Air Plane Game Exercise
- Flow, Line balancing, Kaizen
Inseong Kim
Game
• Exercise objectives and purpose
 Create the Standardized work and understand why the STD work is critical to
Quality, Safety and productivity
 Understand how we can link the STD work with operator balancing and Kaizen
activities
• What
 Paper air plane game
• Where
 In the training room
• How
 4 rounds
 See detailed roles on next page
 Reflections by the teams
• Results
 KPIs evolution from round 1 to 4
Lay out and Preparations
Work station
4
Work station
3
Work station
2
Work station
1
Team
leader
Material
handler
- A4 Paper - White, Yellow
- Label – Buffer, Law material
- Waste basket (Paper cup)
- Scissors
- Jigs, Raw material to make jigs
- Stop watch
- Scale (30 cm)
- Marker pens
- STD work document templates
- Flip chart (Metrics print)
 Lay out
 Preparations
Finished
goods
Roles
 1 Material handler : Trainer can be a material handler
– Responsible to feed the line with raw material from the warehouse.
 4 Operators
– Responsible to assemble according to the assembly instruction on each station
– Responsible to improve SQDC at own work station through Idea suggestion & Kaizen
 1 Team leader / Supervisor
– Responsible to observe any difficulties and problems at the assembly stations
– Responsible to measure the cycle time by element each operator
– Responsible to drive Kaizen activity to improve SQDC
 1 PDI inspector : Trainer can be a material handler
– Responsible for inspect any quality problems before delivering the finished goods to
customer
– Count the # of good parts and defected parts
Folding Process
Job allocation
-Round1 & Round2
•Operator 1 : ①
•Operator 2 : ②~⑥
•Operator 3 : ⑦~⑩
•Operator 4 : ⑪~⑭
1 2 3 4 5
678910
11 12 13 14
Timings
Time Items Tasks
0:25 Game Introduction
0:10 Build Practice
0:10 Round 1 - Flow processing with Push
-Create STD work
-Measure the cycle time
0:20 Metrics & 1st Kaizen -Introduce pull
0:10 Round 2 - Flow processing with Pull
0:30 Metrics & 2nd Kaizen -Introduce operator balancing
0:15 Coffee
0:10
Round 3 - Flow processing with Pull &
operator balancing
0:40 Metrics & 3rd Kaizen -Introduce/improve tools/jigs
0:10
Round 4 - Flow processing with Pull,
operator balancing and improve tools/jigs
0:30 Metrics & Update STD work -Update STD work
0:30 Reflection by team Total productivity improvement
4:00 Tot End
Inspection specification
• Good visual quality
• Mismatch allowance : ± 2 mm
• Cutting tolerance : ± 2 mm
Width 15 mm ± 3 mm &
Height 15 mm ± 3 mm
20 ± 3 mm
Metrics
No Metrics
Round 1
-Push
Round 2
-Pull
Round 3
-Balancing
Round 4
-Tools/Jigs
1 Delivered Quantity
(Total trucks delivered)
2 Good Parts
(Total parts green OK)
3 % Green OK
4 Work In Process
(Raw material +Buffer + SWIP)
5 Lead Time (Sec)
6 # of operators 4 4 4 4
7 Time (Min) 8 8 8 8
8 Productivity
(Good parts/% of operator/Time)
Round 1 - Flow processing with Push
Work station 4 Work station 3 Work station 2 Work station 1
Team
leader
Material
handler
Finished
goods Law
material
Rule
• Material handler
- Feed the raw material (A4 paper-white) : 10 sheets for one delivery
- Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time
• Operator
- Continue to work if there are materials available
- Possible to rest or play with smart phone if there are no WIPs
• Inspector : Check/count defected parts & feedback to team leader/operators
• Team leader
- Measure cycle time and Create Standardized work
- Evaluate team metrics results and communicate with operators
• FIFO : All materials should be kept the FIFO rule between processes
• 8 Min
• Use Scissors &
waste basket
Round 1 - Flow processing with Push
 Push system : Supplier push the customer to accept their product
 Inventory is unlimited
 Inventory is increasing
 Manufacturing lead time is too long
 Big bottle neck operation
 Other operator need to wait
 Waiting = Waste
 Unbalanced line between operators = Waste
 Something is not right = Waste
• Problems & Improvement opportunity
Round 2 - Flow processing with Pull
Work station 4 Work station 3 Work station 2 Work station 1
Team
leader
Material
handler
Finished
goods
Buffer Buffer Buffer
Mat’l
Bin 1
Mat’l
Bin 2
Rule
• Material handler
- Feed the raw material (A4 paper-white) with 2-bin concept
- Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time
• Operator
- Work only if there is no WIP in buffer
- Possible to rest or play with smart phone if there are no WIPs
• Inspector : Check/count defected parts & feedback to team leader/operators
• Team leader
- Evaluate team metrics results and communicate with operators
• 8 Min
• Use buffer label
Round 2 - Flow processing with Pull
 Pull system : Customer pull the product from supplier when needed
 More control of inventory
 More organized work place
• Improvements
 But there is still lot to improve
 The product does not met the demand. Now where is the problem?
 The line is not balanced.
- Operator 2 and 4 are doing a lot more work than others
 But this time, the problem is because the line is not balanced. By balancing
it, it can solve the problem!
• Further Improvement opportunity
0
5
10
15
20
25
30
1st Op 2nd Op 3rd Op 4th Op 1st Op 2nd Op 3rd Op 4th Op
Operator Balance Chart / Yamazumi chart
Round 3 - Flow processing with Pull & Operator balancing
Work station 4 Work station 3 Work station 2 Work station 1
Team
leader
Material
handler
Finished
goods
8 Min
Buffer Buffer Buffer
Mat’l
Bin 1
Mat’l
Bin 2
Rule – Same as Round 2
• But the workload is properly balanced / divided to stabilize process with balancing
• Material handler
- Feed the raw material (A4 paper-white) with 2-bin concept
- Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time
• Operator
- Work only if there is no WIP in buffer
- Possible to rest or play with smart phone if there are no WIPs
• Inspector : Check/count defected parts & feedback to team leader/operators
• Team leader
- Evaluate team metrics results and communicate with operators
Round 3 - Flow processing with Pull & Operator balancing
 Operator balancing
- The workload is properly balanced and divided to stabilize process
 Shorter lead time with “QRPS” problem solving
• Improvements
 But there is still lot to improve
- need to improved the quality
- need to reduce the cycle time
• Further Improvement opportunity
Round 4
-Flow processing with Pull, operator balancing & tools/jigs
Work station 4 Work station 3 Work station 2 Work station 1
Team
leader
Material
handler
Finished
goods
8 Min
Buffer Buffer Buffer
Mat’l
Bin 1
Mat’l
Bin 2
Rule – Same as Round 3
• But new tools & jigs are used to improve quality & reduce cycle time
• Material handler
- Feed the raw material (A4 paper-white) with 2-bin concept
- Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time
• Operator
- Work only if there is no WIP in buffer
- Possible to rest or play with smart phone if there are no WIPs
• Inspector : Check/count defected parts & feedback to team leader/operators
• Team leader
- Evaluate team metrics results and communicate with operators
Operator Balance Chart
0
5
10
15
20
25
30
1st Op 2nd Op 3rd Op 4th Op 1st Op 2nd Op 3rd Op 4th Op
Jigs
Reference
• Half folding jigs • Wing folding jigs
• Cutting jigs…
Metrics
No Metrics
Round 1
-Push
Round 2
-Pull
Round 3
-Balancing
Round 4
-Tools/Jigs
1 Delivered Quantity
(Total trucks delivered)
10 12 14 15
2 Good Parts
(Total parts green OK)
7 9 11 15
3 % Green OK 70% 75% 79% 100%
4 Work In Process
(Raw material +Buffer + SWIP)
57 9 9 9
5 Lead Time (Sec) 75 65 62 56
6 # of operators 4 4 4 4
7 Time (Sec) 8 8 8 8
8 Productivity
(Good parts/% of operator/Time)

More Related Content

What's hot

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
How to Do a Gemba Walk
How to Do a Gemba WalkHow to Do a Gemba Walk
How to Do a Gemba WalkMichael Bremer
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionAnand Subramaniam
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)Aysel Muradlı
 
8 Wastes Of Lean PowerPoint Presentation Slides
8 Wastes Of Lean PowerPoint Presentation Slides 8 Wastes Of Lean PowerPoint Presentation Slides
8 Wastes Of Lean PowerPoint Presentation Slides SlideTeam
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleFrank-G. Adler
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m changeHardil Shah
 
Agile and Lean Games
Agile and Lean GamesAgile and Lean Games
Agile and Lean GamesAdrian Smith
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingJitesh Gaurav
 

What's hot (20)

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
How to Do a Gemba Walk
How to Do a Gemba WalkHow to Do a Gemba Walk
How to Do a Gemba Walk
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Mistake proofing smpl_1
Mistake proofing smpl_1Mistake proofing smpl_1
Mistake proofing smpl_1
 
Lean Daily Management System
Lean Daily Management SystemLean Daily Management System
Lean Daily Management System
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
8 Wastes Of Lean PowerPoint Presentation Slides
8 Wastes Of Lean PowerPoint Presentation Slides 8 Wastes Of Lean PowerPoint Presentation Slides
8 Wastes Of Lean PowerPoint Presentation Slides
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Introduction to Standardized Work
Introduction to Standardized WorkIntroduction to Standardized Work
Introduction to Standardized Work
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
 
Agile and Lean Games
Agile and Lean GamesAgile and Lean Games
Agile and Lean Games
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 

Similar to Air Plane Game Exercise Improves Flow and Productivity

Unit iii operations management
Unit iii operations managementUnit iii operations management
Unit iii operations managementManagement
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chartParvesh Mittal
 
elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes Mutahira Ahad
 
Introduction to lean amy hodgkinson & trevor taylor
Introduction to lean   amy hodgkinson & trevor taylorIntroduction to lean   amy hodgkinson & trevor taylor
Introduction to lean amy hodgkinson & trevor taylorNHS Improving Quality
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systemsaizellbernal
 
Improving productivity through Lean and Total Productive Maintenance
Improving productivity through Lean and Total Productive MaintenanceImproving productivity through Lean and Total Productive Maintenance
Improving productivity through Lean and Total Productive MaintenanceTim Hopper
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesvideoaakash15
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxamanuel236786
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptxRidhoDarmawan10
 
eeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools aeeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools aRai University
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC toolsVarmahk
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019sserwaniko
 
Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuffMaududAhmmad
 

Similar to Air Plane Game Exercise Improves Flow and Productivity (20)

Unit iii operations management
Unit iii operations managementUnit iii operations management
Unit iii operations management
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chart
 
elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes
 
Method study
Method studyMethod study
Method study
 
Introduction to lean amy hodgkinson & trevor taylor
Introduction to lean   amy hodgkinson & trevor taylorIntroduction to lean   amy hodgkinson & trevor taylor
Introduction to lean amy hodgkinson & trevor taylor
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
Improving productivity through Lean and Total Productive Maintenance
Improving productivity through Lean and Total Productive MaintenanceImproving productivity through Lean and Total Productive Maintenance
Improving productivity through Lean and Total Productive Maintenance
 
IE training
IE training IE training
IE training
 
IE Training
IE Training IE Training
IE Training
 
Method Study
Method Study Method Study
Method Study
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
Lean Manufacturign Simulator
Lean Manufacturign SimulatorLean Manufacturign Simulator
Lean Manufacturign Simulator
 
eeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools aeeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools a
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC tools
 
Work study new
Work study newWork study new
Work study new
 
Lean basics
Lean basicsLean basics
Lean basics
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuff
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Air Plane Game Exercise Improves Flow and Productivity

  • 1. Air Plane Game Exercise - Flow, Line balancing, Kaizen Inseong Kim
  • 2. Game • Exercise objectives and purpose  Create the Standardized work and understand why the STD work is critical to Quality, Safety and productivity  Understand how we can link the STD work with operator balancing and Kaizen activities • What  Paper air plane game • Where  In the training room • How  4 rounds  See detailed roles on next page  Reflections by the teams • Results  KPIs evolution from round 1 to 4
  • 3. Lay out and Preparations Work station 4 Work station 3 Work station 2 Work station 1 Team leader Material handler - A4 Paper - White, Yellow - Label – Buffer, Law material - Waste basket (Paper cup) - Scissors - Jigs, Raw material to make jigs - Stop watch - Scale (30 cm) - Marker pens - STD work document templates - Flip chart (Metrics print)  Lay out  Preparations Finished goods
  • 4. Roles  1 Material handler : Trainer can be a material handler – Responsible to feed the line with raw material from the warehouse.  4 Operators – Responsible to assemble according to the assembly instruction on each station – Responsible to improve SQDC at own work station through Idea suggestion & Kaizen  1 Team leader / Supervisor – Responsible to observe any difficulties and problems at the assembly stations – Responsible to measure the cycle time by element each operator – Responsible to drive Kaizen activity to improve SQDC  1 PDI inspector : Trainer can be a material handler – Responsible for inspect any quality problems before delivering the finished goods to customer – Count the # of good parts and defected parts
  • 5. Folding Process Job allocation -Round1 & Round2 •Operator 1 : ① •Operator 2 : ②~⑥ •Operator 3 : ⑦~⑩ •Operator 4 : ⑪~⑭ 1 2 3 4 5 678910 11 12 13 14
  • 6. Timings Time Items Tasks 0:25 Game Introduction 0:10 Build Practice 0:10 Round 1 - Flow processing with Push -Create STD work -Measure the cycle time 0:20 Metrics & 1st Kaizen -Introduce pull 0:10 Round 2 - Flow processing with Pull 0:30 Metrics & 2nd Kaizen -Introduce operator balancing 0:15 Coffee 0:10 Round 3 - Flow processing with Pull & operator balancing 0:40 Metrics & 3rd Kaizen -Introduce/improve tools/jigs 0:10 Round 4 - Flow processing with Pull, operator balancing and improve tools/jigs 0:30 Metrics & Update STD work -Update STD work 0:30 Reflection by team Total productivity improvement 4:00 Tot End
  • 7. Inspection specification • Good visual quality • Mismatch allowance : ± 2 mm • Cutting tolerance : ± 2 mm Width 15 mm ± 3 mm & Height 15 mm ± 3 mm 20 ± 3 mm
  • 8. Metrics No Metrics Round 1 -Push Round 2 -Pull Round 3 -Balancing Round 4 -Tools/Jigs 1 Delivered Quantity (Total trucks delivered) 2 Good Parts (Total parts green OK) 3 % Green OK 4 Work In Process (Raw material +Buffer + SWIP) 5 Lead Time (Sec) 6 # of operators 4 4 4 4 7 Time (Min) 8 8 8 8 8 Productivity (Good parts/% of operator/Time)
  • 9. Round 1 - Flow processing with Push Work station 4 Work station 3 Work station 2 Work station 1 Team leader Material handler Finished goods Law material Rule • Material handler - Feed the raw material (A4 paper-white) : 10 sheets for one delivery - Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time • Operator - Continue to work if there are materials available - Possible to rest or play with smart phone if there are no WIPs • Inspector : Check/count defected parts & feedback to team leader/operators • Team leader - Measure cycle time and Create Standardized work - Evaluate team metrics results and communicate with operators • FIFO : All materials should be kept the FIFO rule between processes • 8 Min • Use Scissors & waste basket
  • 10. Round 1 - Flow processing with Push  Push system : Supplier push the customer to accept their product  Inventory is unlimited  Inventory is increasing  Manufacturing lead time is too long  Big bottle neck operation  Other operator need to wait  Waiting = Waste  Unbalanced line between operators = Waste  Something is not right = Waste • Problems & Improvement opportunity
  • 11. Round 2 - Flow processing with Pull Work station 4 Work station 3 Work station 2 Work station 1 Team leader Material handler Finished goods Buffer Buffer Buffer Mat’l Bin 1 Mat’l Bin 2 Rule • Material handler - Feed the raw material (A4 paper-white) with 2-bin concept - Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time • Operator - Work only if there is no WIP in buffer - Possible to rest or play with smart phone if there are no WIPs • Inspector : Check/count defected parts & feedback to team leader/operators • Team leader - Evaluate team metrics results and communicate with operators • 8 Min • Use buffer label
  • 12. Round 2 - Flow processing with Pull  Pull system : Customer pull the product from supplier when needed  More control of inventory  More organized work place • Improvements  But there is still lot to improve  The product does not met the demand. Now where is the problem?  The line is not balanced. - Operator 2 and 4 are doing a lot more work than others  But this time, the problem is because the line is not balanced. By balancing it, it can solve the problem! • Further Improvement opportunity
  • 13. 0 5 10 15 20 25 30 1st Op 2nd Op 3rd Op 4th Op 1st Op 2nd Op 3rd Op 4th Op Operator Balance Chart / Yamazumi chart
  • 14. Round 3 - Flow processing with Pull & Operator balancing Work station 4 Work station 3 Work station 2 Work station 1 Team leader Material handler Finished goods 8 Min Buffer Buffer Buffer Mat’l Bin 1 Mat’l Bin 2 Rule – Same as Round 2 • But the workload is properly balanced / divided to stabilize process with balancing • Material handler - Feed the raw material (A4 paper-white) with 2-bin concept - Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time • Operator - Work only if there is no WIP in buffer - Possible to rest or play with smart phone if there are no WIPs • Inspector : Check/count defected parts & feedback to team leader/operators • Team leader - Evaluate team metrics results and communicate with operators
  • 15. Round 3 - Flow processing with Pull & Operator balancing  Operator balancing - The workload is properly balanced and divided to stabilize process  Shorter lead time with “QRPS” problem solving • Improvements  But there is still lot to improve - need to improved the quality - need to reduce the cycle time • Further Improvement opportunity
  • 16. Round 4 -Flow processing with Pull, operator balancing & tools/jigs Work station 4 Work station 3 Work station 2 Work station 1 Team leader Material handler Finished goods 8 Min Buffer Buffer Buffer Mat’l Bin 1 Mat’l Bin 2 Rule – Same as Round 3 • But new tools & jigs are used to improve quality & reduce cycle time • Material handler - Feed the raw material (A4 paper-white) with 2-bin concept - Feed the yellow A4 paper in 3 minutes to measure manufacturing lead time • Operator - Work only if there is no WIP in buffer - Possible to rest or play with smart phone if there are no WIPs • Inspector : Check/count defected parts & feedback to team leader/operators • Team leader - Evaluate team metrics results and communicate with operators
  • 17. Operator Balance Chart 0 5 10 15 20 25 30 1st Op 2nd Op 3rd Op 4th Op 1st Op 2nd Op 3rd Op 4th Op
  • 18. Jigs Reference • Half folding jigs • Wing folding jigs • Cutting jigs…
  • 19. Metrics No Metrics Round 1 -Push Round 2 -Pull Round 3 -Balancing Round 4 -Tools/Jigs 1 Delivered Quantity (Total trucks delivered) 10 12 14 15 2 Good Parts (Total parts green OK) 7 9 11 15 3 % Green OK 70% 75% 79% 100% 4 Work In Process (Raw material +Buffer + SWIP) 57 9 9 9 5 Lead Time (Sec) 75 65 62 56 6 # of operators 4 4 4 4 7 Time (Sec) 8 8 8 8 8 Productivity (Good parts/% of operator/Time)