SlideShare a Scribd company logo
 
About Us ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Board of Directors ,[object Object],[object Object],[object Object]
Clients Include ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
What We Are  NOT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Problem: Forced Consumption ,[object Object],[object Object],[object Object],126Volts 114 Volts
Solution: Electrical Harmonizer-AVR ,[object Object],[object Object],[object Object],Electrical Harmonizer - AVR 126 Volts 114 Volts Power Generation Power Distribution Customer Voltage Optimization
Building Pre-Qualification ,[object Object],[object Object],[object Object],[object Object]
Effect ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object]
Benefits Recorded at Science World (Science and Technology Center) June 17 th , 2003, 2:45 PM, pre-Harmonizer installation (ambient temperature 20 0  C), and July 10th, 12:37 PM, post-Harmonizer installation (ambient temperature 22 0  C). Device   Temp Before Temp After Temp Reduction Switch Rm.#2 - T12 Lamp 33°C 30 ° C 9% Switch Rm.#3 – T12 Ballast 45°C 40 ° C 11% Switch Rm.#4 – Air Mover Motor 46°C 30 ° C 35% Switch Rm. #2 - Transformer 65°C 55 ° C 15% Mech. Rm. #8 – Ventilation Motor 49°C 43 ° C 12% Corridor #5 - Compressor Motor 45°C 40 ° C 11% Exhibit Area VDU Rear Vents 45°C 45 ° C 5%
System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Facility Audit ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Proposal ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Installation ,[object Object],[object Object],[object Object],[object Object],[object Object]
Installation ,[object Object],[object Object],[object Object],[object Object]
Installation Location A – Directly on the secondary side of the transformer Location B – Immediately after the main breaker  Location C – After the utility metering (the ideal method)  Location D – On distribution loads
Commercial Building Installation 600, 480, 400 VAC  Utility The Harmonizer-AVR unit can be spliced into several different locations within the electrical distribution system Utility Meter Typically 600, 480 or 400 V distribution
Measurement & Verification ,[object Object],[object Object]
Measurement & Verification Measurements of Instantaneous Kilowatts on 10 Minute Intervals for One Week
Performance Guarantee ,[object Object],[object Object]
Major Accounts “ Based on results observed, it has been concluded that the Harmonizer made significant energy savings…..”
Major Accounts “… our electrical bills dropped in excess of 10%” “ Based on the strong savings results, we were enthusiastic in purchasing your device…. Through the use of the electrical Harmonizer we have reduced our annual energy consumption by more than 330,000-kilowatt hours.”
Photographs   Electrical Harmonizer-AVR   Front Views   Hot Swap AVR
Summary of  Harmonizer-AVR Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Recommendations ,[object Object],[object Object],[object Object]
Legend Power Systems Inc. [email_address]

More Related Content

What's hot

M.tech eee list 2014 15
M.tech eee list 2014 15M.tech eee list 2014 15
M.tech eee list 2014 15
SAK Informatics
 
Resume mohan
Resume mohanResume mohan
Resume mohan
MOHANRAJ N
 
Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)
TESCO - The Eastern Specialty Company
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
R Sanghavi Mercantile Pvt Ltd
 
20150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 201520150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 2015
JOTHIMANIKKAM SOMASUNDARAM
 
JPE Packet Power, Starline Power and Environmental, jpe slide share
JPE Packet Power, Starline Power and Environmental,  jpe slide shareJPE Packet Power, Starline Power and Environmental,  jpe slide share
JPE Packet Power, Starline Power and Environmental, jpe slide share
Ed Hahn
 
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
Sandia National Laboratories: Energy & Climate: Renewables
 
Optimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected ConvertersOptimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected Converters
KayDrive
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
Sandia National Laboratories: Energy & Climate: Renewables
 
Site Verification for Newer Employees
Site Verification for Newer EmployeesSite Verification for Newer Employees
Site Verification for Newer Employees
TESCO - The Eastern Specialty Company
 
ABB Price List 2019
ABB Price List 2019ABB Price List 2019
ABB Price List 2019
R Sanghavi Mercantile Pvt Ltd
 
National Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code ChangesNational Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code Changes
Schneider Electric
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
Sunrator Technologies LLP
 
3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat
cvoproductions
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC Drives
Schneider Electric
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apc
charles1010
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)
Mahesh Chandra Manav
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
Ashish Verma
 
Power components for battery applications webinar presentation
Power components for battery applications   webinar presentationPower components for battery applications   webinar presentation
Power components for battery applications webinar presentation
Vicor Corporation
 

What's hot (20)

M.tech eee list 2014 15
M.tech eee list 2014 15M.tech eee list 2014 15
M.tech eee list 2014 15
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)Learning the Language (Meter Testing 101)
Learning the Language (Meter Testing 101)
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
20150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 201520150209111021 tech spn dtd 29.jan 2015
20150209111021 tech spn dtd 29.jan 2015
 
JPE Packet Power, Starline Power and Environmental, jpe slide share
JPE Packet Power, Starline Power and Environmental,  jpe slide shareJPE Packet Power, Starline Power and Environmental,  jpe slide share
JPE Packet Power, Starline Power and Environmental, jpe slide share
 
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
 
Optimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected ConvertersOptimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected Converters
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
 
Site Verification for Newer Employees
Site Verification for Newer EmployeesSite Verification for Newer Employees
Site Verification for Newer Employees
 
ABB Price List 2019
ABB Price List 2019ABB Price List 2019
ABB Price List 2019
 
National Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code ChangesNational Electrical Code: 2014 Code Changes
National Electrical Code: 2014 Code Changes
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC Drives
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apc
 
Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)Make india = make in india presentation by cs electric (2 files merged)
Make india = make in india presentation by cs electric (2 files merged)
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Power components for battery applications webinar presentation
Power components for battery applications   webinar presentationPower components for battery applications   webinar presentation
Power components for battery applications webinar presentation
 

Viewers also liked

Legend Power LEED Green Building Certification Performance Assessment
Legend Power LEED Green Building Certification Performance AssessmentLegend Power LEED Green Building Certification Performance Assessment
Legend Power LEED Green Building Certification Performance Assessment
Legend Power
 
Afrika Tikkun Annual Review
Afrika Tikkun Annual ReviewAfrika Tikkun Annual Review
Afrika Tikkun Annual Review
Afrika Tikkun USA
 
Celestica Presentation
Celestica PresentationCelestica Presentation
Celestica Presentation
bill balina
 
Hong kong
Hong kongHong kong
Canadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology StandardsCanadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology Standards
Intelliware Development Inc.
 
City of deception
City of deceptionCity of deception
City of deception
Dr Saim Ali soomro
 
Environmental Law for Road Builders
Environmental Law for Road Builders Environmental Law for Road Builders
Environmental Law for Road Builders
DSaxe
 
Power Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing PresentationPower Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing Presentation
Joan Shi
 
I2 Argentina Unitech
I2 Argentina UnitechI2 Argentina Unitech
I2 Argentina Unitech
UNITECH S.A.
 
Agile Testing
Agile Testing  Agile Testing
Why Nortel Went Bankrupt
Why Nortel Went BankruptWhy Nortel Went Bankrupt
Why Nortel Went Bankrupt
Chris Sandström
 
Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?
Antoine Vigneron
 
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
Marketing Network marcus evans
 
celestica
celesticacelestica
Master of deception (mod)
Master of deception (mod)Master of deception (mod)
Master of deception (mod)
Shane Alex Perez
 
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Larry Ajuwon
 
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Intelliware Development Inc.
 
Add 2009 10
Add 2009 10Add 2009 10
Add 2009 10RUAULT
 
Coding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the worldCoding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the world
mcd_boulanger
 
Microsoft H1B Violations
Microsoft H1B ViolationsMicrosoft H1B Violations
Microsoft H1B Violations
H1B
 

Viewers also liked (20)

Legend Power LEED Green Building Certification Performance Assessment
Legend Power LEED Green Building Certification Performance AssessmentLegend Power LEED Green Building Certification Performance Assessment
Legend Power LEED Green Building Certification Performance Assessment
 
Afrika Tikkun Annual Review
Afrika Tikkun Annual ReviewAfrika Tikkun Annual Review
Afrika Tikkun Annual Review
 
Celestica Presentation
Celestica PresentationCelestica Presentation
Celestica Presentation
 
Hong kong
Hong kongHong kong
Hong kong
 
Canadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology StandardsCanadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology Standards
 
City of deception
City of deceptionCity of deception
City of deception
 
Environmental Law for Road Builders
Environmental Law for Road Builders Environmental Law for Road Builders
Environmental Law for Road Builders
 
Power Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing PresentationPower Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing Presentation
 
I2 Argentina Unitech
I2 Argentina UnitechI2 Argentina Unitech
I2 Argentina Unitech
 
Agile Testing
Agile Testing  Agile Testing
Agile Testing
 
Why Nortel Went Bankrupt
Why Nortel Went BankruptWhy Nortel Went Bankrupt
Why Nortel Went Bankrupt
 
Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?
 
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
 
celestica
celesticacelestica
celestica
 
Master of deception (mod)
Master of deception (mod)Master of deception (mod)
Master of deception (mod)
 
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
 
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
 
Add 2009 10
Add 2009 10Add 2009 10
Add 2009 10
 
Coding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the worldCoding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the world
 
Microsoft H1B Violations
Microsoft H1B ViolationsMicrosoft H1B Violations
Microsoft H1B Violations
 

Similar to Legend Power Overview 97 2003 120410 1256 Do

Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
Leonardo ENERGY
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
JoePessa
 
Pepco presentation intro
Pepco presentation   introPepco presentation   intro
Pepco presentation intro
sgraham007
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
René Balle
 
into to gorkon solar
into to gorkon solarinto to gorkon solar
into to gorkon solar
Erik Coverdale
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentation
Amol Chande
 
Short Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptxShort Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptx
MayurHiwarkar4
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz Qazi
IEEEP Karachi
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case Study
Leonardo ENERGY
 
Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
Mahesh Chandra Manav
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
Staco Energy
 
Prsn
PrsnPrsn
Prsn
madh__u
 
Staco Energy: Corporate Overview
Staco Energy: Corporate OverviewStaco Energy: Corporate Overview
Staco Energy: Corporate Overview
Staco Energy
 
20160107 - AQYLON Presentation AMN
20160107 - AQYLON Presentation AMN20160107 - AQYLON Presentation AMN
20160107 - AQYLON Presentation AMN
shaukat1607
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
Zondits
 
Powerstar Brochure
Powerstar BrochurePowerstar Brochure
Powerstar Brochure
Tracy Eaton
 
Supercapacitor Typical Applications
Supercapacitor Typical ApplicationsSupercapacitor Typical Applications
Supercapacitor Typical Applications
Matrix Electrónica
 
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
ARAaus
 
Omnik-solar-inverter-manufacturer-catalog
Omnik-solar-inverter-manufacturer-catalogOmnik-solar-inverter-manufacturer-catalog
Omnik-solar-inverter-manufacturer-catalog
Omnik Solar
 
Omnik solar inverter manufacturer catalog
Omnik solar inverter  manufacturer catalogOmnik solar inverter  manufacturer catalog
Omnik solar inverter manufacturer catalog
Omnik Solar
 

Similar to Legend Power Overview 97 2003 120410 1256 Do (20)

Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
Pepco presentation intro
Pepco presentation   introPepco presentation   intro
Pepco presentation intro
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
into to gorkon solar
into to gorkon solarinto to gorkon solar
into to gorkon solar
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentation
 
Short Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptxShort Commercial presentation_ROW.pptx
Short Commercial presentation_ROW.pptx
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz Qazi
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case Study
 
Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
Prsn
PrsnPrsn
Prsn
 
Staco Energy: Corporate Overview
Staco Energy: Corporate OverviewStaco Energy: Corporate Overview
Staco Energy: Corporate Overview
 
20160107 - AQYLON Presentation AMN
20160107 - AQYLON Presentation AMN20160107 - AQYLON Presentation AMN
20160107 - AQYLON Presentation AMN
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
 
Powerstar Brochure
Powerstar BrochurePowerstar Brochure
Powerstar Brochure
 
Supercapacitor Typical Applications
Supercapacitor Typical ApplicationsSupercapacitor Typical Applications
Supercapacitor Typical Applications
 
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
 
Omnik-solar-inverter-manufacturer-catalog
Omnik-solar-inverter-manufacturer-catalogOmnik-solar-inverter-manufacturer-catalog
Omnik-solar-inverter-manufacturer-catalog
 
Omnik solar inverter manufacturer catalog
Omnik solar inverter  manufacturer catalogOmnik solar inverter  manufacturer catalog
Omnik solar inverter manufacturer catalog
 

More from Legend Power

Legend 2013 agm april 11
Legend 2013 agm april 11Legend 2013 agm april 11
Legend 2013 agm april 11
Legend Power
 
Agm presentation 2012
Agm presentation 2012Agm presentation 2012
Agm presentation 2012
Legend Power
 
Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%
Legend Power
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical Brochure
Legend Power
 
Product Client Presentation
Product Client PresentationProduct Client Presentation
Product Client Presentation
Legend Power
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration Webinar
Legend Power
 

More from Legend Power (6)

Legend 2013 agm april 11
Legend 2013 agm april 11Legend 2013 agm april 11
Legend 2013 agm april 11
 
Agm presentation 2012
Agm presentation 2012Agm presentation 2012
Agm presentation 2012
 
Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical Brochure
 
Product Client Presentation
Product Client PresentationProduct Client Presentation
Product Client Presentation
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration Webinar
 

Legend Power Overview 97 2003 120410 1256 Do

  • 1.  
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Benefits Recorded at Science World (Science and Technology Center) June 17 th , 2003, 2:45 PM, pre-Harmonizer installation (ambient temperature 20 0 C), and July 10th, 12:37 PM, post-Harmonizer installation (ambient temperature 22 0 C). Device   Temp Before Temp After Temp Reduction Switch Rm.#2 - T12 Lamp 33°C 30 ° C 9% Switch Rm.#3 – T12 Ballast 45°C 40 ° C 11% Switch Rm.#4 – Air Mover Motor 46°C 30 ° C 35% Switch Rm. #2 - Transformer 65°C 55 ° C 15% Mech. Rm. #8 – Ventilation Motor 49°C 43 ° C 12% Corridor #5 - Compressor Motor 45°C 40 ° C 11% Exhibit Area VDU Rear Vents 45°C 45 ° C 5%
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Installation Location A – Directly on the secondary side of the transformer Location B – Immediately after the main breaker Location C – After the utility metering (the ideal method) Location D – On distribution loads
  • 19. Commercial Building Installation 600, 480, 400 VAC Utility The Harmonizer-AVR unit can be spliced into several different locations within the electrical distribution system Utility Meter Typically 600, 480 or 400 V distribution
  • 20.
  • 21. Measurement & Verification Measurements of Instantaneous Kilowatts on 10 Minute Intervals for One Week
  • 22.
  • 23. Major Accounts “ Based on results observed, it has been concluded that the Harmonizer made significant energy savings…..”
  • 24. Major Accounts “… our electrical bills dropped in excess of 10%” “ Based on the strong savings results, we were enthusiastic in purchasing your device…. Through the use of the electrical Harmonizer we have reduced our annual energy consumption by more than 330,000-kilowatt hours.”
  • 25. Photographs Electrical Harmonizer-AVR Front Views Hot Swap AVR
  • 26.
  • 27.
  • 28. Legend Power Systems Inc. [email_address]

Editor's Notes

  1. Our Board of Directors includes industry veterans such as: Founding CEO of the Ontario Power Authority and PhD in Electric Power Systems - Dr. Jan Carr Former President/CEO, BC Hydro and BC Transmission Corporation - Michael Costello Former VP Sustainability, BC Hydro; Chair, International Center for Sustainable Cities (ICSC)- Bruce Sampson Former Premier of British Columbia and Chair, External Advisory Committee on Communities - Michael Harcourt P. Eng, UBC Associate Professor, Electrical Engineering & Power Electronics - Dr. William Dunford
  2. There have been quite a number of “black box” power quality solutions offered which claim to deliver savings by improving power factor and harmonics through some type of engineered capacitor set up. We do not do any of this. The Harmonizer-AVR is a patented technology that simply allows the customer to consistently and safely reduce the voltage to the customer facility to the optimal minimum level. That’s it. We do not actively effect power factor or harmonics.
  3. There is an optimal minimum voltage range below 120 volts where lights, motors, etc, will operate comfortably with no effect on their practical performance. At 110-114 volts these loads will work with less waste heat, longer life, a lower carbon foot print and less energy. However, there are two factors preventing the power company from delivering the minimum optimal voltage to commercial and industrial facilities: Line Loss: Since there are “leaks” or line loss along any length of cable run, the power company must deliver more voltage than is required to the buildings closest to the substation so that facilities furthest away will receive at least the minimum voltage. As a result, the power company must deliver an unneeded “buffer” of power to the facilities closest to the substation...and the customer pay for it. Peak Power : Since the power company must always deliver enough electricity to allow for “peak demand” at non-peak times, the voltage being delivered to the customer facility can rise well beyond what is efficiently required. Again, the power company must deliver an unneeded “buffer” of power to the facilities to allow for peak usage times...and the customer pay for it.   If a facility measured their incoming voltage and found that it was quite high, they could install a transformer that would step down the incoming voltage by a certain percentage. This “hard tap” transformer solution has been available for decades. However, if the grid power fluctuated down, the percentage reduction is “fixed” and the voltage can drop too low, causing a brown out. Legend Power Systems Corp. provides a simple and effective technology solution that allows qualified commercial and industrial facilities to reduce their voltage to the optimal minimum level, without any worry about going too low when the power grid fluctuates.
  4. The Harmonizer-AVR has two parts: An extremely high quality and energy efficient (99. 5%), transformer with three voltage reduction taps – 6%, 4%, and 2%.   An electronics payload called an automatic voltage regulator. The AVR is pre-set with the optimal minimum voltage for the customer facility which was determined by out audit. The AVR senses the fluctuations in the power from the grid and dynamically selects one of the three voltage reduction settings. If grid voltage goes too low, the AVR defaults to by-pass and takes itself right out of the circuit allowing all available energy to flow directly into the building - There is no way that the Harmonizer-AVR can negatively impact the customer building’s power supply.   The combination of these two components results in a simple and elegant patented solution that, for the first time, allows facilities to safely always operate at their most efficient voltage level without the need for the ongoing expensive energy buffer.
  5. Legend Power’s Harmonizer-AVR can: Reduce the annual energy bill by 5% -7% Reduce the peak power, saving penalties and charges Be fully installed with no disruption to facility operations and absolutely no change to the way a company or it’s employees does business. Increase lighting and equipment life and reduce maintenance costs (see Science World testimonial) Reduce the garbage caused by replacement bulbs etc. Reduce the building’s carbon foot print   Installation of Legend Power’s patented Harmonizer-AVR requires a four day rough-in, and a half, to four hour building shut-down during non-use hours. The whole process is invisible and seamless.   With available incentive funding, the payback period is 2.8 – 3.0 years. However, this is a solution that has a maintenance-free life of 10 – 20 years. A lighting retrofit may appear to have a more attractive ROI, but the customer still need to factor in the cost of the install disruption, 10 – 20 years of ballast and bulb replacement and cleaning.
  6. Legend Power’s Harmonizer-AVR can: Reduce the annual energy bill by 6% -10% Reduce the peak power, saving penalties and charges Be fully installed with no disruption to facility operations and absolutely no change to the way a company or it’s employees does business. Increase lighting and equipment life and reduce maintenance costs (see Science World testimonial) Reduce the garbage caused by replacement bulbs etc. Reduce the building’s carbon foot print   Installation of Legend Power’s patented Harmonizer-AVR requires a four day rough-in, and a half, to four hour building shut-down during non-use hours. The whole process is invisible and seamless.   With available incentive funding, the payback period is 2.8 – 3.0 years. However, this is a solution that has a maintenance-free life of 10 – 20 years. A lighting retrofit may appear to have a more attractive ROI, but the customer still need to factor in the cost of the install disruption, 10 – 20 years of ballast and bulb replacement and cleaning.
  7. Optimizing voltage and conditioning incoming power results in increased efficiency and reduced operating temperatures for lights and motors. The Following table summarizes surface temperatures for lights and motors. The selection included AC induction prime movers, lighting, VDU’s, and chiller drives. The green figures show the effects of the Harmonizer, reducing the operating temperature. These transfer to effective energy savings. It is recognized that 10 degree C reduction in operating temperature will double the life expectancy of electronics.
  8. Again, the Harmonizer-AVR is a simple and verifiable system that reduces voltage to the optimal minimum level and keeps it there. Savings results are projected once and verified twice after the installation with all reports coming to the customer for review.   We start with a non-intrusive audit that may take one half to two days. The $2,000 - $3,000 cost of this audit is currently waived. The audit consists of: In advance of the audit we will need the following items for each facility: 2 years of billing data. This is usual sent over by the accounting group or by request from the client’s utility. The purpose is to allow our engineers to analyze the facility usage trends and peak power. Single line drawings for the facility. This is often with their electrical contractor, or their maintenance manager. If these are not in digital or PDF format already, they can be scanned or just simple photographed with a digital camera. Worst case, as long as they have them available upon our arrival we can work with that. These drawings let our electrician know where we can safely hook up the power analyzer and where the Harmonizer-AVR will be installed. Any documentation or insurance requirements that they may have   The audit process is a non-intrusive, 4-8 hour process that consists of: Hooking up the Hioki  power analyzer. This will gather seven days of data. We will return in a week to remove it and upload the data to our lab. Introducing the Voltage Optimization Analyzer to the main lighting circuits. The VOA is basically a mini harmonizer. With this test we can determine the exact savings that the full install will have on lighting Non-lighting load inventory. Our auditor will walk the facility and take an inventory of the other loads on the system.   This data is measured and compiled based on a scientific procedure developed and documented by Dr. William Dunford of the University of British Columbia. A copy of the procedure is available to the customer at any time. Within three weeks of the audit, a detailed report is delivered to the customer including the projected savings, available incentive funding, the projected payback and ongoing savings for the life of the system.
  9. Once the installation is completed, we will conduct the Measurement and Verification procedure in conjunction with the incentive funding body’s and/or utility’s auditors. Completed within 30 days of the install Harmonizer-AVR is set to go from 6% reduction to bypass once every 15 minutes for one week generating 672 sample points The Hioki power analyzer collects the data and is retrieved in seven days It is assumed that one full year represents a complete sample (35,040 sample points) A final report will be delivered to the client within three weeks documenting the actual savings results with an accuracy of + 4%, 95% of the time.
  10. Legend Power’s Harmonizer-AVR can: Reduce the annual energy bill by 5% -7% Reduce the peak power, saving penalties and charges Be fully installed with no disruption to facility operations and absolutely no change to the way a company or it’s employees does business. Increase lighting and equipment life and reduce maintenance costs (see Science World testimonial) Reduce the garbage caused by replacement bulbs etc. Reduce the building’s carbon foot print   Installation of Legend Power’s patented Harmonizer-AVR requires a four day rough-in, and a half, to four hour building shut-down during non-use hours. The whole process is invisible and seamless.   With available incentive funding, the payback period is 2.8 – 3.0 years. However, this is a solution that has a maintenance-free life of 10 – 20 years. A lighting retrofit may appear to have a more attractive ROI, but the customer still need to factor in the cost of the install disruption, 10 – 20 years of ballast and bulb replacement and cleaning.