This document provides standard material consumption constants for residential projects based on built-up area. It lists the quantity in metric units of materials like cement, sand, steel, rubble, and murum required per square meter for various construction elements. These include external and internal walls, RCC work, masonry work, plastering, tiling, flooring, and other works. It also specifies steel consumption rates for structural elements like footings, columns, beams, slabs, chajjas, and overhead tanks. The quantities provided are intended to serve as guidelines for estimating material requirements for residential construction projects.
2. For EXTERNAL WALL 15 CM(6") THICK
BLOCK WORK AND INTERNAL WALL 10
CM(4") THICK BLOCK WORK
vaidee1212
3. Sino’s MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
Cement
For Rcc Work 1.940 BAGS 0.1802319
For Masonry Works 0.430
BAGS
0.3994831
For Plaster work 1.180
BAGS
0.10962559
For other Work 0.320
BAGS
0.02972897
Total 3.870
BAGS
0.35953476
3
4. Sino’s MATERIAL ITEM OF WORKS
QUANTITY PER
SQM
Units
QUANTITY PER
SQFT
STEEL For Rcc Work 24.25
Kg/S
mt
2.253
For Rcc Work 0.2100 Cum 0.69766467
For Masonry Works 0.050 Cum 0.16611064
For Internal Plaster 0.230 Cum 0.76410892
For External Plaster 0.150 Cum 0.49833191
For tiling 0.040 Cum 0.13288851
For water proofing 0.030 Cum 0.09966638
4
5. Sino’s MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
For other Work 0.010 Cum 0.03322213
0.7200 Cum 2.39199315
METAL For Rcc Work 0.270
Cum
0.89699743
RUBBLE FOR PLINTH SOLING 0.060 0.19933276
MURUM FOR PLINTH FILLING 0.230 0.76410892
5
6. Sino’s MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
SAND
FOR INTERNAL
PLASTERING
0.270 Smt 0.89699743
LIME FOR FLOORING 0.160 Smt 0.01486449
M.S.WINDOW
_
0.140 Cum 0.01300643
MOSAIC TILES _
0.140
Cum 0.01300643
GLASS FOR
M.S.WINDOWS
FOR ROOMS &
BALCONY FLOORING
0.750 CFT 0.750
MOSAIC
SKIRTING
FOR ROOMS
SKIRTINGS
0.820 CM 0.250
BATH / TOILET
FLOORING
_ 0.050 Smt 0.050
6
7. Sin
o’s
MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
DADO
BATH / W.C. DADO
INCLUDING
W.C.FLOORING
WHITE GLASED
TILES
_
0.090 Smt
0.090
COLOUR
GLASED TILES
_ 0.110
Smt
0.110
TOTAL 0.200 Smt
0.200
KITCHEN
PLATFORM
_ 0.0400 Rm 0.0120
7
8. Sino’s MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
CHEQURED
TILES OR
ROUGH
SHAHABAD
PARKING AREA IN
BUILDING
0.1500 SQMT 0.1500
STAIRCASE
STONE
FLOORING
FOR RISERS 0.014
SQMT
0.014
FOR TREADS 0.028
SQMT 0.028
FOR LANDINGS 0.022
SQMT
0.022
TOTAL 0.064 SQMT 0.064
8
9. 9
Sino’s MATERIAL ITEM OF WORKS
QUANTITY
PER SQM
Units
QUANTITY PER
SQFT
DOOR
FRAMES
_ 0.09 No’s 0.0084
DOOR
SHUTTER
S
_
0.14 Smt 0.140
CONCRET
E GRILLS
FOR STAIRCASE 0.03 Smt 0.0300
9
10. Sino's Items
Consumptions of steels ( On
build up area )
Units
1 Footings 0.55 kg / Sqmt
2 Column up to Plinth 2.15 kg / Sqmt
3 Tie Beam 1.15 kg / Sqmt
4 Column Super Structure 4.80 kg / Sqmt
5 Slab 7.00 kg / Sqmt
6 Beam 7.50 kg / Sqmt
7 Chajja / Loft / lintel 0.55 kg / Sqmt
8 Overhead Tank 0.55 kg / Sqmt
9 Total 24.25 kg / Sqmt
Thumb Rule Steel Consumption