SlideShare a Scribd company logo
1 of 1
Download to read offline
Tier III Data Center Available for Lease
                                                                Parkwest Business Center
                                                   8725 Brooklyn Blvd., Brooklyn Park, MN


Data Center Facts
■ 39,000 total sq. ft. (15,000 sq. ft.
  raised floor space, 10,000 sq. ft.
  white floor space, 5,000 sq. ft.
  mechanical and electrical)

■ Fully redundant power with
  A and B side power available
  to all components within

■ 300 watts per sq. ft. total
  IT power capacity

■ Backup power infrastructure
  (UPS, batteries, emergency
  power generation) designed in
                                                          Up to 4,000 sq. ft. tier III data center available for lease
  accordance with n+1 industry
  standards, 15 minutes of                                      Lessee provides racks and external network connectivity.
                                                                                             Lease terms are negotiable.
  battery run time at full load

■ Cooling infrastructure
  designed in accordance
  with n+1 industry standards,
  including one redundant
  chiller and 5 redundant CRAH
  units at full load, free cooling
  below 40 degrees
                                                Main Entrance                 3' raised floor       Chilled Water Room
■	 Building can withstand
   straight line winds of 90mph

■ Environmentally friendly
  Novec 1230 fire suppression
  system, supplemented by a
  dry pipe system
                                               Power/UPS room            Power distribution            Utility Yard - four
                                                                        units and computer        diesel generators and
■ Ultrasonic humidifiers                                                 room air handlers       air conditioning chillers
  regulate humidification


                                         For more information, contact:
                                         Jeff Kubacki, 952 358 5286

More Related Content

Similar to Tier III Data Center for Lease

Opus Interactive - Hillsboro, Oregon Data Center
Opus Interactive -  Hillsboro, Oregon  Data CenterOpus Interactive -  Hillsboro, Oregon  Data Center
Opus Interactive - Hillsboro, Oregon Data Centerjerianasmith
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Jacklin Berry
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Jacklin Berry
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apccharles1010
 
Cooling & Power Issues
Cooling & Power IssuesCooling & Power Issues
Cooling & Power Issuesinstor
 
MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MEPdoo
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet EnglishMichaelImfeld
 
Apc cooling solutions
Apc cooling solutionsApc cooling solutions
Apc cooling solutionspeperoca
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastAli Shoaee
 
Cold Aisle Containment – Maximum kW per Rack
Cold Aisle Containment – Maximum kW per RackCold Aisle Containment – Maximum kW per Rack
Cold Aisle Containment – Maximum kW per RackKnurr USA
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridDCC Mission Critical
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centersInternap
 
Data centre requirements
Data centre requirementsData centre requirements
Data centre requirementsarjun thakur
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreDerek Webster
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center SolutionsRittal India
 
New Tampa Data Center - Peak 10
New Tampa Data Center - Peak 10New Tampa Data Center - Peak 10
New Tampa Data Center - Peak 10Peak 10
 

Similar to Tier III Data Center for Lease (20)

Opus Interactive - Hillsboro, Oregon Data Center
Opus Interactive -  Hillsboro, Oregon  Data CenterOpus Interactive -  Hillsboro, Oregon  Data Center
Opus Interactive - Hillsboro, Oregon Data Center
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apc
 
Cooling & Power Issues
Cooling & Power IssuesCooling & Power Issues
Cooling & Power Issues
 
Rdcc.roadshow.presentation
Rdcc.roadshow.presentationRdcc.roadshow.presentation
Rdcc.roadshow.presentation
 
MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet English
 
Apc cooling solutions
Apc cooling solutionsApc cooling solutions
Apc cooling solutions
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 
Cold Aisle Containment – Maximum kW per Rack
Cold Aisle Containment – Maximum kW per RackCold Aisle Containment – Maximum kW per Rack
Cold Aisle Containment – Maximum kW per Rack
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green grid
 
Smart bunker fx brochure
Smart bunker fx brochureSmart bunker fx brochure
Smart bunker fx brochure
 
Top Boston Colocation
Top Boston ColocationTop Boston Colocation
Top Boston Colocation
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centers
 
Data centre requirements
Data centre requirementsData centre requirements
Data centre requirements
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data Centre
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center Solutions
 
New Tampa Data Center - Peak 10
New Tampa Data Center - Peak 10New Tampa Data Center - Peak 10
New Tampa Data Center - Peak 10
 

Recently uploaded

TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024Stephen Perrenod
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FIDO Alliance
 
Your enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jYour enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jNeo4j
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...FIDO Alliance
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераMark Opanasiuk
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch TuesdayIvanti
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptxFIDO Alliance
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfUK Journal
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfFIDO Alliance
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentationyogeshlabana357357
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...FIDO Alliance
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessUXDXConf
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfFIDO Alliance
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Skynet Technologies
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?Mark Billinghurst
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfFIDO Alliance
 

Recently uploaded (20)

TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
Your enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jYour enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4j
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 

Tier III Data Center for Lease

  • 1. Tier III Data Center Available for Lease Parkwest Business Center 8725 Brooklyn Blvd., Brooklyn Park, MN Data Center Facts ■ 39,000 total sq. ft. (15,000 sq. ft. raised floor space, 10,000 sq. ft. white floor space, 5,000 sq. ft. mechanical and electrical) ■ Fully redundant power with A and B side power available to all components within ■ 300 watts per sq. ft. total IT power capacity ■ Backup power infrastructure (UPS, batteries, emergency power generation) designed in Up to 4,000 sq. ft. tier III data center available for lease accordance with n+1 industry standards, 15 minutes of Lessee provides racks and external network connectivity. Lease terms are negotiable. battery run time at full load ■ Cooling infrastructure designed in accordance with n+1 industry standards, including one redundant chiller and 5 redundant CRAH units at full load, free cooling below 40 degrees Main Entrance 3' raised floor Chilled Water Room ■ Building can withstand straight line winds of 90mph ■ Environmentally friendly Novec 1230 fire suppression system, supplemented by a dry pipe system Power/UPS room Power distribution Utility Yard - four units and computer diesel generators and ■ Ultrasonic humidifiers room air handlers air conditioning chillers regulate humidification For more information, contact: Jeff Kubacki, 952 358 5286