     KELTECH ENERGIES LIMITED [KEL] is a company of the renowned Chowgule Group
     of companies.
     KEL manufactures industrial explosives under technical know-how from M/s. Du Pont
     of USA and expanded perlite under technical collaboration from M/s. Silibrico Crop
     USA.

    KEL operates two expanders for Perlite production One is South India and other in
    Central India. KEL manufacture Perlite products for construction, low temperature
    insulation, horticulture, refractory, fillers, foundry, as carrier for poultry medicine,
    thermoplastic and other applications.

    KEL also undertakes turnkey Perlite insulations services for cryogenic storage tanks,
    Air Separation units etc.,

    KEL is an active member of the Perlite Institute Inc., USA and an ISO 9001 - 2000
    Company.
    KEL’s current annual business turnover is 23 million USD
Introduction
  From modest beginning in 1916, the Chowgule Group has today activities in the areas as
  diverse as

  Iron Ore mining and Exports
  Iron Ore Pelletization
  Shipbuilding
  International shipping with integrated logistics management
  Ship owners (international tramp trading)
  Explosives
  Industrial salt
  Industrial gases
  Automobile Dealership
  Construction Chemicals and Equipment
  Marketing Agencies
  Education

  A diversification that has only been possible and successful because of the role played
  by the people at Chowgules, their shareholders and the natural resources of the land.
  The Group's turnover is over Rs.l300crores ($ 300 Million)
Iron Ore mining and Exports
Industrial salt and Shipping
Shipbuilding
Pelletization of iron ore
Explosives
Automobile Dealership
Perlite Activities




      Stationary Expanders – Bagged Perlite Products

      Portable Expanders – Site Expansion and Filling

      Perlite Concrete Block – Factory made / Site Cast

      Perlite Removal and Refilling
Perlite Expanders




 KEL has an Licensed capacity to produce 9000 Tons per annum of Expanded
 perlite for varied application at Two Locations
Bagged Products




       KEL Manufactures Bagged Expanded Perlite and Exfoliated Vermiculite
       Products for Horticulture, Construction, Refractory, Foundry, Fillers,
       Animal feed, Cryogenic and Low Temperature Insulation Applications
Perlite Insulation services




• Installation of expanded perlite in the annular space between concentric
  Vertical cylindrical tanks – LNG, Ethylene & Propylene.

• Perlite concrete blocks manufacture and installation

• Leveling concrete over bottom late for placing perlite concrete blocks

• Installation of expanded perlite in to air separation units ( cold boxes)
  and small storage tanks- LOX, LIN & LAR tanks
Portable Site Expanders




Portable Site Expanders - Total 4 Nos.
Capacity - 800 KGs Per Hour
Perlite Concrete Blocks




  KEL is also involved in manufacturing and installation of Perlite Concrete
  Blocks for LNG, LPG, Ethylene, Propylene & Ammonia Tanks.
Perlite Filling of ASU, cold boxes and small cryogenic tanks
Perlite Removal and Refilling




                 Removal of Expanded Perlite from cold boxes,
                            and refilling the same.
Resources




    Each of these units have well equipped laboratory to test raw materials and
    finished products with qualified laboratory technicians.
Organization Chart




Perlite expansion is managed and supervised by qualified Engineers and technicians.
Manpower

Permanent Company Personnel


  Management             -    19

  Engineers          -       35

  Procurement        -        3

  QA / QC            -       10

  Clerical           -       12

  Craftsman          -       50
  ( By Trade )

  TOTAL          -           129
Resources – KEL has its own 20 ft Containers for mobilizing portable   expanders to any project site
Quality Standards

"WE AT KELTECH ENERGIES COMMIT TO ACHIEVE TOTAL CUSTOMER SATISFATION
AND GROWTH BY MANUFACTURE & SUPPLY OF PRODUCTS MEETING CUSTOMER
REQUIREMENTS".

WE COMMIT THIS BY OPTIMUM UTILISATION OF RESOURCES AND CONTINUAL
IMPROVEMENT.


Quality Objectives


                 TO ACHIEVE CUSTOMER SATISFATION.
     TO GROW BY WAY OF PRODUCT IMPROVEMENT AND DEVELOPMENT.
               TO OPTIMISE UTILISATION OF RESOURCES.
                TO ACHIEVE CONTINUAL IMPROVEMENT.
Company ISO Certification
Credentials
Credentials
Credentials
Credentials
Credentials
Site Expansion and Filling
Perlite Ore
Site Expansion and Filling

Perlite Ore


     Perlite Mining

     Perlite Crushing and Grading

    Bagging and Shipment
Site Expansion and Filling

Perlite Mining
Site Expansion and Filling

Perlite Crushing and Grading
Site Expansion and Filling

Bagging and Transportation
Site Expansion and Filling

Shipment




     Perlite ore bags are shipped in containers or as break bulk cargo to the
     port nearest to the project site and transported to the site in trailer trucks
Plant & Machinery


 Required nos of Portable expanders with essential spares
 Conveying hose pipes
 Vibration Equipments
 Control panels an all accessories
 Testing laboratory with equipments




  All the above will be shipped in ISO 20 feet containers
Site Organization Chart
Manpower – 2 Expanders


Project Manager         -    1

Supervisors             -    2

Operators               -    2

QC / QAD                -    2
Safety Supervisor       -    1

Maintenance Assistant   -    1
Casual Labour           -   12
Flow Diagram of - Portable Perlite Expander
Expanded Perlite for Cryogenic Insulation

 Perlite is a type of volcanic glass rock containing combined water. When heated above 850 0C,
 the crude perlite particles expand approximately 20 times its size. The combined water vaporizes
 to form microscopic cells or voids in the heat-softened glass. The resulting honeycomb structure
 accounts for its lightweight and excellent thermal insulation properties. Because of its granular form,
 expanded perlite will conform to and fill irregular shapes easily and completely.

 ADVANTAGES OF USING EXPANDED PERLITE AS CRYOGENIC INSULATOR.

 • Low thermal conductivity at very low temperature [-173 0 C]
 • The low density of expanded perlite
 • Inorganic - No deterioration
 • Free Flowing
 • Easy availability
 • Chemically inert
 • Free from organics

 Hence Perlite has been recognized as the most efficient insulation material for low temperature
 storage vessels and process equipments.
APPLICATIONS OF EXPANDED PERLITE IN CRYOGENIC INSULATION

• Insulation of double wall storage tanks for liquid gases like Oxygen, Nitrogen, Ethylene,
Propylene Ammonia, LNG

• Insulation of double wall liquid gas tankers LNG/LPG tankers (ships) upto 10,000 M    3



• Insulation of cold box and Air Separation units.
Perlite Ore

Principal Manufacturers of cryogenic grade Perlite ore.




  •   Greece                  -        Silver & Barytes
  •   USA                     -        World minerals, Redco
  •   New Zealand             -        Inpro
  •   Philippines             -         Induplex / Asian Perlite
  •   Turkey                  -        D-Perlite
Perlite Ore



Grades

     Size Basis           Size in mm         Application Basis
     Coarse          1mm - 4mm          Horticulture/Construction
     Medium Coarse   0.8mm - 2.5mm      Construction
     Medium          0.3mm - 1.4mm      Construction
     Medium Fine     0.6mm - 0.15mm     Cryogenic, Fine Aggregates
     Fine            0.4mm - 0.15mm     Cryogenic, Fine Aggregates
     Extra Fine      0.075mm - 0.30mm   Fillers, Fine Aggregates
Perlite Ore


Typical Chemical Composition of Crude Perlite Ore

                            REDCO - USA   INPRO-       S&B-GREECE
                                          NEWZEALAND
        Silica             75%            75%          74%

        Aluminium oxide    13.2%          14%          12.7.%

        Ferric Oxide       0.7%           1.0%         0.7%

        Calcium Oxide      0.5%           1.3%         0.7%

        Magnesium Oxide    Trace          0.3%         0.2%


        Sodium Oxide       4.3%           3.0%         3.3%

        Potassium Oxide    4.6%           4.0%         4.0%

        Trace              0.2%           0.3%         0.2%

        Loss of Ignition   3.2%           3.2%         2.8%
Perlite Ore

Other Properties
  Colour                  -           Pale to dark grey, brown, green and black
  Hardness                -           5.5 to 7.0 on Mohr’s scale
  SG                      -           2.0 to 2.8
  SP                      -           760 o C - 1000 0 C
  RI                      -           1.490 to 1.610
Cryogenic Grade Ore
  Size                                -           0.6 - 0.15 mm, or 0.400 - 0.150 mm
  Crushability                        -           Not easily crushable
  Expandability                       -           Good
  Unexpandable material                           -           Minimum

Material Delivery & Storage

The Perlite ore is packed in 1 M.T Jumbo bags. The shipment of ore is done either in
containers or as hold cargo (open). After clearing, the shipment / consignment the perlite ore bags are
loaded
into the trucks and transported to the site. The ore must be stored only in covered space and kept in dry
conditions. Storing of perlite ore outside under plastic cover should be avoided.

Perlite ore will be conveyed to the surge hopper of the expander using pick & carry / forklifts.
Perlite Ore

  Why Site Expansion?

  For large sized jobs above 1500 M 3 volume.

     Insulation of double walled storage tanks for liquid gas

     Insulation of double walled liquid gas tankers

     Insulation of oxygen plants, cold box / ASU



  Advantages
     Reduced transportation cost - Ore / Expanded Perlite

     Less handling problem of bulky Expanded Perlite

     Controlled insulation procedures

     Maximum thermal efficiency (low moisture)
Installation Procedure



Preparation of annular space to receive expanded Perlite to be arranged by the Client:

   All debris and foreign material has to be removed from the annular space completely.

   Installation of required material in the annular space must be completed.

   All structural proof tests and leak tests have to be completed as specified before expanded Perlite
    is installed.

   Any nozzle / penetration into the annular space not to be used for installing the insulation or purging
     the insulation space shall be closed to prevent water or air entering the insulation space.


Weather condition during installation

Expanded perlite can be installed from on site expanders even during rainy season. It will ensured that the
nozzles through which the tank is being filled are properly protected from any infiltration of moisture into the
expanded perlite or insulation space. Rain shelters will be provided wherever necessary.
Portable Expansion and Filling



The perlite ore is transferred from the go down and fed into the feed hopper. The variable speed ore
feeder continuously meters the perlite ore into the bucket elevator, which discharges the same into the
expander. The ore falls from the elevator into the expanding tube. The expanding tube is heated from the
bottom and has a constant upward air flow created by the main exhaust fan. The expanded perlite and hot
gas are discharged into a cyclone and conveyed to the baghouse collector. The product discharges from
the bottom of the collector into the perlite conveying system. Samples are drawn from the sample port for
periodical testing of bulk density, moisture content, size filtered gas is then discharged into the
atmosphere by the exhaust fan. The product is discharged from the Perlite-conveying system through a
flexible pipeline to the tank being insulated.

Filling is started from the top of the annular space with flexible hose. The expanded perlite falls down
gravimetrically and the perlite column starts building naturally. Perlite level shall be monitored regularly
and the filling nozzle changed whenever necessary. When the annular space is filled to the required level
the perlite filling will be stopped to allow settlement of the perlite. Filling is then continued till refusal to
further settlement of perlite is achieved at the reservoir top.
Vibration

The tank manufacturer sometimes insists for additional vibration of the expanded perlite after filling. For this operation
electromagnetic pneumatic vibrators are used.

These vibrators are equally divided along the whole periphery of the tank at almost 3M from the bottom. After 6 hours of
vibration (without adding expanded perlite all the vibrators are raised by 3M. This operation is repeated till we reach the
level of 3M beneath the top of the space to be insulated.

However vibration is possible only in smaller tanks where the outer shell is of steel construction. In larger tanks with
outer shell of pre-stressed concrete wall vibration is carried using plate vibratos




                                                 External Vibration
Vibration




            Internal Vibration
Inspection:


 The following inspection shall be performed in accordance to client’s requirement.

 Compacted Density

 The material shall be measured at least every eight hours of production.

 Moisture content shall be checked once in 24 hours.

 Thermal conductivity shall be measured at the bottom and top section of the tank and will be
 tested as per IS – 3346 / 1980 at 0 C. (Four sample consisting of 3 specimens will be sent to
 CBRI, Roorkee for test. Test report will be submitted after one month).

 Grading:

 Inspection may be performed by the inspector representing the IHI, Owner and / or the
 nominated third party. The inspector has the right to witness the inspection and testing of the
 ordered material. (Once in 12 Hours - 2 samples / day.)
Health, Safety, Environment




     KELTECH is keen to use the best health and safety practices from its operation around the world
and where appropriate to replicate them through out its business. In addition to wearing safety helmets,
safety boots, goggles, gloves and masks, all personnel will wear full safety harness at all times while
working off the ground. Safety ropes and runners will be used as necessary. Some of the KELTECH
project team members are specially trained to raise skill levels in site safety & first aid. HSE plan will be
submitted for site specific project and KEL will ensure that this is complied to.
Clientele for Cryogenic applications
                          CUSTOMER             LOCATION          QTY.    EQUIPMENT       |    YEAR               JOB
  Reliance Petro Chemical                Gujarat              90 MTs     Nitrogen Tank       1990      Filling and supervision
  Industries, Hazira

  S M Dyechem Ltd                        Pune                 80 MTs     ASU                 1992      Supply
  National Ferlilizers Ltd. Vijayapuri   MP                   08 MTs     Liquid Oxygen       1992      Supply
                                                                         Tank

  Rourkela Steel Plant                   Orissa               125 Cu M   ASU                 1991      Supply
  Bhilai Steel Plant, Bhilai             M.P                  200 Cu M   ASU                 1990      Supply
  Industrial Oxygen Co.Ltd.,             Pune                 24 MTs     ASU                 1994      Supply
  Indian     Oxygen            Ltd.      Jamshedpur           70 MTs     ASU                 1989      Supply
  Jamshedpur

  Industrial Oxygen Ltd., Pune           Tuticorin            44 MTs     ASU                 1998      Supply
  (Sterlite Industries Ltd.)

  Toyo Engineering Corporation           Haldia               57 MTs     ASU                 1998-99   Supply and supervision
  Ltd.,                                                                                                of filling

  Ispat Industries Ltd.                  Raigad               35 MTs     ASU                 1999      Supply
  Industrial Oxygen Co.                  Pondicherry          32 MTs     ASU                 2000      Supply
  Pondicherry

  Linde India                            Baroda               13MT       ASU                 2005      Supply
  Petronet LNG Tank                      Dahej, Gujarat       1100 MTs   LNG Tank            2002      Site expansion & Filling.

  Inox Air products., Pune               Pune and Tadapatri   35 MTs     Oxygen plant        2005      supply
                                         [AP]
Clientele for Cryogenic applications

            CUSTOMER              LOCATION            QTY.      EQUIPMENT |     YEAR              JOB

 Inox Air products., Pune     Pune and Tadapatri   35 MTs     Oxygen plant    2005     supply
                              [AP]

 Goyal MG Gases               Burnpur              121 MTs    ASU             2006     Supply & Filling

 Chemplast, [Through VTV].    Karaikal             80 MTs     Ethylene tank   2006     Site expansion, Filling &
                                                                                       Vibration

 Praxair India Ltd            Kalyani steel-       160 MTs    ASU             2006     Supply & Filling
                              Hospet project

 Goyal MG Gases               Durgapur W.B         119 MTs    ASU             2007     Supply & Filling

 Praxair India Ltd            Durgapur             205MTs     ASU             2007     Supply & Filling

 Goyal MG Gases               Burnpur              40 MTs     ASU             2008     Removal & Filling

 Whessoe Al Rushaid Co. Ltd   Petro Rabigh- KSA    1160 MTs   Ethylene &      2008     Site Expansion,Filling &
                                                              Propylene                Vibration
                                                              tanks

 Goyal MG Gases               Raipur               137 MTs    ASU             2008     Supply

 Pull B.V. Rhenen             Bahrain              20 MT      LPG Tankers     2008     Supply
Supply and installation of expanded perlite in to Ethylene/ propylene
tanks- Yansab Project At Yanbu – Kingdom of Saudi Arabia

Plant & Machinery

a.     Portable Expander complete with ore bin, screw type ore feeder, bucket elevator, pipe lines, cyclone,
         expansion tube, blower, exhaust fan, burner, compressor, bag house type collector assembly, ducting,
         hoppers, conveying pump & pipe line for connecting conveying pump to the Vessel being insulated,
         Structural frame and mounting.....2 sets

b. All Essential Spares for expander Assembly

Following are the Essential spares :

     1. Fuel Pumps.
     2. Burner Assembly.
     3. Blowers.
     4. Compressor.
     5. Filter bags.
     6. Hose coupling.
     7. Conveying hose pipes.
     8. Exhaust fans.

c. Control panels and all accessories for Electrical connections

d. Testing equipment and site laboratory
FACILITIES REQUIRED AT SITE
Following facilities are required at site.

A. 10 X 30 M leveled space for erecting 2 portable Expanders close to the both the tanks to be filled.
B. Space for bulk storage of HSD Tank and drums.
C. Unloading and storage of Perlite ore under cover at Site.
D. 3 ton capacity crane with 15 M boom for 7 days to offload and install 3 nos perlite expanders.
E. Fork lift/mobile crane with driver for feeding ore to the hopper and handling of equipments.
F. Supply of HSD
G. Providing Fuel tank age 10 KL capacity and about 5 KL replenishment perday.
H. Providing and permitting access inside tanks.
I. Uninterrupted power supply 150 KVA 440 50 has frequency either through DG sets or Power mains at one point
    near the expander,
J. Required illumination at site to facilitate day and night working,
K. Illumination inside the tank.
L. Toilet and bath facilities.
M. Scaffolding along the tank periphery if required,
N. Boarding, Lodging, entry permits (Visas) for KEL personnel and local conveyance for the Site Team
O. Casual Laborers - 12 Nos.
P. Advance payments at site in local currency and payment of bills at site as authorized by us, which is to be deducte from the
     total amount payable tous.
Q. Safety gadgets, First Aid and sanitary facility at site for the site personnel and staff.
R. Clearing of equipment and to and fro transportation from Jeddah to site and back
S. Customs Duty payment for the equipment.
T. Crane for fixing external vibrators.
Supervisors / Operators - 12 hours / shift




Shift A                    General Shift              Shift B
7 AM to 7 PM               9 AM to 5 PM               7 PM to 7 AM
1 –Supervisor              1 – Project Manager        1 –Supervisor
1 –Operator                1- Maintenance Assistant   1 –Operator
1 –Lab Assistant           3- Safety Supervisor       1 – Lab Assistant
6 –Casual Labour                                      6 –Casual Labour
Quantity of Supply
Perlite ore Required for Ethylene tank TK 7501 – 520 MT
Perlite ore Required for Propylene tank TK 7502 – 360 MT
Total Perlite ore Required                      - 880 MT

Job Execution

The Job will be carried out using 2 perlite expanders each having a capacity of 12 MT / Day
ie 24 MT /Day running Continuously 24 hours / day 7 days a week

Schedule for Filling and vibration

For Ethylene tank – TK 7501 – 520 MT of Perlite ore

Filling – 22 Days

Vibration – 3 Days

Total – 25 Days
For Propylene tank – TK 7502 – 360 MT of Perlite ore

Filling – 15 Days

Vibration – 3 Days

Total - 18 Days
Shifting of Equipments


The equipments will be shifted from port by trucks to the project site for erection.

Erection

The equipments will be erected at site by using cranes / chain pulley blocks and assembled on the
platform as required.

Commissioning

The plant will be commissioned at site and all the systems are thoroughly checked at all stages.
Corrections will be done if any failure is noticed.

Trial Run

A trial run is conducted to check for all the parameters required for inspection. Samples are drawn for
testing.
Site expansion, Filling and internal vibration




 1. Preliminary Operations

 2. Transportation

 3. Expansion and filling

 4. Vibration
1. Preliminary Operations


Preparation of annular space to receive expanded Perlite to be arranged by the Client:

   All debris and foreign material has to be removed from the annular space completely.

   Installation of required material in the annular space must be completed.

   All structural proof tests and leak tests have to be completed as specified before expanded Perlite
   is installed.

   Any nozzle / penetration into the annular space not to be used for installing the insulation or purging
    the insulation space shall be closed to prevent water or air entering the insulation space.
2. Storage and Transportation of Perlite ore




Ore Stored in covered shed   Ore transferred by Forklift   Ore Fed for expansion
3. Expansion




   Expansion Under Progress   Perlite Collector With Pot Blower
Filling of Expanded Perlite
PNEUMATIC CONVEYING SYSTEM FOR PERLITE POWDER
Nozzle Orientation - Ethylene Tank

Conveying pipe from each Expander 1 and 2 will fill the sectors 1and 2 respectively and the dia of each
nozzle and conveying pipe is 6 inch. Total 32 Nozzles - each sector will have 16 nozzles, 8 filling, 8 vent
Nozzle Orientation - Propylene Tank

Conveying pipe from each Expander 1 and 2 will fill the sectors 1and 2 respectively and the dia of each
nozzle and conveying pipe is 6 inch. Total 25 Nozzles - each sector will have 12 and 13 nozzles
respectively.
3. Filling




Perlite Conveying Pipes ( Collector to Tank )   Location of Perlite Conveying
                                                Pipe on Tank
3. Filling




             Vent Socks   Conveying Hoses to Nozzle ( Tank Roof )
3. Filling




             Measuring Level of Perlite Filled
4. External Vibration




Vibration equipment consists of pneumatic hammers, eductors and Vacuum cups
4. External Vibration
Vibration Procedure




•   Fill Perlite to level A
•   Vibrate each shell
•   Perlite settles to level B after first vibration
•   Refill back to level A
•   Vibrate again for every 2.4m between level A and B
•   Perlite settles to level C after 2nd vibration
•   Final filling to be completed to the top roof of the outer tank
4. External Vibration




        19 Vibrators will be used at a distance of 8 M between each other
        for Ethylene tank and 15 Vibrators for the Propylene tank.
Process Control

Sieve analysis, loose & compact density and moisture content will be tested during process.

Qualification

Prior to start of actual expansion & filling the perlite ore and expanders will be qualified at site to ensure that the
required specification of expanded perlite is met.

Fuel & Storage

It is proposed to install a bulk storage tank for HSD, and then transfer to smaller feed tanks for supply to the
expanders.
Filling Procedure

The perlite ore is transferred from the go down and fed into the feed hopper. The variable speed ore feeder
continuously meters the perlite ore into the bucket elevator, which discharges the same into the expander. The ore
falls from the elevator into the expanding tube. The expanding tube is heated from the bottom and has a constant
upward air flow created by the main exhaust fan. The expanded perlite and hot gas are discharged into a cyclone
and conveyed to the baghouse collector. The product discharges from the bottom of the collector into the perlite
conveying system. Samples are drawn from the sample port for periodical testing of bulk density, moisture content,
size analysis etc. The hot gas exit from the top of the baghouse collector. The filtered gas is then discharged into
the atmosphere by the exhaust fan. The product is discharged from the Perlite-conveying system through a flexible
pipeline to the tank being insulated.
Expanded Perlite Test Report: Compact density
Expanded Perlite Test Report: Sieve Analysis
Expanded Perlite Test Report: Moisture Content
Expanded Perlite Test Report: Vibration Report
Project Execution Schedule
Project Execution Details




1. Petronet Dahej LNG tank filling

2. Chemplast Ethylene tank filling

3. Petronet Dahej LNG Perlite concrete blocks for bottom
   insulation – cast at site

4. Perlite concrete blocks Fedo – Cast at factory

5. Praxair ASU and Tank filling

6. Simulation of Vibration
KELTECH ENERGIES LIMITED.


Thank you for your
    attention

More Related Content

What's hot

HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh RajputHAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
Gaurav Singh Rajput
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
ssuserfc98db
 
P & ID for LPG Mounded Bullets
P & ID for LPG Mounded BulletsP & ID for LPG Mounded Bullets
P & ID for LPG Mounded Bullets
lpgbnhgastank
 
Process Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG PlantsProcess Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG Plants
Shilpa Dubey
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
Héctor Nguema Ondo
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
Makrand Kulkarni PMP 2750
 
Glycol dehydration
Glycol dehydration Glycol dehydration
Glycol dehydration
Syed Shaqeeb Shah
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction Industry
Norrazman Zaiha Zainol
 
Aluminium and it’s alloys
Aluminium and it’s alloysAluminium and it’s alloys
Aluminium and it’s alloys
Kunal Rathod
 
Inductortherm furnaces
Inductortherm furnacesInductortherm furnaces
Inductortherm furnaces
Milton Diaz
 
Completion Oil Tools Presentation
Completion Oil Tools PresentationCompletion Oil Tools Presentation
Completion Oil Tools Presentation
Completion Oil Tools Pvt. Ltd.
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
Alex TX
 
Chemical Engineering Apparatus Design Lecture note.pdf
Chemical Engineering  Apparatus Design Lecture note.pdfChemical Engineering  Apparatus Design Lecture note.pdf
Chemical Engineering Apparatus Design Lecture note.pdf
MuktarAbdu2
 
Hse nitish
Hse nitishHse nitish
Hse nitish
Nitish Sharma
 
Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)
Chemical Engineering Guy
 
4 stainless steel, tool steel
4  stainless steel, tool steel4  stainless steel, tool steel
4 stainless steel, tool steel
MathankumarA5
 
Hazop_study_introduction
Hazop_study_introductionHazop_study_introduction
Hazop_study_introduction
Mehdi Shariatmadar
 
LPG TANK INSTALLATION
LPG TANK INSTALLATION LPG TANK INSTALLATION
LPG TANK INSTALLATION
lpgbnhgastank
 
Non ferrous alloy
Non ferrous alloyNon ferrous alloy
Non ferrous alloy
nandlal birle
 
Aspen HYSYS - Basic Course (SS)
Aspen HYSYS - Basic Course (SS)Aspen HYSYS - Basic Course (SS)
Aspen HYSYS - Basic Course (SS)
Chemical Engineering Guy
 

What's hot (20)

HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh RajputHAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
HAZOP I Hazard and operability study I Risk Assessment I Gaurav Singh Rajput
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
 
P & ID for LPG Mounded Bullets
P & ID for LPG Mounded BulletsP & ID for LPG Mounded Bullets
P & ID for LPG Mounded Bullets
 
Process Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG PlantsProcess Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG Plants
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
 
Glycol dehydration
Glycol dehydration Glycol dehydration
Glycol dehydration
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction Industry
 
Aluminium and it’s alloys
Aluminium and it’s alloysAluminium and it’s alloys
Aluminium and it’s alloys
 
Inductortherm furnaces
Inductortherm furnacesInductortherm furnaces
Inductortherm furnaces
 
Completion Oil Tools Presentation
Completion Oil Tools PresentationCompletion Oil Tools Presentation
Completion Oil Tools Presentation
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
Chemical Engineering Apparatus Design Lecture note.pdf
Chemical Engineering  Apparatus Design Lecture note.pdfChemical Engineering  Apparatus Design Lecture note.pdf
Chemical Engineering Apparatus Design Lecture note.pdf
 
Hse nitish
Hse nitishHse nitish
Hse nitish
 
Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)
 
4 stainless steel, tool steel
4  stainless steel, tool steel4  stainless steel, tool steel
4 stainless steel, tool steel
 
Hazop_study_introduction
Hazop_study_introductionHazop_study_introduction
Hazop_study_introduction
 
LPG TANK INSTALLATION
LPG TANK INSTALLATION LPG TANK INSTALLATION
LPG TANK INSTALLATION
 
Non ferrous alloy
Non ferrous alloyNon ferrous alloy
Non ferrous alloy
 
Aspen HYSYS - Basic Course (SS)
Aspen HYSYS - Basic Course (SS)Aspen HYSYS - Basic Course (SS)
Aspen HYSYS - Basic Course (SS)
 

Viewers also liked

Presentation finel
Presentation finelPresentation finel
Presentation finel
mahesh v
 
2. liquefied natural gas (lng) bpcl
2. liquefied natural gas (lng)  bpcl2. liquefied natural gas (lng)  bpcl
2. liquefied natural gas (lng) bpcl
Priyanka Sharma
 
Wmc
WmcWmc
Build a Culture that Will Fill your Resident Camp
Build a Culture that Will Fill your Resident CampBuild a Culture that Will Fill your Resident Camp
Build a Culture that Will Fill your Resident Camp
Dan Weir
 
Creative holidays
Creative holidaysCreative holidays
Creative holidays
mahesh v
 
Apple is doing it. Shouldn't you?
Apple is doing it. Shouldn't you?Apple is doing it. Shouldn't you?
Apple is doing it. Shouldn't you?
Dan Weir
 
accl-automatic changeover cum current limiting device
accl-automatic changeover cum current limiting device accl-automatic changeover cum current limiting device
accl-automatic changeover cum current limiting device
ASHISH BAWA
 
Burn
BurnBurn
Fashion star s2 screenshot deck final 3.12.13
Fashion star s2 screenshot deck final 3.12.13Fashion star s2 screenshot deck final 3.12.13
Fashion star s2 screenshot deck final 3.12.13
miotakahashi
 
Throwing in the towel - saying "come get your kid"
Throwing in the towel - saying "come get your kid"Throwing in the towel - saying "come get your kid"
Throwing in the towel - saying "come get your kid"
Dan Weir
 
Comportamientos digitales
Comportamientos digitalesComportamientos digitales
Comportamientos digitales
PaulaAndrea97
 
Creative holiland
Creative holilandCreative holiland
Creative holiland
mahesh v
 
Digital Strategy Team Resume
Digital Strategy Team ResumeDigital Strategy Team Resume
Digital Strategy Team Resume
Digital Strategy
 
Design thinking para educadores
Design thinking para educadoresDesign thinking para educadores
Design thinking para educadores
Jorge García
 
It's Worth Your Time: Managing Millenials (Jan 2017)
It's Worth Your Time: Managing Millenials (Jan 2017)It's Worth Your Time: Managing Millenials (Jan 2017)
It's Worth Your Time: Managing Millenials (Jan 2017)
Dan Weir
 
Tratamiento de agua.
Tratamiento de agua.Tratamiento de agua.
Tratamiento de agua.
ManUel Lobato
 
The LNG Liquefaction Process - Simply Fancy Household Appliances
The LNG Liquefaction Process - Simply Fancy Household AppliancesThe LNG Liquefaction Process - Simply Fancy Household Appliances
The LNG Liquefaction Process - Simply Fancy Household Appliances
Society of Women Engineers
 
Hydrophobic expanded perlite
Hydrophobic expanded perlite Hydrophobic expanded perlite
Hydrophobic expanded perlite
Kiiza John
 
Fire proof finish
Fire proof finishFire proof finish
Fire proof finish
Manish Jain Luhadia
 

Viewers also liked (20)

Presentation finel
Presentation finelPresentation finel
Presentation finel
 
2. liquefied natural gas (lng) bpcl
2. liquefied natural gas (lng)  bpcl2. liquefied natural gas (lng)  bpcl
2. liquefied natural gas (lng) bpcl
 
Wmc
WmcWmc
Wmc
 
Build a Culture that Will Fill your Resident Camp
Build a Culture that Will Fill your Resident CampBuild a Culture that Will Fill your Resident Camp
Build a Culture that Will Fill your Resident Camp
 
Creative holidays
Creative holidaysCreative holidays
Creative holidays
 
Apple is doing it. Shouldn't you?
Apple is doing it. Shouldn't you?Apple is doing it. Shouldn't you?
Apple is doing it. Shouldn't you?
 
accl-automatic changeover cum current limiting device
accl-automatic changeover cum current limiting device accl-automatic changeover cum current limiting device
accl-automatic changeover cum current limiting device
 
Burn
BurnBurn
Burn
 
Fashion star s2 screenshot deck final 3.12.13
Fashion star s2 screenshot deck final 3.12.13Fashion star s2 screenshot deck final 3.12.13
Fashion star s2 screenshot deck final 3.12.13
 
Throwing in the towel - saying "come get your kid"
Throwing in the towel - saying "come get your kid"Throwing in the towel - saying "come get your kid"
Throwing in the towel - saying "come get your kid"
 
Comportamientos digitales
Comportamientos digitalesComportamientos digitales
Comportamientos digitales
 
Creative holiland
Creative holilandCreative holiland
Creative holiland
 
Digital Strategy Team Resume
Digital Strategy Team ResumeDigital Strategy Team Resume
Digital Strategy Team Resume
 
Design thinking para educadores
Design thinking para educadoresDesign thinking para educadores
Design thinking para educadores
 
It's Worth Your Time: Managing Millenials (Jan 2017)
It's Worth Your Time: Managing Millenials (Jan 2017)It's Worth Your Time: Managing Millenials (Jan 2017)
It's Worth Your Time: Managing Millenials (Jan 2017)
 
Tratamiento de agua.
Tratamiento de agua.Tratamiento de agua.
Tratamiento de agua.
 
123
123123
123
 
The LNG Liquefaction Process - Simply Fancy Household Appliances
The LNG Liquefaction Process - Simply Fancy Household AppliancesThe LNG Liquefaction Process - Simply Fancy Household Appliances
The LNG Liquefaction Process - Simply Fancy Household Appliances
 
Hydrophobic expanded perlite
Hydrophobic expanded perlite Hydrophobic expanded perlite
Hydrophobic expanded perlite
 
Fire proof finish
Fire proof finishFire proof finish
Fire proof finish
 

Similar to Keltech

catalogue(Naike Chemical)
catalogue(Naike Chemical)catalogue(Naike Chemical)
catalogue(Naike Chemical)
Cathy Li
 
Mla group intro presentation
Mla group intro presentationMla group intro presentation
Mla group intro presentation
Vinay Johari
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
Vishnu Kasi reddy
 
COMPANY PRESENTATION - LEMIT INSERV SRL
COMPANY PRESENTATION - LEMIT INSERV SRLCOMPANY PRESENTATION - LEMIT INSERV SRL
COMPANY PRESENTATION - LEMIT INSERV SRL
Octavian Leu
 
DEVAN INTERSHIP REPORT BE SEM 7.pdf
DEVAN INTERSHIP REPORT BE SEM 7.pdfDEVAN INTERSHIP REPORT BE SEM 7.pdf
DEVAN INTERSHIP REPORT BE SEM 7.pdf
DevanBhogayata
 
Presentation lemit inserv
Presentation lemit inservPresentation lemit inserv
Presentation lemit inserv
Octavian Leu
 
Company Presentation LEMIT Inserv
Company Presentation LEMIT InservCompany Presentation LEMIT Inserv
Company Presentation LEMIT Inserv
Octavian Leu
 
KEL- Horticulture products and clientele
KEL- Horticulture products and clienteleKEL- Horticulture products and clientele
KEL- Horticulture products and clientele
Sachin Hingnikar
 
HDO Corporate Presentation
HDO Corporate PresentationHDO Corporate Presentation
HDO Corporate Presentation
ranjit89
 
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
Mike O'Driscoll
 
NERMAT® / SILIMAT®
NERMAT® / SILIMAT® NERMAT® / SILIMAT®
NERMAT® / SILIMAT®
Refratechnik Group
 
Silica one investors page
Silica one investors pageSilica one investors page
Silica one investors page
Vishnu Kasi reddy
 
Sapphit prezentation
Sapphit prezentationSapphit prezentation
Sapphit prezentation
Jan Bitman
 
U09CH153-Industrial Training Report - ATG
U09CH153-Industrial Training Report - ATGU09CH153-Industrial Training Report - ATG
U09CH153-Industrial Training Report - ATG
Kailasham Ramalingam
 
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
John Chapman
 
Sable Corp Company Profile
Sable Corp Company ProfileSable Corp Company Profile
Sable Corp Company Profile
Maxmillian van Wyk
 
Pro Plastics Asia - Company Overview
Pro Plastics Asia - Company OverviewPro Plastics Asia - Company Overview
Pro Plastics Asia - Company Overview
kietzke2009
 
Lakshmi TradeSoft Product Brochure
Lakshmi TradeSoft Product BrochureLakshmi TradeSoft Product Brochure
Lakshmi TradeSoft Product Brochure
Priya R
 
Investment materials and procedures
Investment materials and proceduresInvestment materials and procedures
Investment materials and procedures
Ramesh Maharjan
 
Presentation1 Baugain
Presentation1 BaugainPresentation1 Baugain
Presentation1 Baugain
Mr.Riza Rauf
 

Similar to Keltech (20)

catalogue(Naike Chemical)
catalogue(Naike Chemical)catalogue(Naike Chemical)
catalogue(Naike Chemical)
 
Mla group intro presentation
Mla group intro presentationMla group intro presentation
Mla group intro presentation
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
COMPANY PRESENTATION - LEMIT INSERV SRL
COMPANY PRESENTATION - LEMIT INSERV SRLCOMPANY PRESENTATION - LEMIT INSERV SRL
COMPANY PRESENTATION - LEMIT INSERV SRL
 
DEVAN INTERSHIP REPORT BE SEM 7.pdf
DEVAN INTERSHIP REPORT BE SEM 7.pdfDEVAN INTERSHIP REPORT BE SEM 7.pdf
DEVAN INTERSHIP REPORT BE SEM 7.pdf
 
Presentation lemit inserv
Presentation lemit inservPresentation lemit inserv
Presentation lemit inserv
 
Company Presentation LEMIT Inserv
Company Presentation LEMIT InservCompany Presentation LEMIT Inserv
Company Presentation LEMIT Inserv
 
KEL- Horticulture products and clientele
KEL- Horticulture products and clienteleKEL- Horticulture products and clientele
KEL- Horticulture products and clientele
 
HDO Corporate Presentation
HDO Corporate PresentationHDO Corporate Presentation
HDO Corporate Presentation
 
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
Proppant Prospects for Industrial Minerals Mike O'Driscoll IMFORMED at SME 2015
 
NERMAT® / SILIMAT®
NERMAT® / SILIMAT® NERMAT® / SILIMAT®
NERMAT® / SILIMAT®
 
Silica one investors page
Silica one investors pageSilica one investors page
Silica one investors page
 
Sapphit prezentation
Sapphit prezentationSapphit prezentation
Sapphit prezentation
 
U09CH153-Industrial Training Report - ATG
U09CH153-Industrial Training Report - ATGU09CH153-Industrial Training Report - ATG
U09CH153-Industrial Training Report - ATG
 
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
A Dilemma for New Producers of PGE/Base Metal Flotation and Gravity Concentra...
 
Sable Corp Company Profile
Sable Corp Company ProfileSable Corp Company Profile
Sable Corp Company Profile
 
Pro Plastics Asia - Company Overview
Pro Plastics Asia - Company OverviewPro Plastics Asia - Company Overview
Pro Plastics Asia - Company Overview
 
Lakshmi TradeSoft Product Brochure
Lakshmi TradeSoft Product BrochureLakshmi TradeSoft Product Brochure
Lakshmi TradeSoft Product Brochure
 
Investment materials and procedures
Investment materials and proceduresInvestment materials and procedures
Investment materials and procedures
 
Presentation1 Baugain
Presentation1 BaugainPresentation1 Baugain
Presentation1 Baugain
 

Keltech

  • 1.
  • 2. Introduction KELTECH ENERGIES LIMITED [KEL] is a company of the renowned Chowgule Group of companies. KEL manufactures industrial explosives under technical know-how from M/s. Du Pont of USA and expanded perlite under technical collaboration from M/s. Silibrico Crop USA. KEL operates two expanders for Perlite production One is South India and other in Central India. KEL manufacture Perlite products for construction, low temperature insulation, horticulture, refractory, fillers, foundry, as carrier for poultry medicine, thermoplastic and other applications. KEL also undertakes turnkey Perlite insulations services for cryogenic storage tanks, Air Separation units etc., KEL is an active member of the Perlite Institute Inc., USA and an ISO 9001 - 2000 Company. KEL’s current annual business turnover is 23 million USD
  • 3. Introduction From modest beginning in 1916, the Chowgule Group has today activities in the areas as diverse as Iron Ore mining and Exports Iron Ore Pelletization Shipbuilding International shipping with integrated logistics management Ship owners (international tramp trading) Explosives Industrial salt Industrial gases Automobile Dealership Construction Chemicals and Equipment Marketing Agencies Education A diversification that has only been possible and successful because of the role played by the people at Chowgules, their shareholders and the natural resources of the land. The Group's turnover is over Rs.l300crores ($ 300 Million)
  • 4. Iron Ore mining and Exports
  • 10. Perlite Activities Stationary Expanders – Bagged Perlite Products Portable Expanders – Site Expansion and Filling Perlite Concrete Block – Factory made / Site Cast Perlite Removal and Refilling
  • 11. Perlite Expanders KEL has an Licensed capacity to produce 9000 Tons per annum of Expanded perlite for varied application at Two Locations
  • 12. Bagged Products KEL Manufactures Bagged Expanded Perlite and Exfoliated Vermiculite Products for Horticulture, Construction, Refractory, Foundry, Fillers, Animal feed, Cryogenic and Low Temperature Insulation Applications
  • 13. Perlite Insulation services • Installation of expanded perlite in the annular space between concentric Vertical cylindrical tanks – LNG, Ethylene & Propylene. • Perlite concrete blocks manufacture and installation • Leveling concrete over bottom late for placing perlite concrete blocks • Installation of expanded perlite in to air separation units ( cold boxes) and small storage tanks- LOX, LIN & LAR tanks
  • 14. Portable Site Expanders Portable Site Expanders - Total 4 Nos. Capacity - 800 KGs Per Hour
  • 15. Perlite Concrete Blocks KEL is also involved in manufacturing and installation of Perlite Concrete Blocks for LNG, LPG, Ethylene, Propylene & Ammonia Tanks.
  • 16. Perlite Filling of ASU, cold boxes and small cryogenic tanks
  • 17. Perlite Removal and Refilling Removal of Expanded Perlite from cold boxes, and refilling the same.
  • 18. Resources Each of these units have well equipped laboratory to test raw materials and finished products with qualified laboratory technicians.
  • 19. Organization Chart Perlite expansion is managed and supervised by qualified Engineers and technicians.
  • 20. Manpower Permanent Company Personnel Management - 19 Engineers - 35 Procurement - 3 QA / QC - 10 Clerical - 12 Craftsman - 50 ( By Trade ) TOTAL - 129
  • 21. Resources – KEL has its own 20 ft Containers for mobilizing portable expanders to any project site
  • 22. Quality Standards "WE AT KELTECH ENERGIES COMMIT TO ACHIEVE TOTAL CUSTOMER SATISFATION AND GROWTH BY MANUFACTURE & SUPPLY OF PRODUCTS MEETING CUSTOMER REQUIREMENTS". WE COMMIT THIS BY OPTIMUM UTILISATION OF RESOURCES AND CONTINUAL IMPROVEMENT. Quality Objectives TO ACHIEVE CUSTOMER SATISFATION. TO GROW BY WAY OF PRODUCT IMPROVEMENT AND DEVELOPMENT. TO OPTIMISE UTILISATION OF RESOURCES. TO ACHIEVE CONTINUAL IMPROVEMENT.
  • 29. Site Expansion and Filling Perlite Ore
  • 30. Site Expansion and Filling Perlite Ore Perlite Mining Perlite Crushing and Grading Bagging and Shipment
  • 31. Site Expansion and Filling Perlite Mining
  • 32. Site Expansion and Filling Perlite Crushing and Grading
  • 33. Site Expansion and Filling Bagging and Transportation
  • 34. Site Expansion and Filling Shipment Perlite ore bags are shipped in containers or as break bulk cargo to the port nearest to the project site and transported to the site in trailer trucks
  • 35. Plant & Machinery Required nos of Portable expanders with essential spares Conveying hose pipes Vibration Equipments Control panels an all accessories Testing laboratory with equipments All the above will be shipped in ISO 20 feet containers
  • 37. Manpower – 2 Expanders Project Manager - 1 Supervisors - 2 Operators - 2 QC / QAD - 2 Safety Supervisor - 1 Maintenance Assistant - 1 Casual Labour - 12
  • 38. Flow Diagram of - Portable Perlite Expander
  • 39. Expanded Perlite for Cryogenic Insulation Perlite is a type of volcanic glass rock containing combined water. When heated above 850 0C, the crude perlite particles expand approximately 20 times its size. The combined water vaporizes to form microscopic cells or voids in the heat-softened glass. The resulting honeycomb structure accounts for its lightweight and excellent thermal insulation properties. Because of its granular form, expanded perlite will conform to and fill irregular shapes easily and completely. ADVANTAGES OF USING EXPANDED PERLITE AS CRYOGENIC INSULATOR. • Low thermal conductivity at very low temperature [-173 0 C] • The low density of expanded perlite • Inorganic - No deterioration • Free Flowing • Easy availability • Chemically inert • Free from organics Hence Perlite has been recognized as the most efficient insulation material for low temperature storage vessels and process equipments.
  • 40. APPLICATIONS OF EXPANDED PERLITE IN CRYOGENIC INSULATION • Insulation of double wall storage tanks for liquid gases like Oxygen, Nitrogen, Ethylene, Propylene Ammonia, LNG • Insulation of double wall liquid gas tankers LNG/LPG tankers (ships) upto 10,000 M 3 • Insulation of cold box and Air Separation units.
  • 41. Perlite Ore Principal Manufacturers of cryogenic grade Perlite ore. • Greece - Silver & Barytes • USA - World minerals, Redco • New Zealand - Inpro • Philippines - Induplex / Asian Perlite • Turkey - D-Perlite
  • 42. Perlite Ore Grades Size Basis Size in mm Application Basis Coarse 1mm - 4mm Horticulture/Construction Medium Coarse 0.8mm - 2.5mm Construction Medium 0.3mm - 1.4mm Construction Medium Fine 0.6mm - 0.15mm Cryogenic, Fine Aggregates Fine 0.4mm - 0.15mm Cryogenic, Fine Aggregates Extra Fine 0.075mm - 0.30mm Fillers, Fine Aggregates
  • 43. Perlite Ore Typical Chemical Composition of Crude Perlite Ore REDCO - USA INPRO- S&B-GREECE NEWZEALAND Silica 75% 75% 74% Aluminium oxide 13.2% 14% 12.7.% Ferric Oxide 0.7% 1.0% 0.7% Calcium Oxide 0.5% 1.3% 0.7% Magnesium Oxide Trace 0.3% 0.2% Sodium Oxide 4.3% 3.0% 3.3% Potassium Oxide 4.6% 4.0% 4.0% Trace 0.2% 0.3% 0.2% Loss of Ignition 3.2% 3.2% 2.8%
  • 44. Perlite Ore Other Properties Colour - Pale to dark grey, brown, green and black Hardness - 5.5 to 7.0 on Mohr’s scale SG - 2.0 to 2.8 SP - 760 o C - 1000 0 C RI - 1.490 to 1.610 Cryogenic Grade Ore Size - 0.6 - 0.15 mm, or 0.400 - 0.150 mm Crushability - Not easily crushable Expandability - Good Unexpandable material - Minimum Material Delivery & Storage The Perlite ore is packed in 1 M.T Jumbo bags. The shipment of ore is done either in containers or as hold cargo (open). After clearing, the shipment / consignment the perlite ore bags are loaded into the trucks and transported to the site. The ore must be stored only in covered space and kept in dry conditions. Storing of perlite ore outside under plastic cover should be avoided. Perlite ore will be conveyed to the surge hopper of the expander using pick & carry / forklifts.
  • 45. Perlite Ore Why Site Expansion? For large sized jobs above 1500 M 3 volume.  Insulation of double walled storage tanks for liquid gas  Insulation of double walled liquid gas tankers  Insulation of oxygen plants, cold box / ASU Advantages  Reduced transportation cost - Ore / Expanded Perlite  Less handling problem of bulky Expanded Perlite  Controlled insulation procedures  Maximum thermal efficiency (low moisture)
  • 46. Installation Procedure Preparation of annular space to receive expanded Perlite to be arranged by the Client:  All debris and foreign material has to be removed from the annular space completely.  Installation of required material in the annular space must be completed.  All structural proof tests and leak tests have to be completed as specified before expanded Perlite is installed.  Any nozzle / penetration into the annular space not to be used for installing the insulation or purging the insulation space shall be closed to prevent water or air entering the insulation space. Weather condition during installation Expanded perlite can be installed from on site expanders even during rainy season. It will ensured that the nozzles through which the tank is being filled are properly protected from any infiltration of moisture into the expanded perlite or insulation space. Rain shelters will be provided wherever necessary.
  • 47. Portable Expansion and Filling The perlite ore is transferred from the go down and fed into the feed hopper. The variable speed ore feeder continuously meters the perlite ore into the bucket elevator, which discharges the same into the expander. The ore falls from the elevator into the expanding tube. The expanding tube is heated from the bottom and has a constant upward air flow created by the main exhaust fan. The expanded perlite and hot gas are discharged into a cyclone and conveyed to the baghouse collector. The product discharges from the bottom of the collector into the perlite conveying system. Samples are drawn from the sample port for periodical testing of bulk density, moisture content, size filtered gas is then discharged into the atmosphere by the exhaust fan. The product is discharged from the Perlite-conveying system through a flexible pipeline to the tank being insulated. Filling is started from the top of the annular space with flexible hose. The expanded perlite falls down gravimetrically and the perlite column starts building naturally. Perlite level shall be monitored regularly and the filling nozzle changed whenever necessary. When the annular space is filled to the required level the perlite filling will be stopped to allow settlement of the perlite. Filling is then continued till refusal to further settlement of perlite is achieved at the reservoir top.
  • 48. Vibration The tank manufacturer sometimes insists for additional vibration of the expanded perlite after filling. For this operation electromagnetic pneumatic vibrators are used. These vibrators are equally divided along the whole periphery of the tank at almost 3M from the bottom. After 6 hours of vibration (without adding expanded perlite all the vibrators are raised by 3M. This operation is repeated till we reach the level of 3M beneath the top of the space to be insulated. However vibration is possible only in smaller tanks where the outer shell is of steel construction. In larger tanks with outer shell of pre-stressed concrete wall vibration is carried using plate vibratos External Vibration
  • 49. Vibration Internal Vibration
  • 50. Inspection: The following inspection shall be performed in accordance to client’s requirement. Compacted Density The material shall be measured at least every eight hours of production. Moisture content shall be checked once in 24 hours. Thermal conductivity shall be measured at the bottom and top section of the tank and will be tested as per IS – 3346 / 1980 at 0 C. (Four sample consisting of 3 specimens will be sent to CBRI, Roorkee for test. Test report will be submitted after one month). Grading: Inspection may be performed by the inspector representing the IHI, Owner and / or the nominated third party. The inspector has the right to witness the inspection and testing of the ordered material. (Once in 12 Hours - 2 samples / day.)
  • 51. Health, Safety, Environment KELTECH is keen to use the best health and safety practices from its operation around the world and where appropriate to replicate them through out its business. In addition to wearing safety helmets, safety boots, goggles, gloves and masks, all personnel will wear full safety harness at all times while working off the ground. Safety ropes and runners will be used as necessary. Some of the KELTECH project team members are specially trained to raise skill levels in site safety & first aid. HSE plan will be submitted for site specific project and KEL will ensure that this is complied to.
  • 52. Clientele for Cryogenic applications CUSTOMER LOCATION QTY. EQUIPMENT | YEAR JOB Reliance Petro Chemical Gujarat 90 MTs Nitrogen Tank 1990 Filling and supervision Industries, Hazira S M Dyechem Ltd Pune 80 MTs ASU 1992 Supply National Ferlilizers Ltd. Vijayapuri MP 08 MTs Liquid Oxygen 1992 Supply Tank Rourkela Steel Plant Orissa 125 Cu M ASU 1991 Supply Bhilai Steel Plant, Bhilai M.P 200 Cu M ASU 1990 Supply Industrial Oxygen Co.Ltd., Pune 24 MTs ASU 1994 Supply Indian Oxygen Ltd. Jamshedpur 70 MTs ASU 1989 Supply Jamshedpur Industrial Oxygen Ltd., Pune Tuticorin 44 MTs ASU 1998 Supply (Sterlite Industries Ltd.) Toyo Engineering Corporation Haldia 57 MTs ASU 1998-99 Supply and supervision Ltd., of filling Ispat Industries Ltd. Raigad 35 MTs ASU 1999 Supply Industrial Oxygen Co. Pondicherry 32 MTs ASU 2000 Supply Pondicherry Linde India Baroda 13MT ASU 2005 Supply Petronet LNG Tank Dahej, Gujarat 1100 MTs LNG Tank 2002 Site expansion & Filling. Inox Air products., Pune Pune and Tadapatri 35 MTs Oxygen plant 2005 supply [AP]
  • 53. Clientele for Cryogenic applications CUSTOMER LOCATION QTY. EQUIPMENT | YEAR JOB Inox Air products., Pune Pune and Tadapatri 35 MTs Oxygen plant 2005 supply [AP] Goyal MG Gases Burnpur 121 MTs ASU 2006 Supply & Filling Chemplast, [Through VTV]. Karaikal 80 MTs Ethylene tank 2006 Site expansion, Filling & Vibration Praxair India Ltd Kalyani steel- 160 MTs ASU 2006 Supply & Filling Hospet project Goyal MG Gases Durgapur W.B 119 MTs ASU 2007 Supply & Filling Praxair India Ltd Durgapur 205MTs ASU 2007 Supply & Filling Goyal MG Gases Burnpur 40 MTs ASU 2008 Removal & Filling Whessoe Al Rushaid Co. Ltd Petro Rabigh- KSA 1160 MTs Ethylene & 2008 Site Expansion,Filling & Propylene Vibration tanks Goyal MG Gases Raipur 137 MTs ASU 2008 Supply Pull B.V. Rhenen Bahrain 20 MT LPG Tankers 2008 Supply
  • 54. Supply and installation of expanded perlite in to Ethylene/ propylene tanks- Yansab Project At Yanbu – Kingdom of Saudi Arabia Plant & Machinery a. Portable Expander complete with ore bin, screw type ore feeder, bucket elevator, pipe lines, cyclone, expansion tube, blower, exhaust fan, burner, compressor, bag house type collector assembly, ducting, hoppers, conveying pump & pipe line for connecting conveying pump to the Vessel being insulated, Structural frame and mounting.....2 sets b. All Essential Spares for expander Assembly Following are the Essential spares : 1. Fuel Pumps. 2. Burner Assembly. 3. Blowers. 4. Compressor. 5. Filter bags. 6. Hose coupling. 7. Conveying hose pipes. 8. Exhaust fans. c. Control panels and all accessories for Electrical connections d. Testing equipment and site laboratory
  • 55. FACILITIES REQUIRED AT SITE Following facilities are required at site. A. 10 X 30 M leveled space for erecting 2 portable Expanders close to the both the tanks to be filled. B. Space for bulk storage of HSD Tank and drums. C. Unloading and storage of Perlite ore under cover at Site. D. 3 ton capacity crane with 15 M boom for 7 days to offload and install 3 nos perlite expanders. E. Fork lift/mobile crane with driver for feeding ore to the hopper and handling of equipments. F. Supply of HSD G. Providing Fuel tank age 10 KL capacity and about 5 KL replenishment perday. H. Providing and permitting access inside tanks. I. Uninterrupted power supply 150 KVA 440 50 has frequency either through DG sets or Power mains at one point near the expander, J. Required illumination at site to facilitate day and night working, K. Illumination inside the tank. L. Toilet and bath facilities. M. Scaffolding along the tank periphery if required, N. Boarding, Lodging, entry permits (Visas) for KEL personnel and local conveyance for the Site Team O. Casual Laborers - 12 Nos. P. Advance payments at site in local currency and payment of bills at site as authorized by us, which is to be deducte from the total amount payable tous. Q. Safety gadgets, First Aid and sanitary facility at site for the site personnel and staff. R. Clearing of equipment and to and fro transportation from Jeddah to site and back S. Customs Duty payment for the equipment. T. Crane for fixing external vibrators.
  • 56. Supervisors / Operators - 12 hours / shift Shift A General Shift Shift B 7 AM to 7 PM 9 AM to 5 PM 7 PM to 7 AM 1 –Supervisor 1 – Project Manager 1 –Supervisor 1 –Operator 1- Maintenance Assistant 1 –Operator 1 –Lab Assistant 3- Safety Supervisor 1 – Lab Assistant 6 –Casual Labour 6 –Casual Labour
  • 57. Quantity of Supply Perlite ore Required for Ethylene tank TK 7501 – 520 MT Perlite ore Required for Propylene tank TK 7502 – 360 MT Total Perlite ore Required - 880 MT Job Execution The Job will be carried out using 2 perlite expanders each having a capacity of 12 MT / Day ie 24 MT /Day running Continuously 24 hours / day 7 days a week Schedule for Filling and vibration For Ethylene tank – TK 7501 – 520 MT of Perlite ore Filling – 22 Days Vibration – 3 Days Total – 25 Days
  • 58. For Propylene tank – TK 7502 – 360 MT of Perlite ore Filling – 15 Days Vibration – 3 Days Total - 18 Days
  • 59. Shifting of Equipments The equipments will be shifted from port by trucks to the project site for erection. Erection The equipments will be erected at site by using cranes / chain pulley blocks and assembled on the platform as required. Commissioning The plant will be commissioned at site and all the systems are thoroughly checked at all stages. Corrections will be done if any failure is noticed. Trial Run A trial run is conducted to check for all the parameters required for inspection. Samples are drawn for testing.
  • 60. Site expansion, Filling and internal vibration 1. Preliminary Operations 2. Transportation 3. Expansion and filling 4. Vibration
  • 61. 1. Preliminary Operations Preparation of annular space to receive expanded Perlite to be arranged by the Client:  All debris and foreign material has to be removed from the annular space completely.  Installation of required material in the annular space must be completed.  All structural proof tests and leak tests have to be completed as specified before expanded Perlite is installed.  Any nozzle / penetration into the annular space not to be used for installing the insulation or purging the insulation space shall be closed to prevent water or air entering the insulation space.
  • 62. 2. Storage and Transportation of Perlite ore Ore Stored in covered shed Ore transferred by Forklift Ore Fed for expansion
  • 63. 3. Expansion Expansion Under Progress Perlite Collector With Pot Blower
  • 65. PNEUMATIC CONVEYING SYSTEM FOR PERLITE POWDER
  • 66. Nozzle Orientation - Ethylene Tank Conveying pipe from each Expander 1 and 2 will fill the sectors 1and 2 respectively and the dia of each nozzle and conveying pipe is 6 inch. Total 32 Nozzles - each sector will have 16 nozzles, 8 filling, 8 vent
  • 67. Nozzle Orientation - Propylene Tank Conveying pipe from each Expander 1 and 2 will fill the sectors 1and 2 respectively and the dia of each nozzle and conveying pipe is 6 inch. Total 25 Nozzles - each sector will have 12 and 13 nozzles respectively.
  • 68. 3. Filling Perlite Conveying Pipes ( Collector to Tank ) Location of Perlite Conveying Pipe on Tank
  • 69. 3. Filling Vent Socks Conveying Hoses to Nozzle ( Tank Roof )
  • 70. 3. Filling Measuring Level of Perlite Filled
  • 71. 4. External Vibration Vibration equipment consists of pneumatic hammers, eductors and Vacuum cups
  • 73. Vibration Procedure • Fill Perlite to level A • Vibrate each shell • Perlite settles to level B after first vibration • Refill back to level A • Vibrate again for every 2.4m between level A and B • Perlite settles to level C after 2nd vibration • Final filling to be completed to the top roof of the outer tank
  • 74. 4. External Vibration 19 Vibrators will be used at a distance of 8 M between each other for Ethylene tank and 15 Vibrators for the Propylene tank.
  • 75. Process Control Sieve analysis, loose & compact density and moisture content will be tested during process. Qualification Prior to start of actual expansion & filling the perlite ore and expanders will be qualified at site to ensure that the required specification of expanded perlite is met. Fuel & Storage It is proposed to install a bulk storage tank for HSD, and then transfer to smaller feed tanks for supply to the expanders. Filling Procedure The perlite ore is transferred from the go down and fed into the feed hopper. The variable speed ore feeder continuously meters the perlite ore into the bucket elevator, which discharges the same into the expander. The ore falls from the elevator into the expanding tube. The expanding tube is heated from the bottom and has a constant upward air flow created by the main exhaust fan. The expanded perlite and hot gas are discharged into a cyclone and conveyed to the baghouse collector. The product discharges from the bottom of the collector into the perlite conveying system. Samples are drawn from the sample port for periodical testing of bulk density, moisture content, size analysis etc. The hot gas exit from the top of the baghouse collector. The filtered gas is then discharged into the atmosphere by the exhaust fan. The product is discharged from the Perlite-conveying system through a flexible pipeline to the tank being insulated.
  • 76. Expanded Perlite Test Report: Compact density
  • 77. Expanded Perlite Test Report: Sieve Analysis
  • 78. Expanded Perlite Test Report: Moisture Content
  • 79. Expanded Perlite Test Report: Vibration Report
  • 81. Project Execution Details 1. Petronet Dahej LNG tank filling 2. Chemplast Ethylene tank filling 3. Petronet Dahej LNG Perlite concrete blocks for bottom insulation – cast at site 4. Perlite concrete blocks Fedo – Cast at factory 5. Praxair ASU and Tank filling 6. Simulation of Vibration
  • 82. KELTECH ENERGIES LIMITED. Thank you for your attention