Celebrating our 10 th  Year!
Corporate Information Formed in 1999, ITC is a privately owned certified small business enterprise operated by a team of professionals with more than 90 years of combined contracting experience. Corporate office is located in Citrus Heights, CA and regional operations offices in Cape Coral, FL and Manchester, IL.  Provides on site consulting and managed turnkey services for 30 clients in over 20 states. Dunn & Bradstreet #:07-446-5449  Member of BICSI with an RCDD on staff. Contractors Licenses held in CA, TN, FL and LA.  www.callitc.com
Organizational Structure
Service Offerings Staffing Solutions Telecom/CATV Staffing Information Technology Staffing Turnkey Solutions Planning Services Design Services Construction Services Maintenance Services
Staffing Solutions Providing experienced and/or certified resources on demand to fill specialized and peak load personnel requirements under the following three (3) scenarios: Contract – For short or long term assignments Contract to Hire – Contract to Direct Hire at a later date Direct Hire – Placed directly with the client Services provided through Master Service Agreements on a hourly rate, daily rate, mark-up rate, and/or fixed fee basis.
Telecom/CATV Staffing ITC provides qualified Telecom/CATV professionals including, but not limited to: Project Managers  Construction Managers  Copper Cable Splicers  Project Schedulers  Construction Supervisors  ISP Engineers  Network Planners  Construction Inspectors  Fiber Optic Cable Splicers  Red-line Drafters  Right-of-Way Agents  BIC Engineers  Safety Enforcers Permitting Specialists  Cable Locators  Linemen    Engineering Supervisors  Circuit Provisioners  Tower Climbers  RF Engineers  IPTV Technicians CAT 5/6 Technicians  VOIP Engineers  PBX Technicians  Cable Pullers  OSP Engineers  CAD Operators  COAX Cable Splicers COE Engineers  Triple Play Installers  Sweep Technicians  Switch Engineers CAD Supervisors  I&R Technicians  Make Ready Engineers Equipment Installers  Field Engineers  Trainers
Information Technology Staffing ITC provides qualified and certified IT professionals including, but not limited to: Application Developers  Network Engineers  Network Administrators Computer Technicians  Network Security Administrators  Database Administrators  Network Technicians  Network Systems Administrators  Project Mangers-VOIP/AVVID  Senior Technical Writers  Software Architects  Technical Writers Help Desk Administrators  IT Analysts  Software Developers  IT Engineers  Software Engineers  IT Managers  Software Systems Architects  LAN/WAN Administrators  Systems Analysts  LAN/WAN Developers  Systems Engineers  Management Analysts  Technical Support  Personnel MIS Managers  Helpdesk Technicians  IPTV Technicians RF WiMAX Engineers Web Developers
Turnkey Services Providing total turn-key solutions based upon a defined scope of work and project timeframe, while delivering the highest level of quality and client services, in the following disciplines: Planning Services Design Services Construction Services Maintenance Services Services provided through approved purchase orders on either a hourly rate, daily rate, unit rate, and/or lump sum basis.
Planning Services ITC can provide you with short or long term planning services in the form of a feasibility studies to include the following: Route Selections Path Selections Site Surveys Building Surveys Right of Way Research Technology Assessment Equipment  Recommendations Material Specifications Project Budgeting Project Scheduling Contract Development
Design Services ITC’s design team is a highly specialized group of professionals with extensive wireline and wireless network design expertise offering the following services: RF Engineering OSP Engineering BIC Engineering COE Engineering Make Ready Engineering Permit Acquisition CAD Drafting  Records Posting Services (IDDS, ARES, Microstation, AutoCAD & Opti-Lite)
Construction Services At ITC, we handle all your needs from cradle to grave.  By managing the initial construction, inspections, splicing, equipment installations and final documentation, we’ve become a one-stop shop.  We pride ourselves on our ability to provide you with the following services: Construction Management COAX Cable Splicing Directional Boring Equipment Installations Innerduct Placement   PBX Installations  Underground Cable Placement Triple Play Installations Aerial Cable Placement  System Testing Fiber Optic Splicing   As-Built Documentation Copper Cable Splicing Cable Wrecking
Maintenance Services Our job continues as we make sure that all your cables, switches and equipment are maintained so that you the client can focus on sales, network expansions and customer service issues.  The following is a list of our core abilities: Network Monitoring Ticket Screening Cable Locating Installation and Repair  Equipment Maintenance Route Surveillance Location Records Maintenance
Existing Client List

Itc Service Group Brochure 7 2009

  • 1.
  • 2.
    Corporate Information Formedin 1999, ITC is a privately owned certified small business enterprise operated by a team of professionals with more than 90 years of combined contracting experience. Corporate office is located in Citrus Heights, CA and regional operations offices in Cape Coral, FL and Manchester, IL. Provides on site consulting and managed turnkey services for 30 clients in over 20 states. Dunn & Bradstreet #:07-446-5449 Member of BICSI with an RCDD on staff. Contractors Licenses held in CA, TN, FL and LA. www.callitc.com
  • 3.
  • 4.
    Service Offerings StaffingSolutions Telecom/CATV Staffing Information Technology Staffing Turnkey Solutions Planning Services Design Services Construction Services Maintenance Services
  • 5.
    Staffing Solutions Providingexperienced and/or certified resources on demand to fill specialized and peak load personnel requirements under the following three (3) scenarios: Contract – For short or long term assignments Contract to Hire – Contract to Direct Hire at a later date Direct Hire – Placed directly with the client Services provided through Master Service Agreements on a hourly rate, daily rate, mark-up rate, and/or fixed fee basis.
  • 6.
    Telecom/CATV Staffing ITCprovides qualified Telecom/CATV professionals including, but not limited to: Project Managers Construction Managers Copper Cable Splicers Project Schedulers Construction Supervisors ISP Engineers Network Planners Construction Inspectors Fiber Optic Cable Splicers Red-line Drafters Right-of-Way Agents BIC Engineers Safety Enforcers Permitting Specialists Cable Locators Linemen Engineering Supervisors Circuit Provisioners Tower Climbers RF Engineers IPTV Technicians CAT 5/6 Technicians VOIP Engineers PBX Technicians Cable Pullers OSP Engineers CAD Operators COAX Cable Splicers COE Engineers Triple Play Installers Sweep Technicians Switch Engineers CAD Supervisors I&R Technicians Make Ready Engineers Equipment Installers Field Engineers Trainers
  • 7.
    Information Technology StaffingITC provides qualified and certified IT professionals including, but not limited to: Application Developers Network Engineers Network Administrators Computer Technicians Network Security Administrators Database Administrators Network Technicians Network Systems Administrators Project Mangers-VOIP/AVVID Senior Technical Writers Software Architects Technical Writers Help Desk Administrators IT Analysts Software Developers IT Engineers Software Engineers IT Managers Software Systems Architects LAN/WAN Administrators Systems Analysts LAN/WAN Developers Systems Engineers Management Analysts Technical Support Personnel MIS Managers Helpdesk Technicians IPTV Technicians RF WiMAX Engineers Web Developers
  • 8.
    Turnkey Services Providingtotal turn-key solutions based upon a defined scope of work and project timeframe, while delivering the highest level of quality and client services, in the following disciplines: Planning Services Design Services Construction Services Maintenance Services Services provided through approved purchase orders on either a hourly rate, daily rate, unit rate, and/or lump sum basis.
  • 9.
    Planning Services ITCcan provide you with short or long term planning services in the form of a feasibility studies to include the following: Route Selections Path Selections Site Surveys Building Surveys Right of Way Research Technology Assessment Equipment Recommendations Material Specifications Project Budgeting Project Scheduling Contract Development
  • 10.
    Design Services ITC’sdesign team is a highly specialized group of professionals with extensive wireline and wireless network design expertise offering the following services: RF Engineering OSP Engineering BIC Engineering COE Engineering Make Ready Engineering Permit Acquisition CAD Drafting Records Posting Services (IDDS, ARES, Microstation, AutoCAD & Opti-Lite)
  • 11.
    Construction Services AtITC, we handle all your needs from cradle to grave. By managing the initial construction, inspections, splicing, equipment installations and final documentation, we’ve become a one-stop shop. We pride ourselves on our ability to provide you with the following services: Construction Management COAX Cable Splicing Directional Boring Equipment Installations Innerduct Placement PBX Installations Underground Cable Placement Triple Play Installations Aerial Cable Placement System Testing Fiber Optic Splicing As-Built Documentation Copper Cable Splicing Cable Wrecking
  • 12.
    Maintenance Services Ourjob continues as we make sure that all your cables, switches and equipment are maintained so that you the client can focus on sales, network expansions and customer service issues. The following is a list of our core abilities: Network Monitoring Ticket Screening Cable Locating Installation and Repair Equipment Maintenance Route Surveillance Location Records Maintenance
  • 13.