1. OBJECTIVES:
“A challenging career in a professional and dynamic organization where I can
maximize my ability and knowledge to thoroughly organize projects, analyze
situations, propose solutions, and oversee work flow procedures”
ACADEMIC CREDENTIALS
WORK EXPERIENCE
COMPANY: TATA MOTORS LTD, DHARWAD-580011
DESIGNATION: Diploma Engineer
DEPARTMENT: APL (Auto Projects)
DOMAIN: NPI (New Product Introduction)
DURATION: June 6th
2012 to till date
ROLES AND RESPONSIBILITIES
PROJECT PLANNING
Study the New vehicle with2Dand3D drawings downloadedfromPLM.
For Proper understanding of the fitments, prepare the Station wise Bill
of Materials (BOM).
Check for the availability of parts in other Plant location using SAP for
QAP built.
Prepare and update Master Programs (Detailed project component
schedules) with a proper sequencing and logic to ensure correct
procurement, vehicle build, Facility installation and commissioning.
Responsible for procurement of the material, development tracking
schedule andfollow withADDforon time deliveryasperplanneddates
Raise SORSTOs for Material Procurementtransfer stocks and
monitoring material procurement.
Attend the Progress meeting with SQ for the development status of
parts.
Update schedule and Progress monitoring and recording through
reports.
PRIYADARSHINI .P.AMBORE
Address-DOPanduranga Rao, Sanman Tailors,Market Road, Chickmaglur- 577101
Cell- 9986583830
Personal Email- priyapayal5@gmail.com
Company Email- priyadarshini.ambore@tatamotors.com
CURRICULUM VITAE
PERSONAL STATEMENT
“Destiny is not the matter of
chance; it’s not the matter of
choice.
It’s not the thing to be waited for;
it’s the thing to be achieved!”
PERSONAL STRENGTHS
I’mCreative,Curious,and
Openminded.
I adapt to changes.
I have PersistentWorking
capacity.
I’mnot afraidto climb
stepsof failure tomeet
withsuccess.
I can juggle multiple tasks
withease.
I have Visionfor
professionaland personal
growth.
I have goodsocial
intelligence.
SKILLS
PLM
SAP
ProcessEngineeringtool-
DELMIA
DocumentationTools:
MS-Word,MS-
PowerPoint,MS-Excel.
PLC
2. Monitor Project budget and schedule planning.
Project coordination with all the departments.
Plans and operation analysis.
Strategic communication for CFT members.
Generate value engineeringideasandimprovementinvehicle for
cost reduction.
Coordinationintransferof bill of materialsforDharwad inSAPsystem.
BOM restructuring.
Look afterthe activitiesof Productcosting,Systemsupportfor
Material auditingandMaterial planningetc.basedonBOMin SAP.
Look aftercorrect consumptionof materialsfromlineinthe formof
ReprocessinglistandManual ConsumptionanalysisinSAP.
Coordinate withvariousagencieslike Finance,NPI,TTL,ADD,ERC,
QA, STD1, Productionetc.forvariousBOM(Bill of materials) related
issues.
To keepa track on CostRollupsforcostingof vehicles,aggregates
and parts.
Coordinate withSTD1and Finance teamto achieve the final cost
release approvals.
Conditionof supplyvalidationdone accordingtoinwardingof parts.
Helpingtootherdepartmentstoget3D, 2D visualizationfiles,sap
BOM, TPL etc.
ResolvingissuesrelatedwithBITS.
Determine transportationcostestimationusingKNEXT.
Collectionof Documentslike PFD,PFMEA,WIS,Control Planfrom
respective departmentsandhandoverforProductiondepartment.
PROCESS PLANNING
Study the Design Specification using 2D, 3D drawings and other
specifications.
Analysis of Part Requirements.
Determining Manufacturing Operation and their Sequences.
Selection of MachineTools.
Selection of Tools, Work Holding Devices (Fixtures) and Inspection
Equipment’s
Determining Machine Conditions (Cutting Speed, Feed, and Depth of
Cut and Manufacturing Times (Processing Time and Lead-time)
Testing and implementation.
Training to team members on fitments.
Interpretingstorage areaforLogisticsstorage,Subassemblyfixtures.
Preparation of WIS (Work Instruction Sheet) using DPE.
TECHNICAL AND FUNCTIONAL COMPETENCIES
Working Knowledge in SAP/PLM/ system.
Knowledge of Vehicles components & aggregates.
Proficiency in excel reports and analysis.
Understanding of Technical drawings of parts/aggregate.
HONOURS & PRIZES
TalentedStudentof the year
2005 by St.Joseph’s
Convent.
Artistof the year-2010 By St.
Joseph’sconvent.
District& Interschool level
prizesforDance and
painting.
HOBBIES
Creative writing.
Paintingandsketches
Practice Bharatanatyamstyle
of dance.
Social services.
PERSONAL DETAILS
Father’sName: Panduranga Rao C.N
DOB: 20/08/1993
Gender: Female
Marital Status: Single
Nationality: Indian
Dependence: Mother&Brother
LANGUAGESKNOWN
Kannada,Marathi, English,and
Hindi.
3. PROJECTS HANDELED IN TATA MOTORS
ACE ZIP VARIANTS
LHD( Left Hand Drive)
Quadricycle-Indian and Export.
Ace Zip CNG
Ace Zip BS IV
Ace Zip REFRESH
Ace Zip ICR
Ace zip High Deck and Low Deck load body
Ace Zip 0.75T
KEY ACHIEVEMENTS
Activelyinvolvedandresponsibleforthe New ProductDevelopmentActivitiesforPrototypeDevelopment,
Vehicle Testing, and Engineering Improvements.
Responsible forDesign Verification and Improvements and Vehicle Assembly, Value Engineering (VE).
Played a important role in the Process PlanningSequence planning of the LCV Chassis line.
Introduction and implementation of DPE for Process Estimation for all the projects.
Introduction and implementation of KNEXT for the transportaionFraight cost calculation.
Played important role in BOMtransfer, Restructuring, Cost roll up of first LCV models(712, 912, 410).
Memberof crossfunctional teamformakingProcesssheets,PFMEA,PFD,Controlplan forall newprojects.
Logistic workout for the green fied project( LCV 912 and 712)
Determined the fright cost for LCV models.
TRAININGS
WCQ, BIW-Built in Quality”.
SafetyTrainingsLike WorkatHeight,PPE,JobSafetyAnalysis,andLifting&Supportingof loads,Confinedspace
entry, Machine Guarding. Job Safety Analysis, Permit To Work standard Training, Vehicle and Traffic Safety
Standards, Personality development & health, KUKA Robots, Electrical Safety Management System, LOTO
TS16949 Awareness Program.
Basics of SAP
PLM
DELMIA
Statistics Process control
PLC Programming-by Siements
KUKA robots handling and Programming.
(PRIYADARSHINI.P.AMBORE)
PLACE: CHICKMAGLUR
DATE:
LCVICVVARIANTS
407 34 WB
712 BS III 42 WB
912 BSIII 49 WB
712 & 912 ABS
912 & 712 BS IV
407 31 WB
410 MARCOPOLO BUS CHASSIS
SLF Vehicles
DECLARATION
“I herebyconfirm thatall the above information stated is correct, true and complete to the best of my
knowledge”