ASHISH H TRIVEDI
E-Mail: ashishtrivedi26@gmail com / ashish_trivedi26@yahoo com
Phone: +91-9967196541/ +91-8652106025
A focused individual targeting for challenging position in the field of project management, Planning, sizing,
installation, startup, operations, process control in Oil and Gas Industry
P R O F I L E S U M M A R Y
• A Qualified Engineering professional with more than 5 years of experience in the field of:
• Project Planning Technical Co-ordination Production Planning
• Resource Allocation & Optimization Welding and Fabrication Operations ERP implementation
• Quality Assurance Reporting and documentation Lead Time Reduction
• Proficient with ASME, ASTM, NACE, ISO & NORSOK standards & designing tools like AUTOCAD, Pro E
• Extensive knowledge of Design, Development & implemention of QC systems, procedures to minimize rejections and achieve
highest quality standards along with Production & Quality system implementation, Lean manufacturing setup, Kaizen, 5S and
trained in ISO procedures
• Insightful experience and knowledge of surface preparation and protective coatings activities
• Focused and hardworking professional equipped with thorough knowledge and technical understanding coupled with an
analytic bent of mind and confident to take challenging assignments
O R G A N I S A T I O N A L E X P E R I E N C E
Since Jun’10 with Nirmal Industrial Controls Pvt Ltd , Asangaon as Senior Project Engineer
Growth Path:
Jun’10 –Dec’10 GET
Dec’10 – Dec’11 Project Planning Engineer
Dec-11- Present Senior Project Engineer
Roles:
As Senior Project Engineer (Flowcell Division)
• Handling project planning, scheduling and monitoring & following up with customer, vendors and different internal
departments done during execution of project
• Reviewing project specifications such as of Welding, NDT, Piping specification, Surface preparation & painting, received from
customer and providing feedback to and marketing enabling them to submit formal offer
• Reviewing contract of the orders received based on the submitted offer and sending Order acknowledgement to customer
within 3 working days
• Order booking in ERP system and allotting internal Job numbers and Serial numbers to equipments preparing & releasing BOM
for the orders booked to stores enabling the issue of raw material to production and raise material requisition to SCM
• Preparing and issuing Manufacturing process Plan and Job cards by reviewing GA drawings & Document control
• Preparing & submitting various manufacturing procedures like WPS, Weld plans, NDT, Painting & Hydro Test and others to
customer for approval and maintaining approval records
• Selecting the applicable weld procedure as weld geometry, material and other requirements, accountable for the qualification
of weld procedure as required following ASME Section IX and applicable design codes
• Developing full-scale project plans and setting various milestone targets to ensure timely completion of project by issuing
Pending Order statement to Production
• Providing weekly updates to customer for the progress of each and every project via conference call sessions
• Maintaining financial data such as monthly booking trends, monthly dispatches, Production capacity & setting monthly targets
• Directing technology planning and direction, strategy development, leadership and implementation, business and operational
transformation execution, business solution delivery, and business development
As Project Planning Engineer (Process Division)
• Calculated Coefficient of flow (Cv) value for pressure control valves based on various design parameters like Flow, Inlet
Pressure,Outlet Pressure, Line Size
• Based on Cv value, selected appropriate valve viz , downstream or upstream and prepared its datasheet and uploaded it for
design team to prepare BOM
• Liased with the Design Team, Subcontractors and Process Assembly to ensure the complete assembly and tested valves like
Pressure Control Valves, Creep Relief Valve, Safety Relief Valve, Breather Valve and others
Highlights:
• Successfully implemented ERP for Flow cell business within targeted time as a part of Lean Project Its involved
standardization and codification of the items based on material description, geometrical dimension Owing, order costing,
budgeting can be done just with the click of mouse
• Standardsed the stocking policy so as to deliver the flow cells in shorter lead time which in turn increased in market share to
80% from 60% and increased the inventory turnover ratio. It involved a thorough review of the raw material consumption
pattern and defined stocking of the regularly consumed items Reducing the ideal lead time from 8 weeks to 4-6 weeks
• Awarded with High performance award for the year FY-13 & 14 due to successfully completing the onsite Customer Paint
Inspection activity for PreLUDE LNG project, executed for then end user SHELL. It involved detailed planning of various stage
inspection and co-ordinated with the Vendor, Technip Paint Inspector and SHELL TPIA (Bureau Veritas)
• Nominated as the Head of Department for the Buffer manufacturing unit owing to display of efficient leadership skills by
increasing the sales of buffer from 150 NOS in Q3-2014 to 407 nos in Q4-2014
A C A D E M I C D E T A I L S
• Bachelor’s in Mechanical Engineering in from Konkan Gyanpeeth College of Engineering , Karjat Mumbai University in 2010
with 61 53%
• HSC Examination in Science from Birla College of Science, Arts and Commerce, from Kalyan in 2006 with 75%
• SSC from Mohinder Singh Kabul Singh English High School, Kalyan in 2004 with 85 20%
C E R T I F I C A T I O N
• Certification on Radiographic Testing (Level-2) From Bhide NDT, Matunga Road
• Pro-Engineer from CADD Centre, Thane
I T S K I L L S
• Microsoft Office Tools – 2007, E-Compass, Auto CAD – 2010, PRO –Engineering, Solid Works-2012
K N O W L E D G E P U R V I E W
• ASME Section II (Part A, Part B, Part C & part D)
• ASME Section V (Article-2)
• ASME Section IX
• ASME B31 1, B31 3 & B31 8
• ASME B16 5, B16 47, B36 10
• ASTM A106, A105, A333, A350, A671, A672, A479, A312, A358, A387, A516, A370, A240, B444, B446, B338, B348, B564, B574
• ASTM D4541, D3359, D4285
• NACE MR0175 & MR 0103
• NORSOK M630 & M650, M501
P E R S O N A L D E T A I L S
Date of Birth: 2nd
June, 1988
Languages Known: English, Hindi and Marathi
Mailing Address: 3/302, Giridhar Apt , Near Gauripada Talao, Gauripada, Kalyan (W)-421 301
ANNEXURE
P R O J E C T S U N D E R T A K E N
Title: ‘Performance and Evaluation of Ice Plant’, Karjat
Description: Main aim of the project was to erect and evaluate the performance of miniature ice plant. This involved
thorough knowledge of Vapour Compression Refrigeration Cycle Ice plants were used for the commercial
manufacturing of ice as it consumed fewer amounts of Primary refrigerants such as R-12, R-11 and R-22 and so
on. This reduced overall cost of refrigeration.The Challenge faced was to provide a suitable Stirring mechanism to
bring about uniform cooling of secondary refrigerant (i e brine)
Learning: Team work and understanding the actual process of refrigeration cycle we managed to produce 5 kg of ice with
COP of 3.39
Title: ‘Productivity Enhancement of Buffers’, Asangaon
Description: The aim of the project was to increase the productivity of buffers to meet the sudden boom of customer
requirements. In order to attain this, the raw material requirement & coordinating it with the sourcing team,
machining vendor to speed up the machine activity, was developed. The raw material & stocks of tubes, fillers
and rods was Increased for that purpose & planned out the detailed schedule of execution of the projects and
provided daily updates of the projects to overseas clients.
Learning: Optimum utilization of available resourses, Planning and Effective communication
Title: ’Pre-LUDE LNG Project Coating Inspection’, Vasai
Description: A Prelude LNG project of 8 Flow meter housing body was too coated as per the stringent SHELL paint
specification. There were 2 Inspectors (SHELL & Technip) present for the description of the specific requirements
pertaining to surface preparation. The ‘coating’ was planned at vendor’s site in Vasai. There were many non-
conformance reported from inspectors in relation to various safety regulations for personnel safety of the shop.
The challenge was to close all the NCs and upgrade the workshop at par with required specifications
Learning: Importance of Coating in Marine and Offshore condition Health and safety requirements for carrying out the
Surface preparation and coating activity and effective planning

Curriculum Vitae-Ashish Trivedi

  • 1.
    ASHISH H TRIVEDI E-Mail:ashishtrivedi26@gmail com / ashish_trivedi26@yahoo com Phone: +91-9967196541/ +91-8652106025 A focused individual targeting for challenging position in the field of project management, Planning, sizing, installation, startup, operations, process control in Oil and Gas Industry P R O F I L E S U M M A R Y • A Qualified Engineering professional with more than 5 years of experience in the field of: • Project Planning Technical Co-ordination Production Planning • Resource Allocation & Optimization Welding and Fabrication Operations ERP implementation • Quality Assurance Reporting and documentation Lead Time Reduction • Proficient with ASME, ASTM, NACE, ISO & NORSOK standards & designing tools like AUTOCAD, Pro E • Extensive knowledge of Design, Development & implemention of QC systems, procedures to minimize rejections and achieve highest quality standards along with Production & Quality system implementation, Lean manufacturing setup, Kaizen, 5S and trained in ISO procedures • Insightful experience and knowledge of surface preparation and protective coatings activities • Focused and hardworking professional equipped with thorough knowledge and technical understanding coupled with an analytic bent of mind and confident to take challenging assignments O R G A N I S A T I O N A L E X P E R I E N C E Since Jun’10 with Nirmal Industrial Controls Pvt Ltd , Asangaon as Senior Project Engineer Growth Path: Jun’10 –Dec’10 GET Dec’10 – Dec’11 Project Planning Engineer Dec-11- Present Senior Project Engineer Roles: As Senior Project Engineer (Flowcell Division) • Handling project planning, scheduling and monitoring & following up with customer, vendors and different internal departments done during execution of project • Reviewing project specifications such as of Welding, NDT, Piping specification, Surface preparation & painting, received from customer and providing feedback to and marketing enabling them to submit formal offer • Reviewing contract of the orders received based on the submitted offer and sending Order acknowledgement to customer within 3 working days • Order booking in ERP system and allotting internal Job numbers and Serial numbers to equipments preparing & releasing BOM for the orders booked to stores enabling the issue of raw material to production and raise material requisition to SCM • Preparing and issuing Manufacturing process Plan and Job cards by reviewing GA drawings & Document control • Preparing & submitting various manufacturing procedures like WPS, Weld plans, NDT, Painting & Hydro Test and others to customer for approval and maintaining approval records • Selecting the applicable weld procedure as weld geometry, material and other requirements, accountable for the qualification of weld procedure as required following ASME Section IX and applicable design codes • Developing full-scale project plans and setting various milestone targets to ensure timely completion of project by issuing Pending Order statement to Production • Providing weekly updates to customer for the progress of each and every project via conference call sessions • Maintaining financial data such as monthly booking trends, monthly dispatches, Production capacity & setting monthly targets • Directing technology planning and direction, strategy development, leadership and implementation, business and operational transformation execution, business solution delivery, and business development As Project Planning Engineer (Process Division) • Calculated Coefficient of flow (Cv) value for pressure control valves based on various design parameters like Flow, Inlet Pressure,Outlet Pressure, Line Size • Based on Cv value, selected appropriate valve viz , downstream or upstream and prepared its datasheet and uploaded it for design team to prepare BOM • Liased with the Design Team, Subcontractors and Process Assembly to ensure the complete assembly and tested valves like Pressure Control Valves, Creep Relief Valve, Safety Relief Valve, Breather Valve and others
  • 2.
    Highlights: • Successfully implementedERP for Flow cell business within targeted time as a part of Lean Project Its involved standardization and codification of the items based on material description, geometrical dimension Owing, order costing, budgeting can be done just with the click of mouse • Standardsed the stocking policy so as to deliver the flow cells in shorter lead time which in turn increased in market share to 80% from 60% and increased the inventory turnover ratio. It involved a thorough review of the raw material consumption pattern and defined stocking of the regularly consumed items Reducing the ideal lead time from 8 weeks to 4-6 weeks • Awarded with High performance award for the year FY-13 & 14 due to successfully completing the onsite Customer Paint Inspection activity for PreLUDE LNG project, executed for then end user SHELL. It involved detailed planning of various stage inspection and co-ordinated with the Vendor, Technip Paint Inspector and SHELL TPIA (Bureau Veritas) • Nominated as the Head of Department for the Buffer manufacturing unit owing to display of efficient leadership skills by increasing the sales of buffer from 150 NOS in Q3-2014 to 407 nos in Q4-2014 A C A D E M I C D E T A I L S • Bachelor’s in Mechanical Engineering in from Konkan Gyanpeeth College of Engineering , Karjat Mumbai University in 2010 with 61 53% • HSC Examination in Science from Birla College of Science, Arts and Commerce, from Kalyan in 2006 with 75% • SSC from Mohinder Singh Kabul Singh English High School, Kalyan in 2004 with 85 20% C E R T I F I C A T I O N • Certification on Radiographic Testing (Level-2) From Bhide NDT, Matunga Road • Pro-Engineer from CADD Centre, Thane I T S K I L L S • Microsoft Office Tools – 2007, E-Compass, Auto CAD – 2010, PRO –Engineering, Solid Works-2012 K N O W L E D G E P U R V I E W • ASME Section II (Part A, Part B, Part C & part D) • ASME Section V (Article-2) • ASME Section IX • ASME B31 1, B31 3 & B31 8 • ASME B16 5, B16 47, B36 10 • ASTM A106, A105, A333, A350, A671, A672, A479, A312, A358, A387, A516, A370, A240, B444, B446, B338, B348, B564, B574 • ASTM D4541, D3359, D4285 • NACE MR0175 & MR 0103 • NORSOK M630 & M650, M501 P E R S O N A L D E T A I L S Date of Birth: 2nd June, 1988 Languages Known: English, Hindi and Marathi Mailing Address: 3/302, Giridhar Apt , Near Gauripada Talao, Gauripada, Kalyan (W)-421 301
  • 3.
    ANNEXURE P R OJ E C T S U N D E R T A K E N Title: ‘Performance and Evaluation of Ice Plant’, Karjat Description: Main aim of the project was to erect and evaluate the performance of miniature ice plant. This involved thorough knowledge of Vapour Compression Refrigeration Cycle Ice plants were used for the commercial manufacturing of ice as it consumed fewer amounts of Primary refrigerants such as R-12, R-11 and R-22 and so on. This reduced overall cost of refrigeration.The Challenge faced was to provide a suitable Stirring mechanism to bring about uniform cooling of secondary refrigerant (i e brine) Learning: Team work and understanding the actual process of refrigeration cycle we managed to produce 5 kg of ice with COP of 3.39 Title: ‘Productivity Enhancement of Buffers’, Asangaon Description: The aim of the project was to increase the productivity of buffers to meet the sudden boom of customer requirements. In order to attain this, the raw material requirement & coordinating it with the sourcing team, machining vendor to speed up the machine activity, was developed. The raw material & stocks of tubes, fillers and rods was Increased for that purpose & planned out the detailed schedule of execution of the projects and provided daily updates of the projects to overseas clients. Learning: Optimum utilization of available resourses, Planning and Effective communication Title: ’Pre-LUDE LNG Project Coating Inspection’, Vasai Description: A Prelude LNG project of 8 Flow meter housing body was too coated as per the stringent SHELL paint specification. There were 2 Inspectors (SHELL & Technip) present for the description of the specific requirements pertaining to surface preparation. The ‘coating’ was planned at vendor’s site in Vasai. There were many non- conformance reported from inspectors in relation to various safety regulations for personnel safety of the shop. The challenge was to close all the NCs and upgrade the workshop at par with required specifications Learning: Importance of Coating in Marine and Offshore condition Health and safety requirements for carrying out the Surface preparation and coating activity and effective planning