Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Tier III Data Center for Lease
1. Tier III Data Center Available for Lease
Parkwest Business Center
8725 Brooklyn Blvd., Brooklyn Park, MN
Data Center Facts
■ 39,000 total sq. ft. (15,000 sq. ft.
raised floor space, 10,000 sq. ft.
white floor space, 5,000 sq. ft.
mechanical and electrical)
■ Fully redundant power with
A and B side power available
to all components within
■ 300 watts per sq. ft. total
IT power capacity
■ Backup power infrastructure
(UPS, batteries, emergency
power generation) designed in
Up to 4,000 sq. ft. tier III data center available for lease
accordance with n+1 industry
standards, 15 minutes of Lessee provides racks and external network connectivity.
Lease terms are negotiable.
battery run time at full load
■ Cooling infrastructure
designed in accordance
with n+1 industry standards,
including one redundant
chiller and 5 redundant CRAH
units at full load, free cooling
below 40 degrees
Main Entrance 3' raised floor Chilled Water Room
■ Building can withstand
straight line winds of 90mph
■ Environmentally friendly
Novec 1230 fire suppression
system, supplemented by a
dry pipe system
Power/UPS room Power distribution Utility Yard - four
units and computer diesel generators and
■ Ultrasonic humidifiers room air handlers air conditioning chillers
regulate humidification
For more information, contact:
Jeff Kubacki, 952 358 5286