This document provides a summary of Kaushik Kumar Patel's work experience and qualifications. Some key points:
- Over 13 years of experience in projects planning, execution, quality control, fabrication, erection and commissioning of equipment, piping and structures.
- Currently working as Assistant Construction Manager for L&T at Reliance Industries since 2015. Previous experience includes roles at Bilfinger Plant Equipment and Reliance Industries.
- Holds a diploma in mechanical engineering and has experience working with various industries and clients on large scale refinery, petrochemical and power projects.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
• B.Tech (Electronics & Instrumentation Engineering) with more than +5 years of experience in Design Engineering and Project Execution.
• Adept in Project co-ordination & documentation of all related drawing, data sheets, QAP’s, Field reports, JHA’s, Hook-up diagrams, BOM etc.
• Fair understanding of the aspects of Design & Development Processes, Drafting and Customer Relationship Management
• Adept in handling commissioning activities involving resource planning and co-ordination with internal / external departments/ clients/ vendors.
• Understanding in executing cost saving techniques/measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget
• An effective communicator, hard worker with good interpersonal, problem solving and presentation skills
• B.Tech (Electronics & Instrumentation Engineering) with more than +5 years of experience in Design Engineering and Project Execution.
• Adept in Project co-ordination & documentation of all related drawing, data sheets, QAP’s, Field reports, JHA’s, Hook-up diagrams, BOM etc.
• Fair understanding of the aspects of Design & Development Processes, Drafting and Customer Relationship Management
• Adept in handling commissioning activities involving resource planning and co-ordination with internal / external departments/ clients/ vendors.
• Understanding in executing cost saving techniques/measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget
• An effective communicator, hard worker with good interpersonal, problem solving and presentation skills
Project Title: Formulation Project (Agro chemical)
Location: Ankleshwar, Gujarat.
Company: UPL-3
• Responsible in project all mechanical work including Strucher, piping & support fabrication and erection.
• Review of all Equipment specification and erection.
• Coordinating with Engineering and Construction and liaise with the detail engineering requirements.
• Existing Equipment, pipeline & structure dismantling and new pipeline equipment erection as per requirement.
• Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
• Preparing Daily & Weekly Project Monitoring Report to the Management.
• Certifying sub-contractors bills and coordinating for preparing the client bills.
• Ensure that hydro test reinstatement is to be done as per procedure.
• Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
• Preparation of resources schedule for proper utilization of equipment’s & Preparing Lifting Plan for Heavy Package erections / Installations.
• Manpower handling and stage inspection of mechanical works at site.
• Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively.
• Ensure commissioning work with Production lots.
1. PATEL KAUSHIK KUMAR ISHVARBHAI
Contact: 09687547783, (0261) 2788101 ~ E-Mail: kau.patel1980@gmail.com .
JOB OBJECTIVE
Seeking senior level assignments in the areas of Equipment, Piping & Structural Fabrication with Projects Planning , Execution &
Quality with a leading organization of repute in Refinery, EPC, Heavy Fabrication/ Manufacturing, Power, Oil & Gas, Petrochemical and
Steel projects.
PROFILE SUMMARY
• A dynamic professional with nearly 13 years of rich experience in:
•
~ Projects Planning & Monitoring.
~ Execution & Quality. ~Manpower & Resources Management ~Safety Management
~Fabrication & Welding ~Quality Management ~Project Management
~Erection & Commissioning ~Team Management
• Well versed with industry requirements / trend as well as construction codes like ASME B31.3/ASME SEC-8&9 /IBR/API /IS/
• API 560 a standard, P & ID, Piping Isometrics, GA Drawing and Line Schedule.
• Expert in studying drawings, plans or patterns of structures to be made as per requirements and preparing fabrication drawings for
manufacturing various components.
• Talent for proactively identifying & resolving problems, ramping up project activities with on time deliverables and maximizing
efficiency
• Expertise in working with third-party agencies such as LRIS / LRS, BVIS, EIL, Moody International (South-Africa), AIA, KBR,
PDIL, Authorized Inspector-ASME, Samsung, SGS and TUV, I.T.T,Toyo Setal., Linde,Heurty Petro chem.
• An effective communicator with strong problem solving, multi tasking ability and presentation skills.
CORE COIMPETENCIES
• Managing on-site construction activities to ensure completion of project within the time & cost parameters and effective resource
utilization to maximize the output
• Anchoring on-site erection & commissioning of plants and ensuring effective resource utilization to maximize the output;
ascertaining compliance to safety, economical and technical assessments to secure the best economical results
• Responsible for implementing and preparing drawings with various standards & code and project specific
• Handling the site piping fabrication, erection, test pack, punch list items clear activities, etc
• Overseeing quality control preparation & checking quality assurance plans, preparation of manufacturing process for specialized
jobs in field engineering, troubleshooting and site assistance.
• Conducting safety internal audits & risk assessment and implementing health safety environment management system and
formulating first aid scheme with neighboring industries
WORK EXPERIENCE
JAN -2015 to TILL DATE: L&T (HCP) at Reliance Industries Ltd, Expansion Projects (J-3) at Jamnagar.
As a Asst. Construction Manager,
Key Result Areas:
• Accountable for mechanical works such as fabrication & erection of Structural, Equipment , piping and manpower deployment
schedule and erection of the works for mechanical,& co-ordination with design, civil, electrical department and client billing in a
significant way.
• Developing and submitting various reports on the basis of performance to the management with the coordination of project
controls procedure.
• Looking after fabrication & erection of Structural, Equipment & piping works along with required assessment of line with inspection
test plans and quality assurance system for streamlining operations.
• Monitoring and finalizing lifting scheme for heavy erection of Structural, equipment & pipes along with necessary proposal.
• Dealing with erection & commissioning and quality management activities for better productivity along with safety parameters.
Since June- 2014 to Dec -2014: Bilfinger Plant Equipment Pvt Ltd as an Asst. Manager from Surat.
Key Result Areas:
• Accountable for projects Planning, Execution, Quality with works such as fabrication of Heater, co-ordination with Client.
• Developing and submitting various reports on the basis of performance to the management with the coordination of project
controls procedure.
• Looking after fabrication works of heater along with required assessment of line with inspection test plans and quality assurance
system for streamlining operations.
• Dealing with Prodution and quality management activities for better productivity.
• Proper Maintain Documentation Guide line to Team.
• Daily update progress report & client & contractor billing in significant way.
2. Dec-2013 to June- 2014. Reliance Industries Ltd, Dahej (DMD Project) as Manager – PIPING Construction Engineer.
As a Manager, Dahej.
Key Result Areas:
• Accountable for mechanical works such as fabrication & erection of Equipment , Utility piping and manpower deployment schedule
and erection of the works for mechanical,& co-ordination with design, civil, electrical department and client billing in a significant
way.
• Developing and submitting various reports on the basis of performance to the management with the coordination of project
controls procedure.
• Looking after fabrication & erection of Equipment & piping works along with required assessment of line with inspection test plans
and quality assurance system for streamlining operations.
• Monitoring and finalizing lifting scheme for heavy erection of pipes along with necessary proposal.
• Dealing with erection & commissioning and quality management activities for better productivity.
Since Jun’06 Essar Projects (India) Ltd., Hazira (5 MMTPA Steel Expansion Project & 270MW Multi Fuel Fired Power Plant)
Growth Path
Jun’06-Jun’08 as Deputy Manager, Jamnagar
Jul’08- Aug -13 as Deputy Manager, Surat.
As Deputy Manager, Surat
Key Result Areas:
• Accountable for mechanical works such as fabrication & erection of structural, equipment & Utility piping in Steel plant & In Power
plant pressure parts piping, boiler & turbine generator, equipments and purchase requisitions work orders, manpower deployment
schedule and erection of the works for mechanical,& co-ordination with design, civil, electrical department and client billing in a
significant way.
• Developing and submitting various reports on the basis of performance to the management with the coordination of project
controls procedure.
• Looking after fabrication & erection of piping works along with required assessment of line with inspection test plans and quality
assurance system for streamlining operations.
• Monitoring and finalizing lifting scheme for heavy erection of pipes along with necessary proposal.
• Dealing with erection & commissioning and quality management activities for better productivity.
As Deputy Manager, Essar OIL Refinery Expansion Project Site, Jamnagar
Key Result Areas:
• Responsible for fabrication & erection & commissioning of pressure & utility piping in an proficient manner.
• Supervised fit-up, weld visual, DPT, UT, X-ray, hydro test and implementation of work with significant style.
Highlights:
• Dexterously received Project Pride & Construction Safety Engineer Award in 2010.
• Holds the merit of being ranked for Best Project Pride Honor for exemplary services in Nov.2010.
• Adroitly performed all the given tasks within the allocated time period.
•
Nov’01-May’06 L & T, Hazira Works, Surat as Inspection & Quality Engineer (Contract)
Assignments handled: Fabrication & Inspection of Equipment like Pressure Vessels, Columns, absorbers and reactors.
Nov’01-Nov’02: Raj Engineering Co. (LEMF), Hazira, Surat
Nov’02-Apr’03: M.D Fabrications Co. (MFF), Hazira, Surat
May’03-May’06: Sagar Construction Co. (LEMF), Hazira, Surat
Responsibilities:
• Accountable for plate, pipes, forgings, fittings, fasteners, gaskets, drawing & recognition of mark like Stamp and respect to
drawings and approved code.
• Monitored analysis of drawings & symbols, wep, setup / fit-up, accuracy and weld visual examination.
• Interfaced with Inspector and third-party inspection agencies for utilization of approved WPS with proficient style
• Looked after Dye-Penetrant (DP) / Magnetic Particle Test (MT) / Ultrasonic (UT) / Radiographic (RT) and Pneumatic, Final
inspection (Visual & Dimensional) and Hydrostatic (Proof Test) by effective means for better snap shot.
EDUCATION
2001 Diploma in Mechanical Engineering from Technical Examination Board, Gandhinagar with 72%.
1999 12th
(Science) from GSEB, Gandhinagar with 56%
1997 10th
from GSEB, Gandhinagar with 81.14%
3. Other Courses:
• CNC Technology from Indo-German Tool Room, Ahmedabad in 2001
• Advanced Pneumatics from Indo-German Tool Room, Ahmedabad in 2001
• Diploma in CAD from CAD Institute, Surat in 2002
• ASNT Level-II RT and UT from Mody Institute of Non Destructive Testing, Surat in 2003
• Construction Safety Engineer training.
• First-Aid & BBS Training.
IT SKILLS
• Well versed with:
o MS Office
o Baan Operating
o Diploma AutoCAD
o Internet
TRAINING
• Training attended on:
o Behavior Management and Construction Management
PERSONAL DETAILS
Date of Birth: 2nd
Oct’ 1980
Address: 13, Maitry Society, Adajan Road, Opp.-Water Tank, Near Sardar Bridge, Surat-395009, Gujarat
Languages Known: English, Hindi and Gujarati
Martial Status: Married
Gander: Male
Nationality: Indian
Passport no : K4796377 (expiry 16/7/2022)
Please refer the ANNEXURE for the projects handled in L&T, Hazira, Surat.
ANNEXURE
PROJECTS HANDLED
Client Omifco India Ltd., Oman
Title: Vetrocoke Absorber
Size: Dia.-3950mm and Length-48,500mm
Title: Mathanator
Size: Dia.-4500mm and Length-48,850mm
Title: LT Co-converter
Size: Dia.-3800mm and Length-35,900mm
Title: HT Co-converter
Size: Dia.-4000mm and Length-45,500mm
Title: Cold Collector
Size: Dia.-2500mm and Length-60,500mm
Client China Reactors, China
Title: Acronytriel Reactor (ACN)
Size: Dia.-9000mm and L-55,500mm
Title: HDPE Reactor
Size: Dia.-6700mm and L-75,200mm
Client IOCL, Mathura, Panipat, Baroda
Title: Penix Reactor
Size: Dia.-2900mm and Length-17,000mm
Title: Naphtha Hydro Treading Reactor (NHTR)
Size: Dia.3800mm and Length-45,400mm
Title: Stripper
4. Size: Dia-2500mm and L-60,200mm
Title: Stabilizer
Size: Dia-3800mm and L-55,600mm
Title: Deisohanizer
Size: Dia-4900mm and L-78,850mm
Title: Main column
Size: Dia-3758mm and L-45700mm
Client KBR, SASOL Synfuels, South Africa
Title: Orthoflow Converter
Size: Dia.-7350mm and Length-48,950mm
Title: Orthoflow Converter
Size: Dia.-7350mm and Length-48,950mm
Client GNFC, Bharuch
Title: Stripper
Size: Dia-2500mm and L-40,300mm
Client Exxon & Mobile Refinery Flour, Daniel (USA)
Title: Stripper
Size: Dia-5000mm and L-58,600mm
Title: Stabilizer
Size: Dia-6000mm and L-65,600mm
Title: SHU Reactor
Size: Dia-8500mm and L-45,800mm
Client ONGC, Hazira
Title: Stripper
Size: Dia-3500mm and L-45,800mm
Client China
Title: Gasifier
Size: Dia-4500mm and L-68,200mm
Client MRPL, Mangalore
Title: DEISOHAXINIZER
Size: Dia-4500 L-68,200mm
Client HPCL, Mumbai
Title: Regenerator
Size: Dia-7600mm and L-53,200mm
Title: Catalyst stand pipe
Size: Dia-3000mm and L-17,300mm