SlideShare a Scribd company logo
MANUELITO MINERALS S.A
IOCG MINING PROJECT
Location
 Location: Punitaqui
 From Santiago (RM): 480km
 From Smelter ENAMI DELTA
(IV Region): 100km
 From Coquimbo (nearest harbor):
170kms
 From Smelter Enami Paipote (III
region): 490kms
Mineral Resources. September 2012
 Drill Hole Database
 27000m of drilling (DDH & RC)
 +60kms of geophysics
 Detailed geochemistry, mapping and sampling (from certified
labs)
 Geological Interpretation and 3D Geological
Model
 Integration of the Structural Geology –
Complex Fault System
 Domain Definition
 Technical report compliant to NI 43-101
Mineral Resources
 Drill Hole Database
Mineral Resources
 Integration of the Structural Geology
Mineral Resources
 Domaining
Mineral Resources
 Block Modeling
Conclusions
 The Manuelito Minerals property represents a reasonable copper-iron-silver project. Exploration
drilling to date has defined a mineralized copper-iron-silver zone at Manuelito’s main target Dos
Amigos and also in an area of approximately 4500 hectares extending through a vertical
elevation of 900 meters. The deposit remains open at depth and along the NS long axis of the
mineralized trend. The boundaries of the Dos Amigos (main target) have been only partially
defined and possibility to increase the mineral resource remains open especially with the
primary target La Porrita.
 Infill drilling in Dos Amigos and La Porrita could help the project to become a world
class deposit with a potential of 200-250 million tons.
 The Dos Amigos deposit is estimated to host a measured, indicated and inferred Mineral
Resources of 67 million tones averaging 0.53% TCu, 9.2% Fe and 1.4 g/t Ag at 0.3% TCu
cutoff.
 The change of the mineral resources is explained by the combination of upgrading of a large
portion of Inferred resource and definitions of additional resources due to an improved
geological and structural interpretation.
 The variography produced using data from MANSA’ drill holes, show good continuity down the
hole and limited continuity across and perpendicular to the strike and it is mainly due to the
need of infill drilling. Ordinary kriging was used to interpolate total copper, soluble copper, iron,
vanadium, and silver grades in blocks of 5 x 5 x 5 meters
Mining potential of new targets of Western belt
within the mining property of Manuelito Minerals
S. A.
 La Porrita (100+Mtons - @0.5+ TCu%)
 Dos Amigos (130+Mtons - @0.53 TCu%)
 South Zone (290+Mtons - @0.45 TCu%)
 Central Zone (160+Mtons - @0.45 TCu%)
Total mining potential of the Western mineralized
belt:
Oxide ore 20+Mtons 0.5%TCu
Sulphide ore 600+ Mtons 0.45% TCu
Cross section W-E over the Dos Amigos
mine
MANUELITO MINERALS S.A STRATEGIC PLAN 2012-
2014
Cross section N-S over the Dos Amigos
mine

More Related Content

Similar to Manuelito project, chile

MEP Proactive Investors March 2011
MEP Proactive Investors March 2011MEP Proactive Investors March 2011
MEP Proactive Investors March 2011
Minotaur Exploration
 
426_390_230115 furtherhighgradeassaysatredhill
426_390_230115 furtherhighgradeassaysatredhill426_390_230115 furtherhighgradeassaysatredhill
426_390_230115 furtherhighgradeassaysatredhill
Dr Paul Millsteed
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12
nabarnes
 

Similar to Manuelito project, chile (20)

Resource Estimation and Exploration target generation of Basantgarh Copper-Zi...
Resource Estimation and Exploration target generation of Basantgarh Copper-Zi...Resource Estimation and Exploration target generation of Basantgarh Copper-Zi...
Resource Estimation and Exploration target generation of Basantgarh Copper-Zi...
 
Bher dhingsara report
Bher dhingsara reportBher dhingsara report
Bher dhingsara report
 
The Future Copper Endowment in Peru
The Future Copper Endowment in Peru The Future Copper Endowment in Peru
The Future Copper Endowment in Peru
 
Corporate Profile
Corporate ProfileCorporate Profile
Corporate Profile
 
2015 Broken Hill Resources Investment Symposium - Geological Survey of New S...
2015 Broken Hill Resources Investment Symposium -  Geological Survey of New S...2015 Broken Hill Resources Investment Symposium -  Geological Survey of New S...
2015 Broken Hill Resources Investment Symposium - Geological Survey of New S...
 
Violin
ViolinViolin
Violin
 
Silvercorp ying-technical-report-master 23-feb_2017-final
Silvercorp ying-technical-report-master 23-feb_2017-finalSilvercorp ying-technical-report-master 23-feb_2017-final
Silvercorp ying-technical-report-master 23-feb_2017-final
 
December 2013 Quarterly Report
December 2013 Quarterly ReportDecember 2013 Quarterly Report
December 2013 Quarterly Report
 
MEG Luncheon Presentation
MEG Luncheon PresentationMEG Luncheon Presentation
MEG Luncheon Presentation
 
Imt nr.oct. 20.15 pecors probing and drilling update.gm
Imt nr.oct. 20.15 pecors  probing and drilling update.gmImt nr.oct. 20.15 pecors  probing and drilling update.gm
Imt nr.oct. 20.15 pecors probing and drilling update.gm
 
Cameroon: The New Destination for Mining
Cameroon: The New Destination for MiningCameroon: The New Destination for Mining
Cameroon: The New Destination for Mining
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
 
East Arunta Copper Drilling Results
East Arunta Copper Drilling ResultsEast Arunta Copper Drilling Results
East Arunta Copper Drilling Results
 
Seismic Reflection Surveys in Search for Iron Oxide Copper-Gold (IOCG) Deposits
Seismic Reflection Surveys in Search for Iron Oxide Copper-Gold (IOCG) DepositsSeismic Reflection Surveys in Search for Iron Oxide Copper-Gold (IOCG) Deposits
Seismic Reflection Surveys in Search for Iron Oxide Copper-Gold (IOCG) Deposits
 
MEP Proactive Investors March 2011
MEP Proactive Investors March 2011MEP Proactive Investors March 2011
MEP Proactive Investors March 2011
 
Gold mine myanmar 0830-0845 mitchell
Gold mine myanmar 0830-0845 mitchellGold mine myanmar 0830-0845 mitchell
Gold mine myanmar 0830-0845 mitchell
 
Janes project mines are made
Janes project mines are madeJanes project mines are made
Janes project mines are made
 
426_390_230115 furtherhighgradeassaysatredhill
426_390_230115 furtherhighgradeassaysatredhill426_390_230115 furtherhighgradeassaysatredhill
426_390_230115 furtherhighgradeassaysatredhill
 
Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12
 

Recently uploaded

Recently uploaded (20)

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
НАДІЯ ФЕДЮШКО БАЦ «Професійне зростання QA спеціаліста»
НАДІЯ ФЕДЮШКО БАЦ  «Професійне зростання QA спеціаліста»НАДІЯ ФЕДЮШКО БАЦ  «Професійне зростання QA спеціаліста»
НАДІЯ ФЕДЮШКО БАЦ «Професійне зростання QA спеціаліста»
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 

Manuelito project, chile

  • 2. Location  Location: Punitaqui  From Santiago (RM): 480km  From Smelter ENAMI DELTA (IV Region): 100km  From Coquimbo (nearest harbor): 170kms  From Smelter Enami Paipote (III region): 490kms
  • 3. Mineral Resources. September 2012  Drill Hole Database  27000m of drilling (DDH & RC)  +60kms of geophysics  Detailed geochemistry, mapping and sampling (from certified labs)  Geological Interpretation and 3D Geological Model  Integration of the Structural Geology – Complex Fault System  Domain Definition  Technical report compliant to NI 43-101
  • 5. Mineral Resources  Integration of the Structural Geology
  • 8. Conclusions  The Manuelito Minerals property represents a reasonable copper-iron-silver project. Exploration drilling to date has defined a mineralized copper-iron-silver zone at Manuelito’s main target Dos Amigos and also in an area of approximately 4500 hectares extending through a vertical elevation of 900 meters. The deposit remains open at depth and along the NS long axis of the mineralized trend. The boundaries of the Dos Amigos (main target) have been only partially defined and possibility to increase the mineral resource remains open especially with the primary target La Porrita.  Infill drilling in Dos Amigos and La Porrita could help the project to become a world class deposit with a potential of 200-250 million tons.  The Dos Amigos deposit is estimated to host a measured, indicated and inferred Mineral Resources of 67 million tones averaging 0.53% TCu, 9.2% Fe and 1.4 g/t Ag at 0.3% TCu cutoff.  The change of the mineral resources is explained by the combination of upgrading of a large portion of Inferred resource and definitions of additional resources due to an improved geological and structural interpretation.  The variography produced using data from MANSA’ drill holes, show good continuity down the hole and limited continuity across and perpendicular to the strike and it is mainly due to the need of infill drilling. Ordinary kriging was used to interpolate total copper, soluble copper, iron, vanadium, and silver grades in blocks of 5 x 5 x 5 meters
  • 9. Mining potential of new targets of Western belt within the mining property of Manuelito Minerals S. A.  La Porrita (100+Mtons - @0.5+ TCu%)  Dos Amigos (130+Mtons - @0.53 TCu%)  South Zone (290+Mtons - @0.45 TCu%)  Central Zone (160+Mtons - @0.45 TCu%) Total mining potential of the Western mineralized belt: Oxide ore 20+Mtons 0.5%TCu Sulphide ore 600+ Mtons 0.45% TCu
  • 10. Cross section W-E over the Dos Amigos mine MANUELITO MINERALS S.A STRATEGIC PLAN 2012- 2014
  • 11. Cross section N-S over the Dos Amigos mine