Photoshoot Location
Planning
Zoe Toase
Possible
Locations for my
photoshoot
University
Photo
Studios
St Peter’s
Church
My
House
South Shields
and Roker
Beach
Concert at Metro
Radio ArenaBaltic Art
Gallery
Outdoors/woodland/
park Sunderland
Docks
Pop Recs
Tyneside
Cinema
Newcastle
Quayside
What I could
take images
of – culture
related
Animals
Artwork
Landscapes
models
Records and
record
players
Guitar
Piano
Buildings
Food
Locals Clothes
Weather
Events
Finalised Location Scout
Location 1: Sunderland University Studio
I have decided to use the Photoshoot studio to take
pictures of my models as I feel this will make my
magazine look much more professional. I didn’t use
the studios when doing my AS work therefore I feel
this introduction of high camera quality and lighting
will really improve my images. I also think a plain
white background would really compliment my
contemporary style of magazine and therefore
outdoor locations would draw the attention away
from my models.
As the university is its own establishment I will have
to email the manager to get permission to use it and
book a slot that is suitable for both me and my
models. In preparation for this, I have researched
the email of the manager and first contacted him to
ask what availability he has. I’m then going to feed
this back to my model and find an appropriate time
and day.
Location 1: Scout
The studio is located in Sunderland's David Puttnam
Media Centre which is only a 3 minute walk from my
college and therefore is really accessible. Using an
indoor location means there are no issues with weather
or natural lighting therefore I can feel confident to turn
up at the location prepared. I do however need to make
sure to take an SD card so that I can take my images
home.
I have had work experience in the media
centre therefore I know my way around and
how to get into the studios. The studios
consist of digital lighting and cameras that can
be adjusted to give a high key or low key lit
image. The backdrop of the studio can be
black, white or grey yet I am still undecided as
to which colour I will use. I think white will be
easier to edit and offer a contemporary style
however a black background may make the
magazine more mysterious and therefore
more intriguing.
Location 1: Travel and Parking
If I was going to travel from my college I would simply be able to walk across
however I need to organise transportation for my models. As I know the
area well, I’m going to pick up my models and drive them to the location.
This will however take slightly longer therefore I will have to account for this
when planning a time schedule.
As I will be spending an hour at this
location it means I will require a safe
place to park my car. Luckily, there is a
car park directly behind the studio
that is used by students. Upon
scouting the location I have found
that the car park costs £1.10 an hour
therefore I will need to be prepared
with money and precise with my
timings. The car park is extremely big
which guarantees a space however if I
have trouble I will park at my college
and walk the extra 3 minutes.
Location 2: Indoor house facility
I have decided to take images of props, musical items, food and other cultural
objects in my home. Although a picture of a record player for example would
look much more professional taken in the studio, it would be impossible to
transfer all my props and too time consuming.
I will be taking the pictures in against a white wall or will be creating Tumblr
like flat lays to display them in an aesthetic way. I will try to achieve a similar
studio look by using flash and editing however my camera equipment isn’t as
advanced.
Location 2: Travel and Parking
The location is really easy to get to and as I am
there myself I can take the images any time. I do
not need my models for the images I take in my
home therefore I don’t need to worry about
arranging transport or account travelling time. I
will instead take the images in my own time.
Location 3:

Location scout

  • 1.
  • 2.
    Possible Locations for my photoshoot University Photo Studios StPeter’s Church My House South Shields and Roker Beach Concert at Metro Radio ArenaBaltic Art Gallery Outdoors/woodland/ park Sunderland Docks Pop Recs Tyneside Cinema Newcastle Quayside
  • 3.
    What I could takeimages of – culture related Animals Artwork Landscapes models Records and record players Guitar Piano Buildings Food Locals Clothes Weather Events
  • 4.
    Finalised Location Scout Location1: Sunderland University Studio I have decided to use the Photoshoot studio to take pictures of my models as I feel this will make my magazine look much more professional. I didn’t use the studios when doing my AS work therefore I feel this introduction of high camera quality and lighting will really improve my images. I also think a plain white background would really compliment my contemporary style of magazine and therefore outdoor locations would draw the attention away from my models. As the university is its own establishment I will have to email the manager to get permission to use it and book a slot that is suitable for both me and my models. In preparation for this, I have researched the email of the manager and first contacted him to ask what availability he has. I’m then going to feed this back to my model and find an appropriate time and day.
  • 5.
    Location 1: Scout Thestudio is located in Sunderland's David Puttnam Media Centre which is only a 3 minute walk from my college and therefore is really accessible. Using an indoor location means there are no issues with weather or natural lighting therefore I can feel confident to turn up at the location prepared. I do however need to make sure to take an SD card so that I can take my images home. I have had work experience in the media centre therefore I know my way around and how to get into the studios. The studios consist of digital lighting and cameras that can be adjusted to give a high key or low key lit image. The backdrop of the studio can be black, white or grey yet I am still undecided as to which colour I will use. I think white will be easier to edit and offer a contemporary style however a black background may make the magazine more mysterious and therefore more intriguing.
  • 6.
    Location 1: Traveland Parking If I was going to travel from my college I would simply be able to walk across however I need to organise transportation for my models. As I know the area well, I’m going to pick up my models and drive them to the location. This will however take slightly longer therefore I will have to account for this when planning a time schedule. As I will be spending an hour at this location it means I will require a safe place to park my car. Luckily, there is a car park directly behind the studio that is used by students. Upon scouting the location I have found that the car park costs £1.10 an hour therefore I will need to be prepared with money and precise with my timings. The car park is extremely big which guarantees a space however if I have trouble I will park at my college and walk the extra 3 minutes.
  • 7.
    Location 2: Indoorhouse facility I have decided to take images of props, musical items, food and other cultural objects in my home. Although a picture of a record player for example would look much more professional taken in the studio, it would be impossible to transfer all my props and too time consuming. I will be taking the pictures in against a white wall or will be creating Tumblr like flat lays to display them in an aesthetic way. I will try to achieve a similar studio look by using flash and editing however my camera equipment isn’t as advanced.
  • 8.
    Location 2: Traveland Parking The location is really easy to get to and as I am there myself I can take the images any time. I do not need my models for the images I take in my home therefore I don’t need to worry about arranging transport or account travelling time. I will instead take the images in my own time.
  • 9.