Automation System Modernization
Regain your competitive edge.
With today’s increasing global competition and rapid
                                                              technological advances, many plants around the world
                                                              have legacy automation systems that aren't able to keep
                                                              up with today's production demands.

                                                              Better plant performance begins with better automation.
                                                              And, with today's digital technologies you can expect
                                                              increased productivity and better communications
                                                              between your process information and your business
CONTENTS                                                      systems.

    2 Regaining your competitive edge
      Correcting Missed Opportunities           10 Minimize your downtime during
                                                   Maximize Availability

        through modernization.                       modernization with Emerson
                                                     technology and expertise.
    4 Why modernize with Emerson
        How Emerson delivers more
        performance for a more
                                                12 Get more from your automation
                                                   Maximizing ROI

        profitable plant.                            investment with Emerson’s world-
                                                     class training and simulation tools.
    6 Build a business case Solid PlanOPEX
      Starting Out with a
                            based on
        and CAPEX for the life of your plant.
                                                14 Sustained Improvement
                                                   and Support
                                                     A flexible portfolio of industry
    8   Global Standards and
        Best Practices
                                                     leading support in your city and
                                                     around the world.
        Manage your modernization with
        global project experience.




2
A legacy of lost opportunities.

When should you consider system modernization?
Yesterday’s systems may have been a good investment, but today’s          “Emerson is widely
technology and expertise provide opportunities and benefits that just
weren’t available when these systems were designed. You should consider   recognized as today's
a modernization when:                                                     leader with respect to
  Production & energy costs keep rising
  Inventories of raw materials and finished product pile up               process instruments
  Product quality is inconsistent and customer complaints increase        and automation
  Start up and product grade changes cost more than they should
  Plant trip and alarm systems are unreliable and/or inadequate
                                                                          systems. We expect to
  Production is inflexible and start-up time is lengthy                   benefit greatly from
  Recurring emission problems are constraining throughput
                                                                          their experience in
  Business systems lack meaningful plant floor production data
  Customers are demanding more but your plant cannot deliver:             applying these
    more specialized products and packaging
                                                                          technologies to the
    tighter quality specifications or delivery times
    better service                                                        processing of bitumen,
  Obsolete system support costs continue to increase.                     integrating the
What are you missing?                                                     engineering phase of
You may want to consider how your system (and your current automation     the project, and
supplier) would respond to:
  Plant expansion (including bus-based or wireless I/O) for improved
                                                                          bringing state-of-the-
  plant diagnostics and increased plant uptime                            art efficiency to the
  Reducing variability to establish a foundation for advanced controls
                                                                          operation of our
  and process optimization for better throughput and yields
  Providing field service alerts to operators and/or maintenance,         upgrader.”
  improving response times to specific needs
  Integrating DCS information with your business systems for more                   Robert Pearce
  informed and timely business decision-making                                            President
  Integrating predictive maintenance practices to focus your               North West Upgrading Inc.
  maintenance resources, saving time and money.

See how Emerson’s digital technologies and expertise enable the safest
and most scalable path to on-going capital expense and operational
expense savings.



                                                                           For more information:
                                                                            EmersonProcess.com/
                                                                            Solutions




                                                                                                  3
Why modernize with Emerson?

Take advantage of         Modernize for
Emerson’s experience      measurable results
                          Highlights of customer measurable
with thousands of process results in thousands of PlantWeb
                          installations worldwide include:
automation projects         30% increase in capacity without
worldwide.                  additional personnel
                                         10% increase in throughput
Automation leaders                       20% reduction in raw material
The keystone to Emerson’s                usage
automation technology leadership         15% reduction in rework
is the proven PlantWeb® digital          50% reduction in maintenance
plant architecture, an open              costs with remote diagnostics
standards-based digital solution         New high-margin products never
that networks intelligent field          before possible
                                         Control room space requirement
                                                                           Reduce your risk
devices, digital systems, and
                                                                           With PlantWeb, you can achieve an
software, controlling processes and      reduced as much as 85%
                                                                           effective program for managing
managing equipment and other             Automation investment payback
                                                                           safety, health, and environmental
assets. Embedded, advanced               in less than 4 months.
                                                                           risks and costs—one that goes
control means a more efficient,
                                                                           beyond abnormal situation
consistent, available and optimized    Leaders in service                  management to abnormal situation
operation.                             Emerson’s global network of         prevention.
                                       engineers and consultants has the
Emerson’s commitment to open           real-world industry and process     AMS™ Suite: Intelligent Device
standards, highlighted by our          automation knowledge to help you    Manager gives you key online access
donation of the HART protocol in the   design, plan and implement your     to your instrument and valve
1980’s, continues today with our       automation concept with:            process information, diagnostic
work on FOUNDATION fieldbus and          Modernization and migration       status information, and automatic
wireless standards.                      consulting                        documentation of all field device
                                         Fieldbus consulting               maintenance information. And
                                         Process safety management         DeltaV™ SIS, at the heart of
                                         Human factors optimization        Emerson’s smart SIS, works with
                                         Production information            AMS to continuously diagnose your
                                         management                        intelligent field services and safety
                                         Advanced automation &             functions. This helps ensure your
                                         optimization                      process shuts down only when
                                         Plant system security.            it should.




 4
Better performance.

Operating on the
leading edge                                                                                 “We looked for a
Process manufacturers lose
millions of dollars each year due
                                                                                             company that had the
to process variability and poor                                                              right technology and
control performance, often
                                                                                             also a strong support
unaware that a problem exists.
The powerful new DeltaV InSight                                                              network that would
monitors control performance;
                                                                                             be available to us. We
identifies and diagnoses problem
loops; recommends tuning and                                                                 selected the
maintenance improvements; and                                                                PlantWeb digital
continuously adapts to changing
process conditions.                                                                          plant architecture
                                      Manufacturers have real issues                         from Emerson Process
                                      everyday that effective wireless                       Management. We
                                      solutions can help solve.
                                      Emerson’s Wireless SmartPack™
                                                                                             also selected Emerson
                                      helps you create a secure network                      as our main
                                      right out of the box, giving you
                                                                                             automation
                                      convenient access to information
                                      you simply don’t have today.                           contractor because of
                                                                                             its proven project
Often, fewer than 10 modules
                                                                                             management
cause 40% or more of alarm
activations. So by addressing just                                                           experience and
a few alarms, you can significantly
                                                                                             intimate knowledge
improve operator alarm loading.
DeltaV Analyze makes it easy to                                                              of the technology we
find the most frequently occuring                                                            had selected.”
alarms.
                                                                                                  Evelio Hernandez,
                                                                                                       Process Control
                                                                                                     Systems Manager
                                 Emerson Process Management was again voted the best
                               supplier of process management technologies in CONTROL
                                     Magazine’s 2007 Readers’ Choice Awards. This is the
                                         14th consecutive year that Emerson has captured     For more information:
                                                                                              EmersonProcess.com/
                                                               the user-voted recognition.
                                                                                              PlantWeb
                                                                                              EmersonProcess.com/
                                       ARC and Control Magazine also placed Emerson as        SmartWireless
                                         #1 on their Top 50 Automation Companies List.        EasyDeltaV.com

                                                                                                                    5
How do I get started?

Emerson experts and                   Based on your business objectives,     This plan may cover:
                                      a site assessment , tailored to your     Migration to a new automation
technology help you                   needs, defines performance               system
evaluate where you are                criteria:                                Process modifications
                                         Key process measurements              Additional instrumentation
and plan where you’re                    Process constraints and               Improved regulatory and/or
                                         limitations                           advanced control strategies
going.
                                         Process disturbances                  Safety, environmental and
                                         Equipment or operational              equipment protection
The challenge
                                         limitations.                          Information integration
Selecting the right technology,
                                                                               Asset management.
the right partner, the right
implementation plan and the
                                      Planning for your
right budget minimizes risk.
                                      specific needs                         An Emerson modernization plan
                                      The site assessment feeds a            will consider a variety of migration
Emerson offers unparalleled
                                      process automation feasibility         types and specific needs, and
capabilities to help you set the
                                      study used to develop the process      informs you of viable and profitable
stage for a more profitable plant.
                                      automation modernization plan.         options for your system:
                                                                                Full system upgrade -
Building the business
                                      This study includes a cost/benefit        controllers, I/O and consoles
case for modernization
                                      analysis based on both CAPEX and          Controller upgrade using I/O bus
Emerson works with you and your
                                      OPEX over the lifetime of the             interface
team to help you define and justify
                                      system. This defines the business         Upgrades that work with your
a migration path based on your
                                      case and helps you answer the             existing controllers and I/0
business and production
                                      question: “Will improving my                Console upgrade
perspectives. This often begins
                                      process automation improve my               Advanced control
with a review that includes all
                                      key performance indicators?”.             implementation
appropriate plant and corporate
                                                                                  Historian consolidation.
groups to establish business goals
that could include:


                                                     Your plant:
  Increased availability
  Reduced manufacturing costs
  Increased throughput
  Reduced plant emissions


                                                      An asset to perform
  Improved quality
  Improved ability to introduce
  new products
  Improved response to customer
  demands
  Increased safety.




 6
With a solid business plan.

 Front-end engineering               The FEED package would typically
 and design                          provide a Project Execution Plan
                                                                          2007 Frost & Sullivan
 Once a process automation           with the following elements:
                                       Safety and Environment Plan        Company of the Year
 modernization plan has been
 developed, Emerson’s world-class      Quality Plan                              Award
 team of automation experts            Master Project Schedule               for Industrial
 continue to work with your key        Staffing Plan                        Automation and
 stakeholders to develop a Front-      Project Controls Plan                Process Control
 end engineering and design            Project Communication Plan
 (FEED) plan.                          Hot Cutover Plan                  “The global footprint
                                       Turnaround Plan
 An Emerson FEED study is the          Installation Management Plan.     of the company and its
 foundation for a controllable and
 profitable project making certain
                                                                         outstanding
                                     Emerson total value
 that your design meets your orga-   Emerson’s FEED capabilities are     engineering capability
 nization's overall needs by:        part of a total value proposition   coupled with a sound
   Ensuring that the design meets    to create smart plant solutions
                                     with proven benefits:
                                                                         business process
   your project’s time, budget,
   ROI and operating cost criteria     Lower capital expenditure to      empowers Emerson to
   Setting scope boundaries by         reduce automation costs 20% -
                                                                         deliver the same
   quantifying and justifying the      30%
   investment required for a given     Faster time to profitability      benefits at all
   benefit                             Increased profitability
                                                                         customer locations.”
   Preventing unnecessary              Superior system manageability.
   changes through better change                                                 Kishnan M. Bhat
   management                                                                     Industry Manager
   Identifying and providing for                                                    Frost & Sullivan
   project risks
   Achieving faster
   implementation of technology.




ance

                                                                         For more information:
                                                                          EmersonProcess.com/
                                                                          Solutions/ProjectServices

                                                                                                      7
How do I manage risk?

Precise control over your            Global standards in this context     Expert implementation
                                     refer to standard, modular, pre-     Emerson’s engineering teams
project at a time of                 tested pieces of automation like     have strong advanced technology,
major change is critical             control modules, equipment           integration and optimization
                                     modules, phases, etc.                expertise targeted at
to maintaining plant                                                      modernization.
                                     These standards:
operations and business
                                       Incorporate accumulated            Conversion Services and utilities
objectives.                            knowledge and best practices       Conversion services for graphics,
                                       Help facilitate communication      database, and other
Detailed processes and                 between team members               configurations are available to
global standards                       Shorten the learning curve for     help minimize switching costs and
Emerson integrates global              new project team members           reclaim the value of your legacy
standards and best practices in        Include a customer feedback        system investments for use with
project management processes.          mechanism for continuous           the DeltaV system.
Project deliverables include           improvement.
documentation, support tools,                                             Focused conversion service
and technical standards that help    Our project managers have the        engineers are dedicated
reduce errors and omissions in       training and experience to deliver   resources, familiar with common
budgeting, scheduling, training,     consistent results:                  errors and best practices
and maintenance.                       Highly effective planning and      regarding conversions. Their
                                       design                             expertise covers all aspects of the
Emerson's project management           Excellent change management        automation project including
work process is built upon the         Strong performance to              operator interface, batch
recommended best practices of          budgets; both time and cost        architecture, continuous control,
authorities such as Construction       Optimized product and              devices and I/O, and integration
Industry Institute (CII), Project      technology benefits                with external systems.
Management Institute (PMI), and         Highly efficient
Independent Project Analysis (IPA)     implementation                     Emerson has extensive
methodologies.                         Risk containment                   investments in conversion utilities
                                       Smooth startups and                that make conversion services
                                       commissioning                      efficient and accurate without
                                       Faster ramp up to full             extensive or unnecessary rework.
                                       production.



Scalable automation services

 8
With a wealth of experience.

Platform expertise                    Optimization services
Emerson has invested in legacy        Asset optimization services help
system domain experts for a           with asset prioritization, critical
                                                                            “Emerson's goal is to
variety of platforms, including       asset reliability improvements, and   design a reliable,
non-Emerson systems. These            maintenance work process
experts understand how to             development. We provide
                                                                            advanced instrument
address system-specific intricacies   assistance to maximize asset value    and control system to
for successful migrations.            extraction, performance
                                                                            assure safe, stable, and
                                      improvement and optimization,
Connectivity services                 technology deployment                 long-term quality
Emerson has the services and tools    improvement, integration of
                                                                            operations while
to connect your new automation        maintenance and performance
system to existing advanced           information-driving key               maximizing the
applications and production           performance indices in the right      profitability of the
systems. One example is an auto-      direction.
tag conversion tool that helps                                              company. Emerson has
migrate existing layered              Variability management                proven technologies
applications over to newer            Process variability eats away at
technologies.                         product quality and plant             and a proven track
                                      availability and wastes raw           record in China.
Vertical integration                  materials and energy.
Emerson’s family of
                                                                            Emerson’s local
instrumentation delivers valid,       Variability management consulting     resources and the
actionable field information to the   services provide a comprehensive
DeltaV system’s suite of operations   holistic approach to minimizing
                                                                            support of its global
management, advanced control,         process variability for optimal       resources help to
and asset management                  control performance.
                                                                            mitigate and minimize
applications. Valid plant
information in advance of a plant     Client engagements are performed      risks for owners.”
event or upset is the essence of      by senior professionals who have                   Hongye Hu
abnormal situation prevention         an in-depth understanding of                      MICC Manager
(ASP). Rather than attempting to      process dynamics, control                         Fujian Refinery
manage operational incidents, ASP     equipment, and control strategies.                 August, 2007
is focused on preventing the losses   They use systematic and scientific
associated with facility upsets       methods of control design, loop
altogether.                           tuning, and process
                                      troubleshooting.




                                                                            For more information:
                                                                              EmersonProcess.com/
                                                                              Solutions/Consulting/
                                                                              VariabillityManagement
                                                                                                       9
How do I minimize operational impact?

Emerson’s solutions and              In one example, three key             Each piece of instrumentation has
                                     PlantWeb technologies were used       a special cutover procedure,
experience give you                  in the process to help perform a      based on years of experience in
choices for implementing             hot cutover from pneumatic            implementing cutovers. AMS
                                     control to FOUNDATION™ fieldbus.      Device Manager is used by the
your modernization.                  The FIELDVUE® DVC6000f, with          team to help coordinate these
                                     its unique pressure control           programs, reducing project
Options for                          functionality, allows a fieldbus      risk by:
modernization                        connection to the DeltaV system          Verifying device:
Whether you’re migrating to a new    while also sending a pressure              configurations match
automation system during a           signal to the existing actuator or       specifications
turnaround (cold cutover) or while   pneumatic positioner. Once                 connection and ranging
the process is up and running (hot   pressures are balanced within the          construction materials
cutover), Emerson project            system, control is transferred to        Ensuring that devices function
personnel work with your             the digital valve controller.            as a system, whether checking
operations team to carefully plan                                             interlocks, stroking valves, or
and safely implement your            During this phase, AMS Suite:            verifying alarm points on
modernization plan while saving      Intelligent Device Manager,              field devices
valuable production time.            helps reduce the risk in finalizing      Minimizing device configuration
                                     the hot cutover by enabling local        and implementation times.
                                     communication with the valve to
                                     monitor exactly what is
                                     happening during the process of
                                     mounting, adjusting, stroking,
                                     and calibrating the valve.




Flexible automation solutions



10
Any way you need to.

Flexible solutions                  Switchover savings
A number of other Emerson           As you replace and upgrade your      “Emerson’s
solutions help to save time and     legacy controllers and I/O with
prevent disruption while giving     DeltaV components, get fast          experience really
you flexibility during a system     switchover while retaining your      made a difference in
upgrade. These technologies         termination panel and wiring
allow DeltaV Operator Stations to   investments.                         the planning and
be added to a variety of legacy                                          implementation of the
systems with the process online     Our solutions use existing legacy
and used side-by-side with          field wiring terminations for the    hot cutover to our
existing consoles while the         DeltaV system without lifting or     new control system.
process continues to run.           removing wires. These solutions
                                    can:
                                                                         Their digital
You can also add DeltaV                Save your existing wiring         technology was also
controllers at any time and these      investment
                                                                         critical as they worked
can co-exist with your legacy          Speed startup by not disturbing
system while allowing you to take      field connections                 with us to install and
advantage of technologies such         Reduce process downtime by
                                                                         commission 1100 new
as predictive field device             75% or more compared
intelligence, embedded advance         to rewiring.                      instruments. This
control, and integrated asset                                            project was under
management.                         Reduce risk with
                                    DeltaV Simulate                      budget with no OSHA
With these flexible solutions,      With DeltaV Simulate, you can        or environment
FOUNDATION fieldbus and other       develop and fully test control
digital busses such as HART,        strategies in an offline laptop or   incidents. You cannot
Profibus DP, DeviceNet and AS-i     desktop PC environment. You can      get much better than
bus can be easily integrated with   verify all your DeltaV
your existing legacy equipment.     configurations before you            that!”
                                    migrate control. With add-on                     Bob Sherven
                                    software such as MiMic® I/O                    Project Manager
                                    simulation, you can also checkout       Shell Deer Park Refinery
                                    I/O before connecting live.




                                                                         For more information:
                                                                          FIELDVUE.com
                                                                          EasyDeltaV.com
                                                                          EmersonProcess.com/AMS/
                                                                          index.htm
                                                                          EmersonProcess.com/
                                                                          Solutions/Migration

                                                                                                11
How do I maximize return on investment?

Emerson’s training                     Get more from your                   operations, engineering and

solutions deliver skilled              automation investment                management. Our diverse
                                       To remain competitive,               learning methods range from
operators and                          companies need a highly skilled      general classroom offerings to in-
operational excellence                 workforce, equipped with the         plant customized training.
anywhere in the world.                 knowledge, skills, and ability to    Recent eLearning courses to
                                       take action and be proactive.        consider are DeltaV Operator
                                       Emerson’s Educational Services       Interface for Continuous Control
Start with the basics                  team has been training industry      and Fisher Valve Fundamentals.
PlantWeb University facilitates        professionals around the world for   These new on-line courses allow
your understanding and                 over 65 years with:                  you the opportunity to learn about
evaluation of new ways to
                                         44 fully manned and equipped       these products at just the right
improve project, process, and
                                          training centers                  time for you.
plant performance. PlantWeb
University provides practical, real-     120 full-time and 45 part-time     New equipment and technologies
world information about how to            professional staff                mean you need to recalibrate your
improve process and business             Over 20,000 students trained       operations and maintenance
performance to over 20,000                annually.                         program; we can show you how.
industry users around the world.       Hundreds of courses and training     Training to consider during a
                                       solutions are available for every    modernization can include:
                                       level of your organization from
                                       front-line technicians, to             Simulation-based operator
                                                                              training
                                                                              Control engineer training
                                                                              Process operations training
                                                                              Digital bus training
                                                                              Safety Instrumented Systems
                                                                              training
                                                                              Smart wireless training
                                                                              Advanced control and
                                                                              optimization training.




12
With world-class training.

DeltaV OTS Training                 Transfer knowledge
A key concern when modernizing a    and best practices
plant automation system is that     Actual key process events that
your operators are skilled in       occur on one shift can be             “ The courses are very
making the most of this new         recreated with different operators    helpful and provide
technology.                         and crews. Simulations can be
                                    designed to capture the               loads of knowledge. I
With the new DeltaV Operator        experiences and actions of senior     actually enjoy the
Training Solution (OTS) program,    operators so that new operators
our Educational Services team can   can learn them.
                                                                          courses and look
help ensure that your personnel
                                    Real experience                       forward for new
are primed to capitalize on these
                                    without risk                          topics.”
technologies and unlock the true
                                    Operators will learn DeltaV
potential of your operation.
                                    operating concepts while
Benefits include:
                                    experiencing a breadth of process     “ Very good technical
  Operators are trained before      scenarios. This new training offers
                                                                          overview of the
  actual commissioning takes        the benefits of exposing operators
  place                             to a training environment identical   process digital
  Faster, smoother start-ups        to what they will experience in the
                                                                          world.”
  More confident and experienced    actual control room. Benefits to
  operators                         simulation-based operator
  Reduced incident reporting        training are:                         “ Definitely worth the
  Product quality improved faster
                                      Real experience with no risk        time spent. A lot of
  A better understanding of
                                      Actual plant configuration
  possible failure scenarios                                              good practical tips
                                      graphics and database
  OSHA compliance (Article 29
                                      Realistic dynamic process           and suggestions.”
  CFR PAR 1910.119).
                                      simulation and scenarios
                                      On-site, 24/7 learning
                                      Custom curriculum and               “ I think everyone
                                      courseware
                                      Professional instruction and
                                                                          who is involved in the
                                      support                             field or engineering
                                      Affordable tiered solutions.
                                                                          should review the
                                                                          courses....”



                                                                          For more information:
                                          DeltaV OTS Architecture          EmersonProcess.com/
                                                                           education
                                                                           Plantweb.Emerson
                                                                           Process.com/University

                                                                                                    13
How do I sustain these improvements?

Emerson’s SureService                 Comprehensive                          The SureService program consists
                                      portfolio of support                   of service modules, each designed
portfolio contains all the                                                   to address specific support
                                      services                               requirements. These modules can
right elements to tailor a            We recognize that automation
                                                                             be combined to customize a
                                      system support needs vary from
program to fit your                                                          support program for your plant
                                      one customer to another, and that
                                                                             that is tailored to fit just right,
specific support needs.               our customers make investments
                                                                             meeting your support needs while
                                      over the system life cycle for three
                                                                             providing value and peace of mind.
To this end, Emerson has              important reasons:
developed:                              Availability Services to keep your
  A global service organization         system running                                      Guardian
  Service quality processes             Application Services to apply the                   Support
  Our global Service Management         best PlantWeb technologies           The core element of our
  System                                Sustainability Services to protect   SureService support program will
  Our comprehensive portfolio of        your investment in capital and       help you improve staff
  automation system lifecycle           intellectual property.               productivity while reducing
  support products.                                                          operations and maintenance costs.
                                      Emerson’s portfolio of services can
We meet the expectations of our       be combined in various ways to
customers worldwide by                address your unique needs in each
consistently delivering competent,    of these three areas through a
efficient and reliable services of    combination of factory and field
the highest possible customer         resources and local service
service. This global consistency of   agreements.
service and support from
certified professionals—both          The base element for Emerson
centrally-located and local to        system service agreements is
you—is what separates Emerson         Guardian Support, a prognostic
from all others. To you, this         service designed to optimize the
difference means prompt,              availability, sustainability and
professional response, no             performance of your DeltaV
matter where on the globe             digital automation system.
you operate.




14
SureService                                  SM




     Availability Services                  Application services can help
          These are the basic,              ensure the effective application of
                                            PlantWeb technology with a focus
                                                                                              “...we’ve seen
          essential day-to-day
system maintenance services                 on prevention of system issues                    upwards of 90%
designed to help you achieve the            and overall improvement of plant
                                                                                              reduction in
desired level of certainty for              operation.
system uptime, taking your                                                                    variability on the
process, system design, and in-                 Sustainability                                operation of the kiln,
house resources into account (see                  Services
table).                                                                                       which will
                                                     Sustaining your
                                            automation system such that it                    immediately give us a
      Application Services                  can be routinely supported and                    positive payback.”
         These services help you            serviced is essential to maximizing
         achieve expected results           the return on your system
from the application of                                                                                    Jim Norcross
                                            investment. Sustainability services
technology and related work                                                                    Canadian Forest Products
                                            can include identifying, assessing,
processes, while keeping up with            planning, and implementing
evolving business conditions.               technology updates and upgrades
                                            to minimize system down time,
                                            prevent system offsets, and
                                            minimize total cost of ownership.

 SureService Portfolio                       Availability    Application     Sustainability

 Guardian Support
 Project-to-Operations Transition Support

 Express Module Replacement

 Spares Access Programs
 Emergency On-Site Services

 Scheduled On-Site Services

 Critical Data Backup Application
 Security Assessment Service

 System Upgrade Service
 Application Enrichment

 Alarm Management Services

 Control Performance Improvement
 DeltaV Evergreen Program

 Integration Testing Services
 System Life Planning                                                                         For more information:
 Training                                                                                      SureService.com
 Premiere Service

                                                                                                                    15
If you found this brochure valuable, we also                  © 2007 EmersonProcess Management, LLLP. All rights reserved.
recommend the following brochure:
                                                              The Emerson logo is a trademark and service mark of Emerson Electric Co. PlantWeb, DeltaV,
                                                              Rosemount, AMS, Ovation, SmartProcess, and the Emerson Process Management design are marks
                          Emerson Automation
                          Contracting brochure                owned by one of the Emerson Process Management legal entities. All other marks are the property of
                          for your project planning, design   their respective owners.
                          and implementation needs.
                                                              The contents of this publication are presented for informational purposes only, and while every
                          Visit:                              effort has been made to ensure their accuracy, they are not to be construed as warranties or
                          EmersonProcess.com/solutions        guarantees, express or implied, regarding the products or services described herein or their use or
                                                              applicability. All sales are governed by our software licensing agreement and terms and
                                                              conditions, which are available upon request. We reserve the right to modify or improve the
                                                              designs or specifications of our product and services at any time without notice.

Emerson Process Management
12301 Research Blvd.
Research Park Plaza, Building III
Austin, Texas 78759 USA
T +1 512.835.2190
F +1 512.832.3443


Form B-00022 / Printed in USA / 20K AQ / 10K A4 / 09-07

Emerson Migration Services

  • 1.
  • 2.
    With today’s increasingglobal competition and rapid technological advances, many plants around the world have legacy automation systems that aren't able to keep up with today's production demands. Better plant performance begins with better automation. And, with today's digital technologies you can expect increased productivity and better communications between your process information and your business CONTENTS systems. 2 Regaining your competitive edge Correcting Missed Opportunities 10 Minimize your downtime during Maximize Availability through modernization. modernization with Emerson technology and expertise. 4 Why modernize with Emerson How Emerson delivers more performance for a more 12 Get more from your automation Maximizing ROI profitable plant. investment with Emerson’s world- class training and simulation tools. 6 Build a business case Solid PlanOPEX Starting Out with a based on and CAPEX for the life of your plant. 14 Sustained Improvement and Support A flexible portfolio of industry 8 Global Standards and Best Practices leading support in your city and around the world. Manage your modernization with global project experience. 2
  • 3.
    A legacy oflost opportunities. When should you consider system modernization? Yesterday’s systems may have been a good investment, but today’s “Emerson is widely technology and expertise provide opportunities and benefits that just weren’t available when these systems were designed. You should consider recognized as today's a modernization when: leader with respect to Production & energy costs keep rising Inventories of raw materials and finished product pile up process instruments Product quality is inconsistent and customer complaints increase and automation Start up and product grade changes cost more than they should Plant trip and alarm systems are unreliable and/or inadequate systems. We expect to Production is inflexible and start-up time is lengthy benefit greatly from Recurring emission problems are constraining throughput their experience in Business systems lack meaningful plant floor production data Customers are demanding more but your plant cannot deliver: applying these more specialized products and packaging technologies to the tighter quality specifications or delivery times better service processing of bitumen, Obsolete system support costs continue to increase. integrating the What are you missing? engineering phase of You may want to consider how your system (and your current automation the project, and supplier) would respond to: Plant expansion (including bus-based or wireless I/O) for improved bringing state-of-the- plant diagnostics and increased plant uptime art efficiency to the Reducing variability to establish a foundation for advanced controls operation of our and process optimization for better throughput and yields Providing field service alerts to operators and/or maintenance, upgrader.” improving response times to specific needs Integrating DCS information with your business systems for more Robert Pearce informed and timely business decision-making President Integrating predictive maintenance practices to focus your North West Upgrading Inc. maintenance resources, saving time and money. See how Emerson’s digital technologies and expertise enable the safest and most scalable path to on-going capital expense and operational expense savings. For more information: EmersonProcess.com/ Solutions 3
  • 4.
    Why modernize withEmerson? Take advantage of Modernize for Emerson’s experience measurable results Highlights of customer measurable with thousands of process results in thousands of PlantWeb installations worldwide include: automation projects 30% increase in capacity without worldwide. additional personnel 10% increase in throughput Automation leaders 20% reduction in raw material The keystone to Emerson’s usage automation technology leadership 15% reduction in rework is the proven PlantWeb® digital 50% reduction in maintenance plant architecture, an open costs with remote diagnostics standards-based digital solution New high-margin products never that networks intelligent field before possible Control room space requirement Reduce your risk devices, digital systems, and With PlantWeb, you can achieve an software, controlling processes and reduced as much as 85% effective program for managing managing equipment and other Automation investment payback safety, health, and environmental assets. Embedded, advanced in less than 4 months. risks and costs—one that goes control means a more efficient, beyond abnormal situation consistent, available and optimized Leaders in service management to abnormal situation operation. Emerson’s global network of prevention. engineers and consultants has the Emerson’s commitment to open real-world industry and process AMS™ Suite: Intelligent Device standards, highlighted by our automation knowledge to help you Manager gives you key online access donation of the HART protocol in the design, plan and implement your to your instrument and valve 1980’s, continues today with our automation concept with: process information, diagnostic work on FOUNDATION fieldbus and Modernization and migration status information, and automatic wireless standards. consulting documentation of all field device Fieldbus consulting maintenance information. And Process safety management DeltaV™ SIS, at the heart of Human factors optimization Emerson’s smart SIS, works with Production information AMS to continuously diagnose your management intelligent field services and safety Advanced automation & functions. This helps ensure your optimization process shuts down only when Plant system security. it should. 4
  • 5.
    Better performance. Operating onthe leading edge “We looked for a Process manufacturers lose millions of dollars each year due company that had the to process variability and poor right technology and control performance, often also a strong support unaware that a problem exists. The powerful new DeltaV InSight network that would monitors control performance; be available to us. We identifies and diagnoses problem loops; recommends tuning and selected the maintenance improvements; and PlantWeb digital continuously adapts to changing process conditions. plant architecture Manufacturers have real issues from Emerson Process everyday that effective wireless Management. We solutions can help solve. Emerson’s Wireless SmartPack™ also selected Emerson helps you create a secure network as our main right out of the box, giving you automation convenient access to information you simply don’t have today. contractor because of its proven project Often, fewer than 10 modules management cause 40% or more of alarm activations. So by addressing just experience and a few alarms, you can significantly intimate knowledge improve operator alarm loading. DeltaV Analyze makes it easy to of the technology we find the most frequently occuring had selected.” alarms. Evelio Hernandez, Process Control Systems Manager Emerson Process Management was again voted the best supplier of process management technologies in CONTROL Magazine’s 2007 Readers’ Choice Awards. This is the 14th consecutive year that Emerson has captured For more information: EmersonProcess.com/ the user-voted recognition. PlantWeb EmersonProcess.com/ ARC and Control Magazine also placed Emerson as SmartWireless #1 on their Top 50 Automation Companies List. EasyDeltaV.com 5
  • 6.
    How do Iget started? Emerson experts and Based on your business objectives, This plan may cover: a site assessment , tailored to your Migration to a new automation technology help you needs, defines performance system evaluate where you are criteria: Process modifications Key process measurements Additional instrumentation and plan where you’re Process constraints and Improved regulatory and/or limitations advanced control strategies going. Process disturbances Safety, environmental and Equipment or operational equipment protection The challenge limitations. Information integration Selecting the right technology, Asset management. the right partner, the right implementation plan and the Planning for your right budget minimizes risk. specific needs An Emerson modernization plan The site assessment feeds a will consider a variety of migration Emerson offers unparalleled process automation feasibility types and specific needs, and capabilities to help you set the study used to develop the process informs you of viable and profitable stage for a more profitable plant. automation modernization plan. options for your system: Full system upgrade - Building the business This study includes a cost/benefit controllers, I/O and consoles case for modernization analysis based on both CAPEX and Controller upgrade using I/O bus Emerson works with you and your OPEX over the lifetime of the interface team to help you define and justify system. This defines the business Upgrades that work with your a migration path based on your case and helps you answer the existing controllers and I/0 business and production question: “Will improving my Console upgrade perspectives. This often begins process automation improve my Advanced control with a review that includes all key performance indicators?”. implementation appropriate plant and corporate Historian consolidation. groups to establish business goals that could include: Your plant: Increased availability Reduced manufacturing costs Increased throughput Reduced plant emissions An asset to perform Improved quality Improved ability to introduce new products Improved response to customer demands Increased safety. 6
  • 7.
    With a solidbusiness plan. Front-end engineering The FEED package would typically and design provide a Project Execution Plan 2007 Frost & Sullivan Once a process automation with the following elements: Safety and Environment Plan Company of the Year modernization plan has been developed, Emerson’s world-class Quality Plan Award team of automation experts Master Project Schedule for Industrial continue to work with your key Staffing Plan Automation and stakeholders to develop a Front- Project Controls Plan Process Control end engineering and design Project Communication Plan (FEED) plan. Hot Cutover Plan “The global footprint Turnaround Plan An Emerson FEED study is the Installation Management Plan. of the company and its foundation for a controllable and profitable project making certain outstanding Emerson total value that your design meets your orga- Emerson’s FEED capabilities are engineering capability nization's overall needs by: part of a total value proposition coupled with a sound Ensuring that the design meets to create smart plant solutions with proven benefits: business process your project’s time, budget, ROI and operating cost criteria Lower capital expenditure to empowers Emerson to Setting scope boundaries by reduce automation costs 20% - deliver the same quantifying and justifying the 30% investment required for a given Faster time to profitability benefits at all benefit Increased profitability customer locations.” Preventing unnecessary Superior system manageability. changes through better change Kishnan M. Bhat management Industry Manager Identifying and providing for Frost & Sullivan project risks Achieving faster implementation of technology. ance For more information: EmersonProcess.com/ Solutions/ProjectServices 7
  • 8.
    How do Imanage risk? Precise control over your Global standards in this context Expert implementation refer to standard, modular, pre- Emerson’s engineering teams project at a time of tested pieces of automation like have strong advanced technology, major change is critical control modules, equipment integration and optimization modules, phases, etc. expertise targeted at to maintaining plant modernization. These standards: operations and business Incorporate accumulated Conversion Services and utilities objectives. knowledge and best practices Conversion services for graphics, Help facilitate communication database, and other Detailed processes and between team members configurations are available to global standards Shorten the learning curve for help minimize switching costs and Emerson integrates global new project team members reclaim the value of your legacy standards and best practices in Include a customer feedback system investments for use with project management processes. mechanism for continuous the DeltaV system. Project deliverables include improvement. documentation, support tools, Focused conversion service and technical standards that help Our project managers have the engineers are dedicated reduce errors and omissions in training and experience to deliver resources, familiar with common budgeting, scheduling, training, consistent results: errors and best practices and maintenance. Highly effective planning and regarding conversions. Their design expertise covers all aspects of the Emerson's project management Excellent change management automation project including work process is built upon the Strong performance to operator interface, batch recommended best practices of budgets; both time and cost architecture, continuous control, authorities such as Construction Optimized product and devices and I/O, and integration Industry Institute (CII), Project technology benefits with external systems. Management Institute (PMI), and Highly efficient Independent Project Analysis (IPA) implementation Emerson has extensive methodologies. Risk containment investments in conversion utilities Smooth startups and that make conversion services commissioning efficient and accurate without Faster ramp up to full extensive or unnecessary rework. production. Scalable automation services 8
  • 9.
    With a wealthof experience. Platform expertise Optimization services Emerson has invested in legacy Asset optimization services help system domain experts for a with asset prioritization, critical “Emerson's goal is to variety of platforms, including asset reliability improvements, and design a reliable, non-Emerson systems. These maintenance work process experts understand how to development. We provide advanced instrument address system-specific intricacies assistance to maximize asset value and control system to for successful migrations. extraction, performance assure safe, stable, and improvement and optimization, Connectivity services technology deployment long-term quality Emerson has the services and tools improvement, integration of operations while to connect your new automation maintenance and performance system to existing advanced information-driving key maximizing the applications and production performance indices in the right profitability of the systems. One example is an auto- direction. tag conversion tool that helps company. Emerson has migrate existing layered Variability management proven technologies applications over to newer Process variability eats away at technologies. product quality and plant and a proven track availability and wastes raw record in China. Vertical integration materials and energy. Emerson’s family of Emerson’s local instrumentation delivers valid, Variability management consulting resources and the actionable field information to the services provide a comprehensive DeltaV system’s suite of operations holistic approach to minimizing support of its global management, advanced control, process variability for optimal resources help to and asset management control performance. mitigate and minimize applications. Valid plant information in advance of a plant Client engagements are performed risks for owners.” event or upset is the essence of by senior professionals who have Hongye Hu abnormal situation prevention an in-depth understanding of MICC Manager (ASP). Rather than attempting to process dynamics, control Fujian Refinery manage operational incidents, ASP equipment, and control strategies. August, 2007 is focused on preventing the losses They use systematic and scientific associated with facility upsets methods of control design, loop altogether. tuning, and process troubleshooting. For more information: EmersonProcess.com/ Solutions/Consulting/ VariabillityManagement 9
  • 10.
    How do Iminimize operational impact? Emerson’s solutions and In one example, three key Each piece of instrumentation has PlantWeb technologies were used a special cutover procedure, experience give you in the process to help perform a based on years of experience in choices for implementing hot cutover from pneumatic implementing cutovers. AMS control to FOUNDATION™ fieldbus. Device Manager is used by the your modernization. The FIELDVUE® DVC6000f, with team to help coordinate these its unique pressure control programs, reducing project Options for functionality, allows a fieldbus risk by: modernization connection to the DeltaV system Verifying device: Whether you’re migrating to a new while also sending a pressure configurations match automation system during a signal to the existing actuator or specifications turnaround (cold cutover) or while pneumatic positioner. Once connection and ranging the process is up and running (hot pressures are balanced within the construction materials cutover), Emerson project system, control is transferred to Ensuring that devices function personnel work with your the digital valve controller. as a system, whether checking operations team to carefully plan interlocks, stroking valves, or and safely implement your During this phase, AMS Suite: verifying alarm points on modernization plan while saving Intelligent Device Manager, field devices valuable production time. helps reduce the risk in finalizing Minimizing device configuration the hot cutover by enabling local and implementation times. communication with the valve to monitor exactly what is happening during the process of mounting, adjusting, stroking, and calibrating the valve. Flexible automation solutions 10
  • 11.
    Any way youneed to. Flexible solutions Switchover savings A number of other Emerson As you replace and upgrade your “Emerson’s solutions help to save time and legacy controllers and I/O with prevent disruption while giving DeltaV components, get fast experience really you flexibility during a system switchover while retaining your made a difference in upgrade. These technologies termination panel and wiring allow DeltaV Operator Stations to investments. the planning and be added to a variety of legacy implementation of the systems with the process online Our solutions use existing legacy and used side-by-side with field wiring terminations for the hot cutover to our existing consoles while the DeltaV system without lifting or new control system. process continues to run. removing wires. These solutions can: Their digital You can also add DeltaV Save your existing wiring technology was also controllers at any time and these investment critical as they worked can co-exist with your legacy Speed startup by not disturbing system while allowing you to take field connections with us to install and advantage of technologies such Reduce process downtime by commission 1100 new as predictive field device 75% or more compared intelligence, embedded advance to rewiring. instruments. This control, and integrated asset project was under management. Reduce risk with DeltaV Simulate budget with no OSHA With these flexible solutions, With DeltaV Simulate, you can or environment FOUNDATION fieldbus and other develop and fully test control digital busses such as HART, strategies in an offline laptop or incidents. You cannot Profibus DP, DeviceNet and AS-i desktop PC environment. You can get much better than bus can be easily integrated with verify all your DeltaV your existing legacy equipment. configurations before you that!” migrate control. With add-on Bob Sherven software such as MiMic® I/O Project Manager simulation, you can also checkout Shell Deer Park Refinery I/O before connecting live. For more information: FIELDVUE.com EasyDeltaV.com EmersonProcess.com/AMS/ index.htm EmersonProcess.com/ Solutions/Migration 11
  • 12.
    How do Imaximize return on investment? Emerson’s training Get more from your operations, engineering and solutions deliver skilled automation investment management. Our diverse To remain competitive, learning methods range from operators and companies need a highly skilled general classroom offerings to in- operational excellence workforce, equipped with the plant customized training. anywhere in the world. knowledge, skills, and ability to Recent eLearning courses to take action and be proactive. consider are DeltaV Operator Emerson’s Educational Services Interface for Continuous Control Start with the basics team has been training industry and Fisher Valve Fundamentals. PlantWeb University facilitates professionals around the world for These new on-line courses allow your understanding and over 65 years with: you the opportunity to learn about evaluation of new ways to 44 fully manned and equipped these products at just the right improve project, process, and training centers time for you. plant performance. PlantWeb University provides practical, real- 120 full-time and 45 part-time New equipment and technologies world information about how to professional staff mean you need to recalibrate your improve process and business Over 20,000 students trained operations and maintenance performance to over 20,000 annually. program; we can show you how. industry users around the world. Hundreds of courses and training Training to consider during a solutions are available for every modernization can include: level of your organization from front-line technicians, to Simulation-based operator training Control engineer training Process operations training Digital bus training Safety Instrumented Systems training Smart wireless training Advanced control and optimization training. 12
  • 13.
    With world-class training. DeltaVOTS Training Transfer knowledge A key concern when modernizing a and best practices plant automation system is that Actual key process events that your operators are skilled in occur on one shift can be “ The courses are very making the most of this new recreated with different operators helpful and provide technology. and crews. Simulations can be designed to capture the loads of knowledge. I With the new DeltaV Operator experiences and actions of senior actually enjoy the Training Solution (OTS) program, operators so that new operators our Educational Services team can can learn them. courses and look help ensure that your personnel Real experience forward for new are primed to capitalize on these without risk topics.” technologies and unlock the true Operators will learn DeltaV potential of your operation. operating concepts while Benefits include: experiencing a breadth of process “ Very good technical Operators are trained before scenarios. This new training offers overview of the actual commissioning takes the benefits of exposing operators place to a training environment identical process digital Faster, smoother start-ups to what they will experience in the world.” More confident and experienced actual control room. Benefits to operators simulation-based operator Reduced incident reporting training are: “ Definitely worth the Product quality improved faster Real experience with no risk time spent. A lot of A better understanding of Actual plant configuration possible failure scenarios good practical tips graphics and database OSHA compliance (Article 29 Realistic dynamic process and suggestions.” CFR PAR 1910.119). simulation and scenarios On-site, 24/7 learning Custom curriculum and “ I think everyone courseware Professional instruction and who is involved in the support field or engineering Affordable tiered solutions. should review the courses....” For more information: DeltaV OTS Architecture EmersonProcess.com/ education Plantweb.Emerson Process.com/University 13
  • 14.
    How do Isustain these improvements? Emerson’s SureService Comprehensive The SureService program consists portfolio of support of service modules, each designed portfolio contains all the to address specific support services requirements. These modules can right elements to tailor a We recognize that automation be combined to customize a system support needs vary from program to fit your support program for your plant one customer to another, and that that is tailored to fit just right, specific support needs. our customers make investments meeting your support needs while over the system life cycle for three providing value and peace of mind. To this end, Emerson has important reasons: developed: Availability Services to keep your A global service organization system running Guardian Service quality processes Application Services to apply the Support Our global Service Management best PlantWeb technologies The core element of our System Sustainability Services to protect SureService support program will Our comprehensive portfolio of your investment in capital and help you improve staff automation system lifecycle intellectual property. productivity while reducing support products. operations and maintenance costs. Emerson’s portfolio of services can We meet the expectations of our be combined in various ways to customers worldwide by address your unique needs in each consistently delivering competent, of these three areas through a efficient and reliable services of combination of factory and field the highest possible customer resources and local service service. This global consistency of agreements. service and support from certified professionals—both The base element for Emerson centrally-located and local to system service agreements is you—is what separates Emerson Guardian Support, a prognostic from all others. To you, this service designed to optimize the difference means prompt, availability, sustainability and professional response, no performance of your DeltaV matter where on the globe digital automation system. you operate. 14
  • 15.
    SureService SM Availability Services Application services can help These are the basic, ensure the effective application of PlantWeb technology with a focus “...we’ve seen essential day-to-day system maintenance services on prevention of system issues upwards of 90% designed to help you achieve the and overall improvement of plant reduction in desired level of certainty for operation. system uptime, taking your variability on the process, system design, and in- Sustainability operation of the kiln, house resources into account (see Services table). which will Sustaining your automation system such that it immediately give us a Application Services can be routinely supported and positive payback.” These services help you serviced is essential to maximizing achieve expected results the return on your system from the application of Jim Norcross investment. Sustainability services technology and related work Canadian Forest Products can include identifying, assessing, processes, while keeping up with planning, and implementing evolving business conditions. technology updates and upgrades to minimize system down time, prevent system offsets, and minimize total cost of ownership. SureService Portfolio Availability Application Sustainability Guardian Support Project-to-Operations Transition Support Express Module Replacement Spares Access Programs Emergency On-Site Services Scheduled On-Site Services Critical Data Backup Application Security Assessment Service System Upgrade Service Application Enrichment Alarm Management Services Control Performance Improvement DeltaV Evergreen Program Integration Testing Services System Life Planning For more information: Training SureService.com Premiere Service 15
  • 16.
    If you foundthis brochure valuable, we also © 2007 EmersonProcess Management, LLLP. All rights reserved. recommend the following brochure: The Emerson logo is a trademark and service mark of Emerson Electric Co. PlantWeb, DeltaV, Rosemount, AMS, Ovation, SmartProcess, and the Emerson Process Management design are marks Emerson Automation Contracting brochure owned by one of the Emerson Process Management legal entities. All other marks are the property of for your project planning, design their respective owners. and implementation needs. The contents of this publication are presented for informational purposes only, and while every Visit: effort has been made to ensure their accuracy, they are not to be construed as warranties or EmersonProcess.com/solutions guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our software licensing agreement and terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of our product and services at any time without notice. Emerson Process Management 12301 Research Blvd. Research Park Plaza, Building III Austin, Texas 78759 USA T +1 512.835.2190 F +1 512.832.3443 Form B-00022 / Printed in USA / 20K AQ / 10K A4 / 09-07