Meeting the needs of the Commercial and Government workplace
We build solutions for your
enterprise, starting with project
management and delivering a
collaborative workplace
We understand the enterprise environment
and we build best in class solutions and
services to address the growing needs of our
clients and their business goals. We bring to
the table a blend of technical expertise and
creative awareness that when combined
deliver extraordinary results with the perfect
blend of form and factor.
Enable collaboration with SharePoint
Enable collaboration, productivity, efficiency and
innovation with SharePoint
Intranets are very much on the minds of business and government leaders.
Welcome to the new way to work together. SharePoint, Office 365, Skype and
Yammer introduce new ways to share your work and work with others, organize
your projects and teams and discover people and information.
Offerings:
• SharePoint Design, Architecture, Development & Branding
• SharePoint Implementation
• SharePoint Migration Services
• Office 365, Yammer & Skype for Business Integration
• SharePoint Environment Administration and Support
Virtualization
Virtualization
Organizations need answers to solving the complexity of virtualizing servers,
desktops and tier 1 applications. ITC understands the complexities
companies face and can help them overcome the silos of expertise in
order to make well-informed decisions. We provide companies with
solutions that work today and are designed to scale as their needs grow
and change.
ITC Provides the following offerings:
• VMWare Solutions
• Citrix Solutions
• Microsoft Hyper-V Solutions
Cloud Solutions
Building your enterprise in the Cloud
It’s not a matter of if your company will move to the cloud, it’s a matter
of when. In order to reduce costs, improve efficiency and enhance
security, the cloud has become the solution of choice for running
applications and storing data. The cloud is a rich environment for
application development, application scaling and managing your
virtual environment. Let ITC help you through the maze of choices and
build a cloud solution that will serve your business today and well into
the future.
ITC Provides the following solutions:
• VMware Cloud Solutions
• Citrix Cloud Solutions
• Microsoft Azure
• Amazon Cloud
Project Management
Delivering the right solution
IT projects can be challenging to manage and deliver. Our project
managers are experienced communicators, experts in requirements
gathering, resource planning and management, budgeting, scheduling,
risk management and quality assurance. The PM also provides vendor
relationship management. The goal of the project manager is to deliver
projects on-time and within budget.
Providing Project Management in the following areas:
• Enterprise Infrastructure Management
• HW/SW Migrations
• SharePoint Development and Implementation
• Software Development Projects
• Structured Cabling Projects
• Security Solutions Projects
• Wireless Networking Projects
Software Development
Custom Software Development
Our mission is to provide high-end, enterprise level software development
services that are unmatched in the industry. Our team of U. S. based project
managers, software engineers and designers provide end-to-end consulting
and collaboration throughout the SDLC to deliver database, web app,
mobile app and enterprise application development, built to meet and
exceed your demanding specifications and business goals.
Providing Software Development in the following disciplines:
• Microsoft.net, Oracle, SAP, Microsoft SQL Sever
• C, C+, C#, Java, J2EE, PHP, Perl, Python, Ruby/Rails, Joomla, MySQL
• WordPress, IOS Andriod, WebOS
ITC brings you the finest talent from around the world to produce world-class software solutions.
Enterprise Network Architecture
Enterprise Network Architecture
Your LAN/WAN infrastructure must have a solid foundation. From the
structured cabling, to the firewalls and network security, routers, servers,
switches, storage and backup, to wireless networks, desktops, mobile
devices and virtual devices, your network must perform to deliver high
speed availability of applications, continuity of work, and the internet in a
collaborative environment to support the people and technologies that
keep your business moving forward.
ITC Systems Engineers build your network from the ground up, partnering with today’s Best
in Class solutions providers to bring you the latest in secure networking technology.
ITC partners with Dell, HP, IBM, Lenovo, Panasonic, Cisco, Polycom, Aruba Networks,
Motorola and Xirris to deliver best in class network, WLAN and VOIP solutions. Let our
certified systems engineers plan, design, build and support your LAN/WAN environment.
Network Design & Implementation
Network Design and Implementation
Network Design and Implementation covers planning and/or reengineering of
complex LAN and WAN architectures, from design through implementation, ITC
offers proactive end-to-end design and implementation solutions for your
networks. Infrastructure network design and implementation services are used to
plan, design, build, and integrate a network infrastructure that increases
productivity and helps to achieve strategic business goals.
ITC’s Network Design and Implementation Team can provide assistance with the following elements:
• LAN / WAN Architecture
• Server configuration and deployment
• Perimeter Security including Firewalls, Web Content, and Anti-Spam
• WLAN Implementation
• Network Administration and Support
• Network Security
• Unified Computing
• Exchange Migrations
• VoIP Deployment
• Performance Analysis and Tuning
• Network Documentation
• ISP Provisioning and Cutover
Security Cameras & Video Surveillance
Security Cameras and Video Surveillance Solutions
Security is a fundamental aspect of our lives. We rely on security
camera systems to help prevent crime, video surveillance to protect our
borders, warn us before danger strikes, or in after the fact perpetrator
identification. Bosch and Panasonic provide a broad range of quality
security solutions. Whatever your security needs, Bosch has an answer.
Bosch is your dependable choice for now and in the future.
Bosch and Panasonic best in class systems are found worldwide in:
• Cities, Hotels, Banks, Education, Food Services, Retail, Stadiums
• Airports, Train Stations, Ports, Utilities
• Government Buildings, including Military Bases and Border Security.
Structured Cabling
Voice/Data/Security Structured Cabling
Your structured cabling installation is the foundation of your telecommunications and
security system. Your business needs a solid structured cabling infrastructure in place
so operations run smoothly, which is why ITC is the company of choice for cabling
installation and support. All cabling installations follow the EIA/TIA and BICSI installation
standards. ITC is also a member of BICSI. We only use trained technicians for the
services we offer. The choice is clear – it’s ITC all the way!
We provide:
• Site surveys & estimating
• Infrastructure planning & design
• Installation, certification and maintenance of your communications or security network
• High-grade cable selection - Fiber optics, Data, Voice, Coaxial, Cat 5e, Cat 6, Cat 6e,
Cat 7
• Cable management, racks and patch panel systems
• Conduit systems and cable trays
• LAN, WAN, WLAN, Security Cameras, Fire Alarm, Outdoor Campus infrastructures
• CAD and documentation
• Ongoing maintenance and support
• Lifetime cable plant warranty
Information Assurance & Cyber Security
Information Assurance & Cyber Security
We deliver cutting edge IA and Cyber Security services to companies and
government clients. Network boundaries are no longer confined to company-
owned assets. Remote and home offices, laptops, BYOD mobile, partner networks,
and cloud services are now part of the mix. New service requirements appear
weekly. ITC’s approach to security is data centric, which enables multiple industry
standards (SOX, HIPAA, PCI, etc.) to be met.
ITC Provides the following services in IA and Cyber Security:
• CISSPs are information assurance professionals who define the architecture, design,
management and/or controls that assure the security of business environments.
• Certified Ethical Hacker (CEH) Finding breech points and fixing them ahead of an attack.
• Licensed Penetration Tester (LPT) Finding breech points and fixing them ahead of an attack.
• The Computer Hacking Forensic Investigator (CHFI) conducts and documents the investigation
once a breech has occurred.
ITC provides skilled IA professionals for government and commercial applications worldwide.
Wireless Networking
Wireless Networking
The Wireless Network (Wi-Fi or WLAN) is now the extended enterprise where work gets
done away from the network core. The extended enterprise may be found in individual
stores, malls and regional centers of a retail operation. Or it may be the hotels, or cruise
ships that are a part of an international hospitality chain. Airports, manufacturing plants,
back office operations, logistic centers and warehouses all belong to the extended
enterprise. Hospitals and office buildings belong to the extended enterprise as well, where
IT network operations staff may be thinly available or distant— satellite, regional, and
branch offices fall into to this category. Now wireless networks have extended to include
military bases, stadiums and even cities.
ITC builds and supports wireless networks that exceeds your expectations utilizing the best in
business class products and services.
Managed Services
The Real Benefits of Managed Services
Managed Services is the proactive management of an IT enterprise, asset or
object, by a third party known as an MSP or Managed Service Provider, on
behalf of a customer. What sets us apart as an MSP is the proactive delivery
of our services, as compared to traditional reactive IT services.
From our NOC, we can proactively monitor:
• Network Servers, Desktops and Peripherals
• Provide a Ticketing System, Respond to and Track issues
• Provide Remote Control Capable Helpdesk for servers, desktop clients and
peripherals support.
• Provide Reports for servers and desktop clients
We provide you, with a cost effective and predictable delivery model to have complete
IT management without the cost of onsite resources.
Government Solutions
Executing the right decision
The program manager manages horizontally across multiple projects involved within the program.
Program managers are results driven decision makers who are visionaries and goal setters. Our
program managers work directly with the stakeholder from the planning phase to assessing and
gathering the requirements, scheduling, providing leadership, cost analysis and tracking, risk
management, audits, performance, facilities and operational management, and insuring quality
over the life of the program. Program managers are experts in dispute avoidance, working within
and resolving cross-purpose agendas and conflict resolution. They are the coordinators, the client
advocates, the relationship and the resource managers.
Our program managers are focused on the big picture. They perform capture management, they manage the
stakeholders and the resources delivering the program’s requirements. Program managers enforce work
standards, have advanced skills in finance, budgeting, procurement and contract negotiations. Our program
managers have a deep understanding of the strategic needs of our clients.
• ITC program managers are experts at developing, proposing, winning and delivering federal, state and
local programs, including military programs. Those include putting personnel to work in operations
support, information assurance, network security, vulnerability and risk assessments, video surveillance and
security, training systems, technical writers, courseware developers, modeling and simulation, software
engineering and development, voice and data infrastructure, document imaging and management,
engineering, maintenance, logistical, clerical, data processing, and many more…
Team Augmentation
Developing a winning team
The talent you acquire and retain is a key ingredient to your success. Finding and hiring the right
people, with the skill sets you demand, can be a daunting task. Each member of the team is critical
for the success and effectiveness of the organization. Your company makes a huge investment in
bringing on board excellent resources. You can’t spend hours evaluating every candidate. How do
you make that task happen effortlessly and efficiently? We’re here to help!
ITC provides rapid recruiting, matching the right people with the right employers for projects,
contracts, temp-to-perm and permanent placement opportunities locally and nationwide. We
provide proficiency testing, criminal and background checks, credit checks and drug testing at the
request of the client.
Industries and fields our staffing professionals serve include:
• Program and project management, service delivery, software engineering, development and
testing, web developers, database administration and management, systems engineering,
network and voice administration, infrastructure security, quality assurance, helpdesk,
document imaging and control, engineering, communications, materials management,
procurement, logistics, back office and more…
ITC specializes in putting our veterans and wounded warriors back to work at great companies.
About Us
Building a Workforce with the Technology and Solutions to Match
At ITC, we understand that our people are our greatest asset. As a team, we have the
perfect blend of strategic account managers, program and project managers, customer
service professionals and technical professionals with the skills and capabilities that enable
us to deliver an extraordinary customer and user experience.
We believe in setting clear expectations with every customer to deliver a client focused experience
in order to achieve their goals and solve their business challenges with today’s best solutions and best
practices.
Our commitment is to establish and maintain the highest quality business partnerships, with industry
leaders, leveraging their offerings with ours to provide our customers with the highest quality products
and services available.
Delivering on our promise… From our headquarters in Orlando, ITC can deliver our offerings to Florida
and the nation.
11701 Orpington Street
Suite A
Orlando, FL 32817
407-439-2530
www.itconsortium.net
Serving Florida and the Nation
A Woman-Owned Small Business Enterprise

Itconsortium capabilities brief short

  • 1.
    Meeting the needsof the Commercial and Government workplace
  • 2.
    We build solutionsfor your enterprise, starting with project management and delivering a collaborative workplace We understand the enterprise environment and we build best in class solutions and services to address the growing needs of our clients and their business goals. We bring to the table a blend of technical expertise and creative awareness that when combined deliver extraordinary results with the perfect blend of form and factor.
  • 3.
  • 4.
    Enable collaboration, productivity,efficiency and innovation with SharePoint Intranets are very much on the minds of business and government leaders. Welcome to the new way to work together. SharePoint, Office 365, Skype and Yammer introduce new ways to share your work and work with others, organize your projects and teams and discover people and information. Offerings: • SharePoint Design, Architecture, Development & Branding • SharePoint Implementation • SharePoint Migration Services • Office 365, Yammer & Skype for Business Integration • SharePoint Environment Administration and Support
  • 5.
  • 6.
    Virtualization Organizations need answersto solving the complexity of virtualizing servers, desktops and tier 1 applications. ITC understands the complexities companies face and can help them overcome the silos of expertise in order to make well-informed decisions. We provide companies with solutions that work today and are designed to scale as their needs grow and change. ITC Provides the following offerings: • VMWare Solutions • Citrix Solutions • Microsoft Hyper-V Solutions
  • 7.
  • 8.
    Building your enterprisein the Cloud It’s not a matter of if your company will move to the cloud, it’s a matter of when. In order to reduce costs, improve efficiency and enhance security, the cloud has become the solution of choice for running applications and storing data. The cloud is a rich environment for application development, application scaling and managing your virtual environment. Let ITC help you through the maze of choices and build a cloud solution that will serve your business today and well into the future. ITC Provides the following solutions: • VMware Cloud Solutions • Citrix Cloud Solutions • Microsoft Azure • Amazon Cloud
  • 9.
  • 10.
    Delivering the rightsolution IT projects can be challenging to manage and deliver. Our project managers are experienced communicators, experts in requirements gathering, resource planning and management, budgeting, scheduling, risk management and quality assurance. The PM also provides vendor relationship management. The goal of the project manager is to deliver projects on-time and within budget. Providing Project Management in the following areas: • Enterprise Infrastructure Management • HW/SW Migrations • SharePoint Development and Implementation • Software Development Projects • Structured Cabling Projects • Security Solutions Projects • Wireless Networking Projects
  • 11.
  • 12.
    Custom Software Development Ourmission is to provide high-end, enterprise level software development services that are unmatched in the industry. Our team of U. S. based project managers, software engineers and designers provide end-to-end consulting and collaboration throughout the SDLC to deliver database, web app, mobile app and enterprise application development, built to meet and exceed your demanding specifications and business goals. Providing Software Development in the following disciplines: • Microsoft.net, Oracle, SAP, Microsoft SQL Sever • C, C+, C#, Java, J2EE, PHP, Perl, Python, Ruby/Rails, Joomla, MySQL • WordPress, IOS Andriod, WebOS ITC brings you the finest talent from around the world to produce world-class software solutions.
  • 13.
  • 14.
    Enterprise Network Architecture YourLAN/WAN infrastructure must have a solid foundation. From the structured cabling, to the firewalls and network security, routers, servers, switches, storage and backup, to wireless networks, desktops, mobile devices and virtual devices, your network must perform to deliver high speed availability of applications, continuity of work, and the internet in a collaborative environment to support the people and technologies that keep your business moving forward. ITC Systems Engineers build your network from the ground up, partnering with today’s Best in Class solutions providers to bring you the latest in secure networking technology. ITC partners with Dell, HP, IBM, Lenovo, Panasonic, Cisco, Polycom, Aruba Networks, Motorola and Xirris to deliver best in class network, WLAN and VOIP solutions. Let our certified systems engineers plan, design, build and support your LAN/WAN environment.
  • 15.
    Network Design &Implementation
  • 16.
    Network Design andImplementation Network Design and Implementation covers planning and/or reengineering of complex LAN and WAN architectures, from design through implementation, ITC offers proactive end-to-end design and implementation solutions for your networks. Infrastructure network design and implementation services are used to plan, design, build, and integrate a network infrastructure that increases productivity and helps to achieve strategic business goals. ITC’s Network Design and Implementation Team can provide assistance with the following elements: • LAN / WAN Architecture • Server configuration and deployment • Perimeter Security including Firewalls, Web Content, and Anti-Spam • WLAN Implementation • Network Administration and Support • Network Security • Unified Computing • Exchange Migrations • VoIP Deployment • Performance Analysis and Tuning • Network Documentation • ISP Provisioning and Cutover
  • 17.
    Security Cameras &Video Surveillance
  • 18.
    Security Cameras andVideo Surveillance Solutions Security is a fundamental aspect of our lives. We rely on security camera systems to help prevent crime, video surveillance to protect our borders, warn us before danger strikes, or in after the fact perpetrator identification. Bosch and Panasonic provide a broad range of quality security solutions. Whatever your security needs, Bosch has an answer. Bosch is your dependable choice for now and in the future. Bosch and Panasonic best in class systems are found worldwide in: • Cities, Hotels, Banks, Education, Food Services, Retail, Stadiums • Airports, Train Stations, Ports, Utilities • Government Buildings, including Military Bases and Border Security.
  • 19.
  • 20.
    Voice/Data/Security Structured Cabling Yourstructured cabling installation is the foundation of your telecommunications and security system. Your business needs a solid structured cabling infrastructure in place so operations run smoothly, which is why ITC is the company of choice for cabling installation and support. All cabling installations follow the EIA/TIA and BICSI installation standards. ITC is also a member of BICSI. We only use trained technicians for the services we offer. The choice is clear – it’s ITC all the way! We provide: • Site surveys & estimating • Infrastructure planning & design • Installation, certification and maintenance of your communications or security network • High-grade cable selection - Fiber optics, Data, Voice, Coaxial, Cat 5e, Cat 6, Cat 6e, Cat 7 • Cable management, racks and patch panel systems • Conduit systems and cable trays • LAN, WAN, WLAN, Security Cameras, Fire Alarm, Outdoor Campus infrastructures • CAD and documentation • Ongoing maintenance and support • Lifetime cable plant warranty
  • 21.
  • 22.
    Information Assurance &Cyber Security We deliver cutting edge IA and Cyber Security services to companies and government clients. Network boundaries are no longer confined to company- owned assets. Remote and home offices, laptops, BYOD mobile, partner networks, and cloud services are now part of the mix. New service requirements appear weekly. ITC’s approach to security is data centric, which enables multiple industry standards (SOX, HIPAA, PCI, etc.) to be met. ITC Provides the following services in IA and Cyber Security: • CISSPs are information assurance professionals who define the architecture, design, management and/or controls that assure the security of business environments. • Certified Ethical Hacker (CEH) Finding breech points and fixing them ahead of an attack. • Licensed Penetration Tester (LPT) Finding breech points and fixing them ahead of an attack. • The Computer Hacking Forensic Investigator (CHFI) conducts and documents the investigation once a breech has occurred. ITC provides skilled IA professionals for government and commercial applications worldwide.
  • 23.
  • 24.
    Wireless Networking The WirelessNetwork (Wi-Fi or WLAN) is now the extended enterprise where work gets done away from the network core. The extended enterprise may be found in individual stores, malls and regional centers of a retail operation. Or it may be the hotels, or cruise ships that are a part of an international hospitality chain. Airports, manufacturing plants, back office operations, logistic centers and warehouses all belong to the extended enterprise. Hospitals and office buildings belong to the extended enterprise as well, where IT network operations staff may be thinly available or distant— satellite, regional, and branch offices fall into to this category. Now wireless networks have extended to include military bases, stadiums and even cities. ITC builds and supports wireless networks that exceeds your expectations utilizing the best in business class products and services.
  • 25.
  • 26.
    The Real Benefitsof Managed Services Managed Services is the proactive management of an IT enterprise, asset or object, by a third party known as an MSP or Managed Service Provider, on behalf of a customer. What sets us apart as an MSP is the proactive delivery of our services, as compared to traditional reactive IT services. From our NOC, we can proactively monitor: • Network Servers, Desktops and Peripherals • Provide a Ticketing System, Respond to and Track issues • Provide Remote Control Capable Helpdesk for servers, desktop clients and peripherals support. • Provide Reports for servers and desktop clients We provide you, with a cost effective and predictable delivery model to have complete IT management without the cost of onsite resources.
  • 27.
  • 28.
    Executing the rightdecision The program manager manages horizontally across multiple projects involved within the program. Program managers are results driven decision makers who are visionaries and goal setters. Our program managers work directly with the stakeholder from the planning phase to assessing and gathering the requirements, scheduling, providing leadership, cost analysis and tracking, risk management, audits, performance, facilities and operational management, and insuring quality over the life of the program. Program managers are experts in dispute avoidance, working within and resolving cross-purpose agendas and conflict resolution. They are the coordinators, the client advocates, the relationship and the resource managers. Our program managers are focused on the big picture. They perform capture management, they manage the stakeholders and the resources delivering the program’s requirements. Program managers enforce work standards, have advanced skills in finance, budgeting, procurement and contract negotiations. Our program managers have a deep understanding of the strategic needs of our clients. • ITC program managers are experts at developing, proposing, winning and delivering federal, state and local programs, including military programs. Those include putting personnel to work in operations support, information assurance, network security, vulnerability and risk assessments, video surveillance and security, training systems, technical writers, courseware developers, modeling and simulation, software engineering and development, voice and data infrastructure, document imaging and management, engineering, maintenance, logistical, clerical, data processing, and many more…
  • 29.
  • 30.
    Developing a winningteam The talent you acquire and retain is a key ingredient to your success. Finding and hiring the right people, with the skill sets you demand, can be a daunting task. Each member of the team is critical for the success and effectiveness of the organization. Your company makes a huge investment in bringing on board excellent resources. You can’t spend hours evaluating every candidate. How do you make that task happen effortlessly and efficiently? We’re here to help! ITC provides rapid recruiting, matching the right people with the right employers for projects, contracts, temp-to-perm and permanent placement opportunities locally and nationwide. We provide proficiency testing, criminal and background checks, credit checks and drug testing at the request of the client. Industries and fields our staffing professionals serve include: • Program and project management, service delivery, software engineering, development and testing, web developers, database administration and management, systems engineering, network and voice administration, infrastructure security, quality assurance, helpdesk, document imaging and control, engineering, communications, materials management, procurement, logistics, back office and more… ITC specializes in putting our veterans and wounded warriors back to work at great companies.
  • 31.
  • 32.
    Building a Workforcewith the Technology and Solutions to Match At ITC, we understand that our people are our greatest asset. As a team, we have the perfect blend of strategic account managers, program and project managers, customer service professionals and technical professionals with the skills and capabilities that enable us to deliver an extraordinary customer and user experience. We believe in setting clear expectations with every customer to deliver a client focused experience in order to achieve their goals and solve their business challenges with today’s best solutions and best practices. Our commitment is to establish and maintain the highest quality business partnerships, with industry leaders, leveraging their offerings with ours to provide our customers with the highest quality products and services available. Delivering on our promise… From our headquarters in Orlando, ITC can deliver our offerings to Florida and the nation.
  • 33.
    11701 Orpington Street SuiteA Orlando, FL 32817 407-439-2530 www.itconsortium.net Serving Florida and the Nation A Woman-Owned Small Business Enterprise