Judy Resnik 1949-1986
The future doesn't belong to the fainthearted; it belongs to the brave.  -Ronald Reagan
Judy Resnik was born on April 5, 1949 in Akron, Ohio.  She attended Fairlawn Elementary School, Perkins Middle School, and Firestone High School. She graduated from Firestone High School in 1966. Education
JUDITH A. RESNIK  COMMUNITY LEARNING CENTER
Career Judy received a Bachelor of Science degree in electrical engineering from Carnegie-Melon University and a doctorate in electrical engineering from the University of Maryland. Dr. Resnik was a design engineer conducting support for NASA sounding rocket and telemetry programs.  She was also a biomedical engineer at the National Institution of Health.
Judy in her office at NASA.
NASA Dr. Resnik was chosen to be an astronaut and qualified to be a mission specialist.  Her first mission was the maiden voyage of the space shuttle Discovery .
Discovery Judith Resnik was the second American woman to go into space .
 
Dr. Resnik was a well respected eye doctor in Akron.  (pictured on the far left)
CHALLENGER Judy was chosen to fly on a historic mission on the Space Shuttle Challenger.  This mission would include the first civilian to go into space, an American school teacher. The shuttle launch was planned for January 28, 1986.
 
A Diverse Crew RON MCNAIR CHRISTA MCCAULIFFE MICHAEL SMITH JUDY RESNIK GREGORY JARVIS ELLISON S. ONIZUKA RICHARD SCOBEE
FLIGHT CREW
Christa McCauliffe This flight was special because it included a high school science teacher named Christa McCauliffe. She had been chosen from thousands to become the first civilian in space. More media attention was paid to this flight than had been in many years. Space shuttle flights had become commonplace.
January 28, 1986 was the coldest day NASA ever attempted to launch a space shuttle.
Photos taken on the day of the launch.
Traditional Breakfast It is tradition that the astronauts have a breakfast together before the launch.
The flight had been delayed five times due to weather so despite the conditions they proceeded with the launch. This was the 25 th  Space Shuttle mission and the 10 th  flight for Challenger.
Heading for the Launch Pad
Video:  Boarding the Space Shuttle
As family and friends watched from Cape Canaveral and school age students watched on television across the country, the space shuttle lifted off.
 
 
Seventy-two seconds after lift-off a catastrophic explosion occurred.
Click on picture to start video.
 
Dark smoke can be seen 0.678 second after ignition.
A small flame appears in the area of the leaking joint.  The plume of hot exhaust spills across the bottom of the shuttle’s main fuel tank.
 
Mission Control
The two rocket boosters, still firing, fly onward until they are destroyed by radio command.
 
 
 
Wreckage found on the beach.
Ronald Reagan was informed of the accident as he sat in a meeting to prepare for his State of the Union address that was planned for that evening.
Click for video. Ronald Reagan’s State of the Union Address.
 
NASA Investigates
O-Ring It was determined by the NASA investigation that the Challenger disaster was caused by a frozen O-Ring. The O-Ring is a rubber ring that uses moisture to keep its seal.  When the ring became frozen on that fateful day it became brittle and broken. The seal failure caused a breach in the SRB joint it filled, allowing a flare to reach the outside and impinge upon the adjacent attachment hardware and external fuel tank.
Memorials
Many memorials were held after the accident. The memorial service for Judith A. Resnik was held at Firestone High School on February 3, 1986.
John Glenn Eulogy   We have come here today not just to mourn Judy Resnik's death, but even more to celebrate her life. And in my judgment, there is no better way to celebrate her life than to celebrate the cause for which she died. -John Glenn
Judith Resnik Scholarship A $1,000 scholarship will be awarded to a young woman graduating from a public or private high school in the greater Akron area.  This scholarship is designated for a student accepted into a baccalaureate degree program in the physical sciences, engineering or mathematics at an accredited college or university.
Judy Resnik Award Judith A. Resnik Award was established by the IEEE Board of Directors in 1986 to recognize outstanding contributions to space engineering, within the fields of interest of the IEEE.  This award is presented to an individual or team, with preference given to an individual
Carnegie-Melon Memorial
Fresco that hangs in the U.S. Capitol Building in Washington D.C.
Arlington National Cemetery
A historic marker has been placed at Firestone High School to recognize Judy Resnik’s contributions to the space program.
Every year during the week of the anniversary of the accident flowers are delivered by an anonymous person. People have speculated throughout the years who sends the flowers but nobody knows for certain.
Judy Resnik was known to wear a ILY necklace that displayed “I Love You” in sign language.  It was one of the few personal items recovered from the wreckage.
Other Accidents in the history of the U.S. Space Program
APOLLO 1 On January 27, 1967 Apollo 1 astronauts Virgil (Gus) Grissom, Roger Chaffee, and Edward White were killed in a flash fire during a simulated launch.
The astronauts were already strapped into the capsule and sealed in with bolts when the fire broke out.  There was no way to escape. The capsule is seen at the left.
Columbia February 1, 2003
 
 
 
The space shuttle Columbia burned up on re-entry into the earth’s atmosphere. It was later determined that a missing tile on the belly of the shuttle allowed excessive heat to get into the vessel.
The shuttle is moved from one side of the country to the other by a piggy back ride on a specially designed plane.
 

Judy Resnik

  • 1.
  • 2.
    The future doesn'tbelong to the fainthearted; it belongs to the brave. -Ronald Reagan
  • 3.
    Judy Resnik wasborn on April 5, 1949 in Akron, Ohio. She attended Fairlawn Elementary School, Perkins Middle School, and Firestone High School. She graduated from Firestone High School in 1966. Education
  • 4.
    JUDITH A. RESNIK COMMUNITY LEARNING CENTER
  • 5.
    Career Judy receiveda Bachelor of Science degree in electrical engineering from Carnegie-Melon University and a doctorate in electrical engineering from the University of Maryland. Dr. Resnik was a design engineer conducting support for NASA sounding rocket and telemetry programs. She was also a biomedical engineer at the National Institution of Health.
  • 6.
    Judy in heroffice at NASA.
  • 7.
    NASA Dr. Resnikwas chosen to be an astronaut and qualified to be a mission specialist. Her first mission was the maiden voyage of the space shuttle Discovery .
  • 8.
    Discovery Judith Resnikwas the second American woman to go into space .
  • 9.
  • 10.
    Dr. Resnik wasa well respected eye doctor in Akron. (pictured on the far left)
  • 11.
    CHALLENGER Judy waschosen to fly on a historic mission on the Space Shuttle Challenger. This mission would include the first civilian to go into space, an American school teacher. The shuttle launch was planned for January 28, 1986.
  • 12.
  • 13.
    A Diverse CrewRON MCNAIR CHRISTA MCCAULIFFE MICHAEL SMITH JUDY RESNIK GREGORY JARVIS ELLISON S. ONIZUKA RICHARD SCOBEE
  • 14.
  • 15.
    Christa McCauliffe Thisflight was special because it included a high school science teacher named Christa McCauliffe. She had been chosen from thousands to become the first civilian in space. More media attention was paid to this flight than had been in many years. Space shuttle flights had become commonplace.
  • 16.
    January 28, 1986was the coldest day NASA ever attempted to launch a space shuttle.
  • 17.
    Photos taken onthe day of the launch.
  • 18.
    Traditional Breakfast Itis tradition that the astronauts have a breakfast together before the launch.
  • 19.
    The flight hadbeen delayed five times due to weather so despite the conditions they proceeded with the launch. This was the 25 th Space Shuttle mission and the 10 th flight for Challenger.
  • 20.
    Heading for theLaunch Pad
  • 21.
    Video: Boardingthe Space Shuttle
  • 22.
    As family andfriends watched from Cape Canaveral and school age students watched on television across the country, the space shuttle lifted off.
  • 23.
  • 24.
  • 25.
    Seventy-two seconds afterlift-off a catastrophic explosion occurred.
  • 26.
    Click on pictureto start video.
  • 27.
  • 28.
    Dark smoke canbe seen 0.678 second after ignition.
  • 29.
    A small flameappears in the area of the leaking joint. The plume of hot exhaust spills across the bottom of the shuttle’s main fuel tank.
  • 30.
  • 31.
  • 32.
    The two rocketboosters, still firing, fly onward until they are destroyed by radio command.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
    Ronald Reagan wasinformed of the accident as he sat in a meeting to prepare for his State of the Union address that was planned for that evening.
  • 38.
    Click for video.Ronald Reagan’s State of the Union Address.
  • 39.
  • 40.
  • 41.
    O-Ring It wasdetermined by the NASA investigation that the Challenger disaster was caused by a frozen O-Ring. The O-Ring is a rubber ring that uses moisture to keep its seal. When the ring became frozen on that fateful day it became brittle and broken. The seal failure caused a breach in the SRB joint it filled, allowing a flare to reach the outside and impinge upon the adjacent attachment hardware and external fuel tank.
  • 42.
  • 43.
    Many memorials wereheld after the accident. The memorial service for Judith A. Resnik was held at Firestone High School on February 3, 1986.
  • 44.
    John Glenn Eulogy We have come here today not just to mourn Judy Resnik's death, but even more to celebrate her life. And in my judgment, there is no better way to celebrate her life than to celebrate the cause for which she died. -John Glenn
  • 45.
    Judith Resnik ScholarshipA $1,000 scholarship will be awarded to a young woman graduating from a public or private high school in the greater Akron area. This scholarship is designated for a student accepted into a baccalaureate degree program in the physical sciences, engineering or mathematics at an accredited college or university.
  • 46.
    Judy Resnik AwardJudith A. Resnik Award was established by the IEEE Board of Directors in 1986 to recognize outstanding contributions to space engineering, within the fields of interest of the IEEE.  This award is presented to an individual or team, with preference given to an individual
  • 47.
  • 48.
    Fresco that hangsin the U.S. Capitol Building in Washington D.C.
  • 49.
  • 50.
    A historic markerhas been placed at Firestone High School to recognize Judy Resnik’s contributions to the space program.
  • 51.
    Every year duringthe week of the anniversary of the accident flowers are delivered by an anonymous person. People have speculated throughout the years who sends the flowers but nobody knows for certain.
  • 52.
    Judy Resnik wasknown to wear a ILY necklace that displayed “I Love You” in sign language. It was one of the few personal items recovered from the wreckage.
  • 53.
    Other Accidents inthe history of the U.S. Space Program
  • 54.
    APOLLO 1 OnJanuary 27, 1967 Apollo 1 astronauts Virgil (Gus) Grissom, Roger Chaffee, and Edward White were killed in a flash fire during a simulated launch.
  • 55.
    The astronauts werealready strapped into the capsule and sealed in with bolts when the fire broke out. There was no way to escape. The capsule is seen at the left.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
    The space shuttleColumbia burned up on re-entry into the earth’s atmosphere. It was later determined that a missing tile on the belly of the shuttle allowed excessive heat to get into the vessel.
  • 61.
    The shuttle ismoved from one side of the country to the other by a piggy back ride on a specially designed plane.
  • 62.