SlideShare a Scribd company logo
1 of 27
Download to read offline
FALL43°
FALL28°
FALL29°
FALL43°
FALL28°
FALL29°
FALL28°
FALL28°
FALL60°
FALL60°
W34
01
W33
05
W33
04
W33
03
W33
02
W33
01
W32
01
W34
02
W33
06
W33
07
W33
08
W33
09
W33
10
W32
02
W37
01
W36
01
W35
01
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
A
08
CLERESTORY PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/08
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- CLERESTORY PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
02
D18
01
D20
01
D17
01
D19
W28
01
D22
04
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
03
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
06
FIRST FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/06
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
02
D18
01
D20
01
D17
01
D19
W28
01
D22
04
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
03
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
10
FIRST FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/10
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
02
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01
W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
02
D2
01
D6
01
D5
04
D5
03
D4
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
03
D13
02
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
05
GROUND FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/05
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
02
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
02
D2
01
D6
01
D5
04
D5
03
D4
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
03
D13
02
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
09
GROUND FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/09
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
VOID
VOID
B
03
SOUTH ELEVATION
SCALE: 1:50
NORTH ELEVATIONB
04 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/03
2017 / ARC1215 / MLNKEDAH
B/04
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- NORTH ELEVATION
- SOUTH ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR MR. MOHD ADIB
REMARK:
21.01.2017
26.02.2017
1:50
BENJAMIN TAN.Z.H (0324 857) , VINCENTIA MUTIARA.K (0303 496) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
BENJAMIN T.Z.H , VNCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
BENJAMIN T.Z.H , VINCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
00 50 100
N
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
VOID VOID
VOID
VOID
B
01
EAST ELEVATION
SCALE: 1:50
WEST ELEVATIONB
02 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/01
2017 / ARC1215 / MLNKEDAH
B/02
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- EAST ELEVATION
- WEST ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
26.02.2017
1:50
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
FALL60°
FALL43°
FALL28°
FALL43°
FALL28°
FALL29°FALL29°
FALL28°
FALL28°
FALL60°
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
A
07
Roof Plan
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/07
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- ROOF PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
CLERESTORY PLANFALL43°
FALL28°
FALL29°
FALL43°
FALL28°
FALL29°
FALL28°
FALL28°
FALL60°
FALL60°
W34
01
W33
05
W33
04
W33
03
W33
02
W33
01
W32
01
W34
02
W33
06
W33
07
W33
08
W33
09
W33
10
W32
02
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
W37
01
W36
01
W35
01
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
A
08
CLERESTORY PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/08
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- CLERESTORY PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
1510.0
701.1 45.0 693.9 35.035.0
720.0 720.0
2749.0
2144.0560.0
45.069.0325.0325.0325.0520.0215.0
60.0
170.0
door hinge to manuf's
details
35mm thick timber window
frame to manuf's details
4mm thick fixed glass
panel to manuf's details
door lock to manuf's
details
door knob to manuf's
details
door hinge to manuf's
details
fixed louvered window to
manuf's details
69mm thick timber door
frame to manuf's details
DN 75
1510.0
2144.0605.0
1510.0
965.0
2047.0
DN 10
965.0
2047.0
30.0
965.0
30.0905.0
door hinge to manuf's
details
30mm thick timber
door frame to manuf's
details
door knob to manuf's
details
30.0 905.0 30.0
965.0
2047.0
30.0
door knob to manuf's
details
30mm thick timber
door frame to manuf's
details
door hinge to manuf's
details
DN 10
965.0
965.0
2047.0
890.0
2097.0
890.0
50.0 790.0 50.0
890.0
2097.0
50mm thick timber
door frame to manuf's
details
door knob to manuf's
details
door hinge to manuf's
details
890.0
50.0 790.0 50.0
2097.0
door knob to manuf's
details
50mm thick timber
door frame to manuf's
details
door hinge to manuf's
details
890.0
890.0
2097.0
1830.0
1633.0
1830.0
25.0 915.0 865.0 25.0
1830.0
1633.0
25mm thick steel door
frame to manuf's details
door lock to manuf's
detail
UP 75
1280.0
40.0 560.0 560.0 60.0
1280.0
730.0 465.02870.0
238.7370.0370.0370.0370.0232.0
65.065.065.0
560.094.0
door hinge to manuf's
details
4mm thick fixed glass
panel to manuf's details
4mm thick fixed glass
panel to manuf's details
100mm thick timber window
frame to manuf's details
50mm thick timber door
frame to manuf's details
door lock to manuf's
detail
door knob to manuf's
detail
1280.0
724.0
2145.7
935.0
2118.3
935.0
24.9 885.1 25.0
935.0
777.0
112.51905.8
2118.3
door knob to manuf's
detail
25mm thick alum. door
frame to manuf's details
fixed glass panel to
manuf's detail
door hinge to manuf's
detail
22.0
851.0 22.0
719.0
895.0
75.0936.0914.075.0
2097.0
door knob to manuf's
detail
door hinge to manuf's
detail
fixed glass panel to
manuf's detail
22mm thick alum. door
frame to manuf's details
895.0
895.0
2097.0
790.0
2127.0
790.0
45.0 700.0 45.0
790.0
2082.0
2127.0
door knob to manuf's
detail
door hinge to manuf's
detail
45mm thick timber door
frame to manuf's details
56.0 845.0 56.0
957.0
2068.0
2124.0
door knob to manuf's
detail
door hinge to manuf's
detail
45mm thick timber door
frame to manuf's details
957.0
957.0
2124.0
957.0
2124.0
56.0 845.0 56.0
957.0
2068.0
2124.0
door knob to manuf's
detail
door hinge to manuf's
detail
56mm thick timber door
frame to manuf's details
957.0
957.0
2124.0
957.0
56.0 845.0 56.0
2121.7
2065.7
957.0
door knob to manuf's
detail
door hinge to manuf's
detail
56mm thick timber door
frame to manuf's details
48.0 2470.0 45.0
2563.0
25.0135.0
1420.0690.0
10mm thick steel structure
to manuf's details
45mm thick timber door
frame to manuf's details
door lock to manuf's
detail
2160.0
2563.0
2563.0
2160.0
DRAWING NO.:
SHEET NO.:
E / 02
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- DOOR SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
1:20
LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857)
LOO YEE PEI (0329 148)
-
-
Timber framed and glass paneled door with
fixed glass on top
D1 Location: Corridor A
Quantity: 01
Size: (H)2749mm x (W)1510mm
Timber / Wooden door with timber frame
D2 Location: Male washroom
Quantity: 01
Size: (H)2047mm x (W)965mm
Timber / Wooden door with timber frame
D3 Location: Female washroom
Quantity: 01
Size: (H)2047mm x (W)965mm
Plastic door with timber frame
D4 Location: Male washroom
Quantity: 02
Size: (H)2097mm x (W)890mm
Plastic door with timber frame
D5 Location: Female Washroom
Quantity: 02
Size: (H)2097mm x (W)890mm
Steel door with aluminum steel frame
D6 Location: Storage room
Quantity: 01
Size: (H)1633mm x (W)1830mm
D7 Location: Main entrance to admin office
Quantity: 01
Size: (H)2870mm x (W)1280mm
Timber framed and glass paneled door
with fixed glass on top Glass door with aluminum frame
D8 Location: Manager office A
Quantity: 01
Size: (H)2118.3mm x (W)935mm
Glass door with aluminum frame
D9 Location: Manager office B
Quantity: 01
Size: (H)2097mm x (W)895mm
Timber door with timber frame
D10 Location: Open office Area
Quantity: 01
Size: (H)2127mm x (W)790mm
Timber door with timber frame
D11 Location: Office Area B
Quantity: 01
Size: (H)2124mm x (W)957mm
D12 Location: Documents storage room
Quantity: 01
Size: (H)2124mm x (W)957mm
Timber door with timber frame
D13 Location: Office area B
Quantity: 01
Size: (H)2121.7mm x (W)957mm
Timber door with timber frame
D14 Location: Main entrance to the old museum
Quantity: 01
Size: (H)2160mm x (W)2563mm
Steel sliding door with timber frame
ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION
ELEVATION
ELEVATION
ELEVATION ELEVATION ELEVATION
ELEVATION ELEVATION ELEVATION ELEVATION
PLAN PLAN PLAN PLAN PLAN
PLAN PLAN PLAN PLAN PLAN
PLAN PLAN PLAN PLAN
ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
ISO VIEW ISO VIEW ISO VIEW ISO VIEW
2563.0
821.0 821.0 821.0 50.0
2563.0
50.02010.050.0
2160.0
door lock to manuf's
detail
black tinted fixed glass
door panel to manuf's
detail
50mm thick alum. door
frame to manuf's details
2563.0
2160.0
1000.0
2097.0
50.0 900.0 50.0
1000.0
2072.0
2097.0
door knob to manuf's
detail
door hinge to manuf's
detail
50mm thick timber
frame to manuf's details
1000.0 1829.2
30.3 899.7 869.2 30.0
1829.2
30.02280.0
2350.0
door knob to manuf's
detail
door lock to manuf's
detail
30mm thick timber door
frame to manuf's details
door hinge to manuf's
details
door lock to manuf's
details 1829.2
2350.0
1829.2
2350.0
1291.0
40.0 758.0 453.0 40.0
1211.0
1291.0
239.0370.0370.0370.0370.0204.3
2118.3
2158.3
door hinge to manuf's
details
40mm thick timber door
frame to manuf's details
door lock to manuf's
detail
1291.0
2158.3
1215.0
2660.0
45.0 540.5 539.5 45.0
1215.0
593.01415.0575.0
2051.0
2660.0
door hinge to manuf's
details
fixed louvered window
to manuf's details
45mm thick timber window
frame to manuf's details
4mm thick fixed glass panel
with wire mesh protection
to manuf's details
door lock to manuf's detail
door lock to manuf's detail
30mm thick timber door
frame to manuf's details
1215.0
965.0
2110.0
DN 10
965.0
30.0 905.0 30.0
965.0
2070.0
2110.0
door knob to manuf's
detail
door hinge to manuf's
detail
30mm thick timber
frame to manuf's details
29.7 905.0 30.0
965.0
2070.0
2110.0
door knob to manuf's
detail
door hinge to manuf's
detail
30mm thick timber
frame to manuf's details
DN 10
965.0
965.0
2110.0
1829.2
30.0 869.2 899.7 30.3
1768.9
1829.2
30.02280.0
2350.0
door knob to manuf's
detail
door lock to manuf's
detail
30.3mm thick timber door
frame to manuf's details
door hinge to manuf's
details
door lock to manuf's
details
DRAWING NO.:
SHEET NO.:
E / 02
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- DOOR SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
1:20
LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857)
LOO YEE PEI (0329 148)
-
-
Glass sliding door with aluminum frame
D15 Location: Main entrance to the old museum
Quantity: 01
Size: (H)2160mm x (W)2563mm
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Glass sliding door with aluminum frame
D16 Location: Manager office C
Quantity: 01
Size: (H)2097mm x (W)1000mm
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D17 Location: Utility room A
Quantity: 01
Size: (H)2350mm x (W)1829.2mm
Timber door with timber frame
D18 Location: Utility room B
Quantity: 01
Size: (H)2350mm x (W)1829.2mm
Timber door with timber frame
D19 Location: Utility room A
Quantity: 01
Size: (H)2158.3mm x (W)1291mm
ISO VIEW
ELEVATION
PLAN
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D20
Location: Linked bridge to the
toilet tower
Quantity: 01
Size: (H)2660mm x (W)1215mm
ELEVATION
PLAN
ISO VIEW
Timber door with timber frame
D21 Location: Utility room C
Quantity: 01
Size: (H)2110mm x (W)965mm
Timber door with timber frame
D22 Location: Pantry room
Quantity: 01
Size: (H)2110mm x (W)965mm
ELEVATION
PLAN
ISO VIEW
VOID
VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
EGKLMNP J H F D C B AQ
02
W8
01
W8
01
W10
02
W10
03
W10
04
W10
02
W27
01
W27
03
W8
04
W801
W28
01
D06
VOID VOID
KA C D E F G H J L M N P Q
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
B
W21
01
W20
01
W19
01
W37
01
W36
01
W35
01
W30
01
W29
01
D14
01
B
01
EAST ELEVATION
SCALE: 1:50
WEST ELEVATIONB
02 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/01
2017 / ARC1215 / MLNKEDAH
B/02
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- EAST ELEVATION
- WEST ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
26.02.2017
1:50
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822)
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
02
D18
01
D20
01
D17
01
D19
W28
01
D22
04
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
03
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
06
FIRST FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/06
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
DN 155
DN10
B
C
A
OFFICE AREA B
F.F.L. ± 3.620m
W24
01
W24
02W24W24
W24
11
W24 W24
13
W24 W24
04
W8
02
W26
W27
02
W27
W25
02
01
DN 155
DN10
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
UTILITY ROOM A
F.F.L. ± 3.465m
UTILITY ROOM B
F.F.L. ± 3.465m
PANTRY
F.F.L. ± 3.610m
MANAGER OFFICE C
F.F.L. ± 3.620m
UTILITY ROOM C
F.F.L. ± 3.610m
08
W24W24
03
W24
04
W24
050607
W24
09 10 12 14
W26
01
01
W25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
03
W8
01
W30
01
W29
01
W31
01
D16
02
D18
01
D20
01
D17
01
D19
W28
01
D22
04
01
D15
01
D14
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Glass louvered window with timber
framing to manuf's details
Double swing timber casement
door to manuf's details
Glass louvered window with timber
framing to manuf's details300mm (W) timber flooring
115mm (Radius) timber
column to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with aluminum
steel framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
Double swing timber
casement door to manuf's
details
Double swing timber
casement door to manuf's
details
100mm thick partition wall to
manuf's details
Double swing casement
window with aluminum frame to
manuf's details
D21
03
B
C3
C5
E
D
C4
DN199
NON-ACCESSIBLE
NON-ACCESSIBLE
A
10
FIRST FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/10
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- FIRST FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
02
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01
W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
02
D2
01
D6
01
D5
04
D5
03
D4
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
03
D13
02
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
05
GROUND FLOOR PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/05
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
GROUND FLOOR REFLECTIVE CEILING PLAN
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
02
DN10DN10
DN75
UP75
OPEN OFFICE AREA A
F.F.L. ± 0.230m
MANAGER OFFICE B
F.F.L. ± 0.230m
VERANDAH WAY
F.F.L. ± 0.155m
MANAGER OFFICE A
F.F.L. ± 0.230m
OFFICE AREA A
F.F.L. ± 0.230m
DOCUMENTS
STORAGE ROOM
F.F.L. ± 0.230m
FEMALE WASHROOM
F.F.L. ± 0.165m
MALE WASHROOM
F.F.L. ± 0.165m
STORAGE
ROOM
F.F.L. ± 0.155m
W12
01
W13
01
W14
02
W15
01
W18
01
W21
01
W20
01
W1
01
W2
01
W3
01
W4
01W5
01
W6
01
W7
01
W8
01
W8
02 W19
01
D1
01
VERANDAH WAY
F.F.L. ± 0.155m
01
D7
D3
02
D2
01
D6
01
D5
04
D5
03
D4
D4
01
1
2
3
5
4
6
7
8
10
9
11
12
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
11
10
12
13
14
W9
01
W10
01
W10
02
W10
03
W10
04
W9
02
W11
01
W22
01
W23
01
D10
01
D12
01
D11
03
D13
02
D9
01
D8
01
W16
01
W17
01
Double swing timber casement window
to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Ø115MM timber column to
eng's details
Double swing casement louvered
window with timber framing to
manuf's details
Glass louvered window with timber
framing to manuf's details
Double swing casement louvered window
with timber framing to manuf's details
Single swing casement louver window
with timber framing to manuf's details
150mm brick wall with
plastering on both side
Ø115MM timber column
to eng's details
Single swing timber casement
door to manuf's details
150mm brick wall with
plastering on both side
225mm x 225mm timber
columns to eng's details
Glass louvered window with timber
framing to manuf's details
250mm(tread) x 170mm(riser)
concrete staircase
100mm thick partition wall to
manuf's details
B
C
A
C3
C2
C1
C
C2
C1
A
D
C4
C5
E
B
C3
C5
E
D
C4
UP 170
UP 170
A
09
GROUND FLOOR REFLECTIVE CEILING PLAN
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/09
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- GROUND FLOOR REFLECTIVE CEILING PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
460mm x 460mm x 120mm
r.c column
Ø206.4mm r.c column
Ø114.6mm timber column
460.0 460.0
120.0
4419.6909.0
50mm thk. timber panel
to engr. details
30mm thk. timber panel
to engr. details
semi transparent louvered
window with aluminum frame
210.0EQEQ
50.050.0
650.0
2789.03410.42717.8
EQEQ210.0
650.0
1465.32717.81206.4
50.050.0
2538.6
1006.1
2538.6
1006.1
2529.3
1002.4
2538.6
1006.1
2538.6
1006.1
2553.8
1006.1
1829.0
1183.4
460.0
460.0
R114.6
R206.4
2815.8
1157.9
747.9
2815.8
1158.2
750.0
1565.3
535.0
2371.0
403.6
464.6
2815.8
303.7
409.4
492.4
2020.0
740.0
810.0
1750.0
540.0
2047.0
100.0100.0
2815.9
768.0
4865.0
43°
2298.5
DRAWING NO.:
SHEET NO.:
E / 05
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- COLUMN AND ORNAMENTS DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
AS SHOWN
LOO YEE PEI, CHONG WEN BIN, CHONG JIA YI, CHANG MAY CHEN, WEE SUE WEN, CHIA KEH CHIAN, NIK AHMAD MUNAWWAR, CHLOE TEH.SHU ERN, SHUM LI SZE
LOO YEE PEI (0329 148)
-
-
EXPLODED ISOMETRIC VIEWE
05 SCALE: 1:25
ORNAMENTATION ELEVATION (EAST ELEVATION)E
05 SCALE: 1:20
ORNAMENTATION ELEVATION (NORTH & SOUTH ELEVATION)E
05 SCALE: 1:20
INTERIOR ORNAMENTATIONE
05 SCALE: 1:20
WINDOW ORNAMENTATIONE
05 SCALE: 1:10
COLUMN TOP VIEWE
05 SCALE: 1:10
EXTERIOR ORNAMENTATION AE
05 SCALE: 1:20
EXPLODED ISOMETRIC VIEWE
05 SCALE: 1:10
EXTERIOR ORNAMENTATION BE
05 SCALE: 1:20
EXTERIOR ORNAMENTATION BE
05 SCALE: 1:20
ROOF ORNAMENTATIONE
05 SCALE: 1:25
EXPLODED ROOF ORNAMENTATIONE
05 SCALE: 1:25
Detail B
Detail A
ridge tiles
ridge board
collar tie
100mm thick post
70mm thick rafter
50mm x 50mm thick batten
clay roof tiles to manuf's detail
rafter
50mm x 50mm thick batten
clay roof tiles to manus'f detail
metal connector
rafter tie
ceiling joist
beam
fascia board
DRAWING NO.:
SHEET NO.:
E / 04
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- ROOF DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
04.03.2017
AS SHOWN
LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633) , TEO KUO CHIEN (0320 195)
LOO YEE PEI (0329 148)
-
-
Roof Exploded Isometric View AE
04 SCALE: 1:75
Roof Exploded Isometric View BE
04 SCALE: 1:50
Roof Exploded Isometric View CE
04 SCALE: 1:25
DETAIL AE
04 SCALE: 1:10
DETAIL BE
04 SCALE: 1:10
1
17
16
14
13
12
11
10
9
8
6
5
2
7
15
3
D
CEFGH
BJ
KLMNQ
P
A
4
C
C2
C1
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
FALL60°
FALL43°
FALL28°
FALL43°
FALL28°
FALL29°FALL29°
FALL28°
FALL28°
FALL60°
B
C
A
C3
C2
C1
D
C4
C5
E
B
C3
C5
E
D
C4
A
07
Roof Plan
SCALE: 1:50
DRAWING NO.:
SHEET NO.:
A/07
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- ROOF PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORDED BY
SCALE
FACILITATOR
REMARK:
00 50 100
N
MR. MOHD ADIB
21.01.2017
04.03.2017
1:50
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149)
LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
PERLIS
SINTOK
UUM
LANGKAWI
ISLAND
THAILAND
PERAK
BUKIT KAYU
HITAM
JITRAGUNUNG
KERIANG
KEPALA
BATAS
PERLIS
POKOK
SENA
NAKA
PEDA
LAKE
MUDA
LAKE
GUBIR
GULAU
PENDANG
GUAR
CHEMPEDAK
SIK
BALING
SUNGAI
PETANI
BETTERWORTH
GEORGETOWN
KULIM
BANDAR
BAHARU
YAN
GURUN
KUALA
PERLIS
ALOR
SETAR
GUNUNG
JERAL
PENANG
Kedah River
Jalan Tambang Badak
LorongLiku
LorongPeringgi
Jalan Kelompang
muidatSnalaJ
JalanTunkuHalim
Jalan W
aja 5
LorongTitiSiam
siloPtabajePubI
hadeKnejnitnoK
etatShadeK
muesuM
namAluraD
muidatS
Kedah OldMuseum
namaT
akedreM
Lorong Sena
LorongSukaramai
Jalan Kolam Renang
LebuhrayaDarulAman
LebuhrayaDarulAman
LebuhrayaDarulAman
Jalan Stadium
JalanStadium
JalanStadium
iregeNBDIC
hadeK
Jalan Mahkota
JalanTunkuAbdullah
Taman Tunku Habsah
Jalan Tunku Abdul Halim
VOID VOID
1
5 4
3
2
C3C3
C1
C
C1
C4
LLAF
BB
C2
C
A
C2
A
D
C4
E
C5
D
C5
E
FALL
FALL
FALL
LLAF
FALLLLAF
FALL
FALL
FALL
1
4
3
2
MAIN ROAD
MAJOR TOWN
INTERNATIONAL BORDER
NORTH-SOUTH EXPRESSWAY
LEGEND
STATE BORDER
MOUNTAIN
RIVER
A
01
KEY PLAN
SCALE: NOT TO SCALE
DRAWING NO.:
SHEET NO.:
A/01
2017 / ARC1215 / MLNKEDAH
A/02
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- KEY PLAN
- LOCATION PLAN
- SITE PLAN
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
02.03.2017
AS SHOWN
A/03
A
02
LOCATION PLAN
SCALE: NOT TO SCALE
Measured Drawing
A
04
SITE SECTION
SCALE: 1:200
A
04
SITE PLAN
SCALE: 1:200
Site
N
00 200 400
A/04
CHONG WEN BIN (0327 442) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636 ) , WEE SUE WEN (0322 633) , CHIA KEH CHIAN (0322 063) , LOW CHI YIN (0329 149)
VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
01
W7
01
W6
01
W5
01
W4
01
W3
01
W2
01
W1
W9
01
01
W24
02
W24
03
W24
04
W24
05
W24
06
W24
07
W24
01
W23
01
W26
01
W34
05
W33
04
W33
03
W33
02
W33
01
W33
01
W32
VOID
F.F.L
(Toilet Tower)
G.F.L
R.L
R.L
C.L
F.F.C.L
(Toilet Tower)
R.L
G.F.C.L
F.F.L
16 15 14 13 12 11 10 9 8 7 5 4 23 16
01
W18
01
W15 W14
01
W13
01
W12
01
W11
01
W9
02
14
W24
13
W24
12
W24
11
W24
10
W24
09
W24
08
W24
02
W32
10
W33
09
W33
08
W33
07
W33
06
W33
02
W34
02
W25
02
W26
01
W16
01
W17 01
D07
B
03
SOUTH ELEVATION
SCALE: 1:50
NORTH ELEVATIONB
04 SCALE: 1:50
DRAWING NO.:
SHEET NO.:
B/03
2017 / ARC1215 / MLNKEDAH
B/04
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- NORTH ELEVATION
- SOUTH ELEVATION
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR MR. MOHD ADIB
REMARK:
21.01.2017
26.02.2017
1:50
BENJAMIN TAN.Z.H (0324 857) , VINCENTIA MUTIARA.K (0303 496) , NIK AHMAD MUNAWWAR (0325 167)
LOO YEE PEI (0329 148)
BENJAMIN T.Z.H , VNCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
BENJAMIN T.Z.H , VINCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469)
00 50 100
N
LEGEND
G.F.L - Ground Floor Level
F.F.L - First Floor level
G.F.C.L - Ground Floor Ceiling Level
F.F.C.L - First Floor Ceiling Level
C.L - Ceiling Level
R.L - Roof Level
MANAGER OFFICE B
F.F.L. ± 0.230m
W18
01
W21
01
W20
01
W1
01
W19
01
1
2
3
5
4
6
7
8
9
13
14
15
17
16
18
19
20
21
22
23
24
2
1
3
4
5
6
8
7
9
13
14
W22
01
OPEN OFFICE AREA
UPUP
9470.4
2730.4
258.0
148.0
2006.0
1490.0
2183.4
3370.03370.0
01
W24
MANAGER OFFICE C
F.F.L. ± 3.620mW24
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
01
W30
01
W29
01
W31
01
W10
LIVING AREA
DN DN
Detail B
1568.8
2006.0
1070.0484.0
250.0
150.0
3193.8
2149.5
298.7
Detail A
10mm x 10mm ceramic tiles
r.c concrete
steel ornaments structure
timber railing
r.c concrete
577.1386.6102.2
DRAWING NO.:
SHEET NO.:
E / 03
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- STAIRCASE DETAILS
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
AS SHOWN
LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636)
LOO YEE PEI (0329 148)
-
-
STAIRCASE ISOMETRIC VIEWE
03 SCALE: 1:25
GROUND FLOOR PLANE
03 SCALE: 1:50
FIRST FLOOR PLANE
03 SCALE: 1:50
Staircase sectionE
03 SCALE: 1:25
E
03 SCALE: 1:5
Detail A
E
03 SCALE: 1:10
Detail BE
03 SCALE: 1:10
Railing Detail
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
915.01925.0
100.01735.090.0
586.0 596.0 583.0 580.0 30.0
1182.0 1163.0
F.F.L
2434.0
0.4342
2434.0
1925.0
2427.0
1925.0
2427.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
587.0 581.0 584.0 583.0 30.0
32.0 1168.0 1167.0
2427.0
90.01735.0100.0
1925.0915.0
F.F.L
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
36.0
585.0 583.0 585.0 585.0 29.0
1168.0 1170.0
2432.0
915.01925.0
100.01735.090.0
F.F.L
2432.0
2432.0
1925.0
2417.0
1925.0
2417.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
37.0
626.0 545.5 586.0 561.0 30.0
1171.5 1147.0
2417.0
100.01735.090.0
1925.0915.0
F.F.L
37.0
583.0 582.0 582.0 583.0 35.0
1165.0 1165.0
2437.0
90.01735.0100.0
915.01925.0
F.F.L
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
2437.0
2437.0
1925.0
1837.0
1305.0
1837.0
1020.01305.0
133.0133.0EQEQEQEQEQEQEQ
545.0 572.0 545.0
1837.0
32.0 32.0
35.0
F.F.L
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
545.0 572.0 545.0
32.0 32.0
29.0
1831.0
133.0133.0EQEQEQEQEQEQEQ
1020.01305.0
F.F.L
1831.0
1305.0
1831.0
1934.6
2054.6
60.0
1831.0
1305.0
1061.31305.0
EQ12.0EQEQEQEQEQEQEQ145.0
567.0 604.9 571.9
1934.6
23mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
F.F.L
410.0
1800.0
2414.0
15mm thick steel frame
to manuf's details
15.0570.0570.0570.0
322.020.030.0
steel alloy adj. friction stay
fastener with security locks
F.F.L
1800.0
410.0
1800.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
4 panels casement louvered window with
timber frame
W1 Location: Manager office A
Quantity: 01
Size: (H)1925mm x (W)2434mm
ELEVATION
PLAN
ISO VIEW
W2
ELEVATION
PLAN
ISO VIEW
4 panels casement louvered window with
timber frame
Location: Manager office A-B
Quantity: 01
Size: (H)1925mm x (W)2427mm
ELEVATION
PLAN
ISO VIEW
W3
4 panels casement louvered window with
timber frame
Location: Manager office B
Quantity: 01
Size: (H)1925mm x (W)2432mm
4 panels casement louvered window with
timber frame
W4 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2417mm
4 panels casement louvered window with
timber frame
W5 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2437mm
Semi transparent louvered window with aluminum frame
W6 Location: Documents storage room
Quantity: 01
Size: (H)1305mm x (W)1837mm
Semi transparent louvered window with aluminum frame
W7 Location: Documents storage room
Quantity: 01
Size: (H)1305mm x (W)1831mm
Semi transparent louvered window with aluminum frame
W8 Location: Documents storage room & Office C
Quantity: 04
Size: (H)1305mm x (W)1934.6mm
Top hung window with powder coated black aluminum frame
W9 Location: Male & female washroom
Quantity: 02
Size: (H)410mm x (W)1800mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
2405.0
2405.0
1925.0
1010.0
2405.0
582.0 571.0 578.0 573.0
1153.0 1151.0
1925.0
1735.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
90.0100.0
F.F.L
1010.01925.0
590.0
550.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.01725.0100.0
40.0
F.F.L
590.0
1925.0
590.0585.0
585.0
1925.0
1925.0
585.0
545.0
1010.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
1735.0100.090.0
40.0
F.F.L
1010.0
2436.0
590.0 576.0 595.0 570.0
1925.0
1166.0 1165.0
1725.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.0100.0
35.0
F.F.L
2436.0
2436.0
1925.0
2418.0
1925.0
2418.0
1010.0
2418.0
585.0 573.0 587.0 575.0
1925.0
1158.0 1162.0
1725.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
100.0100.0
35.0
F.F.L
1010.0
2446.0
583.0 572.0 607.0 577.0
1155.0 1184.0
1925.0
1721.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
104.0100.0
39.0
F.F.L
2446.0
2446.0
1925.0
1836.9
1237.0
1836.9
980.0
1828.0
1237.0
544.0 543.0 543.0
20mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
123.0145.0EQEQEQEQEQEQEQ
20.0 31.0 31.0 20.0
F.F.L
980.01237.0
1825.0
543.0 541.0 543.0
23mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
145.0EQEQEQEQEQEQEQ123.0
20.0 31.0 31.0 20.0
F.F.L
1825.0
1825.0
1237.0
600.0
410.0
1237.0
600.0
2569.0410.0
600.0
15mm thick steel frame
to manuf's details
322.030.0
530.0
steel alloy adj. friction stay
4mm thick glass panel
to manuf's details
F.F.L
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Top hung window with powder coated black
aluminum frame
W10 Location: Male & female washroom
Quantity: 04
Size: (H)410mm x (W)600mm
ELEVATION
PLAN
ISO VIEW
W11
ELEVATION
PLAN
ISO VIEW
Semi transparent louvered window with
aluminum frame
Location: Office area B
Quantity: 01
Size: (H)1237mm x (W)1825mm
ELEVATION
PLAN
ISO VIEW
W12
Semi transparent louvered window with
aluminum frame
Location: Office area B
Quantity: 01
Size: (H)1937mm x (W)1828mm
4 panels casement louvered window with
timber frame
W13 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2446mm
4 panels casement louvered window with
timber frame
W14 Location: Open office area
Quantity: 01
Size: (H)1925mm x (W)2418mm
Semi transparent louvered window with aluminum frame
W15 Location: Documents storage room
Quantity: 01
Size: (H)1925mm x (W)2436mm
Single swing casement louvered window with timber frame
W16 Location: Main entrance to the admin office
Quantity: 01
Size: (H)1925mm x (W)585mm
Single swing casement louvered window with timber frame
W17 Location: Open Office A
Quantity: 01
Size: (H)1925mm x (W)590mm
W18 Location: Open office area A
Quantity: 01
Size: (H)1925mm x (W)2405mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
ISO VIEW
PLAN PLAN
4 panels casement louvered window with
timber frame
PLAN
PLANPLANPLAN
ISO VIEW
1064.0
1222.0
1829.0
1161.0
576.0 585.0
1635.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
34.0
110.084.0
F.F.L
1222.0
1222.0
1829.0
2410.0
1829.0
2410.0
1064.0
1160.0 1157.0
587.0 573.0 587.0 570.0
2410.0
50mm timber framing with
pink paint finish
single hung louvered
window with timber frame
to manuf's details
23mm thick timber panel
window hinge to
manuf's details
1829.0
1624.085.0120.0
32.0
F.F.L
1064.01830.0
2443.0
1174.0 1174.0
587.0 587.0 587.0 587.0
512.01318.0
35.0
37.0
4mm black tinted thick
glass panel to manuf's
details
37mm thick aluminum
F.F.L
2443.0
2443.0
1830.0
1011.01086.0
2376.0
1138.0 1138.0 25.0
1034.027.0
4mm thick glass panel
to manuf's details
25mm thick aluminum frame to
manuf's details
frame to manuf's details
F.F.L
2376.0
2376.0
1086.0
1188.0
1086.0
1011.01086.0
1188.0
1144.0
1012.022.0
22.0
4mm thick glass panel
to manuf's details
25mm thick aluminum frame to
manuf's details
F.F.L
1188.1 2748.9
661.11123.0
633.9 629.0 629.0
43.0 43.0 46.0
2748.9
13mm thick steel frame
to manuf's details
12mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
132.5EQEQEQEQEQEQ119.5
626.0
12.015.0
F.F.L
2748.9
1123.0
1945.0
2669.0
1215.0715.1
667.3 667.3 667.3 667.3
307.1
23.5
15mm thick aluminum
frame to manuf's details
4mm black tinted thick glass
panel to manuf's details
fastener with security locks
4mm black tinted thick glass
panel to manuf's details
25mm thick aluminum frame to
manuf's details
F.F.L
2669.0
2669.0
1945.0
1160.0
2800.0
611.0 611.0 611.0 623.0
50.0 50.0 50.0
50.0
50.0
1381.9
15mm thick steel frame
to manuf's details
10mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
140.0EQEQEQEQEQEQ140.0
F.F.L
2800.0
1160.0
2800.0
1203.0
576.0 576.0 576.0 576.0
45.0 45.0 45.0
1437.3
2785.0
16mm thick steel frame
to manuf's details
16mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
142.0EQEQEQEQEQEQ121.0
45.0 45.0
F.F.L
2785.0
2785.0
1203.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Double swing casement louvered window
with timber frame
W19 Location: Open Office A
Quantity: 01
Size: (H)1829mm x (W)1222mm
ELEVATION
PLAN
ISO VIEW
W20
ELEVATION
PLAN
ISO VIEW
Location: Open office area A & Manager office A
Quantity: 01
Size: (H)1829mm x (W)2410mm
ELEVATION
PLAN
ISO VIEW
W21
Aluminum framed casement window with four black tinted glass
panels and fixed windows on top
Location: Manager Office A
Quantity: 01
Size: (H)1830mm x (W)2443mm
Fixed glass with aluminum frame
W22 Location: Manager office A
Quantity: 01
Size: (H)1086mm x (W)2376mm
Fixed glass with aluminum frame
W23 Location: Manager office B
Quantity: 01
Size: (H)1086mm x (W)2418mm
Clear glass louvered window with aluminum frame
W24 Location: Utility room A
Quantity: 14
Size: (H)1123mm x (W)2748.9mm
Aluminum framed casement window with four black tinted
glass panels and fixed windows on top
W25 Location: Linked bridge to the toilet tower
Quantity: 02
Size: (H)1945mm x (W)2669mm
Semi transparent louvered window with aluminum frame
W26 Location: Utility room C & Pantry room
Quantity: 02
Size: (H)1160mm x (W)2800mm
W27 Location: Utility room C & Pantry room
Quantity: 02
Size: (H)1203mm x (W)2785mm
ELEVATION
ELEVATION ELEVATION
ELEVATION ELEVATION
ELEVATION
ISO VIEW
ISO VIEW ISO VIEW
ISO VIEW
ISO VIEW
PLAN PLAN PLAN
PLANPLANPLAN
ISO VIEW
4 panels casement louvered window with
timber frame
Semi transparent louvered window with aluminum frame
3741.9686.0
2825.0
920.0 890.0 900.0
35.0 25.0 25.0 30.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
1198.0
1086.0
1198.0
1086.0
1198.0
1154.0
1166.0
22.0
22mm thick aluminum
frame to manuf's details
4mm thick glass panel
to manuf's details
F.F.L
2010.0
1245.0
2010.0
667.61245.0
2010.0
608.0 596.0 606.0
50.0
50.0
50.0 50.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQ142.0
F.F.L
663.81245.0
2014.1
608.0 606.0 606.0
50.0 50.0 50.0
44.2
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQ142.0
F.F.L
2014.1
1245.0
2014.1
667.61245.0
2020.0
608.0 606.0 606.0
50.0
50.0
50.0 50.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
151.0EQEQEQEQEQEQEQ142.0
F.F.L
2020.0
2020.0
1245.0
2825.0
2825.0
686.0
3741.9686.0
2820.0
920.0 890.0 900.0
30.0 25.0 25.0 30.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
2820.0
2820.0
686.0
3742.1690.2
2845.0
920.0 890.0 900.0
30.0 25.0 25.0 55.0
10mm thick louvered blade
holder to manuf's details
glass panel
F.F.L
2845.0
2845.0
690.2
2335.12058.0
2781.3
486.8 503.0 503.0 503.0 525.5
45.0 45.0 45.0 45.0 25.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
135.0EQEQEQEQEQEQEQEQEQ135.0
1500.0
493.050.0
25.0
F.F.L
2781.3
2781.3
2058.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Clear glass louvered window with aluminum
frame
W28 Location: Utility room B
Quantity: 01
Size: (H)1245mm x (W)2014.1mm
ELEVATION
PLAN
ISO VIEW
W29
ELEVATION
PLAN
ISO VIEW
Location: Utility room B
Quantity: 01
Size: (H)1245mm x (W)2020mm
ELEVATION
PLAN
ISO VIEW
W30 Location: Utility room A
Quantity: 01
Size: (H)1245mm x (W)2010mm
Fixed glass with aluminum frame
W31 Location: Manager office C
Quantity: 01
Size: (H)1086mm x (W)2376mm
Fixed glass with aluminum frame
W32 Location: Utility room A&B
Quantity: 02
Size: (H)686mm x (W)2825mm
ELEVATION
ELEVATION
ISO VIEW
PLAN
PLAN
Clear glass louvered window with aluminum
frame
Clear glass louvered window with aluminum
frame
ISO VIEW
Fixed glass with aluminum frame
W33 Location: Utility room A&B
Quantity: 10
Size: (H)1086mm x (W)2820mm
ELEVATION
PLAN
ISO VIEW
ELEVATION
PLAN
ISO VIEW
Fixed glass with aluminum frame
W34 Location: Utility room A&B
Quantity: 02
Size: (H)690.2mm x (W)2845mm
Fixed glass with aluminum frame
W35 Location: Utility room A&B
Quantity: 01
Size: (H)2058mm x (W)2781.3mm
ELEVATION
PLAN
2335.12058.0
2828.9
525.5 503.0 503.0 503.0 525.5
45.043.9 45.0 45.0 45.0 45.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
1515.0493.050.0
135.0EQEQEQEQEQEQEQEQEQ135.0
F.F.L
2828.9
2828.9
2058.0
3420.0
495.0 520.0 520.0 520.0 520.0 495.0
50.0 50.0 50.0 50.0 50.0 50.0
2043.0
15mm thick steel frame
to manuf's details
15mm thick louvered blade
holder to manuf's details
10mm thick steel structure
to manuf's details
glass panel
1485.0493.0
50.0
F.F.L
2335.1
3420.0
3420.0
2043.0
DRAWING NO.:
SHEET NO.:
E / 01
2017 / ARC1215 / MLNKEDAH
PROJECT TITLE :
ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING
MUZIUM NEGERI KEDAH,
LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK
PERINGGI, 05150 ALOR SETAR,
KEDAH, MALAYSIA.
DRAWING TITLE :
- WINDOW SCHEDULE
STARTING DATE
COMPLETED DATE
DRAWN BY
CHECKED BY
MEASURED BY
RECORD BY
SCALE
FACILITATOR
REMARK:
MR. MOHD ADIB
21.01.2017
03.03.2017
1:20
LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869)
LOO YEE PEI (0329 148)
-
-
Fixed glass with aluminum frame
W36 Location: Office area
Quantity: 01
Size: (H)686mm x (W)2825mm
ELEVATION
PLAN
ISO VIEW
Fixed glass with aluminum frame
W37 Location: Office area
Quantity: 01
Size: (H)686mm x (W)2825mm
ELEVATION
PLAN
ISO VIEW

More Related Content

Viewers also liked

Planeacion camino a la escuela (1)
Planeacion   camino a la escuela (1)Planeacion   camino a la escuela (1)
Planeacion camino a la escuela (1)
leslymh
 

Viewers also liked (18)

Old State Museum of Kedah MoD Report
Old State Museum of Kedah MoD ReportOld State Museum of Kedah MoD Report
Old State Museum of Kedah MoD Report
 
data recovery
data recoverydata recovery
data recovery
 
Mi gran noche
Mi gran nocheMi gran noche
Mi gran noche
 
Buscando enfermos
Buscando enfermosBuscando enfermos
Buscando enfermos
 
Generación de energia
Generación de energiaGeneración de energia
Generación de energia
 
A Study on Cloud and Fog Computing Security Issues and Solutions
A Study on Cloud and Fog Computing Security Issues and SolutionsA Study on Cloud and Fog Computing Security Issues and Solutions
A Study on Cloud and Fog Computing Security Issues and Solutions
 
Maakunta ja sote-uudistus Uudenmaan maakunta Timo Aronkytö
Maakunta  ja sote-uudistus  Uudenmaan maakunta Timo AronkytöMaakunta  ja sote-uudistus  Uudenmaan maakunta Timo Aronkytö
Maakunta ja sote-uudistus Uudenmaan maakunta Timo Aronkytö
 
Photobook Old Museum Measured Drawing
Photobook Old Museum Measured DrawingPhotobook Old Museum Measured Drawing
Photobook Old Museum Measured Drawing
 
Opportunity presentation branded v3r
Opportunity presentation branded v3rOpportunity presentation branded v3r
Opportunity presentation branded v3r
 
También la lluvia esp
También la lluvia esp   También la lluvia esp
También la lluvia esp
 
МО вчителів І ступеня
МО вчителів І ступеняМО вчителів І ступеня
МО вчителів І ступеня
 
CvC Resume
CvC ResumeCvC Resume
CvC Resume
 
Form Analytics & Optimization
Form Analytics & OptimizationForm Analytics & Optimization
Form Analytics & Optimization
 
Having a Happy St Patrick’s Day Made Easy
Having a Happy St Patrick’s Day Made EasyHaving a Happy St Patrick’s Day Made Easy
Having a Happy St Patrick’s Day Made Easy
 
Lmcp1522 pembangunan mapan dalam islam
Lmcp1522 pembangunan mapan dalam islamLmcp1522 pembangunan mapan dalam islam
Lmcp1522 pembangunan mapan dalam islam
 
El misterio de la felicidad
El misterio de la felicidadEl misterio de la felicidad
El misterio de la felicidad
 
Հանում
ՀանումՀանում
Հանում
 
Planeacion camino a la escuela (1)
Planeacion   camino a la escuela (1)Planeacion   camino a la escuela (1)
Planeacion camino a la escuela (1)
 

Similar to Complete Drawings of Old State Museum of Kedah (9)

Measure Drawing Old state museum kedah
Measure Drawing Old state museum kedahMeasure Drawing Old state museum kedah
Measure Drawing Old state museum kedah
 
HOTEL 101 Presentation
HOTEL 101 PresentationHOTEL 101 Presentation
HOTEL 101 Presentation
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
final presentation.pdf
final presentation.pdffinal presentation.pdf
final presentation.pdf
 
1401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.01401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.0
 
Rod Fletcher - personal skills details0001
Rod Fletcher - personal skills details0001Rod Fletcher - personal skills details0001
Rod Fletcher - personal skills details0001
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri Drawings
 
Antisismica ing.civil
Antisismica ing.civilAntisismica ing.civil
Antisismica ing.civil
 

Recently uploaded

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 

Recently uploaded (20)

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 

Complete Drawings of Old State Museum of Kedah

  • 1. FALL43° FALL28° FALL29° FALL43° FALL28° FALL29° FALL28° FALL28° FALL60° FALL60° W34 01 W33 05 W33 04 W33 03 W33 02 W33 01 W32 01 W34 02 W33 06 W33 07 W33 08 W33 09 W33 10 W32 02 W37 01 W36 01 W35 01 B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 A 08 CLERESTORY PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/08 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - CLERESTORY PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 2. DN 155 DN10 B C A OFFICE AREA B F.F.L. ± 3.620m W24 01 W24 02W24W24 W24 11 W24 W24 13 W24 W24 04 W8 02 W26 W27 02 W27 W25 02 01 DN 155 DN10 C3 C2 C1 C C2 C1 A D C4 C5 E UTILITY ROOM A F.F.L. ± 3.465m UTILITY ROOM B F.F.L. ± 3.465m PANTRY F.F.L. ± 3.610m MANAGER OFFICE C F.F.L. ± 3.620m UTILITY ROOM C F.F.L. ± 3.610m 08 W24W24 03 W24 04 W24 050607 W24 09 10 12 14 W26 01 01 W25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 03 W8 01 W30 01 W29 01 W31 01 D16 02 D18 01 D20 01 D17 01 D19 W28 01 D22 04 01 D15 01 D14 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Glass louvered window with timber framing to manuf's details Double swing timber casement door to manuf's details Glass louvered window with timber framing to manuf's details300mm (W) timber flooring 115mm (Radius) timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with aluminum steel framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase Double swing timber casement door to manuf's details Double swing timber casement door to manuf's details 100mm thick partition wall to manuf's details Double swing casement window with aluminum frame to manuf's details D21 03 B C3 C5 E D C4 DN199 NON-ACCESSIBLE NON-ACCESSIBLE A 06 FIRST FLOOR PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/06 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - FIRST FLOOR PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 3. DN 155 DN10 B C A OFFICE AREA B F.F.L. ± 3.620m W24 01 W24 02W24W24 W24 11 W24 W24 13 W24 W24 04 W8 02 W26 W27 02 W27 W25 02 01 DN 155 DN10 C3 C2 C1 C C2 C1 A D C4 C5 E UTILITY ROOM A F.F.L. ± 3.465m UTILITY ROOM B F.F.L. ± 3.465m PANTRY F.F.L. ± 3.610m MANAGER OFFICE C F.F.L. ± 3.620m UTILITY ROOM C F.F.L. ± 3.610m 08 W24W24 03 W24 04 W24 050607 W24 09 10 12 14 W26 01 01 W25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 03 W8 01 W30 01 W29 01 W31 01 D16 02 D18 01 D20 01 D17 01 D19 W28 01 D22 04 01 D15 01 D14 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Glass louvered window with timber framing to manuf's details Double swing timber casement door to manuf's details Glass louvered window with timber framing to manuf's details300mm (W) timber flooring 115mm (Radius) timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with aluminum steel framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase Double swing timber casement door to manuf's details Double swing timber casement door to manuf's details 100mm thick partition wall to manuf's details Double swing casement window with aluminum frame to manuf's details D21 03 B C3 C5 E D C4 DN199 NON-ACCESSIBLE NON-ACCESSIBLE A 10 FIRST FLOOR REFLECTIVE CEILING PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/10 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - FIRST FLOOR REFLECTIVE CEILING PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 4. 02 DN10DN10 DN75 UP75 OPEN OFFICE AREA A F.F.L. ± 0.230m MANAGER OFFICE B F.F.L. ± 0.230m VERANDAH WAY F.F.L. ± 0.155m MANAGER OFFICE A F.F.L. ± 0.230m OFFICE AREA A F.F.L. ± 0.230m DOCUMENTS STORAGE ROOM F.F.L. ± 0.230m FEMALE WASHROOM F.F.L. ± 0.165m MALE WASHROOM F.F.L. ± 0.165m STORAGE ROOM F.F.L. ± 0.155m W12 01 W13 01 W14 02 W15 01 W18 01 W21 01 W20 01 W1 01 W2 01 W3 01 W4 01 W5 01 W6 01 W7 01 W8 01 W8 02 W19 01 D1 01 VERANDAH WAY F.F.L. ± 0.155m 01 D7 D3 02 D2 01 D6 01 D5 04 D5 03 D4 D4 01 1 2 3 5 4 6 7 8 10 9 11 12 13 14 15 17 16 18 19 20 21 22 23 24 2 1 3 4 5 6 8 7 9 11 10 12 13 14 W9 01 W10 01 W10 02 W10 03 W10 04 W9 02 W11 01 W22 01 W23 01 D10 01 D12 01 D11 03 D13 02 D9 01 D8 01 W16 01 W17 01 Double swing timber casement window to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Double swing casement louvered window with timber framing to manuf's details Glass louvered window with timber framing to manuf's details Double swing casement louvered window with timber framing to manuf's details Single swing casement louver window with timber framing to manuf's details 150mm brick wall with plastering on both side Ø115MM timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with timber framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase 100mm thick partition wall to manuf's details B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 UP 170 UP 170 A 05 GROUND FLOOR PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/05 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - GROUND FLOOR PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 5. 02 DN10DN10 DN75 UP75 OPEN OFFICE AREA A F.F.L. ± 0.230m MANAGER OFFICE B F.F.L. ± 0.230m VERANDAH WAY F.F.L. ± 0.155m MANAGER OFFICE A F.F.L. ± 0.230m OFFICE AREA A F.F.L. ± 0.230m DOCUMENTS STORAGE ROOM F.F.L. ± 0.230m FEMALE WASHROOM F.F.L. ± 0.165m MALE WASHROOM F.F.L. ± 0.165m STORAGE ROOM F.F.L. ± 0.155m W12 01 W13 01 W14 02 W15 01 W18 01 W21 01 W20 01 W1 01 W2 01 W3 01 W4 01W5 01 W6 01 W7 01 W8 01 W8 02 W19 01 D1 01 VERANDAH WAY F.F.L. ± 0.155m 01 D7 D3 02 D2 01 D6 01 D5 04 D5 03 D4 D4 01 1 2 3 5 4 6 7 8 10 9 11 12 13 14 15 17 16 18 19 20 21 22 23 24 2 1 3 4 5 6 8 7 9 11 10 12 13 14 W9 01 W10 01 W10 02 W10 03 W10 04 W9 02 W11 01 W22 01 W23 01 D10 01 D12 01 D11 03 D13 02 D9 01 D8 01 W16 01 W17 01 Double swing timber casement window to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Double swing casement louvered window with timber framing to manuf's details Glass louvered window with timber framing to manuf's details Double swing casement louvered window with timber framing to manuf's details Single swing casement louver window with timber framing to manuf's details 150mm brick wall with plastering on both side Ø115MM timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with timber framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase 100mm thick partition wall to manuf's details B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 UP 170 UP 170 A 09 GROUND FLOOR REFLECTIVE CEILING PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/09 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - GROUND FLOOR REFLECTIVE CEILING PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 6. VOID VOID B 03 SOUTH ELEVATION SCALE: 1:50 NORTH ELEVATIONB 04 SCALE: 1:50 DRAWING NO.: SHEET NO.: B/03 2017 / ARC1215 / MLNKEDAH B/04 PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - NORTH ELEVATION - SOUTH ELEVATION STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR MR. MOHD ADIB REMARK: 21.01.2017 26.02.2017 1:50 BENJAMIN TAN.Z.H (0324 857) , VINCENTIA MUTIARA.K (0303 496) , NIK AHMAD MUNAWWAR (0325 167) LOO YEE PEI (0329 148) BENJAMIN T.Z.H , VNCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469) BENJAMIN T.Z.H , VINCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469) 00 50 100 N LEGEND G.F.L - Ground Floor Level F.F.L - First Floor level G.F.C.L - Ground Floor Ceiling Level F.F.C.L - First Floor Ceiling Level C.L - Ceiling Level R.L - Roof Level
  • 7. VOID VOID VOID VOID B 01 EAST ELEVATION SCALE: 1:50 WEST ELEVATIONB 02 SCALE: 1:50 DRAWING NO.: SHEET NO.: B/01 2017 / ARC1215 / MLNKEDAH B/02 PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - EAST ELEVATION - WEST ELEVATION STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 26.02.2017 1:50 LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) , NIK AHMAD MUNAWWAR (0325 167) LOO YEE PEI (0329 148) LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) LEGEND G.F.L - Ground Floor Level F.F.L - First Floor level G.F.C.L - Ground Floor Ceiling Level F.F.C.L - First Floor Ceiling Level C.L - Ceiling Level R.L - Roof Level
  • 8. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 FALL60° FALL43° FALL28° FALL43° FALL28° FALL29°FALL29° FALL28° FALL28° FALL60° B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 A 07 Roof Plan SCALE: 1:50 DRAWING NO.: SHEET NO.: A/07 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - ROOF PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636) NIK AHMAD MUNAWWAR (0325 167) , MR.MOHD ADIB
  • 9. CLERESTORY PLANFALL43° FALL28° FALL29° FALL43° FALL28° FALL29° FALL28° FALL28° FALL60° FALL60° W34 01 W33 05 W33 04 W33 03 W33 02 W33 01 W32 01 W34 02 W33 06 W33 07 W33 08 W33 09 W33 10 W32 02 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 W37 01 W36 01 W35 01 B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 A 08 CLERESTORY PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/08 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - CLERESTORY PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 10. 1510.0 701.1 45.0 693.9 35.035.0 720.0 720.0 2749.0 2144.0560.0 45.069.0325.0325.0325.0520.0215.0 60.0 170.0 door hinge to manuf's details 35mm thick timber window frame to manuf's details 4mm thick fixed glass panel to manuf's details door lock to manuf's details door knob to manuf's details door hinge to manuf's details fixed louvered window to manuf's details 69mm thick timber door frame to manuf's details DN 75 1510.0 2144.0605.0 1510.0 965.0 2047.0 DN 10 965.0 2047.0 30.0 965.0 30.0905.0 door hinge to manuf's details 30mm thick timber door frame to manuf's details door knob to manuf's details 30.0 905.0 30.0 965.0 2047.0 30.0 door knob to manuf's details 30mm thick timber door frame to manuf's details door hinge to manuf's details DN 10 965.0 965.0 2047.0 890.0 2097.0 890.0 50.0 790.0 50.0 890.0 2097.0 50mm thick timber door frame to manuf's details door knob to manuf's details door hinge to manuf's details 890.0 50.0 790.0 50.0 2097.0 door knob to manuf's details 50mm thick timber door frame to manuf's details door hinge to manuf's details 890.0 890.0 2097.0 1830.0 1633.0 1830.0 25.0 915.0 865.0 25.0 1830.0 1633.0 25mm thick steel door frame to manuf's details door lock to manuf's detail UP 75 1280.0 40.0 560.0 560.0 60.0 1280.0 730.0 465.02870.0 238.7370.0370.0370.0370.0232.0 65.065.065.0 560.094.0 door hinge to manuf's details 4mm thick fixed glass panel to manuf's details 4mm thick fixed glass panel to manuf's details 100mm thick timber window frame to manuf's details 50mm thick timber door frame to manuf's details door lock to manuf's detail door knob to manuf's detail 1280.0 724.0 2145.7 935.0 2118.3 935.0 24.9 885.1 25.0 935.0 777.0 112.51905.8 2118.3 door knob to manuf's detail 25mm thick alum. door frame to manuf's details fixed glass panel to manuf's detail door hinge to manuf's detail 22.0 851.0 22.0 719.0 895.0 75.0936.0914.075.0 2097.0 door knob to manuf's detail door hinge to manuf's detail fixed glass panel to manuf's detail 22mm thick alum. door frame to manuf's details 895.0 895.0 2097.0 790.0 2127.0 790.0 45.0 700.0 45.0 790.0 2082.0 2127.0 door knob to manuf's detail door hinge to manuf's detail 45mm thick timber door frame to manuf's details 56.0 845.0 56.0 957.0 2068.0 2124.0 door knob to manuf's detail door hinge to manuf's detail 45mm thick timber door frame to manuf's details 957.0 957.0 2124.0 957.0 2124.0 56.0 845.0 56.0 957.0 2068.0 2124.0 door knob to manuf's detail door hinge to manuf's detail 56mm thick timber door frame to manuf's details 957.0 957.0 2124.0 957.0 56.0 845.0 56.0 2121.7 2065.7 957.0 door knob to manuf's detail door hinge to manuf's detail 56mm thick timber door frame to manuf's details 48.0 2470.0 45.0 2563.0 25.0135.0 1420.0690.0 10mm thick steel structure to manuf's details 45mm thick timber door frame to manuf's details door lock to manuf's detail 2160.0 2563.0 2563.0 2160.0 DRAWING NO.: SHEET NO.: E / 02 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - DOOR SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 02.03.2017 1:20 LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857) LOO YEE PEI (0329 148) - - Timber framed and glass paneled door with fixed glass on top D1 Location: Corridor A Quantity: 01 Size: (H)2749mm x (W)1510mm Timber / Wooden door with timber frame D2 Location: Male washroom Quantity: 01 Size: (H)2047mm x (W)965mm Timber / Wooden door with timber frame D3 Location: Female washroom Quantity: 01 Size: (H)2047mm x (W)965mm Plastic door with timber frame D4 Location: Male washroom Quantity: 02 Size: (H)2097mm x (W)890mm Plastic door with timber frame D5 Location: Female Washroom Quantity: 02 Size: (H)2097mm x (W)890mm Steel door with aluminum steel frame D6 Location: Storage room Quantity: 01 Size: (H)1633mm x (W)1830mm D7 Location: Main entrance to admin office Quantity: 01 Size: (H)2870mm x (W)1280mm Timber framed and glass paneled door with fixed glass on top Glass door with aluminum frame D8 Location: Manager office A Quantity: 01 Size: (H)2118.3mm x (W)935mm Glass door with aluminum frame D9 Location: Manager office B Quantity: 01 Size: (H)2097mm x (W)895mm Timber door with timber frame D10 Location: Open office Area Quantity: 01 Size: (H)2127mm x (W)790mm Timber door with timber frame D11 Location: Office Area B Quantity: 01 Size: (H)2124mm x (W)957mm D12 Location: Documents storage room Quantity: 01 Size: (H)2124mm x (W)957mm Timber door with timber frame D13 Location: Office area B Quantity: 01 Size: (H)2121.7mm x (W)957mm Timber door with timber frame D14 Location: Main entrance to the old museum Quantity: 01 Size: (H)2160mm x (W)2563mm Steel sliding door with timber frame ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
  • 11. 2563.0 821.0 821.0 821.0 50.0 2563.0 50.02010.050.0 2160.0 door lock to manuf's detail black tinted fixed glass door panel to manuf's detail 50mm thick alum. door frame to manuf's details 2563.0 2160.0 1000.0 2097.0 50.0 900.0 50.0 1000.0 2072.0 2097.0 door knob to manuf's detail door hinge to manuf's detail 50mm thick timber frame to manuf's details 1000.0 1829.2 30.3 899.7 869.2 30.0 1829.2 30.02280.0 2350.0 door knob to manuf's detail door lock to manuf's detail 30mm thick timber door frame to manuf's details door hinge to manuf's details door lock to manuf's details 1829.2 2350.0 1829.2 2350.0 1291.0 40.0 758.0 453.0 40.0 1211.0 1291.0 239.0370.0370.0370.0370.0204.3 2118.3 2158.3 door hinge to manuf's details 40mm thick timber door frame to manuf's details door lock to manuf's detail 1291.0 2158.3 1215.0 2660.0 45.0 540.5 539.5 45.0 1215.0 593.01415.0575.0 2051.0 2660.0 door hinge to manuf's details fixed louvered window to manuf's details 45mm thick timber window frame to manuf's details 4mm thick fixed glass panel with wire mesh protection to manuf's details door lock to manuf's detail door lock to manuf's detail 30mm thick timber door frame to manuf's details 1215.0 965.0 2110.0 DN 10 965.0 30.0 905.0 30.0 965.0 2070.0 2110.0 door knob to manuf's detail door hinge to manuf's detail 30mm thick timber frame to manuf's details 29.7 905.0 30.0 965.0 2070.0 2110.0 door knob to manuf's detail door hinge to manuf's detail 30mm thick timber frame to manuf's details DN 10 965.0 965.0 2110.0 1829.2 30.0 869.2 899.7 30.3 1768.9 1829.2 30.02280.0 2350.0 door knob to manuf's detail door lock to manuf's detail 30.3mm thick timber door frame to manuf's details door hinge to manuf's details door lock to manuf's details DRAWING NO.: SHEET NO.: E / 02 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - DOOR SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 02.03.2017 1:20 LOO YEE PEI (0329 148) , BENJAMIN TAN ZI HERN (0324 857) LOO YEE PEI (0329 148) - - Glass sliding door with aluminum frame D15 Location: Main entrance to the old museum Quantity: 01 Size: (H)2160mm x (W)2563mm ELEVATION PLAN ISO VIEW ELEVATION PLAN ISO VIEW Glass sliding door with aluminum frame D16 Location: Manager office C Quantity: 01 Size: (H)2097mm x (W)1000mm ELEVATION PLAN ISO VIEW Timber door with timber frame D17 Location: Utility room A Quantity: 01 Size: (H)2350mm x (W)1829.2mm Timber door with timber frame D18 Location: Utility room B Quantity: 01 Size: (H)2350mm x (W)1829.2mm Timber door with timber frame D19 Location: Utility room A Quantity: 01 Size: (H)2158.3mm x (W)1291mm ISO VIEW ELEVATION PLAN ELEVATION PLAN ISO VIEW ELEVATION PLAN ISO VIEW Timber door with timber frame D20 Location: Linked bridge to the toilet tower Quantity: 01 Size: (H)2660mm x (W)1215mm ELEVATION PLAN ISO VIEW Timber door with timber frame D21 Location: Utility room C Quantity: 01 Size: (H)2110mm x (W)965mm Timber door with timber frame D22 Location: Pantry room Quantity: 01 Size: (H)2110mm x (W)965mm ELEVATION PLAN ISO VIEW
  • 12. VOID VOID F.F.L (Toilet Tower) G.F.L R.L R.L C.L F.F.C.L (Toilet Tower) R.L G.F.C.L F.F.L EGKLMNP J H F D C B AQ 02 W8 01 W8 01 W10 02 W10 03 W10 04 W10 02 W27 01 W27 03 W8 04 W801 W28 01 D06 VOID VOID KA C D E F G H J L M N P Q F.F.L (Toilet Tower) G.F.L R.L R.L C.L F.F.C.L (Toilet Tower) R.L G.F.C.L F.F.L B W21 01 W20 01 W19 01 W37 01 W36 01 W35 01 W30 01 W29 01 D14 01 B 01 EAST ELEVATION SCALE: 1:50 WEST ELEVATIONB 02 SCALE: 1:50 DRAWING NO.: SHEET NO.: B/01 2017 / ARC1215 / MLNKEDAH B/02 PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - EAST ELEVATION - WEST ELEVATION STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 26.02.2017 1:50 LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) , NIK AHMAD MUNAWWAR (0325 167) LOO YEE PEI (0329 148) LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) LOO YEE PEI (0329 148) , SHUM LI SZE (0322 822) LEGEND G.F.L - Ground Floor Level F.F.L - First Floor level G.F.C.L - Ground Floor Ceiling Level F.F.C.L - First Floor Ceiling Level C.L - Ceiling Level R.L - Roof Level
  • 13. 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 DN 155 DN10 B C A OFFICE AREA B F.F.L. ± 3.620m W24 01 W24 02W24W24 W24 11 W24 W24 13 W24 W24 04 W8 02 W26 W27 02 W27 W25 02 01 DN 155 DN10 C3 C2 C1 C C2 C1 A D C4 C5 E UTILITY ROOM A F.F.L. ± 3.465m UTILITY ROOM B F.F.L. ± 3.465m PANTRY F.F.L. ± 3.610m MANAGER OFFICE C F.F.L. ± 3.620m UTILITY ROOM C F.F.L. ± 3.610m 08 W24W24 03 W24 04 W24 050607 W24 09 10 12 14 W26 01 01 W25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 03 W8 01 W30 01 W29 01 W31 01 D16 02 D18 01 D20 01 D17 01 D19 W28 01 D22 04 01 D15 01 D14 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Glass louvered window with timber framing to manuf's details Double swing timber casement door to manuf's details Glass louvered window with timber framing to manuf's details300mm (W) timber flooring 115mm (Radius) timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with aluminum steel framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase Double swing timber casement door to manuf's details Double swing timber casement door to manuf's details 100mm thick partition wall to manuf's details Double swing casement window with aluminum frame to manuf's details D21 03 B C3 C5 E D C4 DN199 NON-ACCESSIBLE NON-ACCESSIBLE A 06 FIRST FLOOR PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/06 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - FIRST FLOOR PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 14. 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 DN 155 DN10 B C A OFFICE AREA B F.F.L. ± 3.620m W24 01 W24 02W24W24 W24 11 W24 W24 13 W24 W24 04 W8 02 W26 W27 02 W27 W25 02 01 DN 155 DN10 C3 C2 C1 C C2 C1 A D C4 C5 E UTILITY ROOM A F.F.L. ± 3.465m UTILITY ROOM B F.F.L. ± 3.465m PANTRY F.F.L. ± 3.610m MANAGER OFFICE C F.F.L. ± 3.620m UTILITY ROOM C F.F.L. ± 3.610m 08 W24W24 03 W24 04 W24 050607 W24 09 10 12 14 W26 01 01 W25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 03 W8 01 W30 01 W29 01 W31 01 D16 02 D18 01 D20 01 D17 01 D19 W28 01 D22 04 01 D15 01 D14 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Glass louvered window with timber framing to manuf's details Double swing timber casement door to manuf's details Glass louvered window with timber framing to manuf's details300mm (W) timber flooring 115mm (Radius) timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with aluminum steel framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase Double swing timber casement door to manuf's details Double swing timber casement door to manuf's details 100mm thick partition wall to manuf's details Double swing casement window with aluminum frame to manuf's details D21 03 B C3 C5 E D C4 DN199 NON-ACCESSIBLE NON-ACCESSIBLE A 10 FIRST FLOOR REFLECTIVE CEILING PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/10 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - FIRST FLOOR REFLECTIVE CEILING PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 15. 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 02 DN10DN10 DN75 UP75 OPEN OFFICE AREA A F.F.L. ± 0.230m MANAGER OFFICE B F.F.L. ± 0.230m VERANDAH WAY F.F.L. ± 0.155m MANAGER OFFICE A F.F.L. ± 0.230m OFFICE AREA A F.F.L. ± 0.230m DOCUMENTS STORAGE ROOM F.F.L. ± 0.230m FEMALE WASHROOM F.F.L. ± 0.165m MALE WASHROOM F.F.L. ± 0.165m STORAGE ROOM F.F.L. ± 0.155m W12 01 W13 01 W14 02 W15 01 W18 01 W21 01 W20 01 W1 01 W2 01 W3 01 W4 01 W5 01 W6 01 W7 01 W8 01 W8 02 W19 01 D1 01 VERANDAH WAY F.F.L. ± 0.155m 01 D7 D3 02 D2 01 D6 01 D5 04 D5 03 D4 D4 01 1 2 3 5 4 6 7 8 10 9 11 12 13 14 15 17 16 18 19 20 21 22 23 24 2 1 3 4 5 6 8 7 9 11 10 12 13 14 W9 01 W10 01 W10 02 W10 03 W10 04 W9 02 W11 01 W22 01 W23 01 D10 01 D12 01 D11 03 D13 02 D9 01 D8 01 W16 01 W17 01 Double swing timber casement window to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Double swing casement louvered window with timber framing to manuf's details Glass louvered window with timber framing to manuf's details Double swing casement louvered window with timber framing to manuf's details Single swing casement louver window with timber framing to manuf's details 150mm brick wall with plastering on both side Ø115MM timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with timber framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase 100mm thick partition wall to manuf's details B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 UP 170 UP 170 A 05 GROUND FLOOR PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/05 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - GROUND FLOOR PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 16. GROUND FLOOR REFLECTIVE CEILING PLAN 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 02 DN10DN10 DN75 UP75 OPEN OFFICE AREA A F.F.L. ± 0.230m MANAGER OFFICE B F.F.L. ± 0.230m VERANDAH WAY F.F.L. ± 0.155m MANAGER OFFICE A F.F.L. ± 0.230m OFFICE AREA A F.F.L. ± 0.230m DOCUMENTS STORAGE ROOM F.F.L. ± 0.230m FEMALE WASHROOM F.F.L. ± 0.165m MALE WASHROOM F.F.L. ± 0.165m STORAGE ROOM F.F.L. ± 0.155m W12 01 W13 01 W14 02 W15 01 W18 01 W21 01 W20 01 W1 01 W2 01 W3 01 W4 01W5 01 W6 01 W7 01 W8 01 W8 02 W19 01 D1 01 VERANDAH WAY F.F.L. ± 0.155m 01 D7 D3 02 D2 01 D6 01 D5 04 D5 03 D4 D4 01 1 2 3 5 4 6 7 8 10 9 11 12 13 14 15 17 16 18 19 20 21 22 23 24 2 1 3 4 5 6 8 7 9 11 10 12 13 14 W9 01 W10 01 W10 02 W10 03 W10 04 W9 02 W11 01 W22 01 W23 01 D10 01 D12 01 D11 03 D13 02 D9 01 D8 01 W16 01 W17 01 Double swing timber casement window to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Ø115MM timber column to eng's details Double swing casement louvered window with timber framing to manuf's details Glass louvered window with timber framing to manuf's details Double swing casement louvered window with timber framing to manuf's details Single swing casement louver window with timber framing to manuf's details 150mm brick wall with plastering on both side Ø115MM timber column to eng's details Single swing timber casement door to manuf's details 150mm brick wall with plastering on both side 225mm x 225mm timber columns to eng's details Glass louvered window with timber framing to manuf's details 250mm(tread) x 170mm(riser) concrete staircase 100mm thick partition wall to manuf's details B C A C3 C2 C1 C C2 C1 A D C4 C5 E B C3 C5 E D C4 UP 170 UP 170 A 09 GROUND FLOOR REFLECTIVE CEILING PLAN SCALE: 1:50 DRAWING NO.: SHEET NO.: A/09 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - GROUND FLOOR REFLECTIVE CEILING PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 17. 460mm x 460mm x 120mm r.c column Ø206.4mm r.c column Ø114.6mm timber column 460.0 460.0 120.0 4419.6909.0 50mm thk. timber panel to engr. details 30mm thk. timber panel to engr. details semi transparent louvered window with aluminum frame 210.0EQEQ 50.050.0 650.0 2789.03410.42717.8 EQEQ210.0 650.0 1465.32717.81206.4 50.050.0 2538.6 1006.1 2538.6 1006.1 2529.3 1002.4 2538.6 1006.1 2538.6 1006.1 2553.8 1006.1 1829.0 1183.4 460.0 460.0 R114.6 R206.4 2815.8 1157.9 747.9 2815.8 1158.2 750.0 1565.3 535.0 2371.0 403.6 464.6 2815.8 303.7 409.4 492.4 2020.0 740.0 810.0 1750.0 540.0 2047.0 100.0100.0 2815.9 768.0 4865.0 43° 2298.5 DRAWING NO.: SHEET NO.: E / 05 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - COLUMN AND ORNAMENTS DETAILS STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 AS SHOWN LOO YEE PEI, CHONG WEN BIN, CHONG JIA YI, CHANG MAY CHEN, WEE SUE WEN, CHIA KEH CHIAN, NIK AHMAD MUNAWWAR, CHLOE TEH.SHU ERN, SHUM LI SZE LOO YEE PEI (0329 148) - - EXPLODED ISOMETRIC VIEWE 05 SCALE: 1:25 ORNAMENTATION ELEVATION (EAST ELEVATION)E 05 SCALE: 1:20 ORNAMENTATION ELEVATION (NORTH & SOUTH ELEVATION)E 05 SCALE: 1:20 INTERIOR ORNAMENTATIONE 05 SCALE: 1:20 WINDOW ORNAMENTATIONE 05 SCALE: 1:10 COLUMN TOP VIEWE 05 SCALE: 1:10 EXTERIOR ORNAMENTATION AE 05 SCALE: 1:20 EXPLODED ISOMETRIC VIEWE 05 SCALE: 1:10 EXTERIOR ORNAMENTATION BE 05 SCALE: 1:20 EXTERIOR ORNAMENTATION BE 05 SCALE: 1:20 ROOF ORNAMENTATIONE 05 SCALE: 1:25 EXPLODED ROOF ORNAMENTATIONE 05 SCALE: 1:25
  • 18. Detail B Detail A ridge tiles ridge board collar tie 100mm thick post 70mm thick rafter 50mm x 50mm thick batten clay roof tiles to manuf's detail rafter 50mm x 50mm thick batten clay roof tiles to manus'f detail metal connector rafter tie ceiling joist beam fascia board DRAWING NO.: SHEET NO.: E / 04 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - ROOF DETAILS STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 04.03.2017 AS SHOWN LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633) , TEO KUO CHIEN (0320 195) LOO YEE PEI (0329 148) - - Roof Exploded Isometric View AE 04 SCALE: 1:75 Roof Exploded Isometric View BE 04 SCALE: 1:50 Roof Exploded Isometric View CE 04 SCALE: 1:25 DETAIL AE 04 SCALE: 1:10 DETAIL BE 04 SCALE: 1:10
  • 19. 1 17 16 14 13 12 11 10 9 8 6 5 2 7 15 3 D CEFGH BJ KLMNQ P A 4 C C2 C1 A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 FALL60° FALL43° FALL28° FALL43° FALL28° FALL29°FALL29° FALL28° FALL28° FALL60° B C A C3 C2 C1 D C4 C5 E B C3 C5 E D C4 A 07 Roof Plan SCALE: 1:50 DRAWING NO.: SHEET NO.: A/07 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - ROOF PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORDED BY SCALE FACILITATOR REMARK: 00 50 100 N MR. MOHD ADIB 21.01.2017 04.03.2017 1:50 LOW CHI YIN (0329 149) LOW CHI YIN (0329 149) LOW CHI YIN (0329 149), CHONG WEN BIN (0327 442), CHONG JIA YI (0320 869) , WEE SUE WEN (0322 633), CHIA KEH CHIAN (0322 063), CHANG MAY CHEN (0322 636)
  • 20. PERLIS SINTOK UUM LANGKAWI ISLAND THAILAND PERAK BUKIT KAYU HITAM JITRAGUNUNG KERIANG KEPALA BATAS PERLIS POKOK SENA NAKA PEDA LAKE MUDA LAKE GUBIR GULAU PENDANG GUAR CHEMPEDAK SIK BALING SUNGAI PETANI BETTERWORTH GEORGETOWN KULIM BANDAR BAHARU YAN GURUN KUALA PERLIS ALOR SETAR GUNUNG JERAL PENANG Kedah River Jalan Tambang Badak LorongLiku LorongPeringgi Jalan Kelompang muidatSnalaJ JalanTunkuHalim Jalan W aja 5 LorongTitiSiam siloPtabajePubI hadeKnejnitnoK etatShadeK muesuM namAluraD muidatS Kedah OldMuseum namaT akedreM Lorong Sena LorongSukaramai Jalan Kolam Renang LebuhrayaDarulAman LebuhrayaDarulAman LebuhrayaDarulAman Jalan Stadium JalanStadium JalanStadium iregeNBDIC hadeK Jalan Mahkota JalanTunkuAbdullah Taman Tunku Habsah Jalan Tunku Abdul Halim VOID VOID 1 5 4 3 2 C3C3 C1 C C1 C4 LLAF BB C2 C A C2 A D C4 E C5 D C5 E FALL FALL FALL LLAF FALLLLAF FALL FALL FALL 1 4 3 2 MAIN ROAD MAJOR TOWN INTERNATIONAL BORDER NORTH-SOUTH EXPRESSWAY LEGEND STATE BORDER MOUNTAIN RIVER A 01 KEY PLAN SCALE: NOT TO SCALE DRAWING NO.: SHEET NO.: A/01 2017 / ARC1215 / MLNKEDAH A/02 PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - KEY PLAN - LOCATION PLAN - SITE PLAN STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 02.03.2017 AS SHOWN A/03 A 02 LOCATION PLAN SCALE: NOT TO SCALE Measured Drawing A 04 SITE SECTION SCALE: 1:200 A 04 SITE PLAN SCALE: 1:200 Site N 00 200 400 A/04 CHONG WEN BIN (0327 442) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636 ) , WEE SUE WEN (0322 633) , CHIA KEH CHIAN (0322 063) , LOW CHI YIN (0329 149)
  • 21. VOID F.F.L (Toilet Tower) G.F.L R.L R.L C.L F.F.C.L (Toilet Tower) R.L G.F.C.L F.F.L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 01 W7 01 W6 01 W5 01 W4 01 W3 01 W2 01 W1 W9 01 01 W24 02 W24 03 W24 04 W24 05 W24 06 W24 07 W24 01 W23 01 W26 01 W34 05 W33 04 W33 03 W33 02 W33 01 W33 01 W32 VOID F.F.L (Toilet Tower) G.F.L R.L R.L C.L F.F.C.L (Toilet Tower) R.L G.F.C.L F.F.L 16 15 14 13 12 11 10 9 8 7 5 4 23 16 01 W18 01 W15 W14 01 W13 01 W12 01 W11 01 W9 02 14 W24 13 W24 12 W24 11 W24 10 W24 09 W24 08 W24 02 W32 10 W33 09 W33 08 W33 07 W33 06 W33 02 W34 02 W25 02 W26 01 W16 01 W17 01 D07 B 03 SOUTH ELEVATION SCALE: 1:50 NORTH ELEVATIONB 04 SCALE: 1:50 DRAWING NO.: SHEET NO.: B/03 2017 / ARC1215 / MLNKEDAH B/04 PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - NORTH ELEVATION - SOUTH ELEVATION STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR MR. MOHD ADIB REMARK: 21.01.2017 26.02.2017 1:50 BENJAMIN TAN.Z.H (0324 857) , VINCENTIA MUTIARA.K (0303 496) , NIK AHMAD MUNAWWAR (0325 167) LOO YEE PEI (0329 148) BENJAMIN T.Z.H , VNCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469) BENJAMIN T.Z.H , VINCENTIA.M.K , MUHAMMAD ZAIM B. AZMI (0325 930) , LOONG BO LIN (0321 469) 00 50 100 N LEGEND G.F.L - Ground Floor Level F.F.L - First Floor level G.F.C.L - Ground Floor Ceiling Level F.F.C.L - First Floor Ceiling Level C.L - Ceiling Level R.L - Roof Level
  • 22. MANAGER OFFICE B F.F.L. ± 0.230m W18 01 W21 01 W20 01 W1 01 W19 01 1 2 3 5 4 6 7 8 9 13 14 15 17 16 18 19 20 21 22 23 24 2 1 3 4 5 6 8 7 9 13 14 W22 01 OPEN OFFICE AREA UPUP 9470.4 2730.4 258.0 148.0 2006.0 1490.0 2183.4 3370.03370.0 01 W24 MANAGER OFFICE C F.F.L. ± 3.620mW24 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 01 W30 01 W29 01 W31 01 W10 LIVING AREA DN DN Detail B 1568.8 2006.0 1070.0484.0 250.0 150.0 3193.8 2149.5 298.7 Detail A 10mm x 10mm ceramic tiles r.c concrete steel ornaments structure timber railing r.c concrete 577.1386.6102.2 DRAWING NO.: SHEET NO.: E / 03 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - STAIRCASE DETAILS STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 AS SHOWN LOO YEE PEI (0329 148) , CHONG JIA YI (0320 869) , CHANG MAY CHEN (0322 636) LOO YEE PEI (0329 148) - - STAIRCASE ISOMETRIC VIEWE 03 SCALE: 1:25 GROUND FLOOR PLANE 03 SCALE: 1:50 FIRST FLOOR PLANE 03 SCALE: 1:50 Staircase sectionE 03 SCALE: 1:25 E 03 SCALE: 1:5 Detail A E 03 SCALE: 1:10 Detail BE 03 SCALE: 1:10 Railing Detail
  • 23. 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 915.01925.0 100.01735.090.0 586.0 596.0 583.0 580.0 30.0 1182.0 1163.0 F.F.L 2434.0 0.4342 2434.0 1925.0 2427.0 1925.0 2427.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 587.0 581.0 584.0 583.0 30.0 32.0 1168.0 1167.0 2427.0 90.01735.0100.0 1925.0915.0 F.F.L 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 36.0 585.0 583.0 585.0 585.0 29.0 1168.0 1170.0 2432.0 915.01925.0 100.01735.090.0 F.F.L 2432.0 2432.0 1925.0 2417.0 1925.0 2417.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 37.0 626.0 545.5 586.0 561.0 30.0 1171.5 1147.0 2417.0 100.01735.090.0 1925.0915.0 F.F.L 37.0 583.0 582.0 582.0 583.0 35.0 1165.0 1165.0 2437.0 90.01735.0100.0 915.01925.0 F.F.L 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 2437.0 2437.0 1925.0 1837.0 1305.0 1837.0 1020.01305.0 133.0133.0EQEQEQEQEQEQEQ 545.0 572.0 545.0 1837.0 32.0 32.0 35.0 F.F.L 23mm thick steel frame to manuf's details 12mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 23mm thick steel frame to manuf's details 12mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 545.0 572.0 545.0 32.0 32.0 29.0 1831.0 133.0133.0EQEQEQEQEQEQEQ 1020.01305.0 F.F.L 1831.0 1305.0 1831.0 1934.6 2054.6 60.0 1831.0 1305.0 1061.31305.0 EQ12.0EQEQEQEQEQEQEQ145.0 567.0 604.9 571.9 1934.6 23mm thick steel frame to manuf's details 12mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel F.F.L 410.0 1800.0 2414.0 15mm thick steel frame to manuf's details 15.0570.0570.0570.0 322.020.030.0 steel alloy adj. friction stay fastener with security locks F.F.L 1800.0 410.0 1800.0 DRAWING NO.: SHEET NO.: E / 01 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - WINDOW SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 1:20 LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869) LOO YEE PEI (0329 148) - - 4 panels casement louvered window with timber frame W1 Location: Manager office A Quantity: 01 Size: (H)1925mm x (W)2434mm ELEVATION PLAN ISO VIEW W2 ELEVATION PLAN ISO VIEW 4 panels casement louvered window with timber frame Location: Manager office A-B Quantity: 01 Size: (H)1925mm x (W)2427mm ELEVATION PLAN ISO VIEW W3 4 panels casement louvered window with timber frame Location: Manager office B Quantity: 01 Size: (H)1925mm x (W)2432mm 4 panels casement louvered window with timber frame W4 Location: Open office area Quantity: 01 Size: (H)1925mm x (W)2417mm 4 panels casement louvered window with timber frame W5 Location: Open office area Quantity: 01 Size: (H)1925mm x (W)2437mm Semi transparent louvered window with aluminum frame W6 Location: Documents storage room Quantity: 01 Size: (H)1305mm x (W)1837mm Semi transparent louvered window with aluminum frame W7 Location: Documents storage room Quantity: 01 Size: (H)1305mm x (W)1831mm Semi transparent louvered window with aluminum frame W8 Location: Documents storage room & Office C Quantity: 04 Size: (H)1305mm x (W)1934.6mm Top hung window with powder coated black aluminum frame W9 Location: Male & female washroom Quantity: 02 Size: (H)410mm x (W)1800mm ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW
  • 24. 2405.0 2405.0 1925.0 1010.0 2405.0 582.0 571.0 578.0 573.0 1153.0 1151.0 1925.0 1735.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 90.0100.0 F.F.L 1010.01925.0 590.0 550.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 100.01725.0100.0 40.0 F.F.L 590.0 1925.0 590.0585.0 585.0 1925.0 1925.0 585.0 545.0 1010.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 1735.0100.090.0 40.0 F.F.L 1010.0 2436.0 590.0 576.0 595.0 570.0 1925.0 1166.0 1165.0 1725.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 100.0100.0 35.0 F.F.L 2436.0 2436.0 1925.0 2418.0 1925.0 2418.0 1010.0 2418.0 585.0 573.0 587.0 575.0 1925.0 1158.0 1162.0 1725.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 100.0100.0 35.0 F.F.L 1010.0 2446.0 583.0 572.0 607.0 577.0 1155.0 1184.0 1925.0 1721.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 104.0100.0 39.0 F.F.L 2446.0 2446.0 1925.0 1836.9 1237.0 1836.9 980.0 1828.0 1237.0 544.0 543.0 543.0 20mm thick steel frame to manuf's details 16mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 123.0145.0EQEQEQEQEQEQEQ 20.0 31.0 31.0 20.0 F.F.L 980.01237.0 1825.0 543.0 541.0 543.0 23mm thick steel frame to manuf's details 16mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 145.0EQEQEQEQEQEQEQ123.0 20.0 31.0 31.0 20.0 F.F.L 1825.0 1825.0 1237.0 600.0 410.0 1237.0 600.0 2569.0410.0 600.0 15mm thick steel frame to manuf's details 322.030.0 530.0 steel alloy adj. friction stay 4mm thick glass panel to manuf's details F.F.L DRAWING NO.: SHEET NO.: E / 01 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - WINDOW SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 1:20 LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869) LOO YEE PEI (0329 148) - - Top hung window with powder coated black aluminum frame W10 Location: Male & female washroom Quantity: 04 Size: (H)410mm x (W)600mm ELEVATION PLAN ISO VIEW W11 ELEVATION PLAN ISO VIEW Semi transparent louvered window with aluminum frame Location: Office area B Quantity: 01 Size: (H)1237mm x (W)1825mm ELEVATION PLAN ISO VIEW W12 Semi transparent louvered window with aluminum frame Location: Office area B Quantity: 01 Size: (H)1937mm x (W)1828mm 4 panels casement louvered window with timber frame W13 Location: Open office area Quantity: 01 Size: (H)1925mm x (W)2446mm 4 panels casement louvered window with timber frame W14 Location: Open office area Quantity: 01 Size: (H)1925mm x (W)2418mm Semi transparent louvered window with aluminum frame W15 Location: Documents storage room Quantity: 01 Size: (H)1925mm x (W)2436mm Single swing casement louvered window with timber frame W16 Location: Main entrance to the admin office Quantity: 01 Size: (H)1925mm x (W)585mm Single swing casement louvered window with timber frame W17 Location: Open Office A Quantity: 01 Size: (H)1925mm x (W)590mm W18 Location: Open office area A Quantity: 01 Size: (H)1925mm x (W)2405mm ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW PLAN PLAN 4 panels casement louvered window with timber frame PLAN PLANPLANPLAN ISO VIEW
  • 25. 1064.0 1222.0 1829.0 1161.0 576.0 585.0 1635.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 34.0 110.084.0 F.F.L 1222.0 1222.0 1829.0 2410.0 1829.0 2410.0 1064.0 1160.0 1157.0 587.0 573.0 587.0 570.0 2410.0 50mm timber framing with pink paint finish single hung louvered window with timber frame to manuf's details 23mm thick timber panel window hinge to manuf's details 1829.0 1624.085.0120.0 32.0 F.F.L 1064.01830.0 2443.0 1174.0 1174.0 587.0 587.0 587.0 587.0 512.01318.0 35.0 37.0 4mm black tinted thick glass panel to manuf's details 37mm thick aluminum F.F.L 2443.0 2443.0 1830.0 1011.01086.0 2376.0 1138.0 1138.0 25.0 1034.027.0 4mm thick glass panel to manuf's details 25mm thick aluminum frame to manuf's details frame to manuf's details F.F.L 2376.0 2376.0 1086.0 1188.0 1086.0 1011.01086.0 1188.0 1144.0 1012.022.0 22.0 4mm thick glass panel to manuf's details 25mm thick aluminum frame to manuf's details F.F.L 1188.1 2748.9 661.11123.0 633.9 629.0 629.0 43.0 43.0 46.0 2748.9 13mm thick steel frame to manuf's details 12mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 132.5EQEQEQEQEQEQ119.5 626.0 12.015.0 F.F.L 2748.9 1123.0 1945.0 2669.0 1215.0715.1 667.3 667.3 667.3 667.3 307.1 23.5 15mm thick aluminum frame to manuf's details 4mm black tinted thick glass panel to manuf's details fastener with security locks 4mm black tinted thick glass panel to manuf's details 25mm thick aluminum frame to manuf's details F.F.L 2669.0 2669.0 1945.0 1160.0 2800.0 611.0 611.0 611.0 623.0 50.0 50.0 50.0 50.0 50.0 1381.9 15mm thick steel frame to manuf's details 10mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 140.0EQEQEQEQEQEQ140.0 F.F.L 2800.0 1160.0 2800.0 1203.0 576.0 576.0 576.0 576.0 45.0 45.0 45.0 1437.3 2785.0 16mm thick steel frame to manuf's details 16mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 142.0EQEQEQEQEQEQ121.0 45.0 45.0 F.F.L 2785.0 2785.0 1203.0 DRAWING NO.: SHEET NO.: E / 01 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - WINDOW SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 1:20 LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869) LOO YEE PEI (0329 148) - - Double swing casement louvered window with timber frame W19 Location: Open Office A Quantity: 01 Size: (H)1829mm x (W)1222mm ELEVATION PLAN ISO VIEW W20 ELEVATION PLAN ISO VIEW Location: Open office area A & Manager office A Quantity: 01 Size: (H)1829mm x (W)2410mm ELEVATION PLAN ISO VIEW W21 Aluminum framed casement window with four black tinted glass panels and fixed windows on top Location: Manager Office A Quantity: 01 Size: (H)1830mm x (W)2443mm Fixed glass with aluminum frame W22 Location: Manager office A Quantity: 01 Size: (H)1086mm x (W)2376mm Fixed glass with aluminum frame W23 Location: Manager office B Quantity: 01 Size: (H)1086mm x (W)2418mm Clear glass louvered window with aluminum frame W24 Location: Utility room A Quantity: 14 Size: (H)1123mm x (W)2748.9mm Aluminum framed casement window with four black tinted glass panels and fixed windows on top W25 Location: Linked bridge to the toilet tower Quantity: 02 Size: (H)1945mm x (W)2669mm Semi transparent louvered window with aluminum frame W26 Location: Utility room C & Pantry room Quantity: 02 Size: (H)1160mm x (W)2800mm W27 Location: Utility room C & Pantry room Quantity: 02 Size: (H)1203mm x (W)2785mm ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ISO VIEW ISO VIEW ISO VIEW ISO VIEW ISO VIEW PLAN PLAN PLAN PLANPLANPLAN ISO VIEW 4 panels casement louvered window with timber frame Semi transparent louvered window with aluminum frame
  • 26. 3741.9686.0 2825.0 920.0 890.0 900.0 35.0 25.0 25.0 30.0 10mm thick louvered blade holder to manuf's details glass panel F.F.L 1198.0 1086.0 1198.0 1086.0 1198.0 1154.0 1166.0 22.0 22mm thick aluminum frame to manuf's details 4mm thick glass panel to manuf's details F.F.L 2010.0 1245.0 2010.0 667.61245.0 2010.0 608.0 596.0 606.0 50.0 50.0 50.0 50.0 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 151.0EQEQEQEQEQEQ142.0 F.F.L 663.81245.0 2014.1 608.0 606.0 606.0 50.0 50.0 50.0 44.2 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 151.0EQEQEQEQEQEQ142.0 F.F.L 2014.1 1245.0 2014.1 667.61245.0 2020.0 608.0 606.0 606.0 50.0 50.0 50.0 50.0 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 151.0EQEQEQEQEQEQEQ142.0 F.F.L 2020.0 2020.0 1245.0 2825.0 2825.0 686.0 3741.9686.0 2820.0 920.0 890.0 900.0 30.0 25.0 25.0 30.0 10mm thick louvered blade holder to manuf's details glass panel F.F.L 2820.0 2820.0 686.0 3742.1690.2 2845.0 920.0 890.0 900.0 30.0 25.0 25.0 55.0 10mm thick louvered blade holder to manuf's details glass panel F.F.L 2845.0 2845.0 690.2 2335.12058.0 2781.3 486.8 503.0 503.0 503.0 525.5 45.0 45.0 45.0 45.0 25.0 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 135.0EQEQEQEQEQEQEQEQEQ135.0 1500.0 493.050.0 25.0 F.F.L 2781.3 2781.3 2058.0 DRAWING NO.: SHEET NO.: E / 01 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - WINDOW SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 1:20 LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869) LOO YEE PEI (0329 148) - - Clear glass louvered window with aluminum frame W28 Location: Utility room B Quantity: 01 Size: (H)1245mm x (W)2014.1mm ELEVATION PLAN ISO VIEW W29 ELEVATION PLAN ISO VIEW Location: Utility room B Quantity: 01 Size: (H)1245mm x (W)2020mm ELEVATION PLAN ISO VIEW W30 Location: Utility room A Quantity: 01 Size: (H)1245mm x (W)2010mm Fixed glass with aluminum frame W31 Location: Manager office C Quantity: 01 Size: (H)1086mm x (W)2376mm Fixed glass with aluminum frame W32 Location: Utility room A&B Quantity: 02 Size: (H)686mm x (W)2825mm ELEVATION ELEVATION ISO VIEW PLAN PLAN Clear glass louvered window with aluminum frame Clear glass louvered window with aluminum frame ISO VIEW Fixed glass with aluminum frame W33 Location: Utility room A&B Quantity: 10 Size: (H)1086mm x (W)2820mm ELEVATION PLAN ISO VIEW ELEVATION PLAN ISO VIEW Fixed glass with aluminum frame W34 Location: Utility room A&B Quantity: 02 Size: (H)690.2mm x (W)2845mm Fixed glass with aluminum frame W35 Location: Utility room A&B Quantity: 01 Size: (H)2058mm x (W)2781.3mm ELEVATION PLAN
  • 27. 2335.12058.0 2828.9 525.5 503.0 503.0 503.0 525.5 45.043.9 45.0 45.0 45.0 45.0 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 1515.0493.050.0 135.0EQEQEQEQEQEQEQEQEQ135.0 F.F.L 2828.9 2828.9 2058.0 3420.0 495.0 520.0 520.0 520.0 520.0 495.0 50.0 50.0 50.0 50.0 50.0 50.0 2043.0 15mm thick steel frame to manuf's details 15mm thick louvered blade holder to manuf's details 10mm thick steel structure to manuf's details glass panel 1485.0493.0 50.0 F.F.L 2335.1 3420.0 3420.0 2043.0 DRAWING NO.: SHEET NO.: E / 01 2017 / ARC1215 / MLNKEDAH PROJECT TITLE : ARC 1215 / METHODS OF DOCUMENTATION AND MEASURED DRAWING MUZIUM NEGERI KEDAH, LEBUHRAYA DARUL AMAN, KAMPUNG LUBOK PERINGGI, 05150 ALOR SETAR, KEDAH, MALAYSIA. DRAWING TITLE : - WINDOW SCHEDULE STARTING DATE COMPLETED DATE DRAWN BY CHECKED BY MEASURED BY RECORD BY SCALE FACILITATOR REMARK: MR. MOHD ADIB 21.01.2017 03.03.2017 1:20 LOO YEE PEI (0329 148) , CHONG WEN BIN (0327 442), CHANG MAY CHEN (0322 636) , CHONG JIA YI (0320 869) LOO YEE PEI (0329 148) - - Fixed glass with aluminum frame W36 Location: Office area Quantity: 01 Size: (H)686mm x (W)2825mm ELEVATION PLAN ISO VIEW Fixed glass with aluminum frame W37 Location: Office area Quantity: 01 Size: (H)686mm x (W)2825mm ELEVATION PLAN ISO VIEW