SlideShare a Scribd company logo
1
1
April 28, 2022
KEY PERFORMANCE INDICATORS (KPIS)
RELATED TO SAP-PM MODULE
You cannot control what you cannot measure.
- Peter Drucker
M A I N T E N A N C E D E P T . ( G O T H M A C H H I )
2
2
QUICK FACTS
KPI implementation demands sheer commitment from top most level as it requires
involvement of all departments.
At department level (in isolation), these KPIs can be implemented with certain
modifications/compromises.
In FFC-GM, at present SAP-PM module is being utilized only for material issuance.
FFC is the only company in fertilizer sector which yet has to consider maintenance
KPI implementation.
3
3
MAJOR SOCIETIES GOVERNING
MAINTENANCE RELIABILITY PRACTICES
4
4
Proactive to Reactive Ratio
Pending & Overdue Notifications
1
2
SELECTED KPIS
Pending & Overdue Workorders
3
5
5
Mean Time Between Failure (MTBF)
Maintenance Cost
1
2
MONITORING ONLY (NON-KPI)
6
6
Proactive to Reactive Ratio
Pending & Overdue Notifications
1
2
SELECTED KPIS
Pending & Overdue Workorders
3
Predictive/Condition based
Maintenance
Preventive Maintenance
PROACTIVE
MAINTENANCE
Corrective Maintenance
Breakdown / Failure
REACTIVE
MAINTENANCE
Your Text Here
Refurbishments / Modifications
Any other planned work
PROACTIVE & REACTIVE MAINTENANCE
8
8
All Work
Target 100%
Capital Work
Target Varies
Predictive/CBM
Target 15%
Corrective Work
from Structured
Work Program
Target 50%
Non-Capitalized
Work
Target 10 – 15%
Preventive
Maintenance
Target 15%
Corrective Work
from Structured
Work Program
Target 5%
Structured Work
Identification
Target 30%
Corrective
Maintenance Work
Target 55%
Other Work
Target < 5%
Improvement &
Modification Work
Target 10 to 5%
9
9
What is KPI
This metric measures the ratio of proactive to reactive work
KPI-I : PROACTIVE TO REACTIVE WORK RATIO
1
Reactive work: Signifies all activities that cannot be scheduled/planned –
Includes corrective, breakdown and unplanned work.
Proactive work: Consists of all maintenance work carried out on the
basis of Preventive, predictive, modification or any other planned
maintenance work.
Mechanical Seal/Gland Leakage which can
be planned without jeopardizing daily
schedule
Corrective work as a result of thickness
monitoring
PROACTIVE
MAINTENANCE
Work on the basis of observation of
operator/unit (insulation rectification etc.)
Mechanical seal/ Gland leakages which
needs to be attended immediately
Pipeline or other process leakages
REACTIVE
MAINTENANCE
Any work which creeps in to maintenance
schedule
Proactive to Reactive work ratio
SAP NOTIFICATION & WORK ORDERS TYPES
12
12
What is KPI
This metric measures the ratio of proactive to reactive work
PROACTIVE TO REACTIVE WORK RATIO
1
2 The KPI can help identify bad actors and improve inspection / maintenance
plans.
World Class Value
Our Value
(Mach-II year 2021)
6 : 1 3.25 : 1
Reactive (unplanned) work: signifies all activities that cannot be scheduled/planned
– Includes all unplanned and breakdown work orders.
Proactive work: consists of all maintenance carried out on the basis of
Preventive, predictive, modification or any other planned maintenance work.
Our Value
(EM-II Urea: one Quarter)
4.1 : 1
Proactive to Reactive work ratio
KPI-II: NOTIFICATION STATUS
This metric measures the status (in percentage) of notifications at various stages
notifications
1
Stages
Overdue
Outstanding
In-process
Completed
Postponed
Targets are set on the basis on notification priority.
No standard benchmarking available.
Target will be fixed after analyzing our own data.
Target may be different for each area.
14
14
What is KPI
Frequently, important/urgent jobs are being executed without notifications.
NOTIFICATIONS: PRESENT ISSUES
1
2
3
4
Mostly notifications are being raised for routine high notification type
regardless of job priority.
Most of the notification raised are of low priority jobs.
Poor description/insufficient data in notification.
Proactive to Reactive work ratio
KPI-III: WORK ORDERS STATUS
This metric measures the status (in percentage) of work orders at various stages
notifications
1
Stages
Created
Released
Overdue
Completed
As per standard, should be calculated on Man-hours
basis
No standard benchmarking available.
Target will be fixed after analyzing our own data.
Target may be different for each area.
Targets are set on the basis on equipment criticality.
Proactive to Reactive work ratio
18
18
What is KPI
Sometimes work orders are not created and notifications are closed after
completion of job, without creating work orders.
WORK ORDER: PRESENT ISSUES
1
2
3
4
Sometimes work orders are created without notifications where material
issuance is required.
Issuance of material in improper work orders.
Review of damage and cause codes.
20
20
Mean time between failure (MTBF)
Maintenance Cost
1
2
MONITORING ONLY (NON-KPI)
Proactive to Reactive work ratio
MEAN TIME BETWEEN FAILURES
This metric measures the average length of operating time between failures for
an asset or component
The objective is to assess the reliability of a repairable asset or component,
perform gap analysis and target reliability improvement of low MTBF assets.
1
2
ORIGINAL: MTBF = Total Operating Time / Number of Failures
MODIFIED: MTBF = Total Time Elapsed / Number of Failures
Proactive to Reactive work ratio
MEAN TIME BETWEEN FAILURES
Data needs to be entered for monitoring
• Proper equipment tag/functional location
• Damage code & cause code (need to be revised)
• Actual start and finish date
3
4 For automated calculations, IT will be involved
Proactive to Reactive work ratio
MAINTENANCE COST
This metric is the measure of the total maintenance cost required incurred on an
equipment during certain time period.
The objective is to assess the reliability of a repairable asset or component,
perform gap analysis and target reliability improvement of low MTBF assets.
1
2
Proactive to Reactive work ratio
ACTION PLAN
Type - B
Session with area engineers for proper work order creation
Awareness of shift engineers for proper notification creation
Monthly monitoring to evaluate data & ensure compliance
Creation of required dashboard and other required changes in SAP
Based on the data, set targets for the next year
Thank you

More Related Content

Similar to Maintenance KPIs April 28.pptx

ICD 10 Timeline
ICD 10 TimelineICD 10 Timeline
ICD 10 TimelineKforce
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010Pierre Latour
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance Progress
Glen Alleman
 
Essential program management views
Essential program management viewsEssential program management views
Essential program management views
Glen Alleman
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTRIrfan Rasheed Rana
 
Operation Management
Operation ManagementOperation Management
Operation Management
Prabu U
 
EVMS with Technical Performance Measures
EVMS with Technical Performance MeasuresEVMS with Technical Performance Measures
EVMS with Technical Performance Measures
Glen Alleman
 
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
AlexanderRamos482228
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET Journal
 
SAP PM CAPABILITES June 24 2023.pptx
SAP PM CAPABILITES June 24 2023.pptxSAP PM CAPABILITES June 24 2023.pptx
SAP PM CAPABILITES June 24 2023.pptx
MKASHIFIDREES
 
Technical Performance Measures
Technical Performance MeasuresTechnical Performance Measures
Technical Performance Measures
Glen Alleman
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and Control
IRJET Journal
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis System
Steven Muñoz
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】
Jerimi Soma
 
Level 3
Level 3Level 3
Level 3
GWC GROUP
 
Handling the punch list.pptx
Handling the punch list.pptxHandling the punch list.pptx
Handling the punch list.pptx
Tobey Houston
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
ijsrd.com
 
05.2 auditing procedure application controls
05.2 auditing procedure   application controls05.2 auditing procedure   application controls
05.2 auditing procedure application controlsMulyadi Yusuf
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015pyi kyaw lynn
 

Similar to Maintenance KPIs April 28.pptx (20)

ICD 10 Timeline
ICD 10 TimelineICD 10 Timeline
ICD 10 Timeline
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance Progress
 
Essential program management views
Essential program management viewsEssential program management views
Essential program management views
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
Operation Management
Operation ManagementOperation Management
Operation Management
 
EVMS with Technical Performance Measures
EVMS with Technical Performance MeasuresEVMS with Technical Performance Measures
EVMS with Technical Performance Measures
 
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
SAP PM CAPABILITES June 24 2023.pptx
SAP PM CAPABILITES June 24 2023.pptxSAP PM CAPABILITES June 24 2023.pptx
SAP PM CAPABILITES June 24 2023.pptx
 
Technical Performance Measures
Technical Performance MeasuresTechnical Performance Measures
Technical Performance Measures
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and Control
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis System
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】
 
Level 3
Level 3Level 3
Level 3
 
Handling the punch list.pptx
Handling the punch list.pptxHandling the punch list.pptx
Handling the punch list.pptx
 
Tpm Diagnostic 4
Tpm Diagnostic              4Tpm Diagnostic              4
Tpm Diagnostic 4
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
05.2 auditing procedure application controls
05.2 auditing procedure   application controls05.2 auditing procedure   application controls
05.2 auditing procedure application controls
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Maintenance KPIs April 28.pptx

  • 1. 1 1 April 28, 2022 KEY PERFORMANCE INDICATORS (KPIS) RELATED TO SAP-PM MODULE You cannot control what you cannot measure. - Peter Drucker M A I N T E N A N C E D E P T . ( G O T H M A C H H I )
  • 2. 2 2 QUICK FACTS KPI implementation demands sheer commitment from top most level as it requires involvement of all departments. At department level (in isolation), these KPIs can be implemented with certain modifications/compromises. In FFC-GM, at present SAP-PM module is being utilized only for material issuance. FFC is the only company in fertilizer sector which yet has to consider maintenance KPI implementation.
  • 4. 4 4 Proactive to Reactive Ratio Pending & Overdue Notifications 1 2 SELECTED KPIS Pending & Overdue Workorders 3
  • 5. 5 5 Mean Time Between Failure (MTBF) Maintenance Cost 1 2 MONITORING ONLY (NON-KPI)
  • 6. 6 6 Proactive to Reactive Ratio Pending & Overdue Notifications 1 2 SELECTED KPIS Pending & Overdue Workorders 3
  • 7. Predictive/Condition based Maintenance Preventive Maintenance PROACTIVE MAINTENANCE Corrective Maintenance Breakdown / Failure REACTIVE MAINTENANCE Your Text Here Refurbishments / Modifications Any other planned work PROACTIVE & REACTIVE MAINTENANCE
  • 8. 8 8 All Work Target 100% Capital Work Target Varies Predictive/CBM Target 15% Corrective Work from Structured Work Program Target 50% Non-Capitalized Work Target 10 – 15% Preventive Maintenance Target 15% Corrective Work from Structured Work Program Target 5% Structured Work Identification Target 30% Corrective Maintenance Work Target 55% Other Work Target < 5% Improvement & Modification Work Target 10 to 5%
  • 9. 9 9 What is KPI This metric measures the ratio of proactive to reactive work KPI-I : PROACTIVE TO REACTIVE WORK RATIO 1 Reactive work: Signifies all activities that cannot be scheduled/planned – Includes corrective, breakdown and unplanned work. Proactive work: Consists of all maintenance work carried out on the basis of Preventive, predictive, modification or any other planned maintenance work.
  • 10. Mechanical Seal/Gland Leakage which can be planned without jeopardizing daily schedule Corrective work as a result of thickness monitoring PROACTIVE MAINTENANCE Work on the basis of observation of operator/unit (insulation rectification etc.) Mechanical seal/ Gland leakages which needs to be attended immediately Pipeline or other process leakages REACTIVE MAINTENANCE Any work which creeps in to maintenance schedule
  • 11. Proactive to Reactive work ratio SAP NOTIFICATION & WORK ORDERS TYPES
  • 12. 12 12 What is KPI This metric measures the ratio of proactive to reactive work PROACTIVE TO REACTIVE WORK RATIO 1 2 The KPI can help identify bad actors and improve inspection / maintenance plans. World Class Value Our Value (Mach-II year 2021) 6 : 1 3.25 : 1 Reactive (unplanned) work: signifies all activities that cannot be scheduled/planned – Includes all unplanned and breakdown work orders. Proactive work: consists of all maintenance carried out on the basis of Preventive, predictive, modification or any other planned maintenance work. Our Value (EM-II Urea: one Quarter) 4.1 : 1
  • 13. Proactive to Reactive work ratio KPI-II: NOTIFICATION STATUS This metric measures the status (in percentage) of notifications at various stages notifications 1 Stages Overdue Outstanding In-process Completed Postponed Targets are set on the basis on notification priority. No standard benchmarking available. Target will be fixed after analyzing our own data. Target may be different for each area.
  • 14. 14 14 What is KPI Frequently, important/urgent jobs are being executed without notifications. NOTIFICATIONS: PRESENT ISSUES 1 2 3 4 Mostly notifications are being raised for routine high notification type regardless of job priority. Most of the notification raised are of low priority jobs. Poor description/insufficient data in notification.
  • 15. Proactive to Reactive work ratio KPI-III: WORK ORDERS STATUS This metric measures the status (in percentage) of work orders at various stages notifications 1 Stages Created Released Overdue Completed As per standard, should be calculated on Man-hours basis No standard benchmarking available. Target will be fixed after analyzing our own data. Target may be different for each area. Targets are set on the basis on equipment criticality.
  • 16. Proactive to Reactive work ratio
  • 17. 18 18 What is KPI Sometimes work orders are not created and notifications are closed after completion of job, without creating work orders. WORK ORDER: PRESENT ISSUES 1 2 3 4 Sometimes work orders are created without notifications where material issuance is required. Issuance of material in improper work orders. Review of damage and cause codes.
  • 18. 20 20 Mean time between failure (MTBF) Maintenance Cost 1 2 MONITORING ONLY (NON-KPI)
  • 19. Proactive to Reactive work ratio MEAN TIME BETWEEN FAILURES This metric measures the average length of operating time between failures for an asset or component The objective is to assess the reliability of a repairable asset or component, perform gap analysis and target reliability improvement of low MTBF assets. 1 2 ORIGINAL: MTBF = Total Operating Time / Number of Failures MODIFIED: MTBF = Total Time Elapsed / Number of Failures
  • 20. Proactive to Reactive work ratio MEAN TIME BETWEEN FAILURES Data needs to be entered for monitoring • Proper equipment tag/functional location • Damage code & cause code (need to be revised) • Actual start and finish date 3 4 For automated calculations, IT will be involved
  • 21. Proactive to Reactive work ratio MAINTENANCE COST This metric is the measure of the total maintenance cost required incurred on an equipment during certain time period. The objective is to assess the reliability of a repairable asset or component, perform gap analysis and target reliability improvement of low MTBF assets. 1 2
  • 22. Proactive to Reactive work ratio ACTION PLAN Type - B Session with area engineers for proper work order creation Awareness of shift engineers for proper notification creation Monthly monitoring to evaluate data & ensure compliance Creation of required dashboard and other required changes in SAP Based on the data, set targets for the next year