SlideShare a Scribd company logo
Paris Student Apartment Studios
19th District Building, France – design by Ofis Arhitekti Architects
19 Feb 2013
Paris Student Apartments
‘Basket Apartments’
Design: Ofis Arhitekti, Slovenia
photograph : Tomaz Gregoric
Basket Apartments in Paris
Urban plan condition
The project is located on a long and very narrow site, on the edge of Parc La Vilette in Paris’s 19th
district, within an urban development done by Reichen & Robert architects. On the northeast, new
Paris tram route is passing along the site. The site is bordering with tram garage on the southwest,
above which is a football field. The first 3 floors of the housing will inevitably share the wall with the
tram garage.
photos : Tomaz Gregoric
Site plan conditions
The parcel has a very particular configuration; 11m in width and extending approximately 200m north-
south. This foreshadows the importance of processing the eastern facade overlooking the extension
of the street, des Petits Ponts, which hosts the tram and both cyclist and pedestrian walkways.
Plot conditions
The long volume of the building is divided into two parts that are connected with a bridge. Between
two volumes is a garden. The building has 11 floors: a technical space in the basement, shared
programs in the ground floor, and student apartments in the upper nine floors. The layout is rational
and modular.
photos : Tomaz Gregoric
Program – student dormitory with 192 studios
The major objective of the project was to provide students with a healthy environment for studying,
learning and meeting. Along the length of the football field is an open corridor and gallery that
overlooks the field and creates a view to the city and the Eiffel tower. This gallery is an access to the
apartments providing students with a common place. All the studios are the same size and contain
the same elements to optimize design and construction: an entrance, bathroom, wardrobe,
kitchenette, working space and a bed. Each apartment has a balcony overlooking the street.
Design concept
Because of the narrow length of the plot, the façades have a significant presence in its surroundings.
Each volume contains two different faces according to the site and the program:
The elevation towards the street des Petits Ponts contains studio balconies-baskets of different sizes
made from HPL timber stripes. They are randomly oriented to diversify the views and rhythm of the
façade. Shifted baskets create a dynamic surface while also breaking down the scale and proportion
of the building.
The elevation towards the football field has an open passage walkway with studio entrances enclosed
with a 3D metal mesh. Both volumes are connected on the first floor with a narrow bridge which is
also an open common space for students.
photos : Tomaz Gregoric
Sustainable efficiency
The building is energy efficient to accommodate the desires of Paris’ sustainable development efforts.
The Plan Climates goal is that future housing will consume 50KW-h.m.² or less. The objectives of
energy performance and the construction timetable were met by focusing on a simple, well insulated
and ventilated object that functions at its best year round. Accommodations are cross ventilating and
allow abundant day lighting throughout the apartment. External corridors and glass staircases also
promote natural lighting in the common circulation, affording energy while also creating comfortable
and well lit social spaces. The building is insulated from the outside with an insulation thickness of 20
cm. Thermal bridge breakers are used on corridor floors and balconies to avoid thermal bridges.
Ventilation is controlled by double flow mechanical ventilation, providing clean air in every apartment
with an optimum temperature throughout the year. The incoming air also reuses heat from the
exhaust air. The roof is covered with 300m² of photovoltaic panels to generate electricity. Rainwater is
harvested on site in a basin pool used for watering outdoor green spaces.
photos : Tomaz Gregoric
Basket Apartments Paris – Building Information
location: 19th district, Paris, France
status: invited competition 2008 ; construction start 2009 ; completion 2012
program: student apartment studios, common spaces, dining area, living space, storage
details: low energy consumption building, 10 floor building with 192 studios
type: student housing
client: Regie Immobiliere de la Ville de Paris
area: site 1981 m2; size of studios 35 m2; building 931 m2; gross floor area 8500 m2; landscape
1050 m2
dimensions: 29,20 m max height
budget: 17M €
materials: concrete, glass, metal, plaster, high-density stratified timber panels, expanded metal mesh
project team:
Rok Oman, Spela Videcnik
Robert Janez, Janez Martincic, Andrej Gregoric, Janja del Linz, Katja Aljaz, Louis Geiswiller,
Hyunggyu Kim, Chaewan Shin, Jaehyun Kim, Erin Durno, Javier Carrera, Giuliana Fimmano, Jolien
Maes, Lin Wei
technical team:
Structural engineering: INTEGRALE 4; Bruno PERSON
Mechanical & electrical engineering, sustainable development: Cabinet MTC; Cyril GANVERT
Paris Basket Apartments images / information from Ofis Arhitekti
27 Nov 2008
Paris Student Apartment Studios
Student apartment studios on Route des Petits Ponts
Paris 19e
2008_invited competition- first prize
Design: Ofis Arhitekti, Slovenia
General Description
The project involves a dormitory with 180 studios on the site of the Stade de Ladoumague in Paris in
19th district. The plot of the building is part of urban development done by Reichen & Robert
architects.
By early 2012, the Paris tram will pass by the site, and the goal is to complete the project before the
opening in 2011. Another project goal is to achieve a building consumption with very little power,
joining the desire of the city of Paris through its “climate plan”. The major objectives of the project is to
design a home to accommodate students able to offer them a healthy environment for study, learn,
have fun, meet … The building must be “energy efficient” and be built at the end of 2010. To achieve
these objectives with energy performance and construction time table plan the focus was to design a
simple, well insulated and ventilated object which will function at best during all seasons.
Route des Petits Ponts Apartments
Architectural, urban and technical proposal
The parcel has a very particular configuration; 11 meters in width and extends about 200 meters long
in north-south axis, which foreshadows the importance of processing the eastern facade overlooking
the extension of the street of small bridges (des Petits Ponts). In addition, this street will host the tram,
a road cyclist and pedestrian walkways. The extension of the street of small bridges also leads to the
Canal de l’Ourcq, hence the priority treatment landscaped plot to accompany this urban landscape.
In our case, it is not just a building to integrate into its environment but rather to integrate a piece of
street, a facade composed of buildings and landscape.
The residence follows the urban plot which are two blocks divided by sharing landscape garden.
Both parts are organized according to a simple and functional frame for a logical and economic
optimization. On ground floor are the lobby, the rooms, common areas opened over the course and
some studios (accessible for the disabled). Upstairs are all studios and a terrace.
The plans are organized according to simple management and maintainance. Also the task was to
provide students environment of indoor and outdoor quality with creating the meeting places in which
each student can feel good and enjoy the indoor and outdoor landscape. Access to the residence is
between the 2 buildings. For security and management reasons, there is only one entry. We used the
system of horizontal flow; taking into account technical constraints related to sports complex vis -a-vis
the main housing openings. The circulations are naturally lit and ventilated, and allowing East-West
views.
Studios_concept_sustainability
The residence comprises 192 studios. Studios are accessible to disabled persons on the ground floor.
All rooms are equipped with the same principle throughout the residence for better optimization.
There is also studio with two bedrooms on each floor. There are seven in total throughout the
building, which used to meet expectations in terms of student housing for couples.
The concept key point is inside the studios: work on light and air quality and spaces.
The accommodations are crossing, allowing for natural light throughout the apartment. The design of
housing was thought to offer comfort, brightness and functionality. The layout is rational and allows
modularity. The apartments are mechanically ventilated with a double shift VMC. The breakdown by
VMC is much more economical and offers students an air and a healthy environment, necessary and
vital for the smooth functioning of the individual. The majority of the studios have a unique outdoor
space with loggias which are actually an extension of interior spaces. The loggias create intimate
outdoor spaces and offer views of the surrounding neighborhoods.
In view of the targets on energy performance, thermal insulation and soundproofing of the building will
be extra efficient. The isolation of the project is done by outside isolation 16cm thick, to reduce heat
loss. This insulation thickness makes the building very well insulated, while opening large bay front to
let maximum light into the apartments. This insulation is of course both thermal and acoustic proof.
The structure of the building next to the wall of the SMR is insulated to prevent heat transfer between
the two structures, and of course acoustic insulation for the building site maintenance
To avoid the problem of thermal bridges of balconies and loggias we integrate the structure of the
elements of broken bridges thermal type SCHÖCK. It avoids thermal losses and especially
sustainable balance investment costs over time.
The Elevations
The facades will have a major impact on environment because of the length of the plot. The eastern
facade of the building looks towards the sport field, and is formed by main entrance gang. The
eastern facade is composed of loggias covered in bamboo. They appear on the cover as wooden
cocoons and are randomly oriented to diversify the views and rhythm to the facade. The arrangement
of the elements creates dynamic surface and breaks the scale of the building at the same time.
The use of bamboo for the loggias has human scale and environmentally approach. The bamboo is
environmentally friendly material. The loggias are equipped with bamboo sunscreens to control
sunlight on the balconies and interior. Bamboo is also used on the western front as horizontal blade to
manage the sunshine of the passageway. At the same time it protects the corridors from the sport
field.
The climbing plants will be grown to serve as visual and environmental filters: In summer, the facade
will be refreshed by the thickening of the filter plant and in winter the facade work normally, everything
perfectly fits into the environment by creating seasonal facades.
The structural composition
The complex consists of two rectangular blocks. The first block dimensions are 30x11m and the
second 65x11m. The overall building rises at 29.2 meters.
The building structure is reinforced concrete. Foundations are types of piles, 12 to 15m deep. They
are connected by sills. The floors are rational and identical. They are made of reinforced concrete
floors on the 2-way and are supported by walls and poles. Both parts of the building have its
communication core which serves all floors. All the walls are reinforced with a thickness of 20 cm.
The landscape
the space between the two parts of the building will be used as a garden, which will have the same
functions than Parisian court in function to shift from one building to another, for meeting and
relaxation. It will be a common landscape, leaving a visual opening to the garden. The garden is
accessible from outside access for fire site of the SMR (magnetic card or key).
The garden located north of the plot has more private character but also provides transparency with
the street. It is used as a park on a small scale. Covered in wood, it is a place of relaxation and
calmness for students. This may be a place of rest or work. The garden is arranged in levels to
respond to the work of art that will be seen from the tram, but also to collect views from the Canal de
l’Ourcq or the surroundings with a panorama in altitude.
All green spaces (common and technical) are equipped with automatic sprinkler dropper, which
requires less maintenance manager of the residence and consumes much less water.
Accessibility for the disabled.
The building was designed to accommodate also disabled people and provide them the best
environment. The residence includes more than 10% of homes directly accessible for the disabled (23
units). These accommodations are arranged on ground floor and first floor for easy access and
proximity to allow common areas, facilitating the social integration of individuals with reduced mobility.
Paris Student Apartments – Design Team
Architects: Rok Oman, Spela Videcnik, Robert Janez, Katja Aljaz, Andrej Gregoric, Javier Carrera
Consultants:
Structural Engineering: Matjaz Pilic – Elea IC
Mechanical, Electrical Engineering & Sustainability: Menerga d.o.o.
Paris Student Apartment images / information from Ofis Arhitekti 271108
Paris Student Studios design : Ofis Arhitekti, Slovenia
Apartemen di Paris
Kondisi rencana kota Proyek ini terletak di sebuah situs yang panjang dan sangat sempit, di
pinggiran Parc La Vilette di distrik ke-19 Paris, dalam perkembangan perkotaan yang
dilakukan oleh arsitek Reichen & Robert. Di timur laut, rute trem Paris baru lewat di
sepanjang lokasi. Situs ini berbatasan dengan garasi trem di barat daya, di atas yang
merupakan lapangan sepak bola. 3 lantai pertama perumahan pasti akan berbagi dinding
dengan garasi trem.
Kondisi rencanalokasi
Paketini memiliki konfigurasi yangsangatkhusus;Lebar11m dan membentangkira-kira200m ke
utara-selatan.Ini pertandapentingnya memprosesfasadtimuryangmenghadapke jalan,desPetits
Ponts,yangmenjadi tempattremdanjalansetapakpengendarasepedadanpejalankaki.
Kondisi plot
Volume bangunanyangpanjangterbagi menjadi duabagianyangterhubungdenganjembatan.
Antara duajilidadalahsebuahtaman.Bangunanini memiliki11lantai:ruang teknisdi ruangbawah
tanah,program bersamadi lantai dasar, danapartemensiswadi sembilanlantai atas.Tataletaknya
rasional danmodular.
Program - asrama siswadengan192 studio
Tujuanutama dari proyekini adalahuntukmemberi siswalingkunganyangsehatuntukbelajar,
belajardanbertemu.Sepanjanglapangansepakbolaadalahkoridorterbukadangaleri yang
menghadapke lapangandanmenciptakanpemandanganke kotadanmenaraEiffel. Galeriini adalah
akseske apartemenyangmemberi siswatempatyangumum.Semuastudioberukuransamadan
mengandungelemenyangsamauntukmengoptimalkandesaindankonstruksi:pintumasuk,kamar
mandi,lemari pakaian,dapurkecil,ruangkerjadantempat tidur.Setiapapartemenmemiliki balkon
yang menghadapke jalan.
Konsepdesain
Karenajarak plotyangsempit,façade memilikikehadiranyangsignifikandi sekitarnya.Setiap
volume berisi duawajahyangberbedasesuai dengansitusdanprogramnya:
KetinggianmenujujalandesPetitsPontsberisibalkonstudio - keranjangdenganberbagai ukuran
yang terbuatdari garis kayuHPL. Merekasecara acak berorientasi untukmendiversifikasi pandangan
dan iramafaçade.Keranjangbergesermenciptakanpermukaanyangdinamissekaligus
menghancurkanskaladanproporsi bangunan.
Ketinggianke arahlapangansepakbolamemiliki jalansetapakyangterbukadenganpintumasuk
studioyangdilapisi denganjaringlogam3D.Keduajilidtersebutterhubungdi lantai satudengan
jembatansempityangjugamerupakanruangterbukabagi siswa.
Efisiensi yangberkelanjutan
Bangunanini hematenergi untukmengakomodasi keinginanupayapembangunanberkelanjutan
Paris.TujuanRencanaIklimadalahbahwaperumahanmasadepanakan mengkonsumsi 50KW-h.m.²
atau kurang.Tujuankinerjaenergi danjadwal konstruksidipenuhi denganmemusatkanperhatian
pada objeksederhanadanterisolasi denganbaikdanberventilasi yangberfungsi sepanjangtahun
terbaiknya.Tempattidurmemiliki ventilasi silangdanmemungkinkanpeneranganhari melimpahdi
seluruhapartemen.Koridoreksternal dantanggakaca jugamempromosikanpencahayaanalami
dalamsirkulasi umum,memberi energi sementarajugamenciptakanruangsosial yangnyamandan
terang.Bangunanituterisolasi dari luardenganketebalanisolasi 20cm. Pemecahjembatantermal
digunakandi lantai koridordanbalkonuntukmenghindarijembatantermal.Ventilasi dikendalikan
olehventilasi mekanikaliranganda,memberikanudarabersihdi setiapapartemendengansuhu
optimumsepanjangtahun.Udarayangmasuk jugamenggunakanpanasdari udara buangan.
Atapnyaditutupi panel fotovoltaik300m²untukmenghasilkanlistrik.Airhujandipanendi lokasi di
kolambaskomyangdigunakanuntukmenyiramruanghijaudi luarruangan.
BasketApartmentsParis - Informasi Bangunan
lokasi:distrik19,Paris,Perancis
status:kompetisi yangdiundang2008; konstruksi mulai 2009; penyelesaian2012
program: studioapartemenmahasiswa,ruangumum, ruangmakan,ruangtamu, tempat
penyimpanan
rincian:bangunankonsumsi energirendah,bangunan10lantai dengan192 studio
tipe:perumahanmahasiswa
klien:Regie Immobiliere de laVille de Paris
area: situs1981 m2; ukuranstudio35 m2; bangunan931 m2; luaslantai kotor 8500 m2; lansekap
1050 m2
dimensi:tinggi maksimal 29,20m
anggaran: 17M €
Bahan: beton,kaca,logam,plester,panel kayuberlapispadat,meshlogamyangdiperluas
timproyek:
Rok Oman,SpelaVidecnik
RobertJanez,JanezMartincic,Andrej Gregoric,Janjadel Linz,KatjaAljaz,LouisGeiswiller,Kim
Hyunggyu,ChaewanShin,KimJaehyun,ErinDurno,JavierCarrera,GiulianaFimmano,JolienMaes,
Lin Wei
timteknis:
RekayasaStruktural:INTEGRALE4; BrunoPERSON
Teknikmekanik&kelistrikan,pembangunanberkelanjutan:KabinetMTC;Cyril GANVERT
Apartemen/gambardari / ke gedungdari / ke
ApartemenApartemenSiswaParis
Studioapartemenpelajardi Route desPetitsPonts
Paris19e
2008_invitedkompetisi - hadiahpertama
Desain:OfisArhitekti,Slovenia
Gambaran umum
Proyekini melibatkansebuahasramadengan180 studiodi lokasi Stade de Ladoumague di Parisdi
distrikke-19.Plotbangunantersebutmerupakanbagiandari pembangunanperkotaanyang
dilakukanoleharsitekReichen&Robert.
Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahmenyelesaikanproyek
sebelumdibukapadatahun2011. Tujuanproyeklainnyaadalahuntukmencapai konsumsi
bangunandengankekuatanyangsangatkecil,bergabungdengankeinginankotaParismelalui
"rencanaiklim"nya.Tujuanutamadari proyekini adalahmerancangrumahuntukmengakomodasi
siswayangdapat menawarkanlingkunganyangsehatuntukbelajar,belajar,bersenang-senang,
bertemu...Bangunanharus"hematenergi"dandibangunpadaakhirtahun2010. Untuk mencapai
Tujuanini dengankinerjaenergi danrencanawaktupemasangankonstruksi fokusnyaadalah
merancangobjekyangsederhana,terisolasi denganbaikdanberventilasi yangakanberfungsi paling
baikselamasemuamusim.
Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahpenyelesaianproyek
sebelumdibukapadatahun2011. Tujuannyaadalahuntukmencapai bangunanyangsedangkecil,
bergabungdengankeinginankotaParismelalui"rencanaiklim"nya. Tujuanutamadari proyekini
adalahrumah untukmenampungsiswayangdapatmenawarkanlingkunganyangsehatuntuk
belajar,belajar,bersenang-senang,bertemu...Bangunanharus"hematenergi"dandibangunpada
akhirtahun 2010. Untuk mencapai tujuanini denganbukuenergi danrencanawaktupemasangan
konstruksi fokusnyaadalahperusahanyangsederhana,terisolasi denganbaikdanberventilasi yang
akan bertenagapalingbaikselamasemuamusim.
Studios_concept_sustainability
Tempattinggalnyaterdiri dari 192 studio.Studiodapatdiaksesolehorang-orangcacatdi lantai
dasar. Semuakamardilengkapi denganprinsipyangsamadi seluruhkediamanuntukoptimasi yang
lebihbaik.
Ada jugastudiodenganduakamar tidurdi setiaplantai.Adatujuhtotal di seluruhbangunan,yang
digunakanuntukmemenuhi harapandalamhal perumahansiswauntukpasangan.
Titikkunci konsepadadi dalam studio:bekerjapadakualitasdanruangcahayadan udara.
Akomodasi yangpersimpangan,memungkinkanuntukcahayaalami di seluruhapartemen.Desain
perumahandiperkirakanmenawarkankenyamanan,kecerahandanfungsionalitas.Tataletaknya
rasional danmemungkinkanmodularitas.Apartemensecaramekanisberventilasidenganshiftganda
VMC. RincianolehVMCjauhlebihekonomisdanmemberi siswaudaradanlingkunganyangsehat,
pentingdanpenting untukkelancaranfungsiindividu.Sebagianbesarstudiomemiliki ruangluar
yang unikdenganloggiayangsebenarnyamerupakanperpanjanganruanginterior.Loggiamembuat
ruang terbukayangintimdanmenawarkanpemandanganlingkungansekitar.
Mengingattargetkinerjaenergi,isolasi termaldankedapsuarabangunanakanlebihefisien.Isolasi
proyekdilakukandenganisolasiluarsetebal 16cm, untukmengurangi kehilanganpanas.Ketebalan
isolasi ini membuatbangunanterisolasi dengansangatbaik,sementaramembukatelukbesaruntuk
membiarkancahayamaksimummasukke apartemen.Isolasi ini tentusajamerupakanbukti termal
dan akustik.
Strukturbangunandi sebelahdindingSMRterisolasi untukmencegahperpindahanpanasantara
keduastruktur,dantentusaja insersi akustikuntukpemeliharaanlokasi bangunan.
Untuk menghindari masalahjembatantermal balkondanloggiakitamengintegrasikanstruktur
elemenjembatantermal tipe termistorSCHÖCK.Ini menghindari kerugiantermal danterutama
biayainvestasi keseimbanganberkelanjutandari waktuke waktu.
Ketinggian
Fasad akanmemiliki dampakbesarterhadaplingkungankarenapanjangplotnya.Fasadtimur
bangunanterlihatke arahlapanganolahraga,dan dibentukolehgangpintumasukutama.Fasad
timurterdiri dari loggiayangditutupi bambu.Merekamuncul di sampul sebagai kepompongkayu
dan secara acak berorientasiuntukmelakukandiversifikasipandangandaniramake fasad.Penataan
elemenmenciptakanpermukaanyangdinamisdanmenghancurkanskalabangunanpadasaatyang
bersamaan.
Penggunaanbambuuntukloggiamemiliki skalamanusiadanpendekatanlingkungan.Bambuitu
bahan ramahlingkungan.Loggiadilengkapidengantabirsuryabambuuntukmengendalikansinar
matahari di balkondaninterior.Bambujugadigunakandi frontbaratsebagai pisauhorisontal untuk
mengatursinarmatahari di lorong.Padasaat yang samamelindungi koridordari lapanganolahraga.
Tanaman pendakianakantumbuhuntukdijadikanfiltervisualdanlingkungan:Di musimpanas,
fasadakan disegarkanoleh penebalantanamanfilterdandi musimdinginfasadbekerjanormal,
semuanyasangatsesuai denganlingkungandenganmenciptakanfasadmusiman.
Komposisi strukturalnya
Kompleksterdiridari duablokpersegi panjang.Dimensiblokpertamaadalah30x11m dan65x11m
kedua.Bangunankeseluruhannaik29,2 meter.
Strukturbangunannyadiperkuatbeton.Pondasi adalahjenistumpukan,12sampai 15m dalam.
Merekaterhubungdengankusen.Lantainyarasional danidentik.Merekaterbuatdari lantai beton
bertulangpada2 arah dan didukungolehdindingdantiang.Keduabagianbangunanmemiliki inti
komunikasi yangmelayani semualantai.Semuadindingnyadiperkuatdenganketebalan20cm.
Pemandangan
ruang antara dua bagianbangunanakandigunakansebagai taman,yangakan memiliki fungsi yang
sama dari pengadilanParisyangberfungsi bergeserdari satubangunanke bangunanlainnya,untuk
pertemuandanrelaksasi.Ini akanmenjadipemandanganumum, meninggalkanpembukaanvisual ke
kebun.Tamanini dapat diaksesdari aksesluar ke tempatapi SMR (kartu magnetikataukunci).
Taman yang terletakdi sebelahutaradari plotmemilikikarakterlebihpribadi namunjuga
memberikantransparansidenganjalan.Ini digunakansebagaitamandalamskalakecil.Tercakup
dalamkayu,itu adalahtempatrelaksasi danketenanganbagi siswa.Ini mungkintempatistirahat
atau pekerjaan.Tamanitudiaturdalamtingkatuntukmeresponkaryaseni yangakandilihatdari
trem,tapi juga untukmengumpulkanpemandangandari Canal de l'Ourcqatau sekitarnyadengan
panoramadi ketinggian.
Semuaruang hijau(umumdanteknis) dilengkapi denganpenetessprinklerotomatis,yang
memerlukanlebihsedikitpengelolapengelolatempattinggal danmengkonsumsi lebihsedikitair.
Aksesibilitasuntukpenyandangcacat.
Bangunanini dirancanguntukmenampungpenyandangcacatdan memberi merekalingkungan
terbaik.Tempattinggal mencakuplebihdari 10% rumah yangdapat diaksessecaralangsunguntuk
penyandangcacat(23 unit).Akomodasi ini diaturdi lantai dasardan lantai pertamauntuk
memudahkanaksesdankedekatanuntukmemungkinkanareaumum, memfasilitasi integrasisosial
individudenganmobilitasrendah.
ApartemenMahasiswaParis - TimDesain
Arsitek:RokOman,SpelaVidecnik,RobertJanez,KatjaAljaz,Andrej Gregoric, JavierCarrera
Konsultan:
RekayasaStruktural:MatjazPilic- Elea IC
Mechanical,Electrical Engineering&Sustainability:Menergad.o.o.
Gambar / informasi ApartemenParisStudentfromisArhitekti271108
DesainstudiomahasiswaParis:OfisArhitekti,Slovenia
Student apartment studios in Paris / OFIS
 00:00 - 27 November, 2008
Save this project



Save
Student apartment studios in Paris / OFIS
Save this picture!
+ 10
 Architects
OFIS Architects
 Location
Paris, France
 Architect
OFIS arhitekti
 Project Leaders
Rok Oman & Špela Videčnik
 Design Team
Rok Oman, Spela Videcnik, Robert Janez, katja aljaz, Andrej Gregoric, JavierCarrera
 Structural Engineering
Matjaz Filic - Elea IC
 Project Year
2008
General Description
The project involves a dormitory with 180 studios on the site of the Stade de
Ladoumègue in Paris in 19th district. The plot of the building is part of urban
development done by Reichen & Robert architects.
By early 2012, the Paris tram will pass by the site, and the goal is to complete the
project before the opening in 2011. Another project goal is to achieve a building
consumption with very little power, joining the desire of the city of Paris through its
"climate plan". The major objectives of the project is to design a home to accommodate
students able to offer them a healthy environment for study, learn, have fun, meet ... The
building must be "energy efficient" and be built at the end of 2010. To achieve these
objectives with energy performance and construction time table plan the focus was to
design a simple, well insulated and ventilated object which will function at best during
all seasons.
Save this picture!
Architectural, urban and technical proposal
The parcel has a very particular configuration; 11 meters in width and extends about
200 meters long in north-south axis, which foreshadows the importance of processing
the eastern facade overlooking the extension of the street of small bridges (des Petits
Ponts). In addition, this street will host the tram, a road cyclist and pedestrian
walkways. The extension of the street of small bridges also leads to the Canal de l'Ourcq,
hence the priority treatment landscaped plot to accompany this urban landscape.
In our case, it is not just a building to integrate into its environment but rather to
integrate a piece of street, a facade composed of buildings and landscape.
The residence follows the urban plot which are two blocks divided by sharing landscape
garden.
Save this picture!
Both parts are organized according to a simple and functional frame for a logical and
economic optimization. On ground floor are the lobby, the rooms, common areas
opened over the course and some studios (accessible for the disabled). Upstairs are all
studios and a terrace.
The plans are organized according to simple management and maintainance. Also the
task was to provide students environment of indoor and outdoor quality with creating
the meeting places in which each student can feel good and enjoy the indoor and
outdoor landscape. Access to the residence is between the 2 buildings. For security and
management reasons, there is only one entry. We used the system of horizontal flow;
taking into account technical constraints related to sports complex vis-à-vis the main
housing openings. The circulations are naturally lit and ventilated, and allowing East-
West views.
Save this picture!
Studios_concept_sustainability
The residence comprises 192 studios. Studios are accessible to disabled persons on the
ground floor. All rooms are equipped with the same principle throughout the residence
for better optimization.
There is also studio with two bedrooms on each floor. There are seven in total
throughout the building, which used to meet expectations in terms of student housing
for couples.
The accommodations are crossing, allowing for natural light throughout the apartment.
The design of housing was thought to offer comfort, brightness and functionality. The
layout is rational and allows modularity. The apartments are mechanically ventilated
with a double shift VMC. The breakdown by VMC is much more economical and offers
students an air and a healthy environment, necessary and vital for the smooth
functioning of the individual. The majority of the studios have a unique outdoor space
with loggias which are actually an extension of interior spaces. The loggias create
intimate outdoor spaces and offer views of the surrounding neighborhoods.
In view of the targets on energy performance, thermal insulation and soundproofing of
the building will be extra efficient. The isolation of the project is done by outside
isolation 16cm thick, to reduce heat loss. This insulation thickness makes the building
very well insulated, while opening large bay front to let maximum light into the
apartments. This insulation is of course both thermal and acoustic proof.
The structure of the building next to the wall of the SMR is insulated to prevent heat
transfer between the two structures, and of course acoustic insulation for the building
site maintenance.
To avoid the problem of thermal bridges of balconies and loggias we integrate the
structure of the elements of broken bridges thermal type SCHÖCK. It avoids thermal
losses and especially sustainable balance investment costs over time.
Save this picture!
Plan
The Elevations
The facades will have a major impact on environment because of the length of the plot.
The eastern facade of the building looks towards the sport field, and is formed by main
entrance gang. The eastern facade is composed of loggias covered in bamboo. They
appear on the cover as wooden cocoons and are randomly oriented to diversify the
views and rhythm to the facade. The arrangement of the elements creates dynamic
surface and breaks the scale of the building at the same time.
The use of bamboo for the loggias has human scale and environmentally approach. The
bamboo is environmentally friendly material. The loggias are equipped with bamboo
sunscreens to control sunlight on the balconies and interior. Bamboo is also used on the
western front as horizontal blade to manage the sunshine of the passageway. At the
same time it protects the corridors from the sport field.
Save this picture!
Diagram
The climbing plants will be grown to serve as visual and environmental filters: In
summer, the facade will be refreshed by the thickening of the filter plant and in winter
the facade work normally, everything perfectly fits into the environment by creating
seasonal facades.
The structural composition
The complex consists of two rectangular blocks. The first block dimensions are 30x11m
and the second 65x11m. The overall building rises at 29.2 meters.
The building structure is reinforced concrete. Foundations are types of piles, 12 to 15m
deep. They are connected by sills. The floors are rational and identical. They are made of
reinforced concrete floors on the 2-way and are supported by walls and poles. Both
parts of the building have its communication core which serves all floors. All the walls
are reinforced with a thickness of 20 cm.
Save this picture!
Plan
The Landscape
The space between the two parts of the building will be used as a garden, which will
have the same functions than Parisian court in function to shift from one building to
another, for meeting and relaxation. It will be a common landscape, leaving a visual
opening to the garden. The garden is accessible from outside access for fire site of the
SMR (magnetic card or key).
The garden located north of the plot has more private character but also provides
transparency with the street. It is used as a park on a small scale. Covered in wood, it is
a place of relaxation and calmness for students. This may be a place of rest or work. The
garden is arranged in levels to respond to the work of art that will be seen from the
tram, but also to collect views from the Canal de l'Ourcq or the surroundings with a
panorama in altitude.
Save this picture!
Section
All green spaces (common and technical) are equipped with automatic sprinkler
dropper, which requires less maintenance manager of the residence and consumes
much less water.
Accessibility for the disabled
The building was designed to accommodate also disabled people and provide them the
best environment. The residence includes more than 10% of homes directly accessible
for the disabled (23 units). These accommodations are arranged on ground floorand
first floor for easy access and proximity to allow common areas, facilitating the social
integration of individuals with reduced mobility
Arahkanartikel menggunakankeyboardAnda
ArchDaily
Proyek
Balai Mahasiswa
Perancis
ArsitekOFIS
2008
Studioapartemenpelajardi Paris/OFIS
Studioapartemenpelajardi Paris/OFIS
00:00 - 27 November,2008
Simpanproyekini PinItSave Studentapartmentstudiodi Paris/OFIS
Simpangambarini!
Studioapartemenpelajardi Paris/OFIS
Studioapartemenpelajardi studioapartemenParis/OFISStudentdi Paris/OFISStudentapartment
studiodi Paris/ OFIS
+10 ArsitekArsitekOFISLokasi Paris,PrancisArsitekOFISarhitektiPemimpinProyekRokOman&
ŠpelaVidečnikDesainTimRokOman,SpelaVidecnik,RobertJanez,katjaaljaz,AndrejGregoric,
JavierCarreraRekayasaStruktural Matjaz Filic - ProyekICEleaTahun 2008
Gambaran umum
Proyekini melibatkansebuahasramadengan180 studiodi lokasi Stade de Ladoumègue di Parisdi
distrikke-19.Plotbangunantersebutmerupakanbagiandari pembangunanperkotaanyang
dilakukanoleharsitekReichen&Robert.
Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahmenyelesaikanproyek
sebelumdibukapadatahun2011. Tujuanproyeklainnyaadalahuntukmencapai konsumsi
bangunandengankekuatanyangsangatkecil,bergabungdengankeinginankotaParismelalui
"rencanaiklim"nya.Tujuanutamadari proyekini adalahmerancangrumahuntukmengakomodasi
siswayangdapat menawarkanlingkunganyangsehatuntukbelajar,belajar,bersenang-senang,
bertemu...Bangunanharus"hematenergi"dandibangunpadaakhirtahun 2010. Untuk mencapai
tujuanini dengankinerjaenergidanrencanatabel waktukonstruksi,fokusnyaadalahmerancang
objekyangsederhana,terisolasidenganbaikdanberventilasi yangakanberfungsi palingbaikselama
semuamusim.
Proposal arsitektur,perkotaandanteknis
Paketini memiliki konfigurasi yangsangatkhusus;Lebarnya11 meterdanmeluassekitar200 meter
di sumbuutara-selatan,yangpertandapentingnyapengolahanfasadtimuryangmenghadapke
perpanjanganjalanjembatankecil(desPetitsPonts).Selainitu,jalanini akanmenjadi tuanrumah
trem,pengendarasepedajalandantrotoarpejalankaki.Perpanjanganjalanjembatankeciljuga
mengarahke Canal de l'Ourcq,maka rangkaianperawatanlansekapprioritasuntukmenemani
lansekapurbanini.
Dalamkasus kami,bukanhanyabangunanyangbisa diintegrasikanke dalamlingkungannya
melainkanuntukmengintegrasikanjalan,fasadyangterdiri dari bangunandanbentangalam.
Tempattinggal mengikuti plotkotayangterbagi duablokdenganberbagi taman lansekap.
Keduabagiandisusunmenurutkerangkasederhanadanfungsional untukoptimasi logisdan
ekonomis.Di lantai dasaradalahlobi,kamar,areaumumdibukaselamakursusdanbeberapastudio
(dapatdiaksesorangcacat). Lantai atas adalahsemuastudiodan teras.
Rencananyadiaturmenurutmanajemendanperawatansederhana.Selainitutugasnyaadalahuntuk
memberi lingkungankepadasiswakualitasindoordanoutdoordenganmenciptakantempat
pertemuandimanasetiapsiswadapatmerasanyamandan menikmati pemandanganindoordan
outdoor.Akseske tempattinggal adalahantara2 bangunan.Untukalasankeamanandan
manajemen,hanyaadasatuentri.Kami menggunakansistemaliranhorisontal;dengan
mempertimbangkankendalateknisyangterkaitdengankompleksolahragaberhadapandengan
bukaanperumahanutama.Sirkulasi secaraalami menyaladanberventilasi,danmemungkinkan
pandanganTimur-Barat.
Studios_concept_sustainability
Tempattinggalnyaterdiri dari 192 studio.Studiodapatdiaksesolehorang-orangcacatdi lantai
dasar. Semuakamardilengkapi denganprinsipyangsamadi seluruhkediamanuntukoptimasi yang
lebihbaik.
Ada jugastudiodenganduakamar tidurdi setiaplantai.Adatujuhtotal di seluruhbangunan,yang
digunakanuntukmemenuhi harapandalamhal perumahansiswauntukpasangan.
Akomodasi yangpersimpangan,memungkinkanuntukcahayaalami di seluruhapartemen.Desain
perumahandiperkirakanmenawarkankenyamanan,kecerahandanfungsionalitas.Tataletaknya
rasional danmemungkinkanmodularitas.Apartemensecaramekanisberventilasidenganshiftganda
VMC. RincianolehVMCjauhlebihekonomisdanmemberi siswaudaradanlingkunganyangsehat,
pentingdanpentinguntukkelancaranfungsiindividu.Sebagianbesarstudiomemiliki ruangluar
yang unikdenganloggiayangsebenarnyamerupakanperpanjanganruanginterior.Loggiamembuat
ruang terbukayangintimdanmenawarkanpemandanganlingkungansekitar.
Mengingattargetkinerjaenergi,isolasi termaldankedapsuarabangunanakanlebihefisien.Isolasi
proyekdilakukandenganisolasiluarsetebal 16cm, untukmengurangi kehilanganpanas.Ketebalan
isolasi ini membuatbangunanterisolasi dengansangatbaik,sementaramembukatelukbesaruntuk
membiarkancahayamaksimummasukke apartemen.Isolasi ini tentusajamerupakanbukti termal
dan akustik.
Strukturbangunandi sebelahdindingSMRterisolasi untukmencegahperpindahanpanasantara
keduastruktur,dantentusaja insasakustikuntukpemeliharaanlokasi bangunan.
Untuk menghindari masalahjembatan termal balkondanloggiakitamengintegrasikanstruktur
elemenjembatantermal tipe termistorSCHÖCK.Ini menghindari kerugiantermal danterutama
biayainvestasi keseimbanganberkelanjutandari waktuke waktu.
Ketinggian
Fasad akanmemiliki dampakbesarterhadaplingkungankarenapanjangplotnya.Fasadtimur
bangunanterlihatke arahlapanganolahraga,dan dibentukolehgangpintumasukutama.Fasad
timurterdiri dari loggiayangditutupi bambu.Merekamuncul di sampul sebagai kepompongkayu
dan secara acak berorientasiuntukmelakukandiversifikasipandangandaniramake fasad.Penataan
elemenmenciptakanpermukaanyangdinamisdanmenghancurkanskalabangunanpadasaatyang
bersamaan.
Penggunaanbambuuntukloggiamemiliki skalamanusiadanpendekatan lingkungan.Bambuitu
bahan ramahlingkungan.Loggiadilengkapidengantabirsuryabambuuntukmengendalikansinar
matahari di balkondaninterior.Bambujugadigunakandi frontbaratsebagai pisauhorisontal untuk
mengatursinarmatahari di lorong.Padasaat yang samamelindungi koridordari lapanganolahraga
Tanaman pendakianakantumbuhuntukdijadikanfiltervisualdanlingkungan:Di musimpanas,
fasadakan disegarkanolehpenebalantanamanfilterdandi musimdinginfasadbekerjanormal,
semuanyasangatsesuai denganlingkungandenganmenciptakanfasadmusiman.
Komposisi strukturalnya
Kompleksterdiridari duablokpersegi panjang.Dimensiblokpertamaadalah30x11m dan65x11m
kedua.Bangunankeseluruhannaik29,2 meter.
Strukturbangunannyadiperkuatbeton.Pondasi adalahjenistumpukan,12sampai 15m dalam.
Merekaterhubungdengankusen.Lantainyarasional danidentik.Merekaterbuatdari lantai beton
bertulangpada2 arah dan didukungolehdindingdantiang.Keduabagianbangunanmemiliki inti
komunikasi yangmelayani semualantai.Semuadindingnyadiperkuatdenganketebalan20cm.
Pemandangan
Ruang antara dua bagianbangunanakandigunakansebagai taman,yangakan memiliki fungsi yang
sama denganpengadilandi Parisyangberfungsi bergeserdari satugedungke bangunanlainnya,
untukpertemuandanrelaksasi.Ini akanmenjadi pemandanganumum, meninggalkanpembukaan
visual ke kebun.Tamanini dapatdiaksesdari aksesluarke tempatapi SMR (kartumagnetikatau
kunci).
Taman yang terletakdi sebelahutaradari plotmemilikikarakterlebihpribadi namunjuga
memberikantransparansidenganjalan.Ini digunakansebagaitamandalamskalakecil.Tercakup
dalamkayu,itu adalahtempatrelaksasi danketenanganbagi siswa.Ini mungkintempatistirahat
atau pekerjaan.Tamanitudiaturdalamtingkatuntukmeresponkaryaseni yangakandilihatdari
trem,tapi juga untukmengumpulkanpemandangandari Canal de l'Ourcqatau sekitarnyadengan
panoramadi ketinggian.
Semuaruang hijau(umumdanteknis) dilengkapi denganpenetessprinklerotomatis,yang
memerlukanlebihsedikitpengelolapengelolatempattinggal danmengkonsumsi lebihsedikitair.
Aksesibilitasuntukpenyandangcacat
Bangunanini dirancanguntukmenampungpenyandangcacatdan memberi merekalingkungan
terbaik.Tempattinggal mencakuplebihdari 10% rumah yangdapat diaksessecaralangsunguntuk
penyandangcacat(23 unit).Akomodasi ini diaturdi lantai dasardan lantai pertamauntuk
memudahkanaksesdankedekatanuntukmemungkinkanareaumum, memfasilitasi integrasisosial
individudenganmobilitasrendah.

More Related Content

What's hot

Environmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise buildingEnvironmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise building
khulna university
 
Case study School Design
Case study School DesignCase study School Design
Case study School Design
Mukesh Ijam Limbu
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
Tieng Wei
 
Portfolio 2012
Portfolio 2012Portfolio 2012
Portfolio 2012
roygrob
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
JayashreeIyer14
 
Building planning
Building planningBuilding planning
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf StyleICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
Terri Meyer Boake
 
Himalaya Pride
Himalaya Pride Himalaya Pride
Himalaya Pride
ncr properties
 
The interlace singapore
The interlace singaporeThe interlace singapore
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsAr. Md Shahroz Alam
 
Planning for the built environment ppt
Planning for the built environment  pptPlanning for the built environment  ppt
Planning for the built environment ppt
Rushabh Shrishrimal
 
Mesiniaga final
Mesiniaga finalMesiniaga final
Mesiniaga final
adamtys
 
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use buildingLEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
Waleed Liaqat
 
Case study- Mixed Use Building
Case study- Mixed Use BuildingCase study- Mixed Use Building
Case study- Mixed Use Building
FathimaTabassum2
 

What's hot (19)

Environmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise buildingEnvironmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise building
 
Case study School Design
Case study School DesignCase study School Design
Case study School Design
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
 
Portfolio 2012
Portfolio 2012Portfolio 2012
Portfolio 2012
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
 
Building planning
Building planningBuilding planning
Building planning
 
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf StyleICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
ICSA 2016 - Mashrabiya Reinvented: Double Façades, Persian Gulf Style
 
Pearl river tower,
Pearl river tower,Pearl river tower,
Pearl river tower,
 
CV+PORTFOLIO_Pelayo Hernández Torres
CV+PORTFOLIO_Pelayo Hernández Torres CV+PORTFOLIO_Pelayo Hernández Torres
CV+PORTFOLIO_Pelayo Hernández Torres
 
Himalaya Pride
Himalaya Pride Himalaya Pride
Himalaya Pride
 
Case Study 2- June 14Ro 2016
Case Study 2-  June 14Ro  2016Case Study 2-  June 14Ro  2016
Case Study 2- June 14Ro 2016
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
Horizon greater noida
Horizon greater noidaHorizon greater noida
Horizon greater noida
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
 
Planning for the built environment ppt
Planning for the built environment  pptPlanning for the built environment  ppt
Planning for the built environment ppt
 
Mesiniaga final
Mesiniaga finalMesiniaga final
Mesiniaga final
 
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use buildingLEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
 
Case study- Mixed Use Building
Case study- Mixed Use BuildingCase study- Mixed Use Building
Case study- Mixed Use Building
 
solus4_Arch_Portfolio01
solus4_Arch_Portfolio01solus4_Arch_Portfolio01
solus4_Arch_Portfolio01
 

Similar to Literature bangunan apartemen mahasiswa

My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilioahmed nagy
 
Smictom in fougères region-en
Smictom in fougères region-enSmictom in fougères region-en
Smictom in fougères region-en
libnam
 
TBS School in Barcelona Batlleiroig ArchDaily.pdf
TBS School in Barcelona  Batlleiroig  ArchDaily.pdfTBS School in Barcelona  Batlleiroig  ArchDaily.pdf
TBS School in Barcelona Batlleiroig ArchDaily.pdf
q6ds847m5t
 
TBS School in Barcelona Batlleiroig ArchDaily.pdf
TBS School in Barcelona  Batlleiroig  ArchDaily.pdfTBS School in Barcelona  Batlleiroig  ArchDaily.pdf
TBS School in Barcelona Batlleiroig ArchDaily.pdf
q6ds847m5t
 
01 case study
01 case study01 case study
01 case studyArchitect
 
Maison neuve holiday cottage-en
Maison neuve holiday cottage-enMaison neuve holiday cottage-en
Maison neuve holiday cottage-en
libnam
 
theinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptxtheinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptx
AlSalahiDiaa
 
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURA
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURACentro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURA
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURAESTUDIONAOS
 
Mellé-en
Mellé-enMellé-en
Mellé-en
libnam
 
Kita Göttingen - Pre cast concrete building
Kita Göttingen - Pre cast concrete buildingKita Göttingen - Pre cast concrete building
Kita Göttingen - Pre cast concrete building
HusseinAzher
 
Facade Research Document
Facade Research DocumentFacade Research Document
Facade Research Document
Nicholas Socrates
 
Cocophony presentation
Cocophony presentationCocophony presentation
Cocophony presentationpamakiaduma
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM
 
The interlace ,Singapore By OMA - architecture housing case study
The interlace ,Singapore By OMA - architecture housing case studyThe interlace ,Singapore By OMA - architecture housing case study
The interlace ,Singapore By OMA - architecture housing case study
Bimenpreet Kaur
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation park
İrfan Meriç
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
Jy Chong
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Prateek Srivastava
 
high rise case study
high rise case studyhigh rise case study
high rise case study
ParthPatel1739
 
Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2
www.theurbanvision.com
 

Similar to Literature bangunan apartemen mahasiswa (20)

My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilio
 
Smictom in fougères region-en
Smictom in fougères region-enSmictom in fougères region-en
Smictom in fougères region-en
 
TBS School in Barcelona Batlleiroig ArchDaily.pdf
TBS School in Barcelona  Batlleiroig  ArchDaily.pdfTBS School in Barcelona  Batlleiroig  ArchDaily.pdf
TBS School in Barcelona Batlleiroig ArchDaily.pdf
 
TBS School in Barcelona Batlleiroig ArchDaily.pdf
TBS School in Barcelona  Batlleiroig  ArchDaily.pdfTBS School in Barcelona  Batlleiroig  ArchDaily.pdf
TBS School in Barcelona Batlleiroig ArchDaily.pdf
 
01 case study
01 case study01 case study
01 case study
 
Maison neuve holiday cottage-en
Maison neuve holiday cottage-enMaison neuve holiday cottage-en
Maison neuve holiday cottage-en
 
theinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptxtheinterlace-210128145128 (1).pptx
theinterlace-210128145128 (1).pptx
 
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURA
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURACentro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURA
Centro de Servicios Sociales de Montealto (A Coruña). NAOS ARQUITECTURA
 
Mellé-en
Mellé-enMellé-en
Mellé-en
 
Kita Göttingen - Pre cast concrete building
Kita Göttingen - Pre cast concrete buildingKita Göttingen - Pre cast concrete building
Kita Göttingen - Pre cast concrete building
 
Facade Research Document
Facade Research DocumentFacade Research Document
Facade Research Document
 
Cocophony presentation
Cocophony presentationCocophony presentation
Cocophony presentation
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)
 
The interlace ,Singapore By OMA - architecture housing case study
The interlace ,Singapore By OMA - architecture housing case studyThe interlace ,Singapore By OMA - architecture housing case study
The interlace ,Singapore By OMA - architecture housing case study
 
Building of the gui'an innovation park
Building of the gui'an innovation parkBuilding of the gui'an innovation park
Building of the gui'an innovation park
 
Maurizi_D
Maurizi_DMaurizi_D
Maurizi_D
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2
 

Recently uploaded

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 

Recently uploaded (20)

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 

Literature bangunan apartemen mahasiswa

  • 1. Paris Student Apartment Studios 19th District Building, France – design by Ofis Arhitekti Architects 19 Feb 2013 Paris Student Apartments ‘Basket Apartments’ Design: Ofis Arhitekti, Slovenia photograph : Tomaz Gregoric Basket Apartments in Paris Urban plan condition The project is located on a long and very narrow site, on the edge of Parc La Vilette in Paris’s 19th district, within an urban development done by Reichen & Robert architects. On the northeast, new Paris tram route is passing along the site. The site is bordering with tram garage on the southwest, above which is a football field. The first 3 floors of the housing will inevitably share the wall with the tram garage. photos : Tomaz Gregoric Site plan conditions The parcel has a very particular configuration; 11m in width and extending approximately 200m north- south. This foreshadows the importance of processing the eastern facade overlooking the extension of the street, des Petits Ponts, which hosts the tram and both cyclist and pedestrian walkways. Plot conditions The long volume of the building is divided into two parts that are connected with a bridge. Between two volumes is a garden. The building has 11 floors: a technical space in the basement, shared
  • 2. programs in the ground floor, and student apartments in the upper nine floors. The layout is rational and modular. photos : Tomaz Gregoric Program – student dormitory with 192 studios The major objective of the project was to provide students with a healthy environment for studying, learning and meeting. Along the length of the football field is an open corridor and gallery that overlooks the field and creates a view to the city and the Eiffel tower. This gallery is an access to the apartments providing students with a common place. All the studios are the same size and contain the same elements to optimize design and construction: an entrance, bathroom, wardrobe, kitchenette, working space and a bed. Each apartment has a balcony overlooking the street. Design concept Because of the narrow length of the plot, the façades have a significant presence in its surroundings. Each volume contains two different faces according to the site and the program: The elevation towards the street des Petits Ponts contains studio balconies-baskets of different sizes made from HPL timber stripes. They are randomly oriented to diversify the views and rhythm of the façade. Shifted baskets create a dynamic surface while also breaking down the scale and proportion of the building. The elevation towards the football field has an open passage walkway with studio entrances enclosed with a 3D metal mesh. Both volumes are connected on the first floor with a narrow bridge which is also an open common space for students. photos : Tomaz Gregoric Sustainable efficiency The building is energy efficient to accommodate the desires of Paris’ sustainable development efforts. The Plan Climates goal is that future housing will consume 50KW-h.m.² or less. The objectives of energy performance and the construction timetable were met by focusing on a simple, well insulated and ventilated object that functions at its best year round. Accommodations are cross ventilating and allow abundant day lighting throughout the apartment. External corridors and glass staircases also promote natural lighting in the common circulation, affording energy while also creating comfortable and well lit social spaces. The building is insulated from the outside with an insulation thickness of 20 cm. Thermal bridge breakers are used on corridor floors and balconies to avoid thermal bridges. Ventilation is controlled by double flow mechanical ventilation, providing clean air in every apartment with an optimum temperature throughout the year. The incoming air also reuses heat from the exhaust air. The roof is covered with 300m² of photovoltaic panels to generate electricity. Rainwater is harvested on site in a basin pool used for watering outdoor green spaces.
  • 3. photos : Tomaz Gregoric Basket Apartments Paris – Building Information location: 19th district, Paris, France status: invited competition 2008 ; construction start 2009 ; completion 2012 program: student apartment studios, common spaces, dining area, living space, storage details: low energy consumption building, 10 floor building with 192 studios type: student housing client: Regie Immobiliere de la Ville de Paris area: site 1981 m2; size of studios 35 m2; building 931 m2; gross floor area 8500 m2; landscape 1050 m2 dimensions: 29,20 m max height budget: 17M € materials: concrete, glass, metal, plaster, high-density stratified timber panels, expanded metal mesh project team: Rok Oman, Spela Videcnik Robert Janez, Janez Martincic, Andrej Gregoric, Janja del Linz, Katja Aljaz, Louis Geiswiller, Hyunggyu Kim, Chaewan Shin, Jaehyun Kim, Erin Durno, Javier Carrera, Giuliana Fimmano, Jolien Maes, Lin Wei technical team: Structural engineering: INTEGRALE 4; Bruno PERSON Mechanical & electrical engineering, sustainable development: Cabinet MTC; Cyril GANVERT Paris Basket Apartments images / information from Ofis Arhitekti 27 Nov 2008 Paris Student Apartment Studios Student apartment studios on Route des Petits Ponts Paris 19e 2008_invited competition- first prize Design: Ofis Arhitekti, Slovenia General Description The project involves a dormitory with 180 studios on the site of the Stade de Ladoumague in Paris in 19th district. The plot of the building is part of urban development done by Reichen & Robert architects.
  • 4. By early 2012, the Paris tram will pass by the site, and the goal is to complete the project before the opening in 2011. Another project goal is to achieve a building consumption with very little power, joining the desire of the city of Paris through its “climate plan”. The major objectives of the project is to design a home to accommodate students able to offer them a healthy environment for study, learn, have fun, meet … The building must be “energy efficient” and be built at the end of 2010. To achieve these objectives with energy performance and construction time table plan the focus was to design a simple, well insulated and ventilated object which will function at best during all seasons. Route des Petits Ponts Apartments Architectural, urban and technical proposal The parcel has a very particular configuration; 11 meters in width and extends about 200 meters long in north-south axis, which foreshadows the importance of processing the eastern facade overlooking the extension of the street of small bridges (des Petits Ponts). In addition, this street will host the tram, a road cyclist and pedestrian walkways. The extension of the street of small bridges also leads to the Canal de l’Ourcq, hence the priority treatment landscaped plot to accompany this urban landscape. In our case, it is not just a building to integrate into its environment but rather to integrate a piece of street, a facade composed of buildings and landscape. The residence follows the urban plot which are two blocks divided by sharing landscape garden. Both parts are organized according to a simple and functional frame for a logical and economic optimization. On ground floor are the lobby, the rooms, common areas opened over the course and some studios (accessible for the disabled). Upstairs are all studios and a terrace. The plans are organized according to simple management and maintainance. Also the task was to provide students environment of indoor and outdoor quality with creating the meeting places in which each student can feel good and enjoy the indoor and outdoor landscape. Access to the residence is between the 2 buildings. For security and management reasons, there is only one entry. We used the system of horizontal flow; taking into account technical constraints related to sports complex vis -a-vis the main housing openings. The circulations are naturally lit and ventilated, and allowing East-West views. Studios_concept_sustainability The residence comprises 192 studios. Studios are accessible to disabled persons on the ground floor. All rooms are equipped with the same principle throughout the residence for better optimization. There is also studio with two bedrooms on each floor. There are seven in total throughout the building, which used to meet expectations in terms of student housing for couples. The concept key point is inside the studios: work on light and air quality and spaces. The accommodations are crossing, allowing for natural light throughout the apartment. The design of housing was thought to offer comfort, brightness and functionality. The layout is rational and allows modularity. The apartments are mechanically ventilated with a double shift VMC. The breakdown by VMC is much more economical and offers students an air and a healthy environment, necessary and vital for the smooth functioning of the individual. The majority of the studios have a unique outdoor space with loggias which are actually an extension of interior spaces. The loggias create intimate outdoor spaces and offer views of the surrounding neighborhoods. In view of the targets on energy performance, thermal insulation and soundproofing of the building will be extra efficient. The isolation of the project is done by outside isolation 16cm thick, to reduce heat loss. This insulation thickness makes the building very well insulated, while opening large bay front to let maximum light into the apartments. This insulation is of course both thermal and acoustic proof.
  • 5. The structure of the building next to the wall of the SMR is insulated to prevent heat transfer between the two structures, and of course acoustic insulation for the building site maintenance To avoid the problem of thermal bridges of balconies and loggias we integrate the structure of the elements of broken bridges thermal type SCHÖCK. It avoids thermal losses and especially sustainable balance investment costs over time. The Elevations The facades will have a major impact on environment because of the length of the plot. The eastern facade of the building looks towards the sport field, and is formed by main entrance gang. The eastern facade is composed of loggias covered in bamboo. They appear on the cover as wooden cocoons and are randomly oriented to diversify the views and rhythm to the facade. The arrangement of the elements creates dynamic surface and breaks the scale of the building at the same time. The use of bamboo for the loggias has human scale and environmentally approach. The bamboo is environmentally friendly material. The loggias are equipped with bamboo sunscreens to control sunlight on the balconies and interior. Bamboo is also used on the western front as horizontal blade to manage the sunshine of the passageway. At the same time it protects the corridors from the sport field. The climbing plants will be grown to serve as visual and environmental filters: In summer, the facade will be refreshed by the thickening of the filter plant and in winter the facade work normally, everything perfectly fits into the environment by creating seasonal facades. The structural composition The complex consists of two rectangular blocks. The first block dimensions are 30x11m and the second 65x11m. The overall building rises at 29.2 meters. The building structure is reinforced concrete. Foundations are types of piles, 12 to 15m deep. They are connected by sills. The floors are rational and identical. They are made of reinforced concrete floors on the 2-way and are supported by walls and poles. Both parts of the building have its communication core which serves all floors. All the walls are reinforced with a thickness of 20 cm. The landscape the space between the two parts of the building will be used as a garden, which will have the same functions than Parisian court in function to shift from one building to another, for meeting and relaxation. It will be a common landscape, leaving a visual opening to the garden. The garden is accessible from outside access for fire site of the SMR (magnetic card or key). The garden located north of the plot has more private character but also provides transparency with the street. It is used as a park on a small scale. Covered in wood, it is a place of relaxation and calmness for students. This may be a place of rest or work. The garden is arranged in levels to respond to the work of art that will be seen from the tram, but also to collect views from the Canal de l’Ourcq or the surroundings with a panorama in altitude. All green spaces (common and technical) are equipped with automatic sprinkler dropper, which requires less maintenance manager of the residence and consumes much less water. Accessibility for the disabled. The building was designed to accommodate also disabled people and provide them the best environment. The residence includes more than 10% of homes directly accessible for the disabled (23 units). These accommodations are arranged on ground floor and first floor for easy access and proximity to allow common areas, facilitating the social integration of individuals with reduced mobility. Paris Student Apartments – Design Team
  • 6. Architects: Rok Oman, Spela Videcnik, Robert Janez, Katja Aljaz, Andrej Gregoric, Javier Carrera Consultants: Structural Engineering: Matjaz Pilic – Elea IC Mechanical, Electrical Engineering & Sustainability: Menerga d.o.o. Paris Student Apartment images / information from Ofis Arhitekti 271108 Paris Student Studios design : Ofis Arhitekti, Slovenia Apartemen di Paris Kondisi rencana kota Proyek ini terletak di sebuah situs yang panjang dan sangat sempit, di pinggiran Parc La Vilette di distrik ke-19 Paris, dalam perkembangan perkotaan yang dilakukan oleh arsitek Reichen & Robert. Di timur laut, rute trem Paris baru lewat di sepanjang lokasi. Situs ini berbatasan dengan garasi trem di barat daya, di atas yang merupakan lapangan sepak bola. 3 lantai pertama perumahan pasti akan berbagi dinding dengan garasi trem. Kondisi rencanalokasi Paketini memiliki konfigurasi yangsangatkhusus;Lebar11m dan membentangkira-kira200m ke utara-selatan.Ini pertandapentingnya memprosesfasadtimuryangmenghadapke jalan,desPetits Ponts,yangmenjadi tempattremdanjalansetapakpengendarasepedadanpejalankaki. Kondisi plot Volume bangunanyangpanjangterbagi menjadi duabagianyangterhubungdenganjembatan. Antara duajilidadalahsebuahtaman.Bangunanini memiliki11lantai:ruang teknisdi ruangbawah tanah,program bersamadi lantai dasar, danapartemensiswadi sembilanlantai atas.Tataletaknya rasional danmodular. Program - asrama siswadengan192 studio Tujuanutama dari proyekini adalahuntukmemberi siswalingkunganyangsehatuntukbelajar, belajardanbertemu.Sepanjanglapangansepakbolaadalahkoridorterbukadangaleri yang menghadapke lapangandanmenciptakanpemandanganke kotadanmenaraEiffel. Galeriini adalah akseske apartemenyangmemberi siswatempatyangumum.Semuastudioberukuransamadan
  • 7. mengandungelemenyangsamauntukmengoptimalkandesaindankonstruksi:pintumasuk,kamar mandi,lemari pakaian,dapurkecil,ruangkerjadantempat tidur.Setiapapartemenmemiliki balkon yang menghadapke jalan. Konsepdesain Karenajarak plotyangsempit,façade memilikikehadiranyangsignifikandi sekitarnya.Setiap volume berisi duawajahyangberbedasesuai dengansitusdanprogramnya: KetinggianmenujujalandesPetitsPontsberisibalkonstudio - keranjangdenganberbagai ukuran yang terbuatdari garis kayuHPL. Merekasecara acak berorientasi untukmendiversifikasi pandangan dan iramafaçade.Keranjangbergesermenciptakanpermukaanyangdinamissekaligus menghancurkanskaladanproporsi bangunan. Ketinggianke arahlapangansepakbolamemiliki jalansetapakyangterbukadenganpintumasuk studioyangdilapisi denganjaringlogam3D.Keduajilidtersebutterhubungdi lantai satudengan jembatansempityangjugamerupakanruangterbukabagi siswa. Efisiensi yangberkelanjutan Bangunanini hematenergi untukmengakomodasi keinginanupayapembangunanberkelanjutan Paris.TujuanRencanaIklimadalahbahwaperumahanmasadepanakan mengkonsumsi 50KW-h.m.² atau kurang.Tujuankinerjaenergi danjadwal konstruksidipenuhi denganmemusatkanperhatian pada objeksederhanadanterisolasi denganbaikdanberventilasi yangberfungsi sepanjangtahun terbaiknya.Tempattidurmemiliki ventilasi silangdanmemungkinkanpeneranganhari melimpahdi seluruhapartemen.Koridoreksternal dantanggakaca jugamempromosikanpencahayaanalami dalamsirkulasi umum,memberi energi sementarajugamenciptakanruangsosial yangnyamandan terang.Bangunanituterisolasi dari luardenganketebalanisolasi 20cm. Pemecahjembatantermal digunakandi lantai koridordanbalkonuntukmenghindarijembatantermal.Ventilasi dikendalikan olehventilasi mekanikaliranganda,memberikanudarabersihdi setiapapartemendengansuhu optimumsepanjangtahun.Udarayangmasuk jugamenggunakanpanasdari udara buangan. Atapnyaditutupi panel fotovoltaik300m²untukmenghasilkanlistrik.Airhujandipanendi lokasi di kolambaskomyangdigunakanuntukmenyiramruanghijaudi luarruangan. BasketApartmentsParis - Informasi Bangunan lokasi:distrik19,Paris,Perancis status:kompetisi yangdiundang2008; konstruksi mulai 2009; penyelesaian2012
  • 8. program: studioapartemenmahasiswa,ruangumum, ruangmakan,ruangtamu, tempat penyimpanan rincian:bangunankonsumsi energirendah,bangunan10lantai dengan192 studio tipe:perumahanmahasiswa klien:Regie Immobiliere de laVille de Paris area: situs1981 m2; ukuranstudio35 m2; bangunan931 m2; luaslantai kotor 8500 m2; lansekap 1050 m2 dimensi:tinggi maksimal 29,20m anggaran: 17M € Bahan: beton,kaca,logam,plester,panel kayuberlapispadat,meshlogamyangdiperluas timproyek: Rok Oman,SpelaVidecnik RobertJanez,JanezMartincic,Andrej Gregoric,Janjadel Linz,KatjaAljaz,LouisGeiswiller,Kim Hyunggyu,ChaewanShin,KimJaehyun,ErinDurno,JavierCarrera,GiulianaFimmano,JolienMaes, Lin Wei timteknis: RekayasaStruktural:INTEGRALE4; BrunoPERSON Teknikmekanik&kelistrikan,pembangunanberkelanjutan:KabinetMTC;Cyril GANVERT Apartemen/gambardari / ke gedungdari / ke ApartemenApartemenSiswaParis Studioapartemenpelajardi Route desPetitsPonts Paris19e 2008_invitedkompetisi - hadiahpertama Desain:OfisArhitekti,Slovenia Gambaran umum
  • 9. Proyekini melibatkansebuahasramadengan180 studiodi lokasi Stade de Ladoumague di Parisdi distrikke-19.Plotbangunantersebutmerupakanbagiandari pembangunanperkotaanyang dilakukanoleharsitekReichen&Robert. Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahmenyelesaikanproyek sebelumdibukapadatahun2011. Tujuanproyeklainnyaadalahuntukmencapai konsumsi bangunandengankekuatanyangsangatkecil,bergabungdengankeinginankotaParismelalui "rencanaiklim"nya.Tujuanutamadari proyekini adalahmerancangrumahuntukmengakomodasi siswayangdapat menawarkanlingkunganyangsehatuntukbelajar,belajar,bersenang-senang, bertemu...Bangunanharus"hematenergi"dandibangunpadaakhirtahun2010. Untuk mencapai Tujuanini dengankinerjaenergi danrencanawaktupemasangankonstruksi fokusnyaadalah merancangobjekyangsederhana,terisolasi denganbaikdanberventilasi yangakanberfungsi paling baikselamasemuamusim. Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahpenyelesaianproyek sebelumdibukapadatahun2011. Tujuannyaadalahuntukmencapai bangunanyangsedangkecil, bergabungdengankeinginankotaParismelalui"rencanaiklim"nya. Tujuanutamadari proyekini adalahrumah untukmenampungsiswayangdapatmenawarkanlingkunganyangsehatuntuk belajar,belajar,bersenang-senang,bertemu...Bangunanharus"hematenergi"dandibangunpada akhirtahun 2010. Untuk mencapai tujuanini denganbukuenergi danrencanawaktupemasangan konstruksi fokusnyaadalahperusahanyangsederhana,terisolasi denganbaikdanberventilasi yang akan bertenagapalingbaikselamasemuamusim. Studios_concept_sustainability Tempattinggalnyaterdiri dari 192 studio.Studiodapatdiaksesolehorang-orangcacatdi lantai dasar. Semuakamardilengkapi denganprinsipyangsamadi seluruhkediamanuntukoptimasi yang lebihbaik. Ada jugastudiodenganduakamar tidurdi setiaplantai.Adatujuhtotal di seluruhbangunan,yang digunakanuntukmemenuhi harapandalamhal perumahansiswauntukpasangan. Titikkunci konsepadadi dalam studio:bekerjapadakualitasdanruangcahayadan udara. Akomodasi yangpersimpangan,memungkinkanuntukcahayaalami di seluruhapartemen.Desain perumahandiperkirakanmenawarkankenyamanan,kecerahandanfungsionalitas.Tataletaknya rasional danmemungkinkanmodularitas.Apartemensecaramekanisberventilasidenganshiftganda VMC. RincianolehVMCjauhlebihekonomisdanmemberi siswaudaradanlingkunganyangsehat, pentingdanpenting untukkelancaranfungsiindividu.Sebagianbesarstudiomemiliki ruangluar yang unikdenganloggiayangsebenarnyamerupakanperpanjanganruanginterior.Loggiamembuat ruang terbukayangintimdanmenawarkanpemandanganlingkungansekitar. Mengingattargetkinerjaenergi,isolasi termaldankedapsuarabangunanakanlebihefisien.Isolasi proyekdilakukandenganisolasiluarsetebal 16cm, untukmengurangi kehilanganpanas.Ketebalan isolasi ini membuatbangunanterisolasi dengansangatbaik,sementaramembukatelukbesaruntuk
  • 10. membiarkancahayamaksimummasukke apartemen.Isolasi ini tentusajamerupakanbukti termal dan akustik. Strukturbangunandi sebelahdindingSMRterisolasi untukmencegahperpindahanpanasantara keduastruktur,dantentusaja insersi akustikuntukpemeliharaanlokasi bangunan. Untuk menghindari masalahjembatantermal balkondanloggiakitamengintegrasikanstruktur elemenjembatantermal tipe termistorSCHÖCK.Ini menghindari kerugiantermal danterutama biayainvestasi keseimbanganberkelanjutandari waktuke waktu. Ketinggian Fasad akanmemiliki dampakbesarterhadaplingkungankarenapanjangplotnya.Fasadtimur bangunanterlihatke arahlapanganolahraga,dan dibentukolehgangpintumasukutama.Fasad timurterdiri dari loggiayangditutupi bambu.Merekamuncul di sampul sebagai kepompongkayu dan secara acak berorientasiuntukmelakukandiversifikasipandangandaniramake fasad.Penataan elemenmenciptakanpermukaanyangdinamisdanmenghancurkanskalabangunanpadasaatyang bersamaan. Penggunaanbambuuntukloggiamemiliki skalamanusiadanpendekatanlingkungan.Bambuitu bahan ramahlingkungan.Loggiadilengkapidengantabirsuryabambuuntukmengendalikansinar matahari di balkondaninterior.Bambujugadigunakandi frontbaratsebagai pisauhorisontal untuk mengatursinarmatahari di lorong.Padasaat yang samamelindungi koridordari lapanganolahraga. Tanaman pendakianakantumbuhuntukdijadikanfiltervisualdanlingkungan:Di musimpanas, fasadakan disegarkanoleh penebalantanamanfilterdandi musimdinginfasadbekerjanormal, semuanyasangatsesuai denganlingkungandenganmenciptakanfasadmusiman. Komposisi strukturalnya Kompleksterdiridari duablokpersegi panjang.Dimensiblokpertamaadalah30x11m dan65x11m kedua.Bangunankeseluruhannaik29,2 meter. Strukturbangunannyadiperkuatbeton.Pondasi adalahjenistumpukan,12sampai 15m dalam. Merekaterhubungdengankusen.Lantainyarasional danidentik.Merekaterbuatdari lantai beton bertulangpada2 arah dan didukungolehdindingdantiang.Keduabagianbangunanmemiliki inti komunikasi yangmelayani semualantai.Semuadindingnyadiperkuatdenganketebalan20cm. Pemandangan ruang antara dua bagianbangunanakandigunakansebagai taman,yangakan memiliki fungsi yang sama dari pengadilanParisyangberfungsi bergeserdari satubangunanke bangunanlainnya,untuk pertemuandanrelaksasi.Ini akanmenjadipemandanganumum, meninggalkanpembukaanvisual ke kebun.Tamanini dapat diaksesdari aksesluar ke tempatapi SMR (kartu magnetikataukunci). Taman yang terletakdi sebelahutaradari plotmemilikikarakterlebihpribadi namunjuga memberikantransparansidenganjalan.Ini digunakansebagaitamandalamskalakecil.Tercakup dalamkayu,itu adalahtempatrelaksasi danketenanganbagi siswa.Ini mungkintempatistirahat
  • 11. atau pekerjaan.Tamanitudiaturdalamtingkatuntukmeresponkaryaseni yangakandilihatdari trem,tapi juga untukmengumpulkanpemandangandari Canal de l'Ourcqatau sekitarnyadengan panoramadi ketinggian. Semuaruang hijau(umumdanteknis) dilengkapi denganpenetessprinklerotomatis,yang memerlukanlebihsedikitpengelolapengelolatempattinggal danmengkonsumsi lebihsedikitair. Aksesibilitasuntukpenyandangcacat. Bangunanini dirancanguntukmenampungpenyandangcacatdan memberi merekalingkungan terbaik.Tempattinggal mencakuplebihdari 10% rumah yangdapat diaksessecaralangsunguntuk penyandangcacat(23 unit).Akomodasi ini diaturdi lantai dasardan lantai pertamauntuk memudahkanaksesdankedekatanuntukmemungkinkanareaumum, memfasilitasi integrasisosial individudenganmobilitasrendah. ApartemenMahasiswaParis - TimDesain Arsitek:RokOman,SpelaVidecnik,RobertJanez,KatjaAljaz,Andrej Gregoric, JavierCarrera Konsultan: RekayasaStruktural:MatjazPilic- Elea IC Mechanical,Electrical Engineering&Sustainability:Menergad.o.o. Gambar / informasi ApartemenParisStudentfromisArhitekti271108 DesainstudiomahasiswaParis:OfisArhitekti,Slovenia Student apartment studios in Paris / OFIS  00:00 - 27 November, 2008 Save this project    Save Student apartment studios in Paris / OFIS
  • 12. Save this picture! + 10  Architects OFIS Architects  Location Paris, France  Architect OFIS arhitekti  Project Leaders Rok Oman & Špela Videčnik  Design Team Rok Oman, Spela Videcnik, Robert Janez, katja aljaz, Andrej Gregoric, JavierCarrera  Structural Engineering Matjaz Filic - Elea IC  Project Year 2008 General Description The project involves a dormitory with 180 studios on the site of the Stade de Ladoumègue in Paris in 19th district. The plot of the building is part of urban development done by Reichen & Robert architects. By early 2012, the Paris tram will pass by the site, and the goal is to complete the project before the opening in 2011. Another project goal is to achieve a building consumption with very little power, joining the desire of the city of Paris through its "climate plan". The major objectives of the project is to design a home to accommodate
  • 13. students able to offer them a healthy environment for study, learn, have fun, meet ... The building must be "energy efficient" and be built at the end of 2010. To achieve these objectives with energy performance and construction time table plan the focus was to design a simple, well insulated and ventilated object which will function at best during all seasons. Save this picture! Architectural, urban and technical proposal The parcel has a very particular configuration; 11 meters in width and extends about 200 meters long in north-south axis, which foreshadows the importance of processing the eastern facade overlooking the extension of the street of small bridges (des Petits Ponts). In addition, this street will host the tram, a road cyclist and pedestrian walkways. The extension of the street of small bridges also leads to the Canal de l'Ourcq, hence the priority treatment landscaped plot to accompany this urban landscape. In our case, it is not just a building to integrate into its environment but rather to integrate a piece of street, a facade composed of buildings and landscape. The residence follows the urban plot which are two blocks divided by sharing landscape garden. Save this picture! Both parts are organized according to a simple and functional frame for a logical and economic optimization. On ground floor are the lobby, the rooms, common areas
  • 14. opened over the course and some studios (accessible for the disabled). Upstairs are all studios and a terrace. The plans are organized according to simple management and maintainance. Also the task was to provide students environment of indoor and outdoor quality with creating the meeting places in which each student can feel good and enjoy the indoor and outdoor landscape. Access to the residence is between the 2 buildings. For security and management reasons, there is only one entry. We used the system of horizontal flow; taking into account technical constraints related to sports complex vis-à-vis the main housing openings. The circulations are naturally lit and ventilated, and allowing East- West views. Save this picture! Studios_concept_sustainability The residence comprises 192 studios. Studios are accessible to disabled persons on the ground floor. All rooms are equipped with the same principle throughout the residence for better optimization. There is also studio with two bedrooms on each floor. There are seven in total throughout the building, which used to meet expectations in terms of student housing for couples. The accommodations are crossing, allowing for natural light throughout the apartment. The design of housing was thought to offer comfort, brightness and functionality. The layout is rational and allows modularity. The apartments are mechanically ventilated with a double shift VMC. The breakdown by VMC is much more economical and offers students an air and a healthy environment, necessary and vital for the smooth functioning of the individual. The majority of the studios have a unique outdoor space
  • 15. with loggias which are actually an extension of interior spaces. The loggias create intimate outdoor spaces and offer views of the surrounding neighborhoods. In view of the targets on energy performance, thermal insulation and soundproofing of the building will be extra efficient. The isolation of the project is done by outside isolation 16cm thick, to reduce heat loss. This insulation thickness makes the building very well insulated, while opening large bay front to let maximum light into the apartments. This insulation is of course both thermal and acoustic proof. The structure of the building next to the wall of the SMR is insulated to prevent heat transfer between the two structures, and of course acoustic insulation for the building site maintenance. To avoid the problem of thermal bridges of balconies and loggias we integrate the structure of the elements of broken bridges thermal type SCHÖCK. It avoids thermal losses and especially sustainable balance investment costs over time. Save this picture! Plan The Elevations The facades will have a major impact on environment because of the length of the plot. The eastern facade of the building looks towards the sport field, and is formed by main entrance gang. The eastern facade is composed of loggias covered in bamboo. They appear on the cover as wooden cocoons and are randomly oriented to diversify the views and rhythm to the facade. The arrangement of the elements creates dynamic surface and breaks the scale of the building at the same time. The use of bamboo for the loggias has human scale and environmentally approach. The bamboo is environmentally friendly material. The loggias are equipped with bamboo
  • 16. sunscreens to control sunlight on the balconies and interior. Bamboo is also used on the western front as horizontal blade to manage the sunshine of the passageway. At the same time it protects the corridors from the sport field. Save this picture! Diagram The climbing plants will be grown to serve as visual and environmental filters: In summer, the facade will be refreshed by the thickening of the filter plant and in winter the facade work normally, everything perfectly fits into the environment by creating seasonal facades. The structural composition The complex consists of two rectangular blocks. The first block dimensions are 30x11m and the second 65x11m. The overall building rises at 29.2 meters. The building structure is reinforced concrete. Foundations are types of piles, 12 to 15m deep. They are connected by sills. The floors are rational and identical. They are made of reinforced concrete floors on the 2-way and are supported by walls and poles. Both parts of the building have its communication core which serves all floors. All the walls are reinforced with a thickness of 20 cm. Save this picture! Plan The Landscape
  • 17. The space between the two parts of the building will be used as a garden, which will have the same functions than Parisian court in function to shift from one building to another, for meeting and relaxation. It will be a common landscape, leaving a visual opening to the garden. The garden is accessible from outside access for fire site of the SMR (magnetic card or key). The garden located north of the plot has more private character but also provides transparency with the street. It is used as a park on a small scale. Covered in wood, it is a place of relaxation and calmness for students. This may be a place of rest or work. The garden is arranged in levels to respond to the work of art that will be seen from the tram, but also to collect views from the Canal de l'Ourcq or the surroundings with a panorama in altitude. Save this picture! Section All green spaces (common and technical) are equipped with automatic sprinkler dropper, which requires less maintenance manager of the residence and consumes much less water. Accessibility for the disabled The building was designed to accommodate also disabled people and provide them the best environment. The residence includes more than 10% of homes directly accessible for the disabled (23 units). These accommodations are arranged on ground floorand first floor for easy access and proximity to allow common areas, facilitating the social integration of individuals with reduced mobility Arahkanartikel menggunakankeyboardAnda
  • 18. ArchDaily Proyek Balai Mahasiswa Perancis ArsitekOFIS 2008 Studioapartemenpelajardi Paris/OFIS Studioapartemenpelajardi Paris/OFIS 00:00 - 27 November,2008 Simpanproyekini PinItSave Studentapartmentstudiodi Paris/OFIS Simpangambarini! Studioapartemenpelajardi Paris/OFIS Studioapartemenpelajardi studioapartemenParis/OFISStudentdi Paris/OFISStudentapartment studiodi Paris/ OFIS +10 ArsitekArsitekOFISLokasi Paris,PrancisArsitekOFISarhitektiPemimpinProyekRokOman& ŠpelaVidečnikDesainTimRokOman,SpelaVidecnik,RobertJanez,katjaaljaz,AndrejGregoric, JavierCarreraRekayasaStruktural Matjaz Filic - ProyekICEleaTahun 2008 Gambaran umum Proyekini melibatkansebuahasramadengan180 studiodi lokasi Stade de Ladoumègue di Parisdi distrikke-19.Plotbangunantersebutmerupakanbagiandari pembangunanperkotaanyang dilakukanoleharsitekReichen&Robert. Pada awal 2012, tremParisakan melewati lokasi,dantujuannyaadalahmenyelesaikanproyek sebelumdibukapadatahun2011. Tujuanproyeklainnyaadalahuntukmencapai konsumsi bangunandengankekuatanyangsangatkecil,bergabungdengankeinginankotaParismelalui "rencanaiklim"nya.Tujuanutamadari proyekini adalahmerancangrumahuntukmengakomodasi siswayangdapat menawarkanlingkunganyangsehatuntukbelajar,belajar,bersenang-senang, bertemu...Bangunanharus"hematenergi"dandibangunpadaakhirtahun 2010. Untuk mencapai tujuanini dengankinerjaenergidanrencanatabel waktukonstruksi,fokusnyaadalahmerancang objekyangsederhana,terisolasidenganbaikdanberventilasi yangakanberfungsi palingbaikselama semuamusim. Proposal arsitektur,perkotaandanteknis
  • 19. Paketini memiliki konfigurasi yangsangatkhusus;Lebarnya11 meterdanmeluassekitar200 meter di sumbuutara-selatan,yangpertandapentingnyapengolahanfasadtimuryangmenghadapke perpanjanganjalanjembatankecil(desPetitsPonts).Selainitu,jalanini akanmenjadi tuanrumah trem,pengendarasepedajalandantrotoarpejalankaki.Perpanjanganjalanjembatankeciljuga mengarahke Canal de l'Ourcq,maka rangkaianperawatanlansekapprioritasuntukmenemani lansekapurbanini. Dalamkasus kami,bukanhanyabangunanyangbisa diintegrasikanke dalamlingkungannya melainkanuntukmengintegrasikanjalan,fasadyangterdiri dari bangunandanbentangalam. Tempattinggal mengikuti plotkotayangterbagi duablokdenganberbagi taman lansekap. Keduabagiandisusunmenurutkerangkasederhanadanfungsional untukoptimasi logisdan ekonomis.Di lantai dasaradalahlobi,kamar,areaumumdibukaselamakursusdanbeberapastudio (dapatdiaksesorangcacat). Lantai atas adalahsemuastudiodan teras. Rencananyadiaturmenurutmanajemendanperawatansederhana.Selainitutugasnyaadalahuntuk memberi lingkungankepadasiswakualitasindoordanoutdoordenganmenciptakantempat pertemuandimanasetiapsiswadapatmerasanyamandan menikmati pemandanganindoordan outdoor.Akseske tempattinggal adalahantara2 bangunan.Untukalasankeamanandan manajemen,hanyaadasatuentri.Kami menggunakansistemaliranhorisontal;dengan mempertimbangkankendalateknisyangterkaitdengankompleksolahragaberhadapandengan bukaanperumahanutama.Sirkulasi secaraalami menyaladanberventilasi,danmemungkinkan pandanganTimur-Barat. Studios_concept_sustainability Tempattinggalnyaterdiri dari 192 studio.Studiodapatdiaksesolehorang-orangcacatdi lantai dasar. Semuakamardilengkapi denganprinsipyangsamadi seluruhkediamanuntukoptimasi yang lebihbaik. Ada jugastudiodenganduakamar tidurdi setiaplantai.Adatujuhtotal di seluruhbangunan,yang digunakanuntukmemenuhi harapandalamhal perumahansiswauntukpasangan. Akomodasi yangpersimpangan,memungkinkanuntukcahayaalami di seluruhapartemen.Desain perumahandiperkirakanmenawarkankenyamanan,kecerahandanfungsionalitas.Tataletaknya rasional danmemungkinkanmodularitas.Apartemensecaramekanisberventilasidenganshiftganda VMC. RincianolehVMCjauhlebihekonomisdanmemberi siswaudaradanlingkunganyangsehat, pentingdanpentinguntukkelancaranfungsiindividu.Sebagianbesarstudiomemiliki ruangluar
  • 20. yang unikdenganloggiayangsebenarnyamerupakanperpanjanganruanginterior.Loggiamembuat ruang terbukayangintimdanmenawarkanpemandanganlingkungansekitar. Mengingattargetkinerjaenergi,isolasi termaldankedapsuarabangunanakanlebihefisien.Isolasi proyekdilakukandenganisolasiluarsetebal 16cm, untukmengurangi kehilanganpanas.Ketebalan isolasi ini membuatbangunanterisolasi dengansangatbaik,sementaramembukatelukbesaruntuk membiarkancahayamaksimummasukke apartemen.Isolasi ini tentusajamerupakanbukti termal dan akustik. Strukturbangunandi sebelahdindingSMRterisolasi untukmencegahperpindahanpanasantara keduastruktur,dantentusaja insasakustikuntukpemeliharaanlokasi bangunan. Untuk menghindari masalahjembatan termal balkondanloggiakitamengintegrasikanstruktur elemenjembatantermal tipe termistorSCHÖCK.Ini menghindari kerugiantermal danterutama biayainvestasi keseimbanganberkelanjutandari waktuke waktu. Ketinggian Fasad akanmemiliki dampakbesarterhadaplingkungankarenapanjangplotnya.Fasadtimur bangunanterlihatke arahlapanganolahraga,dan dibentukolehgangpintumasukutama.Fasad timurterdiri dari loggiayangditutupi bambu.Merekamuncul di sampul sebagai kepompongkayu dan secara acak berorientasiuntukmelakukandiversifikasipandangandaniramake fasad.Penataan elemenmenciptakanpermukaanyangdinamisdanmenghancurkanskalabangunanpadasaatyang bersamaan. Penggunaanbambuuntukloggiamemiliki skalamanusiadanpendekatan lingkungan.Bambuitu bahan ramahlingkungan.Loggiadilengkapidengantabirsuryabambuuntukmengendalikansinar matahari di balkondaninterior.Bambujugadigunakandi frontbaratsebagai pisauhorisontal untuk mengatursinarmatahari di lorong.Padasaat yang samamelindungi koridordari lapanganolahraga Tanaman pendakianakantumbuhuntukdijadikanfiltervisualdanlingkungan:Di musimpanas, fasadakan disegarkanolehpenebalantanamanfilterdandi musimdinginfasadbekerjanormal, semuanyasangatsesuai denganlingkungandenganmenciptakanfasadmusiman. Komposisi strukturalnya Kompleksterdiridari duablokpersegi panjang.Dimensiblokpertamaadalah30x11m dan65x11m kedua.Bangunankeseluruhannaik29,2 meter.
  • 21. Strukturbangunannyadiperkuatbeton.Pondasi adalahjenistumpukan,12sampai 15m dalam. Merekaterhubungdengankusen.Lantainyarasional danidentik.Merekaterbuatdari lantai beton bertulangpada2 arah dan didukungolehdindingdantiang.Keduabagianbangunanmemiliki inti komunikasi yangmelayani semualantai.Semuadindingnyadiperkuatdenganketebalan20cm. Pemandangan Ruang antara dua bagianbangunanakandigunakansebagai taman,yangakan memiliki fungsi yang sama denganpengadilandi Parisyangberfungsi bergeserdari satugedungke bangunanlainnya, untukpertemuandanrelaksasi.Ini akanmenjadi pemandanganumum, meninggalkanpembukaan visual ke kebun.Tamanini dapatdiaksesdari aksesluarke tempatapi SMR (kartumagnetikatau kunci). Taman yang terletakdi sebelahutaradari plotmemilikikarakterlebihpribadi namunjuga memberikantransparansidenganjalan.Ini digunakansebagaitamandalamskalakecil.Tercakup dalamkayu,itu adalahtempatrelaksasi danketenanganbagi siswa.Ini mungkintempatistirahat atau pekerjaan.Tamanitudiaturdalamtingkatuntukmeresponkaryaseni yangakandilihatdari trem,tapi juga untukmengumpulkanpemandangandari Canal de l'Ourcqatau sekitarnyadengan panoramadi ketinggian. Semuaruang hijau(umumdanteknis) dilengkapi denganpenetessprinklerotomatis,yang memerlukanlebihsedikitpengelolapengelolatempattinggal danmengkonsumsi lebihsedikitair. Aksesibilitasuntukpenyandangcacat Bangunanini dirancanguntukmenampungpenyandangcacatdan memberi merekalingkungan terbaik.Tempattinggal mencakuplebihdari 10% rumah yangdapat diaksessecaralangsunguntuk penyandangcacat(23 unit).Akomodasi ini diaturdi lantai dasardan lantai pertamauntuk memudahkanaksesdankedekatanuntukmemungkinkanareaumum, memfasilitasi integrasisosial individudenganmobilitasrendah.