3. 1. Introduction: Research question How could BPM Case Management principles be applied to support knowledge workers in the Lean Office, and how can BPM Case Management solution be improved by leveraging Lean principles?
5. 1. Introduction: Basic framework a) Way of thinking b) Way of modelling Way of describing e) Way of learning d) Way of controlling Way of conceiving c) Way of working f) Way of supporting Seligmann et al, 1989
7. Agenda Introduction Method Lean Office principles BPM Case Management principles Synergy / Support Improve Conclusion
8. 2. Method: Lean Manufacturing Craft production Mass production Lean production: Elimination of waste Maximize flow Lean Craft Customisation Mass Volume
9. 2. Method: Lean Office 1/4 Lean Office: Work can be done simultaneously Activity times are relatively variable and complex to manage
12. 2. Method: Lean Office 4/4 a) Way of thinking 1 2 3 4 5 6 8 9 10 11 15 17 b) Way of working 1 2 6 7 9 10 4 8 12 13 11 13 14 11 15 18 16 17 18 16 18 e) Way of learning d) Way of controlling c) Way of modelling 1 Way of describing Way of conceiving f) Way of supporting
13. Agenda Introduction Method Lean Office principles BPM Case Management principles Synergy / Support Improve Conclusion
14. 2. Method: Business Process Management (BPM) Total Quality Management (TQM) Business Process Re-engineering (BPR) Business Process Management (BPM) Continuity and flexibility
19. 2. Method: BPM Case Management 4/4 a) Way of thinking F J b) Way of working F I M N J E F G E F N H J K e) Way of learning d) Way of controlling L M c) Way of modelling A F Way of describing F Way of conceiving f) Way of supporting C D E F G A B J K L H I M
20. Agenda Introduction Method Lean Office principles BPM Case Management principles Synergy / Support Improve Conclusion
21. 2. Method: Synergy 1/2 a) Way of thinking 1 2 3 4 5 6 8 9 10 11 15 17 F J b) Way of working 1 2 6 7 9 10 4 8 12 13 11 13 14 11 15 18 16 17 18 16 18 F I M J E e) Way of learning d) Way of controlling N E F G F N c) Way of modelling H J K 1 A F Way of describing L M Way of conceiving F f) Way of supporting C D E F G A B J K L H I M
28. Twelve best practices Five best practices covered by Calamity. Case information should be stored in the case itself Production should be triggered by downstream One best practice to improve Calamity with current solution The case flow should be continuously monitored. Six best practices in which ways Cordys can improve its product The customer demand should be leveled to protect a balanced flow. Lean designer should be supported by an online interactive simulation capability
29. Agenda Introduction Method Lean Office principles BPM Case Management principles Synergy / Support Improve Conclusion
30. 2. Method: Best practice Lean designer should be supported by an online interactive simulation capability De Man, 2009
32. Agenda Introduction Method Lean Office principles BPM Case Management principles Synergy / Support Improve Conclusion
33. 3. Conclusion Research question: How could BPM Case Management principles be applied to support knowledge workers in the Lean Office, and how can BPM Case Management solution be improved by leveraging Lean principles? Further research Investigating of other clusters Business Process Lean Management (BPLM)