheme, the largest
integrated water infrastructure project executed by
LT, has the unique feature of continuous pumping
over 100Km with horizontal split casing pumps with
no intermediate booster pumping stations between the
pipeline spreads.
Pump house for VIWSCO
Dwaraka WSS
Transmission mains for Sonia Vihar WSS
An overview of the long span pipeline for Bisalpur-Jaipur WSS
Pump house for Attur WSS
Pump house for Bisalpur-Jaipur WSS
Hogenakkal Water
Supply Scheme
Schematic view of Hogenakkal Water Supply Scheme - Package III
LT’s Water Supply and Distribution Business (WSD BU) executed a significant part of the mega water supply
scheme that enabled safe drinking water to the fluoride affected districts of Dharmapuri and Krishangiri under
the Hogenakkal Water Supply Scheme. WSD BU’s scope of work included construction of water infrastructure for
package III and V which covered 4500 sq.Km, across 3500 habitations sufficing the daily water requirement of
close to 1.3 million people.
The pipeline network in both the packages is designed to feed water supply by gravity and eliminates the need for
power. The master balancing reservoirs are constructed at elevated levels to enable flow of water through gravity.
Significant quantum of works
Pipeline (MS, DI, HDPE)	 4355 Km
Elevated Reservoirs (10000 – 12 lakh litres)	 612 Nos
Underground Sumps	 226 Nos
Pump rooms and Re-chlorination Building	 236 Nos
6 lakh litre capacity master balancing reservoir
Inside view of pump house
Precast valve chamber
75.2 lakh litre capacity pumping station
Robust Retaining
Structures
Storage Reservoirs
A very important segment in water infrastructure
is the storage reservoir from where filtered water
is distributed to the end-users. As a leader in water
infrastructure, WSD BU has executed significant
retaining structures involving overhead reservoirs,
storage tanks, sumps, etc. By continually implementing
value-added solutions for critical and complex works,
WSD BU meets the comprehensive requirements of its
customers.
WSD BU track record in storage reservoirs include:
•  Summer storage of 8000ML capacity for
Nellore WSP
•  3850 ML concrete lined earthern reservoir for
Barmer WSS
•  66 ML service reservoir for Gulbarga WSP
•  45ML partially underground sump for NC-2
WSP at Gujarat
•  25 ML RCC clear water reservoir for Bisalpur-
Jaipur WSS
•  3.7 ML capacity clear water reservoir for
Neelakantapuram Srirami Reddy Phase III
•  2.45 ML overhead reservoir for Allahabad WSP
West Godavari WSS
Over Head Tank for Attur WSS
WSD BU also offers end-to-end responsibility in
executing water cisterns and house service connections
to expand the water network across rural and urban
sectors. WSD BU has completed 1,70,000 house service
connections in Chennai for Chennai Metropolitan
Water Supply and Sewerage Board, executed large
scale house connections for Greater Vishakapatnam
Municipal Corporation Water Supply Scheme and
constructed innumerable water cistern for Sathya Sai
Water Supply Project.
Treated water reservoir for Nalgonda WSS
Reservoir at Krishna WSS
Raw Water Reservoir for Barmer WSS
Sump at Attur WSS
Operation 
Maintenance
Operation, control and maintenance are essential for
an extensive service and safe operation of any water
infrastructure. WSD BU favourably responds to the
growing demand from clients and undertakes the
operation and maintenance of all types of water supply
projects and treatment plants. For the last 15 years,
WSD BU has been taking care of every single aspect
of OM for the Sri Sathya Sai Drinking Water Supply
Scheme and continues to provide uninterrupted
supply of water. The Tirumala Tirupathi WSS is another
landmark project wherein LT has been continuously
providing operation and maintenance services for
more than 10 years.
Bisalpur-Jaipur WSS is another significant project
for which WSD BU is providing the operation and
maintenance service since the last 5 years. The project
caters to the predominant water needs of Jaipur city.
Sri Sathya Sai WSS
Testing of water meters
Water Management
Making Every Drop Count
Okhla WTP Delhi
Watermetersaredeployedtoensureefficientmonitoring
and accounting of water. Considering the huge volume
of end-users, the task calls for a micro implementation
process. For Delhi Jal Board, WSD BU executed a mega
water metering project. The scope involved installation,
operation and maintenance of 2.5 Lakh water meters in
specific areas of Delhi. The project team interacted with
consumers for certification of every meter and achieved
a unique milestone, adding yet another domain in its
water infrastructure capabilities.
Improving
Efficiency
To decrease UFW (Unaccounted for Water) and increase
the flow in service mains and many connections in
the major towns and cities, several Leak Detection
and Rectification works have been undertaken by
LT. This unique technique has several advantages:
minimizing the loss of precious drinking water,
avoiding contamination, maintaining stable pressure
and improving tail end supply. The Leak Detection and
Rectification project in Chennai involved testing of
1400 Km of distribution mains, replacement of 500 Km
of pipelines and 1,70,000 house service connections.
LT is executing leak detection and rectification of D2A
and D2B projects for Bangalore Water Supply covering
a length of 2056 Km of pipeline which will minimize
the leakage by more than 60% and enable efficient use
of potable water.
Leak detection and rectification for BWSSB SCADA system at Muscat
District meter cabinet
Supervisory Control
and Data Acquisition
(SCADA)
WSD BU has end-to-end capability to design and install
Supervisory Control And Data Acquisition (SCADA) for
various customers and help them monitor and improve
the water supply distribution system by detecting,
arresting and reducing leakages. The SCADA systems
installed by LT help clients have full information of
water parameters like flow and pressure of pipeline
laid throughout network from the main control centre.
Geographical Information System (GIS), is extensively
used to map distribution systems, provide pictorial
views and also identify the shortest route to manage
disasters. WSD BU possesses the comprehensive
capability and experience in executing engineering,
supply, delivery, erection, testing and commissioning
of instrumentation, telemetry and SCADA systems
including construction of all associated infrastructure
and operations  maintenance. The track record of
successful projects implemented across the country
reaffirms WSD BU’s commitment to preserve and
manage the precious resource - water.
Comprehensive Design
Solutions for Water
Infrastructure
A well-equipped design facility - Engineering
Design and Research Centre (EDRC) - at Chennai,
provides a broad spectrum of design and
engineering services, ranging from concept to
commissioning of water projects. EDRC provides
time bound and cost effective system design, basic
and detail engineering in process, hydraulics, civil
and structural, geotechnical, mechanical, electrical
and instrumentation under a single roof for water
supply and distribution.
Tirumala Tirupathi Pipeline
3D Model of elevated clariflocculator
EDRC has extensive project experience in water systems
engineering and provides comprehensive solutions for:
•  River and Sea water intake systems
•  Waterways like open channels, closed conduits
•  Storage facilities like ground level  elevated
reservoirs
•  Raw water treatment and desalination plants
•  Pumping systems – fore bays, pump houses 
related pumping machinery
•  Cross country water transmission pipeline systems
•  Distribution networks for industrial, urban  rural
areas
•  Feasibility studies
•  Process design
•  Alternate materials selection
•  Hydraulic analysis  design, sump model study 
pumping system design
•  Surge analysis  flexibility/stress analysis
•  Structural analysis
•  Electrical  instrumentation designs like
substations, power distribution, communication
systems, SCADA
•  System testing  commissioning procedures
•  System operation  maintenance manual
EDRC is also backed up by an exclusive Construction
Methods Planning Cell (CMPC) which complements
execution of water projects by providing value-
added solutions aimed at cost effective construction
methods by incorporating latest trends in construction
technology. EDRC is ISO 9001:2008 certified and strictly
adheres to its quality policy and practices.
Flawless Project Management
At LT Construction,the impetus for creating efficient and reliable water infrastructure is well supported by a multi-
disciplinary team of professionals who cater to turnkey project requirements through meticulous planning and
effective project management. WSD BU leverages on its domain expertise for providing suitable process systems /
schemes to meet varying and ever-increasing customer requirements. To facilitate seamless project control, WSD
BU aligns work schedules by integrating sequences through project monitoring softwares like Microsoft Project,
Primavera which is backed up by a centralized in-house information system for data retrieval.
Desalination is the future source of water. Indigenous technology
combined with high caliber engineering resources and large
scale investment capabilities enable LT to execute state-of-
the-art desalination plants. As a leader in water management,
WSD BU has the prowess to provide solutions for new
generation water systems and meet the most demanding of
delivery schedules.
WSD BU is presently executing seawater reverse osmosis
based desalination plant for Sesa Sterlite Limited at
Tuticorn. The phase I works involves establishing a 10
MLD capacity plant to suffice the water requirement
of the copper smelter plant that can be enhanced to
25 MLD in future. The scope comprises of:
•  Sea water intake and reject facilities
•  Pre - Treatment
•  UF-RO skids
•  Product water tank
Desalination is Key
Perspective of seawater reverse osmosis based desalination plant
being developed for Sesa Sterlite Limited at Tuticorin
1. Intake
2. Pre Treatment
3. UF - RO Building
4. Product Water Storage Tank
Committed to Quality and Safety
• Anantapur Water Supply phase - III • Nellore Water Supply Scheme• GNSS Lift Irrigation Scheme
British Safety Council Awards
LT is committed to continual improvement of its business by implementing globally accepted standards of
Quality and Safety Management across all its businesses and operations. Effective processes are developed to
deliver high quality products and services that will meet or exceed customers’ needs.
LT seeks to go beyond compliance with regulatory standards in pursuit of excellence in Environmental, Health
and Safety (EHS) management practices, as an integral part of its total quality management system. LT’s corporate
management has enunciated policies that emphasize on EHS through its structured and well defined procedures at
every stage of construction that protect the environment.
Growing
International
Presence
LT has executed water supply projects in the
Gulf countries and Mauritius by implementing
advancedtechnologieswiththefinestexecution
methods. Landmark projects executed by LT
include the Water Supply Distribution System
in Saham and Khaburah towns in Oman and
turnkey construction of the 10.8 MLD Water
Treatment Plant at Mont Blanc, Mauritius.
Presently LT is executing a Waste Water
Treatment Plant (187 MLD Ultrafiltration 
92 MLD SBR) at Doha for Ashghal.
Water Treatment Plant at Mauritius
Abu Dhabi
Qatar
Saudi Arabia
Sharjah
Oman
Presence in major Gulf Countries
A Tradition of Delighting Clients
A strong, customer-focussed approach, strict conformance to global EHS standards and the constant quest for top-class
quality has enabled the Water Supply and Distribution BU (WSD BU) to sustain market leadership in the water industry.
WSD BU’s established systems and practices at every stage of engineering, procurement, fabrication, assembly, erection,
testing and commissioning of large and complicated projects give clients the added LT advantage and the reassurance
of being in safe hands.
Major Clients
Gujarat Water Infrastructure Ltd
Karnataka Urban Water Supply 
Drainage Board
Pune Municipal Corporation -
Maharashtra
Bangalore Water Supply
and Sewerage Board
Gujarat Water Supply 
Sewerage Board
Public Health Engineering
Department, West Bengal
Kolkata Municipal Corporation
Hyderabad Metropolitan Water
Supply  Sewerage Board
Phed, Pred, RwsS - Andhra Pradesh
Chennai Metropolitan Water
Suppy  Sewerage Board
Tamilnadu Water Supply 
Drainage Board
Kerala Water Authority
Drinking Water And Sanitation
Department, Jharkhand
Public Health
Engineering, Rajasthan
Madhya Pradesh Jal
Nigam Maryadit
Delhi Jal Board
U.P. Jal Nigam
Haryana Urban
Development Authority
Map not to scale
3rd
Floor, C-Wing, TC-3, Tower-B, Mount Poonamallee Road,
Manapakkam, P.B.No.979, Chennai - 600 089, INDIA
Tel: 044-2270 4501, 2252 8000 Fax: 044-2270 4530
www.Lntecc.com | Email: wsd@lntecc.com

More Related Content

What's hot

water supply Project theory
water supply Project theorywater supply Project theory
water supply Project theoryMadhav Parajuli
 
SEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project reportSEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project reportNitesh Dubey
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Sheel Shah
 
Component of Hydro Power Plant
Component of Hydro Power PlantComponent of Hydro Power Plant
Component of Hydro Power PlantSatish Taji
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant Hussan Sheikh
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure Kiran Jadhav
 
Rule level & gate operation
Rule level & gate operationRule level & gate operation
Rule level & gate operationTushar Dholakia
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantNishkam Dhiman
 
Run of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsRun of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsSatish Taji
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkRamanuj Jaldhari
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANTNilanjana Sen
 
hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system khabat shekhany
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Aniket Raj
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeIJSRD
 
Irrigation field report
Irrigation field reportIrrigation field report
Irrigation field reportSushrut Gautam
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 

What's hot (20)

water supply Project theory
water supply Project theorywater supply Project theory
water supply Project theory
 
SEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project reportSEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project report
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 
Water resource engineering project list 2
Water resource engineering project list 2Water resource engineering project list 2
Water resource engineering project list 2
 
Component of Hydro Power Plant
Component of Hydro Power PlantComponent of Hydro Power Plant
Component of Hydro Power Plant
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
 
6300 l20_inverted_siphons
6300  l20_inverted_siphons6300  l20_inverted_siphons
6300 l20_inverted_siphons
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Rule level & gate operation
Rule level & gate operationRule level & gate operation
Rule level & gate operation
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Run of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsRun of River and Pumped Storage Plants
Run of River and Pumped Storage Plants
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANT
 
hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Irrigation field report
Irrigation field reportIrrigation field report
Irrigation field report
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 

Similar to WET IC brochure

IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.Gitanjali Singh
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015India Water Portal
 
Kaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openKaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openrajuadepu1998
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Chandra Dissanayake
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Chandra Dissanayake
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET Journal
 
Krishana bhagya jala nigam limited
Krishana bhagya jala nigam limitedKrishana bhagya jala nigam limited
Krishana bhagya jala nigam limitedkbjnl
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET Journal
 
Interlinking of rivers in india
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in indiaIqura Malik
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)Alankar jaiswal
 
MEIL_Corporate_Presentation.ppsx
MEIL_Corporate_Presentation.ppsxMEIL_Corporate_Presentation.ppsx
MEIL_Corporate_Presentation.ppsxShwetaJoshi814695
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhandijsrd.com
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation ReportAnuj Kumar
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”IRJET Journal
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Yashwadhan Sahi
 

Similar to WET IC brochure (20)

IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
internship report
internship reportinternship report
internship report
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
 
Kaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openKaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp open
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
 
Krishana bhagya jala nigam limited
Krishana bhagya jala nigam limitedKrishana bhagya jala nigam limited
Krishana bhagya jala nigam limited
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
 
Interlinking of rivers in india
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in india
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
MEIL_Corporate_Presentation.ppsx
MEIL_Corporate_Presentation.ppsxMEIL_Corporate_Presentation.ppsx
MEIL_Corporate_Presentation.ppsx
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhand
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation Report
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01
 

WET IC brochure

  • 1. turnkey solutions for urban and rural water supply
  • 2. A pumphouse at Tataguni near Bangalore Master Balancing Reservoir for Tirupur Water Supply Scheme West Godavari WSS L&T - Fulfilling a Vital Human Need As India’s largest engineering, technology, construction and manufacturing organization, Larsen & Toubro (L&T), has been at the forefront in creating infrastructure for a water-surplus, energy-secure and green world. L&T Construction, the construction arm of L&T, is India’s largest construction organisation and ranked 28th globally among the top 225 contractors by Engineering News Record in 2013. The Company’s capabilities span the entire gamut of construction - civil, mechanical, electrical and instrumentation engineering and its services extend to all core sector industries and infrastructure projects. Supply, clarification, desalination and distribution projects constitute a vital thrust area for L&T Construction in the water sector. Through its dedicated business group - Water & Effluent Treatment Strategic Business Group (WET SBG), L&T Construction, offers total solutions right from concept to commissioning of urban and rural water supply, water treatment plants, waste water treatment and network, industrial and water effluent treatment and lift irrigation projects. Adopting state-of-the-art technologies, WSD BU enables access to clean and safe drinking water thereby fulfilling a vital human need. By associating with Government and private organizations, WSD BU is playing a pivotal part in reaching water across the length and breadth of the country thereby providing succour to millions. WSD BU has been consistently delivering turnkey water supply and distribution projects with single point responsibility and precision. Leveraging on its domain expertise, it undertakes composite works for water infrastructure specialising in intake structures, water treatment plants, pump houses, transmission and storage structures, distribution networks including house service connections. Making Every Drop Count Water! The very source of life and a vital agent that sustains socio-economic development and biodiversity. However, today’s burgeoning population, massive urbanization and relentless industrialisation have gravely diminished water resources leading to severe water scarcity across regions. Estimates indicate that the world could face a 40 percent shortfall between forecasted demand and available supply by 2030. With greater realization and recognition for importance of water, there has been an increasingly sharper focus on its economical use and better management to meet the growing demand across sectors.
  • 3. Landmark Water Supply Schemes Sri Sathya Sai Water Supply Project For the Sri Sathya Sai Central Trust in Andhra Pradesh, L&T executed a mega water supply scheme covering more than 1000 villages that provides water to more than 2 million people. Considered one of the most successful water infrastructure ventures set up in the country, this scheme is operated and maintained by L&T for more than 15 years since its inception. The project involved laying of various types of pipelines ranging up to 600 mm dia across a span of 2000 Km. Barmer Lift Water Supply Project For the Government of Rajasthan, L&T executed a massive water supply scheme that supplies water to 691 villages spanning a distance of more than 200 Km in the arid zone of Barmer. The EPC contract involved execution of 172 MLD water treatment plant, 3845 ML raw water reservoir and 26 ML master balancing reservoir pipelines and pump houses. Underground water storage reservoir and pump house at Tirumala Water Treatment Plant at Haiderpur Bisalpur-Jaipur WSS Clariflocculators at Barmer Sri Sathya Sai WSS Bisalpur - Jaipur Water Supply Project India’s largest integrated water supply project supplying water to more than 3 million people of Jaipur in Rajasthan was executed by L&T on an EPC basis. The turnkey contract involved design, supply, construction, operation and maintenance of water supply, treatment and transmission system from the intake point at Bisalpur dam to the reservoir at Balawala on the periphery of Jaipur city. Tirumala - Tirupathi Water Supply Project A fast track project executed on EPC basis in 77 days enabling lifting of 4.5 million litres of water per day up the Tirumala hills in two stages, over a total head of 763m water column defying gravity and steep gradients. Projects for Delhi Jal Board L&T has executed a complete value chain of water infrastructure for the Delhi Jal Board (DJB) that provides water for 15 million people every single day! Commencing with the Sonia Vihar Clear Water Transmission project in 2001,L&T has executed 13 mega water supply and distribution projects for DJB over the past decade which is a testimony of their confidence in L&T’s performance, quality and strict adherence to time lines.
  • 4. Tapping the Gift of Life Intake Structures All water infrastructure projects begin to flow from the tapping point. A well-established intake structure seamlessly facilitates the distribution network. Different kinds of water bodies like lakes, rivers and reservoirs need different kinds of intake structures. WSD BU has pioneered several intake structures such as intake wells, jack wells, water channels, and collector wells along with infiltration gallery at the major water sources. Significant intake structures executed by WSD BU •  1760 MLD capacity at river Godavari •  423 MLD capacity at (VIWSCO) Vizag Industrial Water Supply Company •  33m high with 10m dia for Neelakantapuram WSS •  Collector well with radial arms for Melur WSS •  Intake with infiltration gallery for Bankura WSS •  Intake jetty at Sahebgunj and Garden Reach WSS Jack well at Tumkur WSS Pumping Main at Nagercoil West Godavari WSSIntake well for Rishivandhiyam WSS, Villupuram22m Dia Intake Well at Godavari Satara WSS Bagheri Ka Naka WSS - Rajasthan
  • 5. Water Treatment Plants Redefining the Purification Process Over the years, LT has gained the expertise and mastered the processing technology for the removal of all types of contaminants and harmful microorganisms from raw water sources to provide potable quality drinking water. With an array of end-to-end customized solutions, the water treatment provided by WSD BU has been consistently superior. State-of-the-art processes engaged in water treatment include flat bottom clarifier, Lamella clarifier, tube settlers and high rate solid contact clarifier. Significant Water Treatment Plants Bisalpur Jaipur WSS - Rajasthan 400 MLD South 24 Paraganas WSS - West Bengal 297 MLD Garden Reach WSS - West Bengal 239 MLD Vellore WSS - Tamil Nadu 181 MLD Barmer WSS - Rajasthan 172 MLD Dhanbad WSS - Jharkhand 143 MLD Major Refurbishment of Water Treatment Plants Bhagirathi WTP at Delhi 450 MLD Kilpauk WTP at Chennai 270 MLD Bisalpur Jaipur WSS Cascade aerator at Ananthapur WSS Filter House at Hubli Dharwad WSS Pollachi WSS TWAD Vellore
  • 6. Customized Electro - Mechanical Solutions Pumping Stations Safe Channels for Seamless Flow Transmission and Distribution Network LT has vast experience in the fabrication, supply and laying of critical pipeline networks by maintaining high quality and safety standards within stipulated time frame. Irrespective of whether it is above ground, underground or involves laying of pipelines on rugged hilly terrains over long distances, LT’s cutting edge technology ensures a safe and reliable network. Various types of pipelines in different sizes up to 3000mm dia have been executed by LT covering large geographical areas.Electro-mechanical components play a crucial part in water infrastructure projects. WSD BU possesses the experience and expertise to implement complicated and challenging pumping systems with precision providing customized design solutions, adopting state- of-the-art technology that enhances the efficiency and performance of the electro-mechanical components across projects. The Bisalpur – Jaipur Water Supply Scheme, the largest integrated water infrastructure project executed by LT, has the unique feature of continuous pumping over 100Km with horizontal split casing pumps with no intermediate booster pumping stations between the pipeline spreads. Pump house for VIWSCO Dwaraka WSS Transmission mains for Sonia Vihar WSS An overview of the long span pipeline for Bisalpur-Jaipur WSS Pump house for Attur WSS Pump house for Bisalpur-Jaipur WSS
  • 7. Hogenakkal Water Supply Scheme Schematic view of Hogenakkal Water Supply Scheme - Package III LT’s Water Supply and Distribution Business (WSD BU) executed a significant part of the mega water supply scheme that enabled safe drinking water to the fluoride affected districts of Dharmapuri and Krishangiri under the Hogenakkal Water Supply Scheme. WSD BU’s scope of work included construction of water infrastructure for package III and V which covered 4500 sq.Km, across 3500 habitations sufficing the daily water requirement of close to 1.3 million people. The pipeline network in both the packages is designed to feed water supply by gravity and eliminates the need for power. The master balancing reservoirs are constructed at elevated levels to enable flow of water through gravity. Significant quantum of works Pipeline (MS, DI, HDPE) 4355 Km Elevated Reservoirs (10000 – 12 lakh litres) 612 Nos Underground Sumps 226 Nos Pump rooms and Re-chlorination Building 236 Nos 6 lakh litre capacity master balancing reservoir Inside view of pump house Precast valve chamber 75.2 lakh litre capacity pumping station
  • 8. Robust Retaining Structures Storage Reservoirs A very important segment in water infrastructure is the storage reservoir from where filtered water is distributed to the end-users. As a leader in water infrastructure, WSD BU has executed significant retaining structures involving overhead reservoirs, storage tanks, sumps, etc. By continually implementing value-added solutions for critical and complex works, WSD BU meets the comprehensive requirements of its customers. WSD BU track record in storage reservoirs include: •  Summer storage of 8000ML capacity for Nellore WSP •  3850 ML concrete lined earthern reservoir for Barmer WSS •  66 ML service reservoir for Gulbarga WSP •  45ML partially underground sump for NC-2 WSP at Gujarat •  25 ML RCC clear water reservoir for Bisalpur- Jaipur WSS •  3.7 ML capacity clear water reservoir for Neelakantapuram Srirami Reddy Phase III •  2.45 ML overhead reservoir for Allahabad WSP West Godavari WSS Over Head Tank for Attur WSS WSD BU also offers end-to-end responsibility in executing water cisterns and house service connections to expand the water network across rural and urban sectors. WSD BU has completed 1,70,000 house service connections in Chennai for Chennai Metropolitan Water Supply and Sewerage Board, executed large scale house connections for Greater Vishakapatnam Municipal Corporation Water Supply Scheme and constructed innumerable water cistern for Sathya Sai Water Supply Project. Treated water reservoir for Nalgonda WSS Reservoir at Krishna WSS Raw Water Reservoir for Barmer WSS Sump at Attur WSS
  • 9. Operation Maintenance Operation, control and maintenance are essential for an extensive service and safe operation of any water infrastructure. WSD BU favourably responds to the growing demand from clients and undertakes the operation and maintenance of all types of water supply projects and treatment plants. For the last 15 years, WSD BU has been taking care of every single aspect of OM for the Sri Sathya Sai Drinking Water Supply Scheme and continues to provide uninterrupted supply of water. The Tirumala Tirupathi WSS is another landmark project wherein LT has been continuously providing operation and maintenance services for more than 10 years. Bisalpur-Jaipur WSS is another significant project for which WSD BU is providing the operation and maintenance service since the last 5 years. The project caters to the predominant water needs of Jaipur city. Sri Sathya Sai WSS Testing of water meters Water Management Making Every Drop Count Okhla WTP Delhi Watermetersaredeployedtoensureefficientmonitoring and accounting of water. Considering the huge volume of end-users, the task calls for a micro implementation process. For Delhi Jal Board, WSD BU executed a mega water metering project. The scope involved installation, operation and maintenance of 2.5 Lakh water meters in specific areas of Delhi. The project team interacted with consumers for certification of every meter and achieved a unique milestone, adding yet another domain in its water infrastructure capabilities.
  • 10. Improving Efficiency To decrease UFW (Unaccounted for Water) and increase the flow in service mains and many connections in the major towns and cities, several Leak Detection and Rectification works have been undertaken by LT. This unique technique has several advantages: minimizing the loss of precious drinking water, avoiding contamination, maintaining stable pressure and improving tail end supply. The Leak Detection and Rectification project in Chennai involved testing of 1400 Km of distribution mains, replacement of 500 Km of pipelines and 1,70,000 house service connections. LT is executing leak detection and rectification of D2A and D2B projects for Bangalore Water Supply covering a length of 2056 Km of pipeline which will minimize the leakage by more than 60% and enable efficient use of potable water. Leak detection and rectification for BWSSB SCADA system at Muscat District meter cabinet Supervisory Control and Data Acquisition (SCADA) WSD BU has end-to-end capability to design and install Supervisory Control And Data Acquisition (SCADA) for various customers and help them monitor and improve the water supply distribution system by detecting, arresting and reducing leakages. The SCADA systems installed by LT help clients have full information of water parameters like flow and pressure of pipeline laid throughout network from the main control centre. Geographical Information System (GIS), is extensively used to map distribution systems, provide pictorial views and also identify the shortest route to manage disasters. WSD BU possesses the comprehensive capability and experience in executing engineering, supply, delivery, erection, testing and commissioning of instrumentation, telemetry and SCADA systems including construction of all associated infrastructure and operations maintenance. The track record of successful projects implemented across the country reaffirms WSD BU’s commitment to preserve and manage the precious resource - water.
  • 11. Comprehensive Design Solutions for Water Infrastructure A well-equipped design facility - Engineering Design and Research Centre (EDRC) - at Chennai, provides a broad spectrum of design and engineering services, ranging from concept to commissioning of water projects. EDRC provides time bound and cost effective system design, basic and detail engineering in process, hydraulics, civil and structural, geotechnical, mechanical, electrical and instrumentation under a single roof for water supply and distribution. Tirumala Tirupathi Pipeline 3D Model of elevated clariflocculator EDRC has extensive project experience in water systems engineering and provides comprehensive solutions for: •  River and Sea water intake systems •  Waterways like open channels, closed conduits •  Storage facilities like ground level elevated reservoirs •  Raw water treatment and desalination plants •  Pumping systems – fore bays, pump houses related pumping machinery •  Cross country water transmission pipeline systems •  Distribution networks for industrial, urban rural areas •  Feasibility studies •  Process design •  Alternate materials selection •  Hydraulic analysis design, sump model study pumping system design •  Surge analysis flexibility/stress analysis •  Structural analysis •  Electrical instrumentation designs like substations, power distribution, communication systems, SCADA •  System testing commissioning procedures •  System operation maintenance manual EDRC is also backed up by an exclusive Construction Methods Planning Cell (CMPC) which complements execution of water projects by providing value- added solutions aimed at cost effective construction methods by incorporating latest trends in construction technology. EDRC is ISO 9001:2008 certified and strictly adheres to its quality policy and practices.
  • 12. Flawless Project Management At LT Construction,the impetus for creating efficient and reliable water infrastructure is well supported by a multi- disciplinary team of professionals who cater to turnkey project requirements through meticulous planning and effective project management. WSD BU leverages on its domain expertise for providing suitable process systems / schemes to meet varying and ever-increasing customer requirements. To facilitate seamless project control, WSD BU aligns work schedules by integrating sequences through project monitoring softwares like Microsoft Project, Primavera which is backed up by a centralized in-house information system for data retrieval. Desalination is the future source of water. Indigenous technology combined with high caliber engineering resources and large scale investment capabilities enable LT to execute state-of- the-art desalination plants. As a leader in water management, WSD BU has the prowess to provide solutions for new generation water systems and meet the most demanding of delivery schedules. WSD BU is presently executing seawater reverse osmosis based desalination plant for Sesa Sterlite Limited at Tuticorn. The phase I works involves establishing a 10 MLD capacity plant to suffice the water requirement of the copper smelter plant that can be enhanced to 25 MLD in future. The scope comprises of: •  Sea water intake and reject facilities •  Pre - Treatment •  UF-RO skids •  Product water tank Desalination is Key Perspective of seawater reverse osmosis based desalination plant being developed for Sesa Sterlite Limited at Tuticorin 1. Intake 2. Pre Treatment 3. UF - RO Building 4. Product Water Storage Tank
  • 13. Committed to Quality and Safety • Anantapur Water Supply phase - III • Nellore Water Supply Scheme• GNSS Lift Irrigation Scheme British Safety Council Awards LT is committed to continual improvement of its business by implementing globally accepted standards of Quality and Safety Management across all its businesses and operations. Effective processes are developed to deliver high quality products and services that will meet or exceed customers’ needs. LT seeks to go beyond compliance with regulatory standards in pursuit of excellence in Environmental, Health and Safety (EHS) management practices, as an integral part of its total quality management system. LT’s corporate management has enunciated policies that emphasize on EHS through its structured and well defined procedures at every stage of construction that protect the environment.
  • 14. Growing International Presence LT has executed water supply projects in the Gulf countries and Mauritius by implementing advancedtechnologieswiththefinestexecution methods. Landmark projects executed by LT include the Water Supply Distribution System in Saham and Khaburah towns in Oman and turnkey construction of the 10.8 MLD Water Treatment Plant at Mont Blanc, Mauritius. Presently LT is executing a Waste Water Treatment Plant (187 MLD Ultrafiltration 92 MLD SBR) at Doha for Ashghal. Water Treatment Plant at Mauritius Abu Dhabi Qatar Saudi Arabia Sharjah Oman Presence in major Gulf Countries A Tradition of Delighting Clients A strong, customer-focussed approach, strict conformance to global EHS standards and the constant quest for top-class quality has enabled the Water Supply and Distribution BU (WSD BU) to sustain market leadership in the water industry. WSD BU’s established systems and practices at every stage of engineering, procurement, fabrication, assembly, erection, testing and commissioning of large and complicated projects give clients the added LT advantage and the reassurance of being in safe hands. Major Clients Gujarat Water Infrastructure Ltd Karnataka Urban Water Supply Drainage Board Pune Municipal Corporation - Maharashtra Bangalore Water Supply and Sewerage Board Gujarat Water Supply Sewerage Board Public Health Engineering Department, West Bengal Kolkata Municipal Corporation Hyderabad Metropolitan Water Supply Sewerage Board Phed, Pred, RwsS - Andhra Pradesh Chennai Metropolitan Water Suppy Sewerage Board Tamilnadu Water Supply Drainage Board Kerala Water Authority Drinking Water And Sanitation Department, Jharkhand Public Health Engineering, Rajasthan Madhya Pradesh Jal Nigam Maryadit Delhi Jal Board U.P. Jal Nigam Haryana Urban Development Authority Map not to scale