SlideShare a Scribd company logo
Hillsboro Data Center
Technology,
meet humanity.
Our Customer Commitment
99 100% Uptime
99 24/7/365 Support
99 SLA Guarantees
About Opus Interactive
Founded in 1994, Opus Interactive
provides cloud hosting, managed
services and colocation from Tier III+
data centers in Hillsboro, Portland,
Santa Clara, and Dallas.
Through close partnerships with
industry-leaders and a commitment
to customer satisfaction, Opus
Interactive has earned a reputation
for willingness to design and build
customized hosting solutions that fit
unique requirements for equipment,
scalability, budget and future growth
needs of its customers.
Headquartered in Portland, Oregon,
Opus Interactive is an accredited
member of the International
Managed Services Provider Alliance
and is PCI compliant and SAS70/
SSAE16 audited.
99 IT Outsourcing Services
99 Cloud Hosting Services
99 Data Center Services + Colocation
99 Hosting Services
99 Network and Internet Services
Hillsboro Data Center
21515 NW Evergreen Parkway
Hillsboro, OR 97124
www.opusinteractive.com
sales@opusinteractive.com
(866) 678-7955
Customized solutions and reputable customer service,
backed by 100% uptime SLA guarantees. That’s us.
Whether you need a single rack, or a full suite, we have the space
you need and on-site engineers to keep you online at this state-of-
the-art facility.
Property Highlights
High Capacity
99 Phase 1 provides 7.9 MW of critical IT load
99 39,000 SF of data room space, supports high energy densities > 200 W/SF
99 60,000 SF of private office space available
High Availability
99 2N service for all IT critical load
99 Tier 3 availability, concurrent maintainability on all infrastructure
99 Unmatched availability history - 100% uptime guarantee
High Energy Efficiency
99 Low pass-through PUE, estimated at 1.2
99 Free cooling, full aisle containment
99 High Service
99 24x7x365 on-site security and on-site engineering / facility management
99 ISO 9001 compliant processes
99 PCI compliant processes
Low Cost
99 No sales tax (Oregon State Law)
99 No property tax – located within an Enterprise Zone
99 Income tax rebate – located within an Ecommerce Zone
99 Highly reliable green power
Building
Nearest Airports: Portland International Airport – PDX; Portland-Hillsboro Airport – HIO (private)
Building Size: 240,000 square feet
Floor Loading: 2,500 lbs. / square foot
Loading Docks: 2 secure privately accessed loading docks, one at grade level and one
dock-high truck dock with a dock leveler
Parking: 343 parking spaces
Structure Enhancements: Facility meets “Essential Facility” requirements of the 2010
Oregon Structural Specialty Code (OSSC). With a Structural Importance Factor (SIF) of 1.5,
the facility meets or exceeds the OSSC requirements for:
• Stronger seismic forces (SIF = 1.5)
• Heavier roof snow load (SIF = 1.2)
• Greater wind pressure (SIF = 1.15)
Flood Plain: Outside of 500 year flood plain
Office Space: 60,000 square feet among first and second floors
Fire Suppression: Double interlock, pre-action dry pipe fire suppression system with VESDA
system for data and electrical rooms; separate VESDA system for mezzanine level equipment
Storage/staging: Secure caged storage available for customer use
Power System
Utility Provider: Portland General Electric (PGE), Rate Schedule 89
Generation Mix:Onanannual basis, 75% energyfrom low/nocarbon(naturalgasorhydro/renewable)
Distribution Grid: Designed and operated to SEMI 47 Standards (for semiconductor fabs
in Silicon Forest). The area Grid carries a “high-reli-ability” designation, meaning that in
addition to higher design standards, O&M procedures include annual IR scans for every
feeder & vault with regularly scheduled shutdowns and maintenance.
Substation: Served by PGE’s Sunset Substation, which is in turn fed by triply redundant
transmission lines from BPA’s Keeler Substation, PGE’s St Mary’s North in Beaverton and
PGE’s St Mary’s South in Beaverton (each supply transmission line is capable of carrying
100% of the Sunset load).
Performance history: The Sunset substation has been in service for 15 years with no outages
Facility Utility Service Feeds: Dual, underground medium-voltage (12.47 KV) utility
entrances supplying physically redundant dedicated feeds from PGE
Redundancy: Concurrent maintainability on all components
Data Room Specifications
Description: Each data room provides 100% usable, unencumbered space with no
electrical or mechanical infrastructure on the tenant data room floor. Each data room has
dedicated electrical and mechanical infrastructure.
Allocated Power and Space for Phase I:
• 4 data rooms, can be combined or demised
• Each data room: 1.975 MW / 9,750 sq. ft
• Average Energy Density: 200+ watts/ sq ft (can be increased)
Allocated Power and Space for Phase II: 3.95 MW / 19,000 sq ft
Allocated Power and Space for Phase III: 7.9 MW / 40,000 sq ft
Power Delivery: Power is delivered to PDU, customer to access from output breaker to
deliver to data room
Flooring: Slab on grade concrete throughout facility, anti-static vinyl composition tile (VCT)
throughout data rooms / corridors
Ceiling Height: 11’ above finished floor
Ceiling Infrastructure: 2 x 4 ceiling T-bar grid system to support customer’s overhead
infrastructure, ceiling infrastructure houses a return air plenum. The air handling systems
are located on a segregat-ed equipment mezzanine above the data rooms.
Cooling: Aisle containment required
Basis of Design for Critical Power Service
Tier 3 Availability: Dual cord power to the rack; ability to isolate and provide maintenance at
all levels of the power distribution system
Total Capacity: 7.9 MW of critical power, supplied by 4 separate UPS/PDU systems of 1.975
MW each. Each separate UPS/PDU system served by a dedicated 480V critical power
switchboard, backed up by a dedicated generator as well as a common reserve generator.
Emergency / Back-up Power Infrastructure
Generators for Phase I:
Description: 4 x 2.25 MW standby generators for critical load; 2 x 2 MW standby generators
for mechanical loads; 1 x 2.25 MW swing generator (15.25 MW total capacity)
Number of Hours of On-Site Fuel: 36 hours per generator
Fueling Replenishment: Multiple refueling vendor sites under SLA supply contract
Fuel Storage Tanks: Every generator has a dedicated UL 142 double walled belly tank;
©2014 Opus Interactive, Inc. All rights reserved.
Emergency / Back-up Power Infrastructure (continued)
4,400 gallons capacity for 2.25 MW units; 3,800 gallon capacity for 2 MW units; 29,600
total gallons of on-site diesel
UPS / PDU Systems (per 1.975 MW Data Room)
UPS Description: 4 x 825kVA Eaton Powerware 9395 UPS modules (99% efficient in ESS mode)
Batteries: 5-minute minimum run-time (can be extended). Automated battery monitoring by
Intellibatt.
UPS Configuration: Distributed Redundant
PDU Description: 8 x 400kVA; 480 volt primary 120/208 secondary with individually
metered output breakers
PDU Configuration: 2N diverse paths to IT load in data center
Cooling Infrastructure (Phase I and II)
Basis of Design: Tier 3 availability; ability to isolate and provide maintenance at all levels of
the closed loop system
Description: Contained hot/cold air system, shared air supply with direct isolated returned air
Chilled Water Plant: 3 primary chillers (2 x 700 ton and 1 x 1000 ton) with 1 redundant
swing chiller (1 x 1000 ton) for 3,400 ton total capacity (2,400 ton capacity @ N+1)
3-fold Water: Mechanical cooling, direct evaporative cooling, and water-side economization
(heat exchanger supplements central plant – further reduces tenant utility costs)
Chilled Water Storage: 72 hours of on-site make-up water store, fed from 142,000 gallon tank
Air-handlers: Cold air delivered by 45 individual air-handlers, supplied by 2 sets of electrical
switchgear (2N electrical distribution system); all air-handlers contribute to common plenum
– contributes to very high redundancy
Air Temperature to Data Room: Commissioned to design load of 68 degrees; can be modified
Redundancy: Concurrently maintainable
Network / Communications
MPOE: 2 diverse underground points of entry
Conduits: Fiber enters the site from two physically redundant pathways (SE and SW)
Carriers: Level 3, Zayo, Spectrum Networks, Cogent, Comcast, TW Telecom, Frontier and
Integra within building, other carriers (to include Tier 1 carriers) are at property line and
readily accessible.
Trans-pacific Cable System Access: Three cable-landing sites within a half a mile of the property
Meet-Me-Rom Description: Redundant Meet–Me–Rooms, fault tolerant
Security
Description: Multiple layers and methods of authentication, accesscontrol, and surveillance
Building and Perimeter: CCTV 24x7x365 monitored and recorded video surveillance of all
entrances, building exterior, interior corridors and Data Room
Security Staffing: Guaranteed 100% on-site staff coverage. 2 FTEs on-site 24x7x365;
security desk at customer entrance always manned. Staff trained for operations, fire, & life
safety incident response.
Building Access Control: Proximity badge reader with photo ID system, mantrap with
secondary proximity badge reader
Tenant Premise Access Control: Proximity badge reader with photo identification system,
system can accept second factor access systems (biometrics)
Call 866-678-7955 or email Sales@opusinteractive.com for a quote TODAY!

More Related Content

What's hot

Specification skt cna ssx2-rc 20160821
Specification skt cna ssx2-rc 20160821Specification skt cna ssx2-rc 20160821
Specification skt cna ssx2-rc 20160821
Junho Suh
 
4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System
Safaet Hossain
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
 
Data center hvac
Data center hvacData center hvac
Data center hvac
Sulma Mahardiani
 
Si Technology Whitepaper
Si Technology WhitepaperSi Technology Whitepaper
Si Technology Whitepaperstepk99
 
Microwave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware StructureMicrowave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware Structure
ibrahimnabil17
 
Huawei ad9431 dn 24x central ap datasheet
Huawei ad9431 dn 24x central ap datasheetHuawei ad9431 dn 24x central ap datasheet
Huawei ad9431 dn 24x central ap datasheet
ranoo hashem
 
Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNC
Ahmed Nabeeh
 
NetSure ITM 48V DC UPS
NetSure ITM 48V DC UPSNetSure ITM 48V DC UPS
NetSure ITM 48V DC UPS
mmurrill
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC Drives
Schneider Electric
 
Presentation gamatronic
Presentation gamatronicPresentation gamatronic
Presentation gamatronichoanv
 
1 bss-overview
1 bss-overview1 bss-overview
1 bss-overviewTelesom
 
Kathreins system
Kathreins systemKathreins system
Kathreins system
Haman Tchaido Haman Said
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System Basics
Pratap Chandra
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011vikings28
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
ibrahimnabil17
 
Rectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom SitesRectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom Sites
ibrahimnabil17
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
Hải Nguyễn Hồ Bá
 

What's hot (19)

Specification skt cna ssx2-rc 20160821
Specification skt cna ssx2-rc 20160821Specification skt cna ssx2-rc 20160821
Specification skt cna ssx2-rc 20160821
 
4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
NetSure-502-Brochure
NetSure-502-BrochureNetSure-502-Brochure
NetSure-502-Brochure
 
Data center hvac
Data center hvacData center hvac
Data center hvac
 
Si Technology Whitepaper
Si Technology WhitepaperSi Technology Whitepaper
Si Technology Whitepaper
 
Microwave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware StructureMicrowave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware Structure
 
Huawei ad9431 dn 24x central ap datasheet
Huawei ad9431 dn 24x central ap datasheetHuawei ad9431 dn 24x central ap datasheet
Huawei ad9431 dn 24x central ap datasheet
 
Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNC
 
NetSure ITM 48V DC UPS
NetSure ITM 48V DC UPSNetSure ITM 48V DC UPS
NetSure ITM 48V DC UPS
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC Drives
 
Presentation gamatronic
Presentation gamatronicPresentation gamatronic
Presentation gamatronic
 
1 bss-overview
1 bss-overview1 bss-overview
1 bss-overview
 
Kathreins system
Kathreins systemKathreins system
Kathreins system
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System Basics
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
 
Rectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom SitesRectifiers and Back up Batteries at Telecom Sites
Rectifiers and Back up Batteries at Telecom Sites
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
 

Viewers also liked

Avaluació dels aprenentatges dels alumnes participants al programa d
Avaluació dels aprenentatges dels alumnes participants al programa dAvaluació dels aprenentatges dels alumnes participants al programa d
Avaluació dels aprenentatges dels alumnes participants al programa dnaissanjuan
 
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
jerianasmith
 
Taller6 cebek
Taller6 cebekTaller6 cebek
Taller6 cebek
Aitziber3
 
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolar
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolarAnàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolar
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolarnaissanjuan
 
Guions entrevistes fase 1
Guions entrevistes fase 1Guions entrevistes fase 1
Guions entrevistes fase 1naissanjuan
 
Guions entrevistes fase1
Guions entrevistes fase1Guions entrevistes fase1
Guions entrevistes fase1naissanjuan
 
App Awards - Lancement d'une application mobile : quelle stratégie ?
App Awards - Lancement d'une application mobile  : quelle stratégie ?App Awards - Lancement d'une application mobile  : quelle stratégie ?
App Awards - Lancement d'une application mobile : quelle stratégie ?
Heliceum
 
QA and scrum
QA and scrumQA and scrum
QA and scrum
clintonbosch
 
Genghis Grill Nutrition Guide
Genghis Grill Nutrition GuideGenghis Grill Nutrition Guide
Genghis Grill Nutrition Guide
jerianasmith
 

Viewers also liked (10)

Avaluació dels aprenentatges dels alumnes participants al programa d
Avaluació dels aprenentatges dels alumnes participants al programa dAvaluació dels aprenentatges dels alumnes participants al programa d
Avaluació dels aprenentatges dels alumnes participants al programa d
 
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
Field Lubricity Measurements Correlate with Improved Performance of Novel Wat...
 
Taller6 cebek
Taller6 cebekTaller6 cebek
Taller6 cebek
 
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolar
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolarAnàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolar
Anàlisis dades qüestionaris alumnat 2 n eso sobre aei i convivència escolar
 
Guions entrevistes fase 1
Guions entrevistes fase 1Guions entrevistes fase 1
Guions entrevistes fase 1
 
Cap ver 3d
Cap ver 3dCap ver 3d
Cap ver 3d
 
Guions entrevistes fase1
Guions entrevistes fase1Guions entrevistes fase1
Guions entrevistes fase1
 
App Awards - Lancement d'une application mobile : quelle stratégie ?
App Awards - Lancement d'une application mobile  : quelle stratégie ?App Awards - Lancement d'une application mobile  : quelle stratégie ?
App Awards - Lancement d'une application mobile : quelle stratégie ?
 
QA and scrum
QA and scrumQA and scrum
QA and scrum
 
Genghis Grill Nutrition Guide
Genghis Grill Nutrition GuideGenghis Grill Nutrition Guide
Genghis Grill Nutrition Guide
 

Similar to Opus Interactive - Hillsboro, Oregon Data Center

WORPCLOUD HOSTING SERVICES - Fast, Secure & Affordable
WORPCLOUD  HOSTING SERVICES - Fast, Secure & AffordableWORPCLOUD  HOSTING SERVICES - Fast, Secure & Affordable
WORPCLOUD HOSTING SERVICES - Fast, Secure & Affordable
WORPCLOUD LTD
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apc
charles1010
 
Corexchange Data Center Tour
Corexchange Data Center TourCorexchange Data Center Tour
Corexchange Data Center Tour
tpersky
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet English
MichaelImfeld
 
Flex Pod Solution
Flex Pod SolutionFlex Pod Solution
Flex Pod Solution
myazhome
 
Elliptical 2010 preso
Elliptical 2010 preso Elliptical 2010 preso
Elliptical 2010 preso
ellipticalmedia
 
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
SkillFactory
 
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supplyEfore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
EFORE Group
 
Lasting+ +centre+de+date+-++12mai2010
Lasting+ +centre+de+date+-++12mai2010Lasting+ +centre+de+date+-++12mai2010
Lasting+ +centre+de+date+-++12mai2010
Agora Group
 
EADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III DatacentreEADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III Datacentre
stevenpaterson
 
Aruba Data Center - English
Aruba Data Center - EnglishAruba Data Center - English
Aruba Data Center - English
Aruba S.p.A.
 
Remote Office 2010
Remote Office 2010Remote Office 2010
Remote Office 2010
myazhome
 
Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8
Panduit
 
Tactical Power
Tactical PowerTactical Power
Athens1 Data Center -Technical Presentation 2009
Athens1 Data Center -Technical Presentation 2009Athens1 Data Center -Technical Presentation 2009
Athens1 Data Center -Technical Presentation 2009gueste19bbe
 
Athens 1 Technical Presentation 2009
Athens 1 Technical Presentation 2009Athens 1 Technical Presentation 2009
Athens 1 Technical Presentation 2009akakkos
 
Cyrusone lewisville
Cyrusone lewisvilleCyrusone lewisville
Cyrusone lewisvillebpm1102750
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building Power
EnergyTech2015
 
Delta-Data Center Solutions (1)
Delta-Data Center Solutions (1)Delta-Data Center Solutions (1)
Delta-Data Center Solutions (1)Joydio Cadayday
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green grid
DCC Mission Critical
 

Similar to Opus Interactive - Hillsboro, Oregon Data Center (20)

WORPCLOUD HOSTING SERVICES - Fast, Secure & Affordable
WORPCLOUD  HOSTING SERVICES - Fast, Secure & AffordableWORPCLOUD  HOSTING SERVICES - Fast, Secure & Affordable
WORPCLOUD HOSTING SERVICES - Fast, Secure & Affordable
 
Power Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited ApcPower Point Data Centre Uk Limited Apc
Power Point Data Centre Uk Limited Apc
 
Corexchange Data Center Tour
Corexchange Data Center TourCorexchange Data Center Tour
Corexchange Data Center Tour
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet English
 
Flex Pod Solution
Flex Pod SolutionFlex Pod Solution
Flex Pod Solution
 
Elliptical 2010 preso
Elliptical 2010 preso Elliptical 2010 preso
Elliptical 2010 preso
 
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
 
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supplyEfore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
Efore DC backup SYSTEM, Master Portfolio 2016, uninterruptible power supply
 
Lasting+ +centre+de+date+-++12mai2010
Lasting+ +centre+de+date+-++12mai2010Lasting+ +centre+de+date+-++12mai2010
Lasting+ +centre+de+date+-++12mai2010
 
EADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III DatacentreEADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III Datacentre
 
Aruba Data Center - English
Aruba Data Center - EnglishAruba Data Center - English
Aruba Data Center - English
 
Remote Office 2010
Remote Office 2010Remote Office 2010
Remote Office 2010
 
Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8Panduit EMEA SI Webinar 8
Panduit EMEA SI Webinar 8
 
Tactical Power
Tactical PowerTactical Power
Tactical Power
 
Athens1 Data Center -Technical Presentation 2009
Athens1 Data Center -Technical Presentation 2009Athens1 Data Center -Technical Presentation 2009
Athens1 Data Center -Technical Presentation 2009
 
Athens 1 Technical Presentation 2009
Athens 1 Technical Presentation 2009Athens 1 Technical Presentation 2009
Athens 1 Technical Presentation 2009
 
Cyrusone lewisville
Cyrusone lewisvilleCyrusone lewisville
Cyrusone lewisville
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building Power
 
Delta-Data Center Solutions (1)
Delta-Data Center Solutions (1)Delta-Data Center Solutions (1)
Delta-Data Center Solutions (1)
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green grid
 

Recently uploaded

Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 

Recently uploaded (20)

Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 

Opus Interactive - Hillsboro, Oregon Data Center

  • 2. Technology, meet humanity. Our Customer Commitment 99 100% Uptime 99 24/7/365 Support 99 SLA Guarantees About Opus Interactive Founded in 1994, Opus Interactive provides cloud hosting, managed services and colocation from Tier III+ data centers in Hillsboro, Portland, Santa Clara, and Dallas. Through close partnerships with industry-leaders and a commitment to customer satisfaction, Opus Interactive has earned a reputation for willingness to design and build customized hosting solutions that fit unique requirements for equipment, scalability, budget and future growth needs of its customers. Headquartered in Portland, Oregon, Opus Interactive is an accredited member of the International Managed Services Provider Alliance and is PCI compliant and SAS70/ SSAE16 audited. 99 IT Outsourcing Services 99 Cloud Hosting Services 99 Data Center Services + Colocation 99 Hosting Services 99 Network and Internet Services Hillsboro Data Center 21515 NW Evergreen Parkway Hillsboro, OR 97124 www.opusinteractive.com sales@opusinteractive.com (866) 678-7955 Customized solutions and reputable customer service, backed by 100% uptime SLA guarantees. That’s us. Whether you need a single rack, or a full suite, we have the space you need and on-site engineers to keep you online at this state-of- the-art facility. Property Highlights High Capacity 99 Phase 1 provides 7.9 MW of critical IT load 99 39,000 SF of data room space, supports high energy densities > 200 W/SF 99 60,000 SF of private office space available High Availability 99 2N service for all IT critical load 99 Tier 3 availability, concurrent maintainability on all infrastructure 99 Unmatched availability history - 100% uptime guarantee High Energy Efficiency 99 Low pass-through PUE, estimated at 1.2 99 Free cooling, full aisle containment 99 High Service 99 24x7x365 on-site security and on-site engineering / facility management 99 ISO 9001 compliant processes 99 PCI compliant processes Low Cost 99 No sales tax (Oregon State Law) 99 No property tax – located within an Enterprise Zone 99 Income tax rebate – located within an Ecommerce Zone 99 Highly reliable green power
  • 3. Building Nearest Airports: Portland International Airport – PDX; Portland-Hillsboro Airport – HIO (private) Building Size: 240,000 square feet Floor Loading: 2,500 lbs. / square foot Loading Docks: 2 secure privately accessed loading docks, one at grade level and one dock-high truck dock with a dock leveler Parking: 343 parking spaces Structure Enhancements: Facility meets “Essential Facility” requirements of the 2010 Oregon Structural Specialty Code (OSSC). With a Structural Importance Factor (SIF) of 1.5, the facility meets or exceeds the OSSC requirements for: • Stronger seismic forces (SIF = 1.5) • Heavier roof snow load (SIF = 1.2) • Greater wind pressure (SIF = 1.15) Flood Plain: Outside of 500 year flood plain Office Space: 60,000 square feet among first and second floors Fire Suppression: Double interlock, pre-action dry pipe fire suppression system with VESDA system for data and electrical rooms; separate VESDA system for mezzanine level equipment Storage/staging: Secure caged storage available for customer use Power System Utility Provider: Portland General Electric (PGE), Rate Schedule 89 Generation Mix:Onanannual basis, 75% energyfrom low/nocarbon(naturalgasorhydro/renewable) Distribution Grid: Designed and operated to SEMI 47 Standards (for semiconductor fabs in Silicon Forest). The area Grid carries a “high-reli-ability” designation, meaning that in addition to higher design standards, O&M procedures include annual IR scans for every feeder & vault with regularly scheduled shutdowns and maintenance. Substation: Served by PGE’s Sunset Substation, which is in turn fed by triply redundant transmission lines from BPA’s Keeler Substation, PGE’s St Mary’s North in Beaverton and PGE’s St Mary’s South in Beaverton (each supply transmission line is capable of carrying 100% of the Sunset load). Performance history: The Sunset substation has been in service for 15 years with no outages Facility Utility Service Feeds: Dual, underground medium-voltage (12.47 KV) utility entrances supplying physically redundant dedicated feeds from PGE Redundancy: Concurrent maintainability on all components Data Room Specifications Description: Each data room provides 100% usable, unencumbered space with no electrical or mechanical infrastructure on the tenant data room floor. Each data room has dedicated electrical and mechanical infrastructure. Allocated Power and Space for Phase I: • 4 data rooms, can be combined or demised • Each data room: 1.975 MW / 9,750 sq. ft • Average Energy Density: 200+ watts/ sq ft (can be increased) Allocated Power and Space for Phase II: 3.95 MW / 19,000 sq ft Allocated Power and Space for Phase III: 7.9 MW / 40,000 sq ft Power Delivery: Power is delivered to PDU, customer to access from output breaker to deliver to data room Flooring: Slab on grade concrete throughout facility, anti-static vinyl composition tile (VCT) throughout data rooms / corridors Ceiling Height: 11’ above finished floor Ceiling Infrastructure: 2 x 4 ceiling T-bar grid system to support customer’s overhead infrastructure, ceiling infrastructure houses a return air plenum. The air handling systems are located on a segregat-ed equipment mezzanine above the data rooms. Cooling: Aisle containment required Basis of Design for Critical Power Service Tier 3 Availability: Dual cord power to the rack; ability to isolate and provide maintenance at all levels of the power distribution system Total Capacity: 7.9 MW of critical power, supplied by 4 separate UPS/PDU systems of 1.975 MW each. Each separate UPS/PDU system served by a dedicated 480V critical power switchboard, backed up by a dedicated generator as well as a common reserve generator. Emergency / Back-up Power Infrastructure Generators for Phase I: Description: 4 x 2.25 MW standby generators for critical load; 2 x 2 MW standby generators for mechanical loads; 1 x 2.25 MW swing generator (15.25 MW total capacity) Number of Hours of On-Site Fuel: 36 hours per generator Fueling Replenishment: Multiple refueling vendor sites under SLA supply contract Fuel Storage Tanks: Every generator has a dedicated UL 142 double walled belly tank; ©2014 Opus Interactive, Inc. All rights reserved.
  • 4. Emergency / Back-up Power Infrastructure (continued) 4,400 gallons capacity for 2.25 MW units; 3,800 gallon capacity for 2 MW units; 29,600 total gallons of on-site diesel UPS / PDU Systems (per 1.975 MW Data Room) UPS Description: 4 x 825kVA Eaton Powerware 9395 UPS modules (99% efficient in ESS mode) Batteries: 5-minute minimum run-time (can be extended). Automated battery monitoring by Intellibatt. UPS Configuration: Distributed Redundant PDU Description: 8 x 400kVA; 480 volt primary 120/208 secondary with individually metered output breakers PDU Configuration: 2N diverse paths to IT load in data center Cooling Infrastructure (Phase I and II) Basis of Design: Tier 3 availability; ability to isolate and provide maintenance at all levels of the closed loop system Description: Contained hot/cold air system, shared air supply with direct isolated returned air Chilled Water Plant: 3 primary chillers (2 x 700 ton and 1 x 1000 ton) with 1 redundant swing chiller (1 x 1000 ton) for 3,400 ton total capacity (2,400 ton capacity @ N+1) 3-fold Water: Mechanical cooling, direct evaporative cooling, and water-side economization (heat exchanger supplements central plant – further reduces tenant utility costs) Chilled Water Storage: 72 hours of on-site make-up water store, fed from 142,000 gallon tank Air-handlers: Cold air delivered by 45 individual air-handlers, supplied by 2 sets of electrical switchgear (2N electrical distribution system); all air-handlers contribute to common plenum – contributes to very high redundancy Air Temperature to Data Room: Commissioned to design load of 68 degrees; can be modified Redundancy: Concurrently maintainable Network / Communications MPOE: 2 diverse underground points of entry Conduits: Fiber enters the site from two physically redundant pathways (SE and SW) Carriers: Level 3, Zayo, Spectrum Networks, Cogent, Comcast, TW Telecom, Frontier and Integra within building, other carriers (to include Tier 1 carriers) are at property line and readily accessible. Trans-pacific Cable System Access: Three cable-landing sites within a half a mile of the property Meet-Me-Rom Description: Redundant Meet–Me–Rooms, fault tolerant Security Description: Multiple layers and methods of authentication, accesscontrol, and surveillance Building and Perimeter: CCTV 24x7x365 monitored and recorded video surveillance of all entrances, building exterior, interior corridors and Data Room Security Staffing: Guaranteed 100% on-site staff coverage. 2 FTEs on-site 24x7x365; security desk at customer entrance always manned. Staff trained for operations, fire, & life safety incident response. Building Access Control: Proximity badge reader with photo ID system, mantrap with secondary proximity badge reader Tenant Premise Access Control: Proximity badge reader with photo identification system, system can accept second factor access systems (biometrics) Call 866-678-7955 or email Sales@opusinteractive.com for a quote TODAY!