SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 318
Comparative Study on Rebar Tying Tools with Different Parameters
Vaibhav Badgujar1, Himanshu Divekar2, Sagar Chaudhari3, Nilesh Lende4
1,2,3Student, Dept. of Civil Engineering, Datta Meghe College of Engineering, Maharashtra, India
4Asst. Professor, Dept. of Civil Engineering, Datta Meghe College of Engineering, Maharashtra, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - In construction, 80 percent of material constitute
of concrete, reinforcement and finishing materials. The
structure wholly cannot be constructed only by concrete
even having high compressive strength as the tension
cannot be resisted by concrete alone. So proper placing of
reinforcements play a vital role in increasing tension, strain,
flexural properties of concrete reducing tension cracks,
leakages and corrosion after many years also reducing the
maintenance of structure. In this paper we have listed the
methods of tying rebar using various tools and to compare
the cost, quality of the experiment pragmatically.
Key Index Terms- Rebar tying tools, musculoskeletal
disorders,Gauge of binding wire,Quality,Cost
1. INTRODUCTION
History of construction in India:-From the past 50 years
India as reported 40 percent of development investment
and over 30 million people are engaged in construction
industry and hence considered as an important factor for
development of India. The main activities subsumed in
construction are excavation, Reinforced concrete work
(RCC), Finishing work, Services provision etc. RCC work
has the tasks such as shuttering of slab columns etc. steel
bar bending, Laying and tying of bars and concreting, de-
shuttering. These undertakings have a requisition of cash
flow, time, quality and labor efforts so in order to make
construction sites safer and workers more efficient. There
is much advancement made in technologies, tools,
equipment to increase productivity, improve performance,
collaboration and tackle many bottlenecks in high end
projects. The modern technology/ equipment have their
pros cons i.e. The modern construction techniques may
increase the cash flow of the project by 25% but quality of
construction or construction speed can be boosted as
compared to the conventional method.
Concrete, by itself, is a material with high compressive
strength and low tensile strength. Steel, a material that is
strong in tension as well as compression, is used as
tension reinforcement for concrete [1]. But if the
reinforcements are not in proper position the structural
part can be found weak in tension also the capricious
behavior of rebar due to high pressure of concrete while
concreting or the foot fall has made indispensible to
deploy proper methods and tools.
2. REBAR TYING TOOLS
2.1 Conventional Hook
This conventional hook is preferably used all over India
due to its continuous use since decades and also its
availability in market. This tool is usually made from mild
steel and approximately half kilograms in weight. This tool
has a hook at the tip by which the fitter twists the binding
wire, as this requires twisting the tool again and again
requires more time in tying one tie and the most
concerning factor is the musculoskeletal disorders
hindering the performance of fitter. Also it has a smooth
and glossy body requiring more strength for the fitter to
hold the hook in position. New methods and technologies
have been used worldwide but for adapting them mindset
needs to be changed.
Fig.1 Conventional Hook
2.2 Semi-automatic rebar tying hook
This semi-automatic tie wire tool can be used for heavy
duty work and its working is based on spring-return
action requiring a little effort but eliminating fatigue and
saving time as compared to manual twisting. The tool has
rubberized handle for comfort and ergonomics to
minimize slipping of hands weighing around 220-300
grams and having overall length of 2 feet after extension.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 319
Fig. 2 Semi-automatic rebar tying hook
Fig. 3 Rebar tying machine
2.3 Rebar tying machine
For reducing the musculoskeletal disorders of the labors a
new innovation in technology has been brought into
practice. The basic components are the body, battery, wire
spool. The machine is operated by rechargeable Li-ion/Ni-
Cd batteries allowing a continuous work front of
approximately 2000-3000 ties per charge depending on
the manufacturer. The weight of the machine is
approximately 2-2.7 kilograms. The manufacturers set a
suitable applicable range for binding the bars. For example
4-28 mm i.e. two bars should have thickness less than
28mm.
The spool used has a GI 100 meter binding wire which
usually is of 21 gauge i.e. 0.813 mm in diameter as
compared to conventionally used which is of 17 or 18
gauge i.e. 1.422 and 1.219 mm in diameter respectively.
The initial cost incurred for the machine and cost of spool
is expensive but the productivity and benefitting on a
larger scale.
3. METHOLOGIES FOR REBAR TYING
Binding wire plays an important role in holding the
reinforcements in place when there is foot movement and
even while concreting, immense pressure on the bars can
displace them making them unrecognized. Nowadays, 17-
gauge wire is preferably used to tie rebar. Regular practice
on an average we need 10-13 kilograms of binding wire
per ton of reinforcement used. These binding wires do not
provide any strength to the structure.
Fitters have many methods to tie rebar together which
depends on the purpose or circumstances, some of them
are:-
A. Snap tie or simple tie-In current scenario this type of tie
is widely used in construction industry. Encasing a single
wire around the transverse bars of steel and then twisting
the two ends of wire with a conventional hook which is
made of mild steel until they are tight enough.
B. Double-strand simple tie-This tie is similar to simple tie
but instead of using a single wire we use double binding
wire and tie in a similar way.
C. Snap tie with a round turn or wall tie-As the name
suggests this tie is used for tying the horizontal bars in
long shear walls, compound walls where the simple tie is
not capable of holding the horizontal ones.
D. Saddle or U tie-This type of tie is intricate than other
ties but is favorable in some locations such as for tying
foundation reinforcements/shear walls. The productivity
is lessened as this tie is more time consuming.
E. Cross tie or figure eight tie-. This tie can provide the
maximum resistance to twisting of the bars and permitting
huge load on the reinforcements. With the use of such ties,
intermittent ties can be provided.
F. Saddle or U tie with a twist-These ties are similar to U
tie but one and half excess turn is wrapped which provides
extra stiffness to the reinforcements used mainly for heavy
rafts or in case where precast reinforcements are done.
Fig. 4 Type of knots
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 320
4. MUSCULOSKELETAL DISORDERS
Musculoskeletal injuries (MSDs) are commonly found in
labors who face lot of physical exertions by lifting heavy
loads or repetitive unusual postures which causing strain
in muscles, ligaments, cartilages and all the joints leading to
weakness, pain and noise in joints and indirectly affecting
the labor output, efficiency and reducing the productivity.
It is found that in United States sixteen million such
disorders were treated in year 2004 and as they have
increased with increase in demand of construction
activities.
Workplace controls-Employers can also utilize engineering
controls and administrative controls to prevent injury that
cannot be detected in short course of action. So various
tools and technologies have been taken into practice to
avoid such disorders and taking these disorders in
consideration we have conducted a mock up for rebar tying
machine to monitor the quality, time and cost with respect
to conventional methods.
5. EXPERIMENTAL PROCEDURE
A demonstration was conducted on site by considering a
slab of 2x2 meter. Conventional tools, Semi-Automatic
Rebar tier and Automatic rebar tier were compared by
recording parameters such as time cost and quality. For
the best results and experience the task was allotted to the
labors on site. Before the experiment the technical
specifications, previous articles and the vendors for the
same were explored for the availability of the tools and the
game plan for the demo was set up and the results were
noted accordingly. This trial was conducted on a small
scale and snap type of tie was used for all tools as rebar
tier had the snap tie by default. The time noted for tying 1
tie and cost is shown in Table 1.
Table 1 Time and cost comparison of tools
Sr.
No.
Method of tying
adopted
Time
needed to
tie 1 knot
Cost per
tool
1 Conventional
tying hook
8-9
seconds
100
rupees
2 30cm Semi-
automatic fast
rebar tier tool
6-7
seconds
1020
rupees
3 Rebar tying
machine
4-5
seconds
22000
rupees
As mentioned earlier, 3 tools were used for tying the bars
on a slab of 2 by 2 meters for each tool and the spacing of
rebar was 220 mm in X direction and 200 in Y direction
having 90 joints. The only difference was the thickness of
binding wire as the coil of rebar tying machine had wire of
21 gauge =0.813mm and conventionally 17 gauge=1.422
mm is used. The thickness and gauge of wire are inversely
proportional [4]. Proper training about how to use the
rebar tier was given to the fitter and the cost required for
the demo was worked out taking the actual wastages
during working which is shown in table 2 below
Table 2 Cost for demo incurred by rebar tying machine
Output by
Conventional
hook
Semi-
automatic
tier
Rebar
machine
Gauge of binding
wire
17 17 22
Total number of
knots
90 90 90
Time taken to tie
in seconds
750 560 310
Time for
tying/knot in
seconds
8.3 6.2 3.4
Wastage of wire
in numbers
4 5 7
Length of one
binding wire mm
152.4 152.4 435.0
Total length of
binding wire in
meter
14.3 14.5 42.2
Length of 1 kg
binding wire
80.4 80.4 320.2
Weight in
kilogram of wire
used for demo
0.2 0.2 0.1
Cost of 1 kg wire 56.6 56.6 442
Total cost
incurred for the
demo in Rupees
10.1 10.2 58.2
Fig.5 Labor using rebar tying machine on site and enlarged
image of a knot by the machine
5.1 Feedback from labors
The rebar tying machine was a new concept for them and
they were going to use the machine for the first time and
comparing the workability since the use of conventional
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 321
hook has been a regular practice fitters are comfortable
but the new fitters complained about hand paining and for
rebar tying machine, initially the fitter was comfortable
and tying was quick but later he complained about hand
paining due to weight of the machine. He also commented
about the quality of knots mentioning that the knots were
not that rigid and stiff due to less thickness of wire but the
load movement on the slab was resisted.
5.2 Advantages and Disadvantages
Advantages
a) Slab tying time can be reduced up to three times
by which we can speed up our construction
b) Manpower can be optimized as time is saved
c) Musculoskeletal disorder, Ergonomic risks, hand
pain can be reduced
d) The cut length binding wires are wasted due to
falling form the bundles, carrying of them by birds
as observed on site and can be reduced by using
rebar tying machine
Disadvantages
a) Initial cost of the machine is incurred.
b) Weight of the machine is 1.5-2 kilogram more
than the conventional tool and semi-automatic
rebar tier tool which weighs 220-300 grams
c) The cost of the approx. 400 grams spool
measuring 100 meters is more than that of cut
sized conventional binding wires
d) Different activities such as slab, column, beam
require dedicated tying machine depending upon
the dimensions of reinforcements
e) The rebar tying machine is not guaranteed for use
during rains
f) The cut length of one binding wire by machine is
fixed so more wastage is observed where the
length is more than required
Comparison between time and number of ties and cost and
number of ties can show us a broad scope and hence
refinement in our way of choosing the work method. The
table 3 below shows the time and cost that will be
required for assumed number of ties.
Table 3 Time required for tying knots
Number
of Knots
Time in minutes for
Conventional
Hook
Semi-Automatic
Rebar tying tool
Rebar tying
Machine
1 0.1 0.1 0.1
90 12.5 9.3 5.2
500 69.4 51.9 28.7
2000 277.8 207.4 114.8
Table 4 Cost required for tying knots
Number
of Knots
Cost in Rupees for
Conventional
Hook
Semi-
Automatic
Rebar tying
tool
Rebar
tying
Machine
1 0.1 0.1 0.8
90 10.1 10.2 75
500 56.1 56.7 415
2000 224.4 226.7 1660
Further from the graph 1, it can be inferred that by using
semi-automatic rebar tying tool can reduce the time by
25% and by using Rebar tying machine can reduce the
time by 58% as compared to the conventional hook for
2000 ties and time savings will increase with increase in
number of ties.
Graph 1 Comparing time vs. ties
On comparing cost vs. number of ties graph it is seen the
cost incurred for semi-automatic rebar tying tool is same
as that of conventional tool since same binding wire is
used for both the tools. The cost for rebar tying hook
shoots up if we consider fitters tying 2000 ties but instead
reducing manpower and optimizing time cost can be cut
indirectly.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 322
Graph 2 Comparing cost vs. ties
6. CONCLUSIONS
Based on the above results we can conclude that for small
scale constructions Semi-Automatic rebar tying tool which
need not be changed for rebar with varying thickness i.e.
for slabs, columns whereas Rebar tying machine is
beneficial for a large span and by using rebar tying
machine human efforts and health disorders can be
reduced and the productivity can be increased after
proper training to the labors. The human repetitive,
monotonous actions can be minimized. Studying the
thickness of the binding wire used in rebar tying machine
was 22 gauge but in IS 2502 -1963 it is mentioned that the
minimum thickness of binding wire must be more than 0.9
mm and as the rebar tying machine uses wire of gauge 21
i.e. less than 0.9 mm we can also choose wire of 20/19
gauge for tying of slabs even while tying them in a
conventional way thus effectively cutting down the cost.
Consider the demo results which incurred cost of 10
rupees by using 17 gauge binding wire but if the same
demonstration had been done by 20 gauge binding wire,
the cost of demo would be cut down to 6 rupees i.e. 40
percent saving which would be considerable amount for
the whole project but trials regarding the same will have
to be conducted.
REFERENCES
[1] Dr. Santosh K Patil , Akshay Manesh Sancheti, 2019,
Replacement of Steel Reinforcement with Glass Fiber
Reinforcement, International Journal of Engineering
Research & Technology (IJERT), Volume 08, Issue 07
(July 2019)
[2] Tying of reinforcement bars from IS:2502-1963 Code
for practice for bending and fixing of bars for concrete
reinforcement, New Delhi Publication.
[3] Tony Almeida and Peter Vi Briand, "Reducing Risk of
Musculoskeletal Disorders and Promoting Return-To-
Work Through The Use Of Rebar Tying Machines",
Construction Safety Association of Ontario, WSIB
Grant #01023, September, 2004.
[4] Central Service Association of Ontario, "An effective
way to reduce upper limb MSIs", Winter 2001.
[5] Choi, Sang D. Ergonomic assessment of
musculoskeletal discomfort of iron workers in
highway construction. Work 36.1, 47-53, 2010.
[6] Bureau of Labor Statistic. Occupational Employment
and Wages. 47-2171 Reinforcing Iron and Rebar
Workers, 2014.
[7] Albers JT, Estill CF. Simple solutions ergonomics for
construction workers, Edited by National Institute for
Occupational Safety and Health, Cincinnati, 2007
[8] Safety Agency Compares Injury Trends In Rebar Tying
Methods, Concrete Products, 109, 4, p. PC26, Small
Business, Reference Center, EBSCOhost, 2016.
[9] Vi, P. A field study investigating the effects of a rebar-
tying machine on trunk flexion, tool usability and
productivity. Ergonomics 49.14, 1437-1455, 2006.

More Related Content

What's hot

IRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
IRJET Journal
 
IRJET- Finite Element Analysis on Strengthening of Fully Prefabricated St...
IRJET-  	  Finite Element Analysis on Strengthening of Fully Prefabricated St...IRJET-  	  Finite Element Analysis on Strengthening of Fully Prefabricated St...
IRJET- Finite Element Analysis on Strengthening of Fully Prefabricated St...
IRJET Journal
 
IRJET- Estimation of Stress Intensity Factor for the different Crack Mode...
IRJET-  	  Estimation of Stress Intensity Factor for the different Crack Mode...IRJET-  	  Estimation of Stress Intensity Factor for the different Crack Mode...
IRJET- Estimation of Stress Intensity Factor for the different Crack Mode...
IRJET Journal
 
15020441033
1502044103315020441033
15020441033
Aman Kumar Singh
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
ASHISH JAISWAL
 
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
IRJET Journal
 
IRJET- Precast Carbon Fibre Reinforced Footing
IRJET-  	  Precast Carbon Fibre Reinforced FootingIRJET-  	  Precast Carbon Fibre Reinforced Footing
IRJET- Precast Carbon Fibre Reinforced Footing
IRJET Journal
 
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
NorthwireCable
 
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
IRJET Journal
 
Interview in Equipment India. Oct 2016.
Interview in Equipment India. Oct 2016.Interview in Equipment India. Oct 2016.
Interview in Equipment India. Oct 2016.Subhasis Chatterjee
 
Enhancing productivity by elimination of hole offset rejection of an obj socke
Enhancing productivity by elimination of hole offset rejection of an obj sockeEnhancing productivity by elimination of hole offset rejection of an obj socke
Enhancing productivity by elimination of hole offset rejection of an obj sockeIAEME Publication
 
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting ConcreteIRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
IRJET Journal
 
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
IRJET Journal
 
Study of Seismic Behaviour of Tunnel Form Buildings
Study of Seismic Behaviour of Tunnel Form BuildingsStudy of Seismic Behaviour of Tunnel Form Buildings
Study of Seismic Behaviour of Tunnel Form Buildings
IRJET Journal
 
Kec international ltd.
Kec international ltd.Kec international ltd.
Kec international ltd.
HarshSaini1608
 

What's hot (15)

IRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
 
IRJET- Finite Element Analysis on Strengthening of Fully Prefabricated St...
IRJET-  	  Finite Element Analysis on Strengthening of Fully Prefabricated St...IRJET-  	  Finite Element Analysis on Strengthening of Fully Prefabricated St...
IRJET- Finite Element Analysis on Strengthening of Fully Prefabricated St...
 
IRJET- Estimation of Stress Intensity Factor for the different Crack Mode...
IRJET-  	  Estimation of Stress Intensity Factor for the different Crack Mode...IRJET-  	  Estimation of Stress Intensity Factor for the different Crack Mode...
IRJET- Estimation of Stress Intensity Factor for the different Crack Mode...
 
15020441033
1502044103315020441033
15020441033
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
 
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
IRJET- Experimental Study on Crack Detection and Damage Index in Conventional...
 
IRJET- Precast Carbon Fibre Reinforced Footing
IRJET-  	  Precast Carbon Fibre Reinforced FootingIRJET-  	  Precast Carbon Fibre Reinforced Footing
IRJET- Precast Carbon Fibre Reinforced Footing
 
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
Extreme Materials: Robust Performance from Cable to Connector – White Paper S...
 
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
IRJET-Replacement of Cement with Coconut Shell ash and Egg Shell Powder for P...
 
Interview in Equipment India. Oct 2016.
Interview in Equipment India. Oct 2016.Interview in Equipment India. Oct 2016.
Interview in Equipment India. Oct 2016.
 
Enhancing productivity by elimination of hole offset rejection of an obj socke
Enhancing productivity by elimination of hole offset rejection of an obj sockeEnhancing productivity by elimination of hole offset rejection of an obj socke
Enhancing productivity by elimination of hole offset rejection of an obj socke
 
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting ConcreteIRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
IRJET- A Study on Retrofitted Hybrid Fibre Self Compacting Concrete
 
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
IRJET- Waste Glass Powder as a Partial Replacement of Cement for Sustainable ...
 
Study of Seismic Behaviour of Tunnel Form Buildings
Study of Seismic Behaviour of Tunnel Form BuildingsStudy of Seismic Behaviour of Tunnel Form Buildings
Study of Seismic Behaviour of Tunnel Form Buildings
 
Kec international ltd.
Kec international ltd.Kec international ltd.
Kec international ltd.
 

Similar to IRJET- Comparative Study on Rebar Tying Tools with Different Parameters

Vice Cum Bender Machine
Vice Cum Bender MachineVice Cum Bender Machine
Vice Cum Bender Machine
IRJET Journal
 
IRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
IRJET- Vibration Analysis of Boring Tool to Improve Surface FinishIRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
IRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
IRJET Journal
 
Pipe Conveyor
Pipe ConveyorPipe Conveyor
Pipe Conveyor
IRJET Journal
 
FORGING HAMMER
FORGING HAMMERFORGING HAMMER
FORGING HAMMER
IRJET Journal
 
IRJET- Pneumatic Operated Hack Saw and Griding
IRJET- Pneumatic Operated Hack Saw and GridingIRJET- Pneumatic Operated Hack Saw and Griding
IRJET- Pneumatic Operated Hack Saw and Griding
IRJET Journal
 
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test RigIRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
IRJET Journal
 
IRJET- Ultra High Performance Concrete on Bridges
IRJET- Ultra High Performance Concrete on BridgesIRJET- Ultra High Performance Concrete on Bridges
IRJET- Ultra High Performance Concrete on Bridges
IRJET Journal
 
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQMIncrease the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
IRJET Journal
 
IRJET- Review Paper on Single Bolt Configuration with Different Adhesive
IRJET- Review Paper on Single Bolt Configuration with Different AdhesiveIRJET- Review Paper on Single Bolt Configuration with Different Adhesive
IRJET- Review Paper on Single Bolt Configuration with Different Adhesive
IRJET Journal
 
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIEDESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
IRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET Journal
 
IRJET- Assessment of Mechanical Properties of Bamboo and its Compatibilty...
IRJET-  	  Assessment of Mechanical Properties of Bamboo and its Compatibilty...IRJET-  	  Assessment of Mechanical Properties of Bamboo and its Compatibilty...
IRJET- Assessment of Mechanical Properties of Bamboo and its Compatibilty...
IRJET Journal
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET-  	  Structural Audit and Rehabilitation of BuildingIRJET-  	  Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
IRJET Journal
 
IRJET- Design and Modification in Clamping System
IRJET- Design and Modification in Clamping SystemIRJET- Design and Modification in Clamping System
IRJET- Design and Modification in Clamping System
IRJET Journal
 
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
IRJET Journal
 
Design and Analysis of Electric Vehicle Battery Fixture
Design and Analysis of Electric Vehicle Battery FixtureDesign and Analysis of Electric Vehicle Battery Fixture
Design and Analysis of Electric Vehicle Battery Fixture
IRJET Journal
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot Technology
IRJET Journal
 
Analysis and simulation of progressive die
Analysis and simulation of progressive dieAnalysis and simulation of progressive die
Analysis and simulation of progressive die
eSAT Publishing House
 
IRJET- Flange Internal Surface Weld Overlay Automation
IRJET- Flange Internal Surface Weld Overlay AutomationIRJET- Flange Internal Surface Weld Overlay Automation
IRJET- Flange Internal Surface Weld Overlay Automation
IRJET Journal
 
Design & Development of Prosthetic Leg
Design & Development of Prosthetic LegDesign & Development of Prosthetic Leg
Design & Development of Prosthetic Leg
IRJET Journal
 

Similar to IRJET- Comparative Study on Rebar Tying Tools with Different Parameters (20)

Vice Cum Bender Machine
Vice Cum Bender MachineVice Cum Bender Machine
Vice Cum Bender Machine
 
IRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
IRJET- Vibration Analysis of Boring Tool to Improve Surface FinishIRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
IRJET- Vibration Analysis of Boring Tool to Improve Surface Finish
 
Pipe Conveyor
Pipe ConveyorPipe Conveyor
Pipe Conveyor
 
FORGING HAMMER
FORGING HAMMERFORGING HAMMER
FORGING HAMMER
 
IRJET- Pneumatic Operated Hack Saw and Griding
IRJET- Pneumatic Operated Hack Saw and GridingIRJET- Pneumatic Operated Hack Saw and Griding
IRJET- Pneumatic Operated Hack Saw and Griding
 
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test RigIRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
IRJET- Design and Analysis of Work Holding Fixture in a Shaft Bearing Test Rig
 
IRJET- Ultra High Performance Concrete on Bridges
IRJET- Ultra High Performance Concrete on BridgesIRJET- Ultra High Performance Concrete on Bridges
IRJET- Ultra High Performance Concrete on Bridges
 
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQMIncrease the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
Increase the Life of Bend Pulley Lagging of HL-3 Conveyor using TQM
 
IRJET- Review Paper on Single Bolt Configuration with Different Adhesive
IRJET- Review Paper on Single Bolt Configuration with Different AdhesiveIRJET- Review Paper on Single Bolt Configuration with Different Adhesive
IRJET- Review Paper on Single Bolt Configuration with Different Adhesive
 
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIEDESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
DESIGN AND ANALYSIS OF MULTIFACE HYDRAULIC BENDING MACHINE DIE
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
IRJET- Assessment of Mechanical Properties of Bamboo and its Compatibilty...
IRJET-  	  Assessment of Mechanical Properties of Bamboo and its Compatibilty...IRJET-  	  Assessment of Mechanical Properties of Bamboo and its Compatibilty...
IRJET- Assessment of Mechanical Properties of Bamboo and its Compatibilty...
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET-  	  Structural Audit and Rehabilitation of BuildingIRJET-  	  Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
 
IRJET- Design and Modification in Clamping System
IRJET- Design and Modification in Clamping SystemIRJET- Design and Modification in Clamping System
IRJET- Design and Modification in Clamping System
 
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
IRJET- Ergonomic Design and Development of Flywheel in Exercise Equipment for...
 
Design and Analysis of Electric Vehicle Battery Fixture
Design and Analysis of Electric Vehicle Battery FixtureDesign and Analysis of Electric Vehicle Battery Fixture
Design and Analysis of Electric Vehicle Battery Fixture
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot Technology
 
Analysis and simulation of progressive die
Analysis and simulation of progressive dieAnalysis and simulation of progressive die
Analysis and simulation of progressive die
 
IRJET- Flange Internal Surface Weld Overlay Automation
IRJET- Flange Internal Surface Weld Overlay AutomationIRJET- Flange Internal Surface Weld Overlay Automation
IRJET- Flange Internal Surface Weld Overlay Automation
 
Design & Development of Prosthetic Leg
Design & Development of Prosthetic LegDesign & Development of Prosthetic Leg
Design & Development of Prosthetic Leg
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

IRJET- Comparative Study on Rebar Tying Tools with Different Parameters

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 318 Comparative Study on Rebar Tying Tools with Different Parameters Vaibhav Badgujar1, Himanshu Divekar2, Sagar Chaudhari3, Nilesh Lende4 1,2,3Student, Dept. of Civil Engineering, Datta Meghe College of Engineering, Maharashtra, India 4Asst. Professor, Dept. of Civil Engineering, Datta Meghe College of Engineering, Maharashtra, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - In construction, 80 percent of material constitute of concrete, reinforcement and finishing materials. The structure wholly cannot be constructed only by concrete even having high compressive strength as the tension cannot be resisted by concrete alone. So proper placing of reinforcements play a vital role in increasing tension, strain, flexural properties of concrete reducing tension cracks, leakages and corrosion after many years also reducing the maintenance of structure. In this paper we have listed the methods of tying rebar using various tools and to compare the cost, quality of the experiment pragmatically. Key Index Terms- Rebar tying tools, musculoskeletal disorders,Gauge of binding wire,Quality,Cost 1. INTRODUCTION History of construction in India:-From the past 50 years India as reported 40 percent of development investment and over 30 million people are engaged in construction industry and hence considered as an important factor for development of India. The main activities subsumed in construction are excavation, Reinforced concrete work (RCC), Finishing work, Services provision etc. RCC work has the tasks such as shuttering of slab columns etc. steel bar bending, Laying and tying of bars and concreting, de- shuttering. These undertakings have a requisition of cash flow, time, quality and labor efforts so in order to make construction sites safer and workers more efficient. There is much advancement made in technologies, tools, equipment to increase productivity, improve performance, collaboration and tackle many bottlenecks in high end projects. The modern technology/ equipment have their pros cons i.e. The modern construction techniques may increase the cash flow of the project by 25% but quality of construction or construction speed can be boosted as compared to the conventional method. Concrete, by itself, is a material with high compressive strength and low tensile strength. Steel, a material that is strong in tension as well as compression, is used as tension reinforcement for concrete [1]. But if the reinforcements are not in proper position the structural part can be found weak in tension also the capricious behavior of rebar due to high pressure of concrete while concreting or the foot fall has made indispensible to deploy proper methods and tools. 2. REBAR TYING TOOLS 2.1 Conventional Hook This conventional hook is preferably used all over India due to its continuous use since decades and also its availability in market. This tool is usually made from mild steel and approximately half kilograms in weight. This tool has a hook at the tip by which the fitter twists the binding wire, as this requires twisting the tool again and again requires more time in tying one tie and the most concerning factor is the musculoskeletal disorders hindering the performance of fitter. Also it has a smooth and glossy body requiring more strength for the fitter to hold the hook in position. New methods and technologies have been used worldwide but for adapting them mindset needs to be changed. Fig.1 Conventional Hook 2.2 Semi-automatic rebar tying hook This semi-automatic tie wire tool can be used for heavy duty work and its working is based on spring-return action requiring a little effort but eliminating fatigue and saving time as compared to manual twisting. The tool has rubberized handle for comfort and ergonomics to minimize slipping of hands weighing around 220-300 grams and having overall length of 2 feet after extension.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 319 Fig. 2 Semi-automatic rebar tying hook Fig. 3 Rebar tying machine 2.3 Rebar tying machine For reducing the musculoskeletal disorders of the labors a new innovation in technology has been brought into practice. The basic components are the body, battery, wire spool. The machine is operated by rechargeable Li-ion/Ni- Cd batteries allowing a continuous work front of approximately 2000-3000 ties per charge depending on the manufacturer. The weight of the machine is approximately 2-2.7 kilograms. The manufacturers set a suitable applicable range for binding the bars. For example 4-28 mm i.e. two bars should have thickness less than 28mm. The spool used has a GI 100 meter binding wire which usually is of 21 gauge i.e. 0.813 mm in diameter as compared to conventionally used which is of 17 or 18 gauge i.e. 1.422 and 1.219 mm in diameter respectively. The initial cost incurred for the machine and cost of spool is expensive but the productivity and benefitting on a larger scale. 3. METHOLOGIES FOR REBAR TYING Binding wire plays an important role in holding the reinforcements in place when there is foot movement and even while concreting, immense pressure on the bars can displace them making them unrecognized. Nowadays, 17- gauge wire is preferably used to tie rebar. Regular practice on an average we need 10-13 kilograms of binding wire per ton of reinforcement used. These binding wires do not provide any strength to the structure. Fitters have many methods to tie rebar together which depends on the purpose or circumstances, some of them are:- A. Snap tie or simple tie-In current scenario this type of tie is widely used in construction industry. Encasing a single wire around the transverse bars of steel and then twisting the two ends of wire with a conventional hook which is made of mild steel until they are tight enough. B. Double-strand simple tie-This tie is similar to simple tie but instead of using a single wire we use double binding wire and tie in a similar way. C. Snap tie with a round turn or wall tie-As the name suggests this tie is used for tying the horizontal bars in long shear walls, compound walls where the simple tie is not capable of holding the horizontal ones. D. Saddle or U tie-This type of tie is intricate than other ties but is favorable in some locations such as for tying foundation reinforcements/shear walls. The productivity is lessened as this tie is more time consuming. E. Cross tie or figure eight tie-. This tie can provide the maximum resistance to twisting of the bars and permitting huge load on the reinforcements. With the use of such ties, intermittent ties can be provided. F. Saddle or U tie with a twist-These ties are similar to U tie but one and half excess turn is wrapped which provides extra stiffness to the reinforcements used mainly for heavy rafts or in case where precast reinforcements are done. Fig. 4 Type of knots
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 320 4. MUSCULOSKELETAL DISORDERS Musculoskeletal injuries (MSDs) are commonly found in labors who face lot of physical exertions by lifting heavy loads or repetitive unusual postures which causing strain in muscles, ligaments, cartilages and all the joints leading to weakness, pain and noise in joints and indirectly affecting the labor output, efficiency and reducing the productivity. It is found that in United States sixteen million such disorders were treated in year 2004 and as they have increased with increase in demand of construction activities. Workplace controls-Employers can also utilize engineering controls and administrative controls to prevent injury that cannot be detected in short course of action. So various tools and technologies have been taken into practice to avoid such disorders and taking these disorders in consideration we have conducted a mock up for rebar tying machine to monitor the quality, time and cost with respect to conventional methods. 5. EXPERIMENTAL PROCEDURE A demonstration was conducted on site by considering a slab of 2x2 meter. Conventional tools, Semi-Automatic Rebar tier and Automatic rebar tier were compared by recording parameters such as time cost and quality. For the best results and experience the task was allotted to the labors on site. Before the experiment the technical specifications, previous articles and the vendors for the same were explored for the availability of the tools and the game plan for the demo was set up and the results were noted accordingly. This trial was conducted on a small scale and snap type of tie was used for all tools as rebar tier had the snap tie by default. The time noted for tying 1 tie and cost is shown in Table 1. Table 1 Time and cost comparison of tools Sr. No. Method of tying adopted Time needed to tie 1 knot Cost per tool 1 Conventional tying hook 8-9 seconds 100 rupees 2 30cm Semi- automatic fast rebar tier tool 6-7 seconds 1020 rupees 3 Rebar tying machine 4-5 seconds 22000 rupees As mentioned earlier, 3 tools were used for tying the bars on a slab of 2 by 2 meters for each tool and the spacing of rebar was 220 mm in X direction and 200 in Y direction having 90 joints. The only difference was the thickness of binding wire as the coil of rebar tying machine had wire of 21 gauge =0.813mm and conventionally 17 gauge=1.422 mm is used. The thickness and gauge of wire are inversely proportional [4]. Proper training about how to use the rebar tier was given to the fitter and the cost required for the demo was worked out taking the actual wastages during working which is shown in table 2 below Table 2 Cost for demo incurred by rebar tying machine Output by Conventional hook Semi- automatic tier Rebar machine Gauge of binding wire 17 17 22 Total number of knots 90 90 90 Time taken to tie in seconds 750 560 310 Time for tying/knot in seconds 8.3 6.2 3.4 Wastage of wire in numbers 4 5 7 Length of one binding wire mm 152.4 152.4 435.0 Total length of binding wire in meter 14.3 14.5 42.2 Length of 1 kg binding wire 80.4 80.4 320.2 Weight in kilogram of wire used for demo 0.2 0.2 0.1 Cost of 1 kg wire 56.6 56.6 442 Total cost incurred for the demo in Rupees 10.1 10.2 58.2 Fig.5 Labor using rebar tying machine on site and enlarged image of a knot by the machine 5.1 Feedback from labors The rebar tying machine was a new concept for them and they were going to use the machine for the first time and comparing the workability since the use of conventional
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 321 hook has been a regular practice fitters are comfortable but the new fitters complained about hand paining and for rebar tying machine, initially the fitter was comfortable and tying was quick but later he complained about hand paining due to weight of the machine. He also commented about the quality of knots mentioning that the knots were not that rigid and stiff due to less thickness of wire but the load movement on the slab was resisted. 5.2 Advantages and Disadvantages Advantages a) Slab tying time can be reduced up to three times by which we can speed up our construction b) Manpower can be optimized as time is saved c) Musculoskeletal disorder, Ergonomic risks, hand pain can be reduced d) The cut length binding wires are wasted due to falling form the bundles, carrying of them by birds as observed on site and can be reduced by using rebar tying machine Disadvantages a) Initial cost of the machine is incurred. b) Weight of the machine is 1.5-2 kilogram more than the conventional tool and semi-automatic rebar tier tool which weighs 220-300 grams c) The cost of the approx. 400 grams spool measuring 100 meters is more than that of cut sized conventional binding wires d) Different activities such as slab, column, beam require dedicated tying machine depending upon the dimensions of reinforcements e) The rebar tying machine is not guaranteed for use during rains f) The cut length of one binding wire by machine is fixed so more wastage is observed where the length is more than required Comparison between time and number of ties and cost and number of ties can show us a broad scope and hence refinement in our way of choosing the work method. The table 3 below shows the time and cost that will be required for assumed number of ties. Table 3 Time required for tying knots Number of Knots Time in minutes for Conventional Hook Semi-Automatic Rebar tying tool Rebar tying Machine 1 0.1 0.1 0.1 90 12.5 9.3 5.2 500 69.4 51.9 28.7 2000 277.8 207.4 114.8 Table 4 Cost required for tying knots Number of Knots Cost in Rupees for Conventional Hook Semi- Automatic Rebar tying tool Rebar tying Machine 1 0.1 0.1 0.8 90 10.1 10.2 75 500 56.1 56.7 415 2000 224.4 226.7 1660 Further from the graph 1, it can be inferred that by using semi-automatic rebar tying tool can reduce the time by 25% and by using Rebar tying machine can reduce the time by 58% as compared to the conventional hook for 2000 ties and time savings will increase with increase in number of ties. Graph 1 Comparing time vs. ties On comparing cost vs. number of ties graph it is seen the cost incurred for semi-automatic rebar tying tool is same as that of conventional tool since same binding wire is used for both the tools. The cost for rebar tying hook shoots up if we consider fitters tying 2000 ties but instead reducing manpower and optimizing time cost can be cut indirectly.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 322 Graph 2 Comparing cost vs. ties 6. CONCLUSIONS Based on the above results we can conclude that for small scale constructions Semi-Automatic rebar tying tool which need not be changed for rebar with varying thickness i.e. for slabs, columns whereas Rebar tying machine is beneficial for a large span and by using rebar tying machine human efforts and health disorders can be reduced and the productivity can be increased after proper training to the labors. The human repetitive, monotonous actions can be minimized. Studying the thickness of the binding wire used in rebar tying machine was 22 gauge but in IS 2502 -1963 it is mentioned that the minimum thickness of binding wire must be more than 0.9 mm and as the rebar tying machine uses wire of gauge 21 i.e. less than 0.9 mm we can also choose wire of 20/19 gauge for tying of slabs even while tying them in a conventional way thus effectively cutting down the cost. Consider the demo results which incurred cost of 10 rupees by using 17 gauge binding wire but if the same demonstration had been done by 20 gauge binding wire, the cost of demo would be cut down to 6 rupees i.e. 40 percent saving which would be considerable amount for the whole project but trials regarding the same will have to be conducted. REFERENCES [1] Dr. Santosh K Patil , Akshay Manesh Sancheti, 2019, Replacement of Steel Reinforcement with Glass Fiber Reinforcement, International Journal of Engineering Research & Technology (IJERT), Volume 08, Issue 07 (July 2019) [2] Tying of reinforcement bars from IS:2502-1963 Code for practice for bending and fixing of bars for concrete reinforcement, New Delhi Publication. [3] Tony Almeida and Peter Vi Briand, "Reducing Risk of Musculoskeletal Disorders and Promoting Return-To- Work Through The Use Of Rebar Tying Machines", Construction Safety Association of Ontario, WSIB Grant #01023, September, 2004. [4] Central Service Association of Ontario, "An effective way to reduce upper limb MSIs", Winter 2001. [5] Choi, Sang D. Ergonomic assessment of musculoskeletal discomfort of iron workers in highway construction. Work 36.1, 47-53, 2010. [6] Bureau of Labor Statistic. Occupational Employment and Wages. 47-2171 Reinforcing Iron and Rebar Workers, 2014. [7] Albers JT, Estill CF. Simple solutions ergonomics for construction workers, Edited by National Institute for Occupational Safety and Health, Cincinnati, 2007 [8] Safety Agency Compares Injury Trends In Rebar Tying Methods, Concrete Products, 109, 4, p. PC26, Small Business, Reference Center, EBSCOhost, 2016. [9] Vi, P. A field study investigating the effects of a rebar- tying machine on trunk flexion, tool usability and productivity. Ergonomics 49.14, 1437-1455, 2006.