CARRER HIGHLIGHTS:
15 Years of experience in Civil Engineering construction filed (Execution & Site Supervisions). This includes collection,
compilation & applications of construction fields for the Highways Structures Canals. Study of Project Drawings, Changes &
Revision in the road profile according to the site available conditions. Financially and economically time savings during
running time frame of the project. Preparation of programming & scheduling of the Road Construction activities.
Preparations of the rate analysis and daily finical analysis. Checking and revisions of BOQ quantities. Preparation of IPC,
preparation of shop drawings as per site requirements. Checking of X- Sectional area cut & fills quantities. Provision of
super elevations incorporated. Preparations of site visits for tendering, feasibility reports and its estimation for the
project. Preparation of daily, weekly & monthly project reports, and corresponding, meetings, with Client – Consultants –
Contractors – Local Administrative Departments – local communities and arrangements of professional skilled crews, for the
Project.
AREAS OF EXPERTISE
Building Structure
Site Supervision
Quantity Surveyor
Quality Control
Infrastructure
CONTINUED PROFESSIONAL DEVELOPMENT AND AWARDS
Attended Seminars & Workshops of different on Project Execution & Management.
Detailed Reporting Writing.
Undertook training at HSE ( Health , Safety & Environment )
Attended three courses on “Construction Material Testing “, Soil, Aggregates, water, Cement, Concrete, Admixture, Steel & Asphalt.
EMPLOYMENT HISTORY:
From October, 2013 to September 2015 : Assistant Resident Engineer / Highway Engineer
EMPLOYER : Engineering Associates (Consultants) Karachi Pakistan.
PROJECT : Additional Carriage Way, Indus Highway (N-55) from Sehwan to
Ratodero Project.
1
SCOPE OF WORK : Total Length of the project 200 kilometer additional carriageway
including 12 bridges, 400 culverts. Estimated cost (Rs. 200 billions)
CLIENT : National Highway Authority Pakistan.
JOB RESPONSIBLITIES:
To study of construction drawings and executed construction as per approved cross sections. Supervision of construction of
Highways includes as Earthwork, Granular Sub base, Aggregate Base Course, and Asphlatic Concrete, Structural Works as
Bridges and Box Culverts and related items. Estimation of quantities of various activities .Preparation of Daily, Weekly, and
Monthly Progress reports.
From December, 2009 to September 2013 : Construction Manager
EMPLOYER : Usmani Associates Engineer & Contractors Pvt: Ltd Pakistan
PROJECT : Dualizationof Sakrand –Shaheed Benazirabad Road Package - II
Connecting to (N-5 NHA) and Defence flyover Karachi.
SCOPE OF WORK : Total Length of the project 40 kilometer DCW
including 02 bridge, 17 Box culverts. Estimated cost (Rs. 700 Millions)
CLIENT : National Highway Authority Pakistan.
JOB RESPONSIBLITIES:
To execution of work according to the given schedules, Construction and supervision of all activities of contactor,
Preparation of monthly statements for onwards submission to client, dealing with client representative in order to resolve
daily site problems and material testing. Prepare the list of Manpower and construction equipment to be utilized.
From October, 2004 to November 2009 : Assistant Resident Engineer
EMPLOYER : Professional Engineering Associates (Consultants) Islamabad Pakistan
PROJECT : Rehabilitation & Maintainance projects routes N-25, N-40, N-50
N-65.
.
SCOPE OF WORK : Total Length of the project 200 kilometer
Estimated cost (Rs.100 Millions)
CLIENT : National Highway Authority Pakistan.
JOB RESPONSIBLITIES:
Supervision of civil construction work according to Drawings and Specification, Review the Drawings, Method Statements
and work procedure. To review the (BOQ) Quantities as per actual site conditions, to give approvals and comments to the
works carried out after the inspection. Review and give approval to the shop drawings, material submitted by the
contractor. To prepare Daily, Weekly, and Monthly progress reports for the project, Preparation of Drafts for minutes of
progress, Review meetings of progress, Supervision of civil construction Work (Earthwork, Embankment, Rock cutting, Sub
grade, Sub base, ABC, Asphalt work, steel reinforcement and Concrete pouring. to supervise the work according to the
Project Specifications and Construction Drawings, to co-ordinate with Client, Contractors and Subcontractors. Quality
Control & Quality Assurance, Keeping up date office record.
2
From July, 2002 to September 2004 : Junior Engineer
EMPLOYER :M M Pakistan (Consultants) Karachi Pakistan.
PROJECT :Extension of Right Bank out fall drain (R.B.O.D) project from Sehwan to
Sea.
.
SCOPE OF WORK : Total Length of the project 273 kilometers, 557Minor Structures, 18
medium structures & 11 Major Structure, Earth work Packages and
flood protection works. Estimated cost (Rs. 16794.298millions)
CLIENT : Irrigation & Power department Govt of Sindh Pakistan
JOB RESPONSIBLITIES:
Responsible for supervision of all civil work including checking layout, survey and cross sections of drainage works and
structural excavations. Supervise the works according to design and construction drawings .Preparation of daily, weekly and
monthly progress reports including site visit presentations, coordinate with client and other stake holders on construction
related issues.
From March, 2001to June 2002 : Civil Engineer (Structure)
EMPLOYER : (North East International Electric Corporation) of China in a
Manshera. KPK Pakistan.
PROJECT : Construction of new 132/13.8 kv Sub Station (8523) at Masehra KPK
Pakistan.
JOB RESPOSIBILITIES:
Daily inspection and supervise of different kind of civil activities according to design and standard specifications. Inspect
all type of structural activities like, all type of foundations, type of slabs as per specifications and method of statement.
Maintain daily diary, progress and monthly report. Planning for labor and arrangement of material as per site requirements.
Procurement and management for the site requirements. To demonstrate thorough and practical knowledge and proven
ability in contractions techniques with emphasis on soil mechanics, foundations, and retaining walls. Structural steel,
masonry, underground water tanks, building interiors, building finishes and roof treatment system. Testing of various
materials for quality control assurance. To follow the safety measures for the safe work. Scrutinize the activities like form
work, steel reinforcement as per schedule, line and levels. Studying critically the various departments and independent
activities of the project in order to accelerate the progress of work so as to save the time and cost. Construction of new
132/13.8 kv Sub Station (8523) at Mansehra KPK Pakistan. The project consists of building having raft foundation
containing G.I.S room, Control Room, Transformer Foundations, Telecom Room, Switch Gear Rooms, Battery Room, Store
Room and Bath Room. Transformer Foundations (Present & Future), G.I.B Foundations, N.E.R Foundations, Fire walls,
Outdoor lighting pole foundations.
From August, 2000 to February 2001 : Site Engineer
EMPLOYER :Husnain Construction Company Lahore Pakistan
PROJECT : Additional Carriage Way (N-5) fromKotri Kabir to Baberlo Section.
.
SCOPE OF WORK : Total Length of the project 73.4 kilometer
Estimated cost (Rs.2029 millions)
3
CLIENT : National Highway Authority Pakistan.
JOB RESPONSIBLITIES:
To prepare the sharp drawing, work program and calculate work done quantities. Execute the work according to the
construction drawings and standard specifications. Involved construction of earth work, sub base, aggregate base course
and asphaltic base course and wearing course including drainage structures. Submission of daily and monthly progress report
and preparation of invoices.
QUALIFICATION:
BE/BSc – Civil Engineering (1st
Division) Mehran University of Engineering & Technology, Jamshoro, sindh, Pakistan-1999
MEMBERSHIP & REGISTATION: Life time member of Pakistan Engineering Council having registration no. Civil 20007
SOFT WARES AND SKILLS: Ms Word, Ms Excel and Internet applications etc.
PERSONAL INFORMATION: Status: Married (having 03 kids).
Date of birth: 01-01-1974
Nationality: Pakistani
Passport no: BL0206641
LANGUAGES: English
Urdu
Sindhi
Punjabi
4

CV M.Ilyas - 1

  • 1.
    TRANSFERABLE IQAMA MUHAMMAD ILYAS B.E/BScCivil Engineering – 1999 E-mail:milyas1memon@gmail.com @ Engineering Associates Cell no. 00966593056654 Skype id: mohammad7015867 Address: Al Khobar KSA CARRER HIGHLIGHTS: 15 Years of experience in Civil Engineering construction filed (Execution & Site Supervisions). This includes collection, compilation & applications of construction fields for the Highways Structures Canals. Study of Project Drawings, Changes & Revision in the road profile according to the site available conditions. Financially and economically time savings during running time frame of the project. Preparation of programming & scheduling of the Road Construction activities. Preparations of the rate analysis and daily finical analysis. Checking and revisions of BOQ quantities. Preparation of IPC, preparation of shop drawings as per site requirements. Checking of X- Sectional area cut & fills quantities. Provision of super elevations incorporated. Preparations of site visits for tendering, feasibility reports and its estimation for the project. Preparation of daily, weekly & monthly project reports, and corresponding, meetings, with Client – Consultants – Contractors – Local Administrative Departments – local communities and arrangements of professional skilled crews, for the Project. AREAS OF EXPERTISE Building Structure Site Supervision Quantity Surveyor Quality Control Infrastructure CONTINUED PROFESSIONAL DEVELOPMENT AND AWARDS Attended Seminars & Workshops of different on Project Execution & Management. Detailed Reporting Writing. Undertook training at HSE ( Health , Safety & Environment ) Attended three courses on “Construction Material Testing “, Soil, Aggregates, water, Cement, Concrete, Admixture, Steel & Asphalt. EMPLOYMENT HISTORY: From October, 2013 to September 2015 : Assistant Resident Engineer / Highway Engineer EMPLOYER : Engineering Associates (Consultants) Karachi Pakistan. PROJECT : Additional Carriage Way, Indus Highway (N-55) from Sehwan to Ratodero Project. 1
  • 2.
    SCOPE OF WORK: Total Length of the project 200 kilometer additional carriageway including 12 bridges, 400 culverts. Estimated cost (Rs. 200 billions) CLIENT : National Highway Authority Pakistan. JOB RESPONSIBLITIES: To study of construction drawings and executed construction as per approved cross sections. Supervision of construction of Highways includes as Earthwork, Granular Sub base, Aggregate Base Course, and Asphlatic Concrete, Structural Works as Bridges and Box Culverts and related items. Estimation of quantities of various activities .Preparation of Daily, Weekly, and Monthly Progress reports. From December, 2009 to September 2013 : Construction Manager EMPLOYER : Usmani Associates Engineer & Contractors Pvt: Ltd Pakistan PROJECT : Dualizationof Sakrand –Shaheed Benazirabad Road Package - II Connecting to (N-5 NHA) and Defence flyover Karachi. SCOPE OF WORK : Total Length of the project 40 kilometer DCW including 02 bridge, 17 Box culverts. Estimated cost (Rs. 700 Millions) CLIENT : National Highway Authority Pakistan. JOB RESPONSIBLITIES: To execution of work according to the given schedules, Construction and supervision of all activities of contactor, Preparation of monthly statements for onwards submission to client, dealing with client representative in order to resolve daily site problems and material testing. Prepare the list of Manpower and construction equipment to be utilized. From October, 2004 to November 2009 : Assistant Resident Engineer EMPLOYER : Professional Engineering Associates (Consultants) Islamabad Pakistan PROJECT : Rehabilitation & Maintainance projects routes N-25, N-40, N-50 N-65. . SCOPE OF WORK : Total Length of the project 200 kilometer Estimated cost (Rs.100 Millions) CLIENT : National Highway Authority Pakistan. JOB RESPONSIBLITIES: Supervision of civil construction work according to Drawings and Specification, Review the Drawings, Method Statements and work procedure. To review the (BOQ) Quantities as per actual site conditions, to give approvals and comments to the works carried out after the inspection. Review and give approval to the shop drawings, material submitted by the contractor. To prepare Daily, Weekly, and Monthly progress reports for the project, Preparation of Drafts for minutes of progress, Review meetings of progress, Supervision of civil construction Work (Earthwork, Embankment, Rock cutting, Sub grade, Sub base, ABC, Asphalt work, steel reinforcement and Concrete pouring. to supervise the work according to the Project Specifications and Construction Drawings, to co-ordinate with Client, Contractors and Subcontractors. Quality Control & Quality Assurance, Keeping up date office record. 2
  • 3.
    From July, 2002to September 2004 : Junior Engineer EMPLOYER :M M Pakistan (Consultants) Karachi Pakistan. PROJECT :Extension of Right Bank out fall drain (R.B.O.D) project from Sehwan to Sea. . SCOPE OF WORK : Total Length of the project 273 kilometers, 557Minor Structures, 18 medium structures & 11 Major Structure, Earth work Packages and flood protection works. Estimated cost (Rs. 16794.298millions) CLIENT : Irrigation & Power department Govt of Sindh Pakistan JOB RESPONSIBLITIES: Responsible for supervision of all civil work including checking layout, survey and cross sections of drainage works and structural excavations. Supervise the works according to design and construction drawings .Preparation of daily, weekly and monthly progress reports including site visit presentations, coordinate with client and other stake holders on construction related issues. From March, 2001to June 2002 : Civil Engineer (Structure) EMPLOYER : (North East International Electric Corporation) of China in a Manshera. KPK Pakistan. PROJECT : Construction of new 132/13.8 kv Sub Station (8523) at Masehra KPK Pakistan. JOB RESPOSIBILITIES: Daily inspection and supervise of different kind of civil activities according to design and standard specifications. Inspect all type of structural activities like, all type of foundations, type of slabs as per specifications and method of statement. Maintain daily diary, progress and monthly report. Planning for labor and arrangement of material as per site requirements. Procurement and management for the site requirements. To demonstrate thorough and practical knowledge and proven ability in contractions techniques with emphasis on soil mechanics, foundations, and retaining walls. Structural steel, masonry, underground water tanks, building interiors, building finishes and roof treatment system. Testing of various materials for quality control assurance. To follow the safety measures for the safe work. Scrutinize the activities like form work, steel reinforcement as per schedule, line and levels. Studying critically the various departments and independent activities of the project in order to accelerate the progress of work so as to save the time and cost. Construction of new 132/13.8 kv Sub Station (8523) at Mansehra KPK Pakistan. The project consists of building having raft foundation containing G.I.S room, Control Room, Transformer Foundations, Telecom Room, Switch Gear Rooms, Battery Room, Store Room and Bath Room. Transformer Foundations (Present & Future), G.I.B Foundations, N.E.R Foundations, Fire walls, Outdoor lighting pole foundations. From August, 2000 to February 2001 : Site Engineer EMPLOYER :Husnain Construction Company Lahore Pakistan PROJECT : Additional Carriage Way (N-5) fromKotri Kabir to Baberlo Section. . SCOPE OF WORK : Total Length of the project 73.4 kilometer Estimated cost (Rs.2029 millions) 3
  • 4.
    CLIENT : NationalHighway Authority Pakistan. JOB RESPONSIBLITIES: To prepare the sharp drawing, work program and calculate work done quantities. Execute the work according to the construction drawings and standard specifications. Involved construction of earth work, sub base, aggregate base course and asphaltic base course and wearing course including drainage structures. Submission of daily and monthly progress report and preparation of invoices. QUALIFICATION: BE/BSc – Civil Engineering (1st Division) Mehran University of Engineering & Technology, Jamshoro, sindh, Pakistan-1999 MEMBERSHIP & REGISTATION: Life time member of Pakistan Engineering Council having registration no. Civil 20007 SOFT WARES AND SKILLS: Ms Word, Ms Excel and Internet applications etc. PERSONAL INFORMATION: Status: Married (having 03 kids). Date of birth: 01-01-1974 Nationality: Pakistani Passport no: BL0206641 LANGUAGES: English Urdu Sindhi Punjabi 4