Laura Crossman RN, BSN Page 1
LAURA CROSSMAN RN, BSN
1433 Kingman Drive  St. Joseph, MI 49085  Phone: 269-428-4425  crossman1433@aol.com
Epic Willow Pharmacy / Inpatient Procedure Orders Analyst
Epic certified technology professional with experience in enterprise implementations of healthcare information
and EHR systems. Expert in gathering, analyzing and defining business and functional requirements; software
design, gap analysis and other decision-making tools; leading Go-Live Cutover and 90,60,30-day Go-Live
Implementation initiatives; designing/re-engineering processes, workflows and technology solutions for
healthcare systems and networks. Proven ability to lead seamless implementations and deliver next-generation
technical solutions improving revenues, margins and workplace productivity.
Epic Build Skills Expertise
 Simple & Mixture (ERX) Medication Build
 Frequencies (EFQ) set-up
 Order Composer Configuration (OCC)
 Preference Lists/Med Lists
 Order Sets (PRL)/Order Panel (OSQ) Build
 SmartTexts, SmartLinks, SmartLists Build
 Charge on Admin vs. Charge on Dispense
 FDB (First Data Bank) Med Load
 Alternative Alerts (LMA)
 Pharmacy Cart Build
 Security Build (EMP) (SER) (E2R) (LPR)
 Pharmacy Record (PHR) set-up
 Pharmacist Dashboard / Radar Configuration
 In-Basket Design including Web Redirectories
 Barcoding / Barcode Validation
 Custom NDC Build
 Label / Label Routing Build
 One-Step Med Configuration for OpTime/Anesthesia
 BCMA (Barcode Med Administration)
 Dispensing Logic
Professional Experience
BASSETT HEALTHCARE – COOPERSTOWN, NY July 2015-Present
Epic Willow Consultant
 Epic / ProVation evidenced-based order set review/build
MEMORIAL HEALTH – SAVANNAH, GA Dec 2014 – May 2015
Epic Willow Consultant
 Built, tested and obtained validation for:
o All Pharmacy Labels (35 total)
o Label Routing for all dispense codes
o Custom Labels (prior to transitioning to CNR)
o Pharmacy Security Build (Technicians, Charge Supervisor, Pharmacists & Managers)
 Willow Lead for Integrated Testing
o Created Sherlock tickets to report integrated testing issues.
o Collaborated with all applicable teams to resolve build issues discovered during integrated
testing.
o Researched and proposed build solutions related to integrated testing issues.
 Go-Live Command Center Support
PARKVIEW HEALTH – FORT WAYNE, IN 2012-Aug 2014
Epic Willow Consultant
 Willow Lead for the Community Connect Project (Paulding County Hospital).
o Built, tested and obtained validation for all build related to Willow for:
 Ohio State Board of Pharmacy Positive ID
Laura Crossman RN, BSN Page 2
 Analysis, review & build of all Willow workflows to accommodate a Non-Parkview
owned hospital
o Go-Live & Post Go-Live Support
 Built, tested and obtained validation for:
o Specialty Preference Lists
o Respiratory Therapy ERX/EAP Order Panel Build
o Alternative Alerts for Therapeutic Interchanges & Combo Meds
o Oral Liquid Build to accommodate age-based contextual dispensing including Orderables
 Go-Live Command Center support (rolling Go-Live – 2 main hospitals then 4 Community Hospitals)
 Post Go-Live liaison for ticket investigation and resolution.
LAKELAND HEALTHCARE – ST. JOSEPH, MI 2006-2013
Willow Pharmacy/Inpatient Procedure Orders Analyst - ConnectCare 2010-2013
 Lead the Willow team with the investigation, planning and implementation of Epic software.
 Provided leadership and direction.
 Analyzed operational workflows and Epic functionality to guide gap analysis, options, decision-making and
maintenance.
 Served as a conduit for aligning resources and activities related to Epic topics and issues.
 Lead clinical/operational activities in software design, configuration, implementation, testing, and
activation of Epic software.
 Developed detailed project schedules; coordinated and scheduled meetings; Lead for the 90-60-30 Day
GLRA.
 Built, Tested and Validated build for ERX’s, LPF’s, OSQ’s, LMA’s, IDM’s, NDC’s, EFQ’s, OCC’s and all Willow
Security.
 Implemented charging overrides for a newly purchased hospital to ride out a different med vendor contract
(including OSQ overrides based on hospital location for Order Sets).
 Collaborated with Up-to-Date to sync Epic so that End Users could earn CME’s.
 Participated in the review and testing of Nova Notes for SU’s and the 2010-2012 upgrade.
 Coordinated new application functionality with the training team.
 Go-Live Command Center Support & Post Go-Live liaison for ticket investigation and resolution.
Registered Nurse – Medical/Oncology 2007-2010
Nurse Technician – Float Pool 2006-2007
 Charge Nurse - coordinated admission processes; maintained staff schedules; managed floor PRN.
 Mentor and preceptor including delegation utilizing a team approach.
 Managed care and ADL’s; updated Care Plans; performed nursing assessments and documentation.
 Collaborated with the multi-disciplinary team to provide exceptional patient care.
LAKESIDE CANCER SPECIALISTS – ST. JOSEPH, MI 2010
Registered Nurse – Infusion Clinic
 Conducted nurse evaluations.
 Accessed and verified parenteral infusion site during chemotherapeutic infusion.
 Monitored vitals per protocol; performed ongoing assessments during infusion.
 Documentation via Electronic Health Record – ONCO EMR.
Laura Crossman RN, BSN Page 3
ALL-PHASE ELECTRIC SUPPLY – BENTON HARBOR, MI 1999-2005
Accounts Receivable Clerk 2001-2005
Accounts Payable Clerk 1999-2001
 Prepared and entered all customer payments via NXTREND and CMS systems.
 Designed and implemented an EXCEL spreadsheet to manage Bad Debt write-offs and recoveries.
 Managed monthly bank reconciliations, daily deposits and credit card payments, collection calls.
 Processed invoices to purchase orders, evaluated and resolved problematic invoices, applied credits and
charge backs to vendor accounts.
FIFTH THIRD BANK – STEVENSVILLE, MI 1997-1998
Customer Service Representative
 Processed loan applications and wire transfers.
 Managed office during staffing shortage; including day to day operations, customer complaints, supervision
and scheduling of employees.
 Ordered and maintained supply of inventory to manage office.
 Collaborated with the main headquarters to balance cash drawers, ATM and office vault.
 Knowledge and application of deposits, withdrawals, certificate of deposits, money orders and transfers.
THE BUCKLE – BENTON HARBOR, MI 1996-1998
Team Leader
 Merchandised clothing by creating new wall layouts and designs.
 Supervised all employees during the absence of the store manager.
 Ordered and maintained supply of inventory; Implemented markdowns.
 Increased revenue by displaying exceptional salesmanship and customer service skills.
 Collaborated with management to perform cash drawer balancing and deposits.
Education
BETHEL COLLEGE – MISHAWAKA, IN
Bachelor’s Degree in Applied Science – 2010
 NLNAC accredited
 GPA 3.95
 Sigma Theta Tau International Honor Society
LAKE MICHIGAN COLLEGE – BENTON HARBOR, MI
Associate Degree in Applied Science – 2007
 NLNAC accredited
 GPA 3.12
 Phi Theta Kappa Honor Society
 Certificate of Achievement for academic proficiency in Critical Thinking
LAKESHORE HIGH SCHOOL – STEVENSVILLE, MI
General Diploma - 1997
 GPA 3.45
 Mathematics and Reading endorsements
 Drug Abuse Resistance Education (DARE)
 Cheerleading, Track, Softball
Laura Crossman RN, BSN Page 4
 Quill & Scroll award
Certifications & Specialized Training
Registered Nurse (RN) license # 4704261247
Basic Life Support (BLS) / CPR Certified
Advanced Cardiac Life Support (ACLS) Certified
Chemotherapy Certification – Oncology Nursing Society # 350918
2010 Willow Pharmacy Certified w/ 2012, 2014 & 2015 NVT – Epic
2010 Inpatient Procedure Orders Certified w/ 2012, 2014 & 2015 NVT - Epic
References
Available upon request

Laura Crossman RN, BSN

  • 1.
    Laura Crossman RN,BSN Page 1 LAURA CROSSMAN RN, BSN 1433 Kingman Drive  St. Joseph, MI 49085  Phone: 269-428-4425  crossman1433@aol.com Epic Willow Pharmacy / Inpatient Procedure Orders Analyst Epic certified technology professional with experience in enterprise implementations of healthcare information and EHR systems. Expert in gathering, analyzing and defining business and functional requirements; software design, gap analysis and other decision-making tools; leading Go-Live Cutover and 90,60,30-day Go-Live Implementation initiatives; designing/re-engineering processes, workflows and technology solutions for healthcare systems and networks. Proven ability to lead seamless implementations and deliver next-generation technical solutions improving revenues, margins and workplace productivity. Epic Build Skills Expertise  Simple & Mixture (ERX) Medication Build  Frequencies (EFQ) set-up  Order Composer Configuration (OCC)  Preference Lists/Med Lists  Order Sets (PRL)/Order Panel (OSQ) Build  SmartTexts, SmartLinks, SmartLists Build  Charge on Admin vs. Charge on Dispense  FDB (First Data Bank) Med Load  Alternative Alerts (LMA)  Pharmacy Cart Build  Security Build (EMP) (SER) (E2R) (LPR)  Pharmacy Record (PHR) set-up  Pharmacist Dashboard / Radar Configuration  In-Basket Design including Web Redirectories  Barcoding / Barcode Validation  Custom NDC Build  Label / Label Routing Build  One-Step Med Configuration for OpTime/Anesthesia  BCMA (Barcode Med Administration)  Dispensing Logic Professional Experience BASSETT HEALTHCARE – COOPERSTOWN, NY July 2015-Present Epic Willow Consultant  Epic / ProVation evidenced-based order set review/build MEMORIAL HEALTH – SAVANNAH, GA Dec 2014 – May 2015 Epic Willow Consultant  Built, tested and obtained validation for: o All Pharmacy Labels (35 total) o Label Routing for all dispense codes o Custom Labels (prior to transitioning to CNR) o Pharmacy Security Build (Technicians, Charge Supervisor, Pharmacists & Managers)  Willow Lead for Integrated Testing o Created Sherlock tickets to report integrated testing issues. o Collaborated with all applicable teams to resolve build issues discovered during integrated testing. o Researched and proposed build solutions related to integrated testing issues.  Go-Live Command Center Support PARKVIEW HEALTH – FORT WAYNE, IN 2012-Aug 2014 Epic Willow Consultant  Willow Lead for the Community Connect Project (Paulding County Hospital). o Built, tested and obtained validation for all build related to Willow for:  Ohio State Board of Pharmacy Positive ID
  • 2.
    Laura Crossman RN,BSN Page 2  Analysis, review & build of all Willow workflows to accommodate a Non-Parkview owned hospital o Go-Live & Post Go-Live Support  Built, tested and obtained validation for: o Specialty Preference Lists o Respiratory Therapy ERX/EAP Order Panel Build o Alternative Alerts for Therapeutic Interchanges & Combo Meds o Oral Liquid Build to accommodate age-based contextual dispensing including Orderables  Go-Live Command Center support (rolling Go-Live – 2 main hospitals then 4 Community Hospitals)  Post Go-Live liaison for ticket investigation and resolution. LAKELAND HEALTHCARE – ST. JOSEPH, MI 2006-2013 Willow Pharmacy/Inpatient Procedure Orders Analyst - ConnectCare 2010-2013  Lead the Willow team with the investigation, planning and implementation of Epic software.  Provided leadership and direction.  Analyzed operational workflows and Epic functionality to guide gap analysis, options, decision-making and maintenance.  Served as a conduit for aligning resources and activities related to Epic topics and issues.  Lead clinical/operational activities in software design, configuration, implementation, testing, and activation of Epic software.  Developed detailed project schedules; coordinated and scheduled meetings; Lead for the 90-60-30 Day GLRA.  Built, Tested and Validated build for ERX’s, LPF’s, OSQ’s, LMA’s, IDM’s, NDC’s, EFQ’s, OCC’s and all Willow Security.  Implemented charging overrides for a newly purchased hospital to ride out a different med vendor contract (including OSQ overrides based on hospital location for Order Sets).  Collaborated with Up-to-Date to sync Epic so that End Users could earn CME’s.  Participated in the review and testing of Nova Notes for SU’s and the 2010-2012 upgrade.  Coordinated new application functionality with the training team.  Go-Live Command Center Support & Post Go-Live liaison for ticket investigation and resolution. Registered Nurse – Medical/Oncology 2007-2010 Nurse Technician – Float Pool 2006-2007  Charge Nurse - coordinated admission processes; maintained staff schedules; managed floor PRN.  Mentor and preceptor including delegation utilizing a team approach.  Managed care and ADL’s; updated Care Plans; performed nursing assessments and documentation.  Collaborated with the multi-disciplinary team to provide exceptional patient care. LAKESIDE CANCER SPECIALISTS – ST. JOSEPH, MI 2010 Registered Nurse – Infusion Clinic  Conducted nurse evaluations.  Accessed and verified parenteral infusion site during chemotherapeutic infusion.  Monitored vitals per protocol; performed ongoing assessments during infusion.  Documentation via Electronic Health Record – ONCO EMR.
  • 3.
    Laura Crossman RN,BSN Page 3 ALL-PHASE ELECTRIC SUPPLY – BENTON HARBOR, MI 1999-2005 Accounts Receivable Clerk 2001-2005 Accounts Payable Clerk 1999-2001  Prepared and entered all customer payments via NXTREND and CMS systems.  Designed and implemented an EXCEL spreadsheet to manage Bad Debt write-offs and recoveries.  Managed monthly bank reconciliations, daily deposits and credit card payments, collection calls.  Processed invoices to purchase orders, evaluated and resolved problematic invoices, applied credits and charge backs to vendor accounts. FIFTH THIRD BANK – STEVENSVILLE, MI 1997-1998 Customer Service Representative  Processed loan applications and wire transfers.  Managed office during staffing shortage; including day to day operations, customer complaints, supervision and scheduling of employees.  Ordered and maintained supply of inventory to manage office.  Collaborated with the main headquarters to balance cash drawers, ATM and office vault.  Knowledge and application of deposits, withdrawals, certificate of deposits, money orders and transfers. THE BUCKLE – BENTON HARBOR, MI 1996-1998 Team Leader  Merchandised clothing by creating new wall layouts and designs.  Supervised all employees during the absence of the store manager.  Ordered and maintained supply of inventory; Implemented markdowns.  Increased revenue by displaying exceptional salesmanship and customer service skills.  Collaborated with management to perform cash drawer balancing and deposits. Education BETHEL COLLEGE – MISHAWAKA, IN Bachelor’s Degree in Applied Science – 2010  NLNAC accredited  GPA 3.95  Sigma Theta Tau International Honor Society LAKE MICHIGAN COLLEGE – BENTON HARBOR, MI Associate Degree in Applied Science – 2007  NLNAC accredited  GPA 3.12  Phi Theta Kappa Honor Society  Certificate of Achievement for academic proficiency in Critical Thinking LAKESHORE HIGH SCHOOL – STEVENSVILLE, MI General Diploma - 1997  GPA 3.45  Mathematics and Reading endorsements  Drug Abuse Resistance Education (DARE)  Cheerleading, Track, Softball
  • 4.
    Laura Crossman RN,BSN Page 4  Quill & Scroll award Certifications & Specialized Training Registered Nurse (RN) license # 4704261247 Basic Life Support (BLS) / CPR Certified Advanced Cardiac Life Support (ACLS) Certified Chemotherapy Certification – Oncology Nursing Society # 350918 2010 Willow Pharmacy Certified w/ 2012, 2014 & 2015 NVT – Epic 2010 Inpatient Procedure Orders Certified w/ 2012, 2014 & 2015 NVT - Epic References Available upon request