The document discusses options for a long term combined sewer overflow control plan for the Maumee River and Swan Creek areas. It provides an overview of existing overflow frequencies and volumes. Several control alternatives are presented involving storage, treatment, and separation. Input is sought from the public on aspects of the alternatives like site selection, preferred technologies, acceptable overflow frequencies, and costs. A final alternative will be selected to reduce overflows and improve water quality while considering public input and costs.