SlideShare a Scribd company logo
1 of 3
Download to read offline
Lawrence Whaley
10, Holmfield Drive, Great Sutton, Ellesmere Port, CH66 2SS
Mobile: 07977937742,– Email: lawrencewhaley@aol.com
PROFILE
An experienced and much in demand Site Coatings Inspector (Nace Certified Level 3) possessing 25 years of
experience working in the Industrial Painting and Coatings sector. Demonstrates excellent Client-relationship skills and
is fully competent in carrying out Surveys, Inspections and delivering reports according to Client demands. Shows skill
at supervising project teams, preparing documentation, recording climatic conditions, to name a few
Now seeking to continue professional development in a role in the Coatings industry where value can be added
following a very successful career to date.
KEY SKILLS & EXPERTISE
 Technical Competencies: Exposed to and knowledgeable in various tasks as a Site Coatings Inspector and is
skilled at carrying out Surveys, performing Inspections, scoping of work, to mention a few and NACE Level 3
qualified.
 Health and Safety: Complies with company and regulatory safety protocol and policies and procedures and
reputed for within current and previous roles for proactively managing risk and hazards within any assignment set.
 Leadership and Training: Has excellent experience in delivering comprehensive leadership and on the job
mentoring to staff in each role undertaken. An effective Supervisor who leads from the front who is recognised by
Senior Management and colleagues alike for influencing performance teams. This has been demonstrated in the
current role of Site Coating Inspector working at Calor gas, Canvey Island.
 Planning and Organisation: Has the ability to effectively organise complex projects by way of prioritising tasks in
order to complete jobs in a timely manner. Is adept at working unsupervised whilst also supervising subordinates.
 Adaptable: Can easily adjust to working in different environments and under pressurised situations to a very high
standard. This has regularly been drawn upon throughout a successful professional career to date.
 Communication: Has excellent verbal communication skills and can communicate proficiently with colleagues in
order to convey accurate working instructions.
EXPERTISE
 Coatings Inspection
 Quality Assurance & Quality Control
 Health & Safety
 Surveys
 Supervisory
 Project Planning
PROFESSIONAL DEVELOPMENT
Professional Qualifications/Tickets:
 NACE 3
 SMSTS
 IPAF Category 1a 1b 3a 3b
 ICATS
 CSCS CARD
 FIRST AID
 PASMA
 CONFINED SPACE TRAINED
PROFESSIONAL EXPERIENCE (Relevant)
Present EPIC (Hares, Kiers and Jacobs)
Tmf project Urenco BNFL
Site Coatings Inspector
Responsibilities:
 Ensuring work carried out by EPIC is done in accordance with vendor/Client specification.
 Recording data relating to climatic conditions identifying any potential issues/defects.
 Performing dft checks as well as ensuring the quality of application.
 Inspecting intumescent coatings on all structural steelwork e.g. installed by Hares as well as all pipework being
installed by Jacobs.
 Develop clear and achievable project objectives within management team and other stakeholders.
 Working closely with Client from project commencement through to final handover.
 Following Method Statements, Risk Assessments and partaking in Tool Box Talks.
2015 Client: Calor Gas, Canvey Island
Site Coatings Inspector
Responsibilities:
 Effectively carry out Coatings Inspections of various Gas Holders before reporting back findings to Senior
Management recommending areas to achieve best practice.
 Co-ordinating the Inspection of jobs from Work-UP stage through to final sign off.
 Accountable for maintaining the quality of all coatings preparation and application as well proactively reporting
any queries pertaining to environmental conditions, salt content levels, blast profile/cleanliness and coating
thicknesses.
 Accurately record and document job details from surveys before promptly identifying potential problems.
 Relied upon to ensure that all Coatings works are given a final sign off at the end of each project phase.
 Ensuring all activities adhere to current regulations and referring miscorrelation or compliance as required,
through appropriate channels.
Jan 2014 Radcliffe Power Station
Site Manager/Inspector (FGD Absorbers)
Responsibilities:
 Relied upon to supervise and manage the daily running of a squad of Blaster/Painters providing corrective
instruction in order to ensure that all works are carried out in line with project objectives.
 Accountable for carrying work in a timely and safe manner and in accordance with strict Health and Safety
protocol.
 Utilise first-class communication, rapport building, relationship management, and influencing skills working with
EON management and Jotun Paint Inspectors in order to improve practical efficiency.
 Sought upon to proactively raise Quality Observations before formulating a successful resolution. Proactively
monitor Quality Control procedures.
 Participate fully in Tool Box and proactively identify areas for achieving best practice.
 Accountable for good house keeping pertaining to making sure the working environment in both safe and clean.
May 2013 – Jan 2014 Anfield, Centenary Stand & KOP Super Structure Project
Site Manager/Supervisor/Inspector
Responsibilities:
 Sought upon to provide supervision to 20 Industrial Painters utilising various methods of management and
leadership, providing inspiration through initiatives that reward, engaging dialogue and leading by example. This
pertains to the effective preparation and coating of steel work.
 Relied upon to respect budget constraints and deadlines ensuing that these meet project objectives and scope.
 Assigning work to Operatives based on current demands and creating a working environment orientated to trust,
performance and team work. Providing constructive feedback to support professional development and project
completion.
 Formulate and communicate QA/QC reports to Project Manager as to coatings on internal steelwork; raising
issues before escalation.
 Accountable for own work output being of the highest standard by adhering to thorough Quality Control
procedures.
OVERVIEW OF EARLIER PROFESSIONAL EXPERIENCE
2006 – 2012 Nustar Storage
Supervisor (Pipelines, Storage Tanks, Bund Lining)
Responsibilities:
 Overall responsibility for carrying out coating projects including, but not limited to, internal/external storage tanks,
surface preparation, Pipeline blasting and coating and application of Intumescent coatings.
Other successful projects completed consist of: United Molasses, World Fuel Limited, Network Rail, AMCO,
Kier, Murphy Rail, Henty Oils, Blackburn Rovers FC and Unilever. Includes work on Bridges, Pipelines,
Storage Tanks, Stadia, to name a few.

More Related Content

What's hot

What's hot (20)

Michael Groarke Resume
Michael Groarke ResumeMichael Groarke Resume
Michael Groarke Resume
 
Daniel Roberson Resume 2015
Daniel Roberson Resume 2015Daniel Roberson Resume 2015
Daniel Roberson Resume 2015
 
Victor Duplessis Resume
Victor Duplessis ResumeVictor Duplessis Resume
Victor Duplessis Resume
 
Marcel Lankas CV
Marcel Lankas CVMarcel Lankas CV
Marcel Lankas CV
 
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1
 
Rs backup
Rs backupRs backup
Rs backup
 
Sebin Joseph 2016
Sebin Joseph 2016Sebin Joseph 2016
Sebin Joseph 2016
 
gene-malboeuf-resume
gene-malboeuf-resumegene-malboeuf-resume
gene-malboeuf-resume
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Resume joseph chavez
Resume joseph chavezResume joseph chavez
Resume joseph chavez
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.
 
Veera raghavan current cv 10 august 2016
Veera  raghavan current  cv 10 august 2016Veera  raghavan current  cv 10 august 2016
Veera raghavan current cv 10 august 2016
 
McLeod, Sean Resume
McLeod, Sean ResumeMcLeod, Sean Resume
McLeod, Sean Resume
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
JAMES MARSHALL CV PDF
JAMES MARSHALL CV PDFJAMES MARSHALL CV PDF
JAMES MARSHALL CV PDF
 
Benjamin Santos Resume V1
Benjamin Santos Resume V1Benjamin Santos Resume V1
Benjamin Santos Resume V1
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
NadeemCV-1
NadeemCV-1NadeemCV-1
NadeemCV-1
 

Viewers also liked

Viewers also liked (6)

CV Nitin V Vasudeo
CV Nitin V VasudeoCV Nitin V Vasudeo
CV Nitin V Vasudeo
 
OmexEngBrochure
OmexEngBrochureOmexEngBrochure
OmexEngBrochure
 
UNIDAD 2 Calculo de predicados
UNIDAD 2 Calculo de predicadosUNIDAD 2 Calculo de predicados
UNIDAD 2 Calculo de predicados
 
ENSAYO SOBRE EL LENGUAJE C
ENSAYO SOBRE EL LENGUAJE C ENSAYO SOBRE EL LENGUAJE C
ENSAYO SOBRE EL LENGUAJE C
 
Presentacion como archivo
Presentacion como archivoPresentacion como archivo
Presentacion como archivo
 
morfologia vistas de edificacion
morfologia vistas de edificacionmorfologia vistas de edificacion
morfologia vistas de edificacion
 

Similar to Experienced NACE Level 3 Coatings Inspector Seeking New Role

Similar to Experienced NACE Level 3 Coatings Inspector Seeking New Role (20)

Customer copy (5) 1 (2)
Customer copy (5)   1 (2)Customer copy (5)   1 (2)
Customer copy (5) 1 (2)
 
Engineer Mahboob's CV
Engineer Mahboob's CVEngineer Mahboob's CV
Engineer Mahboob's CV
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
CT CV (6)
CT CV (6)CT CV (6)
CT CV (6)
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
Eddie Gomez Resume 1
Eddie Gomez Resume 1Eddie Gomez Resume 1
Eddie Gomez Resume 1
 
Updated cv, uk
Updated cv, ukUpdated cv, uk
Updated cv, uk
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
CM-McConnell
CM-McConnellCM-McConnell
CM-McConnell
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Neil Harveyresume.v1
Neil Harveyresume.v1Neil Harveyresume.v1
Neil Harveyresume.v1
 
A Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - CurrentA Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - Current
 

Experienced NACE Level 3 Coatings Inspector Seeking New Role

  • 1. Lawrence Whaley 10, Holmfield Drive, Great Sutton, Ellesmere Port, CH66 2SS Mobile: 07977937742,– Email: lawrencewhaley@aol.com PROFILE An experienced and much in demand Site Coatings Inspector (Nace Certified Level 3) possessing 25 years of experience working in the Industrial Painting and Coatings sector. Demonstrates excellent Client-relationship skills and is fully competent in carrying out Surveys, Inspections and delivering reports according to Client demands. Shows skill at supervising project teams, preparing documentation, recording climatic conditions, to name a few Now seeking to continue professional development in a role in the Coatings industry where value can be added following a very successful career to date. KEY SKILLS & EXPERTISE  Technical Competencies: Exposed to and knowledgeable in various tasks as a Site Coatings Inspector and is skilled at carrying out Surveys, performing Inspections, scoping of work, to mention a few and NACE Level 3 qualified.  Health and Safety: Complies with company and regulatory safety protocol and policies and procedures and reputed for within current and previous roles for proactively managing risk and hazards within any assignment set.  Leadership and Training: Has excellent experience in delivering comprehensive leadership and on the job mentoring to staff in each role undertaken. An effective Supervisor who leads from the front who is recognised by Senior Management and colleagues alike for influencing performance teams. This has been demonstrated in the current role of Site Coating Inspector working at Calor gas, Canvey Island.  Planning and Organisation: Has the ability to effectively organise complex projects by way of prioritising tasks in order to complete jobs in a timely manner. Is adept at working unsupervised whilst also supervising subordinates.  Adaptable: Can easily adjust to working in different environments and under pressurised situations to a very high standard. This has regularly been drawn upon throughout a successful professional career to date.  Communication: Has excellent verbal communication skills and can communicate proficiently with colleagues in order to convey accurate working instructions. EXPERTISE  Coatings Inspection  Quality Assurance & Quality Control  Health & Safety  Surveys  Supervisory  Project Planning PROFESSIONAL DEVELOPMENT Professional Qualifications/Tickets:  NACE 3  SMSTS  IPAF Category 1a 1b 3a 3b  ICATS  CSCS CARD  FIRST AID  PASMA  CONFINED SPACE TRAINED
  • 2. PROFESSIONAL EXPERIENCE (Relevant) Present EPIC (Hares, Kiers and Jacobs) Tmf project Urenco BNFL Site Coatings Inspector Responsibilities:  Ensuring work carried out by EPIC is done in accordance with vendor/Client specification.  Recording data relating to climatic conditions identifying any potential issues/defects.  Performing dft checks as well as ensuring the quality of application.  Inspecting intumescent coatings on all structural steelwork e.g. installed by Hares as well as all pipework being installed by Jacobs.  Develop clear and achievable project objectives within management team and other stakeholders.  Working closely with Client from project commencement through to final handover.  Following Method Statements, Risk Assessments and partaking in Tool Box Talks. 2015 Client: Calor Gas, Canvey Island Site Coatings Inspector Responsibilities:  Effectively carry out Coatings Inspections of various Gas Holders before reporting back findings to Senior Management recommending areas to achieve best practice.  Co-ordinating the Inspection of jobs from Work-UP stage through to final sign off.  Accountable for maintaining the quality of all coatings preparation and application as well proactively reporting any queries pertaining to environmental conditions, salt content levels, blast profile/cleanliness and coating thicknesses.  Accurately record and document job details from surveys before promptly identifying potential problems.  Relied upon to ensure that all Coatings works are given a final sign off at the end of each project phase.  Ensuring all activities adhere to current regulations and referring miscorrelation or compliance as required, through appropriate channels. Jan 2014 Radcliffe Power Station Site Manager/Inspector (FGD Absorbers) Responsibilities:  Relied upon to supervise and manage the daily running of a squad of Blaster/Painters providing corrective instruction in order to ensure that all works are carried out in line with project objectives.  Accountable for carrying work in a timely and safe manner and in accordance with strict Health and Safety protocol.  Utilise first-class communication, rapport building, relationship management, and influencing skills working with EON management and Jotun Paint Inspectors in order to improve practical efficiency.  Sought upon to proactively raise Quality Observations before formulating a successful resolution. Proactively monitor Quality Control procedures.  Participate fully in Tool Box and proactively identify areas for achieving best practice.  Accountable for good house keeping pertaining to making sure the working environment in both safe and clean. May 2013 – Jan 2014 Anfield, Centenary Stand & KOP Super Structure Project Site Manager/Supervisor/Inspector Responsibilities:  Sought upon to provide supervision to 20 Industrial Painters utilising various methods of management and leadership, providing inspiration through initiatives that reward, engaging dialogue and leading by example. This pertains to the effective preparation and coating of steel work.  Relied upon to respect budget constraints and deadlines ensuing that these meet project objectives and scope.  Assigning work to Operatives based on current demands and creating a working environment orientated to trust, performance and team work. Providing constructive feedback to support professional development and project completion.  Formulate and communicate QA/QC reports to Project Manager as to coatings on internal steelwork; raising issues before escalation.  Accountable for own work output being of the highest standard by adhering to thorough Quality Control procedures.
  • 3. OVERVIEW OF EARLIER PROFESSIONAL EXPERIENCE 2006 – 2012 Nustar Storage Supervisor (Pipelines, Storage Tanks, Bund Lining) Responsibilities:  Overall responsibility for carrying out coating projects including, but not limited to, internal/external storage tanks, surface preparation, Pipeline blasting and coating and application of Intumescent coatings. Other successful projects completed consist of: United Molasses, World Fuel Limited, Network Rail, AMCO, Kier, Murphy Rail, Henty Oils, Blackburn Rovers FC and Unilever. Includes work on Bridges, Pipelines, Storage Tanks, Stadia, to name a few.