SlideShare a Scribd company logo
MELWIN SAMUEL.W
# 1254, 1st Cross Shankaracharya Road
Vidhyanagar, Hassan-573 201.
Mobile: +91 7411119788.
Email : melwin.samuel096@gmail.com.
Objective
Seeking an innovation and challenging career in a reputed organization, which allows professional
growth while working.
Education
 Piping Engineering form INDIAN INSTITUTE OF TECHNOLOGY (IIT) IN 2015, BOMBAY.
 PG-Diploma in process piping design and engineering from PETROCON INSTITUTE OF PIPING
ENGINEERING IN 2013.
 Hold BACHELOR OF ENGINEER [BE] in MECHANICAL with 59% aggregate from VISVESVARAYA
TECHNOLOGICAL UNIVERSITY IN 2012, BELGAUM ,KARNATAKA.
 12th
standard (PUC) with 45% of marks from ST Joseph’s composit PU College IN 2008, Hassan.
 10th
standard (SSLC) with 68% of marks from Sri Aravinda High School IN 2006, Hassan.
Achievements
 Three times participated in STATE LEVEL TABLE TENNIS tournament held at CHICKMAGALURU
AND BELLARY.
SOFTWARE PROFICIENCY
 PDMS (Plant design management system).
 Auto CAD.
Trainings Undergone
Process Piping Engineering as per ASME B31.3, with knowledge on the following
 Pipe sizes, Schedule No.
 Codes and Standards.
 Familiar with Piping Components, Fittings.
 Process Flow Diagrams, Utility Flow Diagrams, Piping and Instrumentation diagrams
 HAZOP study.
 Development of Plot Plan.
 Development of Piping Layout, Equipment Layout.
 GA Drawings, Isometric Drawings, GA to ISO conversion.
 Pipe Supports and its selection criteria.
 Pipe rack load calculation.
 Various types of piping like Compressor piping, Steam piping, Utility piping, Fire Fighting lines,
Vessel trims, Flare Piping, Cooler Piping, Column piping.
Personal Skills
 Ability to work individually and closely with others to accomplish assigned goals.
 Time punctuality, sincere and hard worker.
 Ability to learn and adapt to new techniques.
 Comprehensive problem solving abilities.
PROFESSIONAL EXPERIENCE
VERTEX PIPING ENGINEERS PVT LTD, Bangalore, KA. (Nov 2014 till date)
Designation : Piping Designer – Planning and Design department
Projects handled:
Mo 99: Supply, Installation, Testing & Commissioning of exempt low activity liquid water
collection and disposal system for Medical use of Fission based M099 production facility for
BRIT near BARC South Gate at Trombay, Mumbai.
 Prepared and modified As Built drawings.
ICTS FIRE FIGHTING: Supply, Installation, Testing & Commissioning of Fire fighting, Domestic
and Flushing water supply system for ICTS TIFR Campus, Bangalore.
 Prepared and modified As Built drawings.
HIGH PRESSURE HIGH TEMPARATURE – WATER CIRCULATION SYSTEM: Fabrication,
installation, commissioning and testing of high pressure high temperature closed loop water
circulation system for high heat flux test facility at Bhat, Gandhinagar, Gujarat
 Developed and prepared optimized equipment layouts from conceptual stage through the
conceptual study and FEED phases of project.
 Prepared and modified piping arrangement, pipe support location with reference of P&ID and
finalization by utilizing AutoCAD 2D and PDMS 3D software.
 Development of layout with cost efficient focus that minimizes installing plant operation
costs, whilst ensuring that constructability, operational, safety and maintenance requirements
with prior intension.
 Indicate Platform Elevation, ladder & staircase arrangement & hand railing.
 Discussing about plant layout issues with project manager, in a highly professional manner
and exchanged sound constructive ideas and advice.
 Prepared piping Isometric Drawing with individual BOM.
 Preparation and review of Line index and Equipment list.
 Maintaining production system records. Material take-off for individual isometrics for
particular process areas.
 Preparing and monitoring of fabrication sequencing as per codes and standards during
fabrication work, is performed in accordance with the approved construction procedure,
latest IFC drawings, specifications and correct materials.
 Fabrication and Erection of Structural steel.
 Installation of process for utility & process pipelines, erection of pressure vessels, receivers,
heat exchangers, pumps, heaters etc.
 Prepared and modified As Built piping arrangement.
 Performing the job according to fabrication drawings and project client specifications and also
after completion of fit up, arranging for QC inspectors and third party inspector according to
approved ITP.
 Sending feed backs to the line managers for maintaining the project schedule on time.
 Performing Hydro Testing & Pneumatic Testing for process and utility piping.
Worked with pre-commissioning activities.
FALCON TYRES LIMITED, Mysore, KA. (DUNLOP TYRES) (Nov 2013 till May 2014)
Designation : Senior management trainee – Production department
Production Engineer
 Analyzing the requirement of the different sized tyres in each shift.
 Reviewing the inventory left out by the previous shift.
 Ensuring the timely production of different size of treads and passing forward next to green
tyres building section as per requirement.
 Interacting with other sections like 4 roll calendar, tread extruder, bead winding, green tyres
building for proper flow of materials.
 Coordinating with planning, technical, quality & maintenance departments.
 Making final report of the output achieved in the particular shift and hand over of follow ups
to the relieving in-charge.
INDO CYLINDERSS, Bangalore, KA. (Sep 2012 till Oct 2013)
Designation : Trainee – Quality control and Production department
Quality Control and Production Engineer:
 Creation of visual work instruction, Process flow chart and Control Plan.
 Inspection of components as per drawing using UTM (Universal testing Machine) & standard
measuring instruments.
 Identify the non conformance, find the corrective action and measure their effectiveness root
cause analysis.
 Maintaining the records as per the ISO standards (9001-2008)
 Conducting NDT (Non Destructive Tests) like Hydrostatic test, Hydrostatic stretch test,
Pneumatic test, Paint thickness measurement, Torque inspection.
 Conducting DT (Destructive Tests) like Acceptance test, burst test.
 Preparation of test samples for Acceptance test, testing of samples in presence of BIS officer
and Clearance of test certificate.
 Formation of the required gang by allotment of man power.
 Scheduling for the gang job.
Personal details
 Date of birth : 09 December 1990
 Father’s name : William Francis S
 Nationality : Indian
 Languages known : English, Kannada, Hindi.
Declaration
I hereby solemnly declare and affirm that all statements made in this application are true and correct
to the best of my knowledge and belief.
Place: Bangalore, India. Yours Faithfully
Date: W Melwin Samuel

More Related Content

What's hot (20)

CV_1
CV_1CV_1
CV_1
 
RAJNISH_RANJAN-1 (1).PDF
RAJNISH_RANJAN-1 (1).PDFRAJNISH_RANJAN-1 (1).PDF
RAJNISH_RANJAN-1 (1).PDF
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
Resume
ResumeResume
Resume
 
Sandeep Suryavanshi CoverLetter and Resume
Sandeep Suryavanshi  CoverLetter and ResumeSandeep Suryavanshi  CoverLetter and Resume
Sandeep Suryavanshi CoverLetter and Resume
 
CV
CVCV
CV
 
Updated Resume 2015
Updated Resume 2015Updated Resume 2015
Updated Resume 2015
 
Mohd Imran CV
Mohd Imran CVMohd Imran CV
Mohd Imran CV
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Akbar Resume (1)
Akbar Resume (1)Akbar Resume (1)
Akbar Resume (1)
 
David Resume'
David Resume'David Resume'
David Resume'
 
Gopal senior Engineer
Gopal senior EngineerGopal senior Engineer
Gopal senior Engineer
 
resume (1)
resume (1)resume (1)
resume (1)
 
jsw resume
jsw resumejsw resume
jsw resume
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 
Abbott Resume
Abbott ResumeAbbott Resume
Abbott Resume
 
Martin-CV- M.Tech
Martin-CV- M.TechMartin-CV- M.Tech
Martin-CV- M.Tech
 
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
 

Similar to Cv melwin samuel w lt

Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
chirag patel
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMonikandan .B
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMANSaif kharal
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
Manoj R Mishra
 

Similar to Cv melwin samuel w lt (20)

Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume
ResumeResume
Resume
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - B
 
Piping Purushothaman.k Resume
Piping Purushothaman.k ResumePiping Purushothaman.k Resume
Piping Purushothaman.k Resume
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------
 
RESUME_Chelladurai
RESUME_ChelladuraiRESUME_Chelladurai
RESUME_Chelladurai
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
swapnil cv
swapnil cvswapnil cv
swapnil cv
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
updated cv of indrasen
updated cv of indrasenupdated cv of indrasen
updated cv of indrasen
 
Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016
 
Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 

Cv melwin samuel w lt

  • 1. MELWIN SAMUEL.W # 1254, 1st Cross Shankaracharya Road Vidhyanagar, Hassan-573 201. Mobile: +91 7411119788. Email : melwin.samuel096@gmail.com. Objective Seeking an innovation and challenging career in a reputed organization, which allows professional growth while working. Education  Piping Engineering form INDIAN INSTITUTE OF TECHNOLOGY (IIT) IN 2015, BOMBAY.  PG-Diploma in process piping design and engineering from PETROCON INSTITUTE OF PIPING ENGINEERING IN 2013.  Hold BACHELOR OF ENGINEER [BE] in MECHANICAL with 59% aggregate from VISVESVARAYA TECHNOLOGICAL UNIVERSITY IN 2012, BELGAUM ,KARNATAKA.  12th standard (PUC) with 45% of marks from ST Joseph’s composit PU College IN 2008, Hassan.  10th standard (SSLC) with 68% of marks from Sri Aravinda High School IN 2006, Hassan. Achievements  Three times participated in STATE LEVEL TABLE TENNIS tournament held at CHICKMAGALURU AND BELLARY. SOFTWARE PROFICIENCY  PDMS (Plant design management system).  Auto CAD. Trainings Undergone Process Piping Engineering as per ASME B31.3, with knowledge on the following  Pipe sizes, Schedule No.  Codes and Standards.  Familiar with Piping Components, Fittings.  Process Flow Diagrams, Utility Flow Diagrams, Piping and Instrumentation diagrams
  • 2.  HAZOP study.  Development of Plot Plan.  Development of Piping Layout, Equipment Layout.  GA Drawings, Isometric Drawings, GA to ISO conversion.  Pipe Supports and its selection criteria.  Pipe rack load calculation.  Various types of piping like Compressor piping, Steam piping, Utility piping, Fire Fighting lines, Vessel trims, Flare Piping, Cooler Piping, Column piping. Personal Skills  Ability to work individually and closely with others to accomplish assigned goals.  Time punctuality, sincere and hard worker.  Ability to learn and adapt to new techniques.  Comprehensive problem solving abilities. PROFESSIONAL EXPERIENCE VERTEX PIPING ENGINEERS PVT LTD, Bangalore, KA. (Nov 2014 till date) Designation : Piping Designer – Planning and Design department Projects handled: Mo 99: Supply, Installation, Testing & Commissioning of exempt low activity liquid water collection and disposal system for Medical use of Fission based M099 production facility for BRIT near BARC South Gate at Trombay, Mumbai.  Prepared and modified As Built drawings. ICTS FIRE FIGHTING: Supply, Installation, Testing & Commissioning of Fire fighting, Domestic and Flushing water supply system for ICTS TIFR Campus, Bangalore.  Prepared and modified As Built drawings. HIGH PRESSURE HIGH TEMPARATURE – WATER CIRCULATION SYSTEM: Fabrication, installation, commissioning and testing of high pressure high temperature closed loop water circulation system for high heat flux test facility at Bhat, Gandhinagar, Gujarat  Developed and prepared optimized equipment layouts from conceptual stage through the conceptual study and FEED phases of project.  Prepared and modified piping arrangement, pipe support location with reference of P&ID and finalization by utilizing AutoCAD 2D and PDMS 3D software.
  • 3.  Development of layout with cost efficient focus that minimizes installing plant operation costs, whilst ensuring that constructability, operational, safety and maintenance requirements with prior intension.  Indicate Platform Elevation, ladder & staircase arrangement & hand railing.  Discussing about plant layout issues with project manager, in a highly professional manner and exchanged sound constructive ideas and advice.  Prepared piping Isometric Drawing with individual BOM.  Preparation and review of Line index and Equipment list.  Maintaining production system records. Material take-off for individual isometrics for particular process areas.  Preparing and monitoring of fabrication sequencing as per codes and standards during fabrication work, is performed in accordance with the approved construction procedure, latest IFC drawings, specifications and correct materials.  Fabrication and Erection of Structural steel.  Installation of process for utility & process pipelines, erection of pressure vessels, receivers, heat exchangers, pumps, heaters etc.  Prepared and modified As Built piping arrangement.  Performing the job according to fabrication drawings and project client specifications and also after completion of fit up, arranging for QC inspectors and third party inspector according to approved ITP.  Sending feed backs to the line managers for maintaining the project schedule on time.  Performing Hydro Testing & Pneumatic Testing for process and utility piping. Worked with pre-commissioning activities. FALCON TYRES LIMITED, Mysore, KA. (DUNLOP TYRES) (Nov 2013 till May 2014) Designation : Senior management trainee – Production department Production Engineer  Analyzing the requirement of the different sized tyres in each shift.  Reviewing the inventory left out by the previous shift.  Ensuring the timely production of different size of treads and passing forward next to green tyres building section as per requirement.  Interacting with other sections like 4 roll calendar, tread extruder, bead winding, green tyres building for proper flow of materials.  Coordinating with planning, technical, quality & maintenance departments.  Making final report of the output achieved in the particular shift and hand over of follow ups to the relieving in-charge. INDO CYLINDERSS, Bangalore, KA. (Sep 2012 till Oct 2013) Designation : Trainee – Quality control and Production department Quality Control and Production Engineer:  Creation of visual work instruction, Process flow chart and Control Plan.
  • 4.  Inspection of components as per drawing using UTM (Universal testing Machine) & standard measuring instruments.  Identify the non conformance, find the corrective action and measure their effectiveness root cause analysis.  Maintaining the records as per the ISO standards (9001-2008)  Conducting NDT (Non Destructive Tests) like Hydrostatic test, Hydrostatic stretch test, Pneumatic test, Paint thickness measurement, Torque inspection.  Conducting DT (Destructive Tests) like Acceptance test, burst test.  Preparation of test samples for Acceptance test, testing of samples in presence of BIS officer and Clearance of test certificate.  Formation of the required gang by allotment of man power.  Scheduling for the gang job. Personal details  Date of birth : 09 December 1990  Father’s name : William Francis S  Nationality : Indian  Languages known : English, Kannada, Hindi. Declaration I hereby solemnly declare and affirm that all statements made in this application are true and correct to the best of my knowledge and belief. Place: Bangalore, India. Yours Faithfully Date: W Melwin Samuel