Northern Power Generation Company Limited
pg. 1
Northern Power Generation Company Limited
NPGCL internship
report
pg. 2
Northern Power Generation Company Limited
Preface
Practice makes the man prefect and practical
knowledge is essential in order to introducting with
the practical life. Theoretical knowledge is not such
important without with combination of practical. It is
the part of its academic curriculum to do internship of
Bs (Accounting & Finance) student to various
business concerns with the view to allowing students
to get opportunity to acquire practical and
processional knowledge. As the partial filament of Bs
(Accounting & Finance) the writer of this report was
also assigned the task of preparing the term paper, the
topic was “(GENCO-lll) Northern Power Generation
Company Limited”. To adjust myself in such a large
organization was not an easy task, but by the grace of
Allah aids my internship in a benefitting manner and I
learned a lot about the overall generation company.
This report is a thorough essence of my rigorous
studies which I undergone through in a period of two
months in a generation company. I have exclusive
studied and observed the operations/functioning of the
company and tried my best to abreast myself with all
the dimensions of the generation company. It was a
great experience to work there and contribute
handsomely in the process of apprising its pros and
cons and feeling it be a significant part of the
company. I am thankful to all those who helped me in
one-way or the other and guided me in the
pg. 3
Northern Power Generation Company Limited
preparation and compilation of this report in a
presented fashion.
pg. 4
Northern Power Generation Company Limited
Acknowledgment
Success and achievement is possible only through
hard work, determination and strong will. We are
grateful to ALL MIGHTY ALLAH who gave me the
strength to think, plan and act according which make
us possible to complete my internship.
Through it is a literary tradition to acknowledge the
contribution and help by different people and
organization in the completion of an internship, but as
a matter of fact some words cannot express our
gratitude to the various helping hands. It is very
difficult to appreciate each and every person for his
contribution, without those people it would be difficult
for us to complete this internship successfully.
pg. 5
Northern Power Generation Company Limited
DEDICATION
At first dedicating this work to almighty ALLAH,
without his mercy and sympathy I was not able to
accomplish this work, Almighty ALLAH gave me
power and confidence to done my internship and also
HOLY PROPHET HAZARAT MUHAMMAD (Peace
Be upon Him) who is a light for humanity. I also
dedicate this work to my lovely parents with deepest
gratitude whose love and prayers always been a
source of strength for me.
pg. 6
Northern Power Generation Company Limited
EXECUTIVE SUMMARY
According to internship requirement, I passed two month in
GENCO from ----------- to -----------. This was so much
learning period for me. This internship report is about
Thermal Power Station Muzaffargarh also named as
GENCO-III. In GENCO-III, there are total 6 units in which
Phase-I consists of 210MW each and phase-II consist 2 units
of 210MW each and a separate unit namely unit- IV having a
capacity of 320MW. So a total of 1370MW capacity of
GENCO-III. The generation installed are al furnace oil
generation consisting of a steam turbine and having water
tube boiler. In this repot, different protections of generator
and transformers are discussed. The circuit Breakers and
their types and relays and the role of instrument transformer
are briefly discussed. The important of switchyard is given in
detail. Later on, all types of motors are put into light.
In this report I given introduction history of GENCO-III. I
passed many days in different
departments------------------------. I describe working and
functions of those departments in this report in this report I
did SWOT analysis. There is also some recommendation at
the end.
pg. 7
Northern Power Generation Company Limited
TALBE OF CONTANT
Title Pg. no
GENCO-III 08
Capacity 10
Accounts Department 11
SWOT Analysis 14
Recommendation 17
pg. 8
Northern Power Generation Company Limited
GENCO-III
Mission Statement:
Our mission is to bring the assurance of energy to our customer, with world class quality and
commitment for satisfaction as we in our quest for excellence.
Background:
Northern Power Generation Company Limited owns and operates thermal power generation
facilities located at Muzaffargarh, Multan and Faisalabad. Installed capacity of the generation
assets is 1921MW, which has declined over the years to dependable capacity of 1169MW complex
pattern of internal and external factor constrain operating and financial performance of the
company. The company has been operating with a negative bottom line, which has jeopardized
sustainability.
Government of Pakistan aims to address the country’s power sector issues by implementing power
sector reform program. As part of the program the public sector thermal power generation
companies (GENCOs), including NPGCL were required to develop and implement Business plans to
effectively respond to constraints and obstacles to satisfactory performance.
Introduction:
This thermal power station is situated in Multan division’s district Muzaffargarh. In 1985 Ghulam
Ishaq Khan make an agreement with Russia for the establishment of the power station. Initially
this project was documented for Multan. But due to certain reason like arability of land, cost etc.
this project shifted to Muzaffargarh by the name of Multan-II. Initially three units were established
in Muzaffargarh, called Phas-1. These are also known as Russia units. These units are operated
with oil & gas. The each of 210MW capacities. China establishes their units to meet the need/
demand of electricity. These units are also 210MW. China has also established a unit called #4
witches has the capacity of 320MW. The unit #4 is fully computerized. All its functionality is
handled through computerized programs about 1500 people are working in this organization
including both technical & non-technical. To make this project Economic District Muzaffargarh was
select. Other reasons for this location is there is no thermal house in this is no thermal house in
this Area at that time the Area like Multan Division and D.G.Khan lies at center of Pakistan
approximately. The selection of the location may be due to safety reason in war conditions.
Pakistan water and power development authority (WAPDA) is an integrated utility in Pakistan.
WAPDA is responsible for the development of hydel power and water sector project in Pakistan.
WAPDA operates through-power wing and water wing, it is engaged in the generation,
transmission and distribution of power. In addition, it also manages irrigation, water supply and
drainage system in the country. Further, it is also responsible for prevention of water logging and
reclamation of water logged and saline land.
pg. 9
Northern Power Generation Company Limited
The Pakistan water and power development authority (WAPDA) was established through an act of
parliament in Feb 1958 for integrated and rapid development and maintenance of water and
power resource of the country. As per the charter, amended in March 1959 to transfer the existing
electricity department from the federating units to it, WAPDA has been assigned the duties of
investigation, planning and execution of projects and schemes for:
• Generation, transmission and distribution
• Irrigation, water supply and drainage
• Prevention of water logging and reclamation of saline land,
• Food control and inland navigation.
Under the later on developments, the “energy policy 1994”, setting up of thermal power
generation projects was shifted to the private sector. Now 13 entities are working under WAPDA.
These are:
• National Transmission and Dispatch Company (NTDC)
• Four Thermal Power Generation Companies (GENCOs)
• Eight Distribution Companies (Discos)
pg. 10
Northern Power Generation Company Limited
pg. 11
Northern Power Generation Company Limited
Capacity
“Capacity is the maximum rate of output for a facility”. The facility can be a workstation or an
entire organization.
There are two phases working at thermal power station Muzaffargarh.
PHASE-1:
In phase one there are three units of capacity 210MW. This phase was establish by Russia also
called Russia phase.
PHASE-2:
In phase two there are two units of capacity 210MW and one unit of capacity 320MW.
The phase-1 can produce 15120000 units/24 hrs.
So the total capacity of both two phase is 48000000 units/24 hrs. But this is situation when all the
units are working with their full capacity. But there are little situation
When this type of occurrence. But they utilize their capacity according to the requirement. All the
decisions about the utilization are done at higher level. NPCC Islamabad gives all the instruction
about the utilization. The reason is that all the thermal houses in Pakistan are connected just a ring
topology (the term in networking). When sufficient amount of water are available the more
concentration are given to produce Hydroelectricity because this source of electricity are much
cheap than thermal electricity.
Key stats as of June 30, 2015
 Installed capacity, MW 1921
 Dependable capacity, MW1400
 Maximum power dispatch, MW 1169
 Unit generated, MWh 564.705
 Unit sent out, MWh 507.048
 Auxiliaries, % 10.21
 Load factor, % 56.60
 Plant, % 50.57
 FSA, quality & period 180000/month for 15 years
 GSA, quality & period under negotiation
pg. 12
Northern Power Generation Company Limited
pg. 13
Northern Power Generation Company Limited
Accounts department
Any field of business in this world the accounts department is very necessary for it that maintain
its account and show the result that the business goes in profit or loss. So, the accounts
department of GENCO-III is also called head quarter. It was establish in 1998 at Muzaffargarh,
before its works at WAPDA office Lahore. It maintain the accounts of eight power plants over the
Punjab.
The hierarchy of accounts department is shown below:
There are six sections/formulations in accounts department. These are below:
1. Banking Section.
2. Admin Section.
3. B.T.B Section.
4. General Accounting.
5. Payroll Section.
6. Taxation and pre-audit.
Banking Section:
In banking section we deal with General Account, impress account, pension account & letter of
Credit. Our biggest buyer/customer is NTDC, NTDC transfer the fund in our accounts and our
pg. 14
Northern Power Generation Company Limited
biggest supplier is PSO, we get oil/Gas from PSO. Transfer the funds in their accounts. In this
section we get demand of salaries from other power plants like Nandipur power plant, Shahdara,
MEPCO Multan etc.
Every section has its own Assistant Manager Accounts the banking section (AMA) is Mr.
ZAHID NAWAZ DASTI and its Accounts Officer are i) Mr. AMMAR ii) Mr. HOSHYAR
ALI
Admin Section:
In Admin section, we deal with all documentation and pension of employees. Mr. Athar is the
Assistant Manager Accounts of Admin and Mr. Rafiq is Account officer.
B.T.B Section:
In this section we forecast the budget of next year according to the current year. In budget we
forecast the revenue, expanse and production of the next year. Mr. Shokat is the AMA of
B.T.B Section and Mr. Azam is the Account officer.
Gernal Accounting:
pg. 15
Northern Power Generation Company Limited
In General Accounting we compile all data from all other section here the accounting cycle is
complete and it is also called compilation section. In this section we maintain our ledger book
by LPS (Ledger Post Summary) then trial balance are also maintain. Mr. Sharif and Mr.
Wallyat are the AMA of this section. Mr. Zeeshan is the Account officer of this section.
Payroll Section:
This section deal with salaries of the employees their medical bills and T.A/D.A. In this section
every employee has its own code and profile.
Taxation & Pre-Audit:
In this section, we deduct the tax from the salaries of employees and audit the all bills and invoices
it’s also called internal audit. Mr. Shahzad is AMA of this Section.
pg. 16
Northern Power Generation Company Limited
pg. 17
Northern Power Generation Company Limited
Strength
 The largest Generation Company in public sector
 Provision of Dual Fuel Firing
 Power Plant are located in the load centers
 Availability of land for capital expansion
 Road and rail facility for furnace oil supply
 Highly qualified skilled labor available
 Established infrastructure
 Experienced & dedicated engineers available
 Correction of the bills
 Co-location of XEN & RO offices
 Good relation with different department
 Restructure of stores to ensure prompt available
 Printing a last 12 month history on bills
 Mobile customer service facility
 Establish a marketing cell
 Provide high technology for development and maintenance
Weakness
 Lack of capital investment
 Ineffective performance appraisal system
 Delayed decision making
 Ineffective material management system
 Non availability of gas
 They take so much time for processing any project
 Lack of communication level between employees
 Most of department based on manual system
 Lack of loyalty in front of custom
 There is still improvement of technology in the GENCO computer
 There is no objective/ target of employees
 Performance of service center is not too great for satisfaction to customer
 People has less trust over company
 Dealing to customer not too much efficient
Opportunity
pg. 18
Northern Power Generation Company Limited
 Use of land for expansion
 Vicinity of furnace oil refinery
 Modification/ rehabilitation of plant in process
 Expansion in installed capacity
 Establish a new grid station
 Extension of existing grid station
 Transmission lines
 Services easily in market
Threats
 Influence of oil mafia
 Lack of fuel/gas supply
 Security lapses
 Dishonesty of officials
 Low government budget
 Not a good support for supplies
 Heavy taxes b government
 Day by day technology change
 Overall performance is decreasing
 Politic in employees
 Labor union are very awful for company
 In future market value will be decrease
pg. 19
Northern Power Generation Company Limited
Recommendations
 The trust of the customer must be retained
 The employees must be well trained for customer services issues
 Attendance system of the employees must be changes
 Give full safety to the employees
 The procedure of new connection meter must be reduced staff
 The organization hierarchy must be reduced in the organization
 Must give the safety precaution to the employees
 To increase their productivity
 Behavior with customer should be improved
 Make better plan for stop the line loses
 Offer new training course to the employees
 Provide friendly environment
 Make some specific plans for internees
 Manual accounts are replace with latest accounting software
pg. 20

Internship Report

  • 1.
    Northern Power GenerationCompany Limited pg. 1
  • 2.
    Northern Power GenerationCompany Limited NPGCL internship report pg. 2
  • 3.
    Northern Power GenerationCompany Limited Preface Practice makes the man prefect and practical knowledge is essential in order to introducting with the practical life. Theoretical knowledge is not such important without with combination of practical. It is the part of its academic curriculum to do internship of Bs (Accounting & Finance) student to various business concerns with the view to allowing students to get opportunity to acquire practical and processional knowledge. As the partial filament of Bs (Accounting & Finance) the writer of this report was also assigned the task of preparing the term paper, the topic was “(GENCO-lll) Northern Power Generation Company Limited”. To adjust myself in such a large organization was not an easy task, but by the grace of Allah aids my internship in a benefitting manner and I learned a lot about the overall generation company. This report is a thorough essence of my rigorous studies which I undergone through in a period of two months in a generation company. I have exclusive studied and observed the operations/functioning of the company and tried my best to abreast myself with all the dimensions of the generation company. It was a great experience to work there and contribute handsomely in the process of apprising its pros and cons and feeling it be a significant part of the company. I am thankful to all those who helped me in one-way or the other and guided me in the pg. 3
  • 4.
    Northern Power GenerationCompany Limited preparation and compilation of this report in a presented fashion. pg. 4
  • 5.
    Northern Power GenerationCompany Limited Acknowledgment Success and achievement is possible only through hard work, determination and strong will. We are grateful to ALL MIGHTY ALLAH who gave me the strength to think, plan and act according which make us possible to complete my internship. Through it is a literary tradition to acknowledge the contribution and help by different people and organization in the completion of an internship, but as a matter of fact some words cannot express our gratitude to the various helping hands. It is very difficult to appreciate each and every person for his contribution, without those people it would be difficult for us to complete this internship successfully. pg. 5
  • 6.
    Northern Power GenerationCompany Limited DEDICATION At first dedicating this work to almighty ALLAH, without his mercy and sympathy I was not able to accomplish this work, Almighty ALLAH gave me power and confidence to done my internship and also HOLY PROPHET HAZARAT MUHAMMAD (Peace Be upon Him) who is a light for humanity. I also dedicate this work to my lovely parents with deepest gratitude whose love and prayers always been a source of strength for me. pg. 6
  • 7.
    Northern Power GenerationCompany Limited EXECUTIVE SUMMARY According to internship requirement, I passed two month in GENCO from ----------- to -----------. This was so much learning period for me. This internship report is about Thermal Power Station Muzaffargarh also named as GENCO-III. In GENCO-III, there are total 6 units in which Phase-I consists of 210MW each and phase-II consist 2 units of 210MW each and a separate unit namely unit- IV having a capacity of 320MW. So a total of 1370MW capacity of GENCO-III. The generation installed are al furnace oil generation consisting of a steam turbine and having water tube boiler. In this repot, different protections of generator and transformers are discussed. The circuit Breakers and their types and relays and the role of instrument transformer are briefly discussed. The important of switchyard is given in detail. Later on, all types of motors are put into light. In this report I given introduction history of GENCO-III. I passed many days in different departments------------------------. I describe working and functions of those departments in this report in this report I did SWOT analysis. There is also some recommendation at the end. pg. 7
  • 8.
    Northern Power GenerationCompany Limited TALBE OF CONTANT Title Pg. no GENCO-III 08 Capacity 10 Accounts Department 11 SWOT Analysis 14 Recommendation 17 pg. 8
  • 9.
    Northern Power GenerationCompany Limited GENCO-III Mission Statement: Our mission is to bring the assurance of energy to our customer, with world class quality and commitment for satisfaction as we in our quest for excellence. Background: Northern Power Generation Company Limited owns and operates thermal power generation facilities located at Muzaffargarh, Multan and Faisalabad. Installed capacity of the generation assets is 1921MW, which has declined over the years to dependable capacity of 1169MW complex pattern of internal and external factor constrain operating and financial performance of the company. The company has been operating with a negative bottom line, which has jeopardized sustainability. Government of Pakistan aims to address the country’s power sector issues by implementing power sector reform program. As part of the program the public sector thermal power generation companies (GENCOs), including NPGCL were required to develop and implement Business plans to effectively respond to constraints and obstacles to satisfactory performance. Introduction: This thermal power station is situated in Multan division’s district Muzaffargarh. In 1985 Ghulam Ishaq Khan make an agreement with Russia for the establishment of the power station. Initially this project was documented for Multan. But due to certain reason like arability of land, cost etc. this project shifted to Muzaffargarh by the name of Multan-II. Initially three units were established in Muzaffargarh, called Phas-1. These are also known as Russia units. These units are operated with oil & gas. The each of 210MW capacities. China establishes their units to meet the need/ demand of electricity. These units are also 210MW. China has also established a unit called #4 witches has the capacity of 320MW. The unit #4 is fully computerized. All its functionality is handled through computerized programs about 1500 people are working in this organization including both technical & non-technical. To make this project Economic District Muzaffargarh was select. Other reasons for this location is there is no thermal house in this is no thermal house in this Area at that time the Area like Multan Division and D.G.Khan lies at center of Pakistan approximately. The selection of the location may be due to safety reason in war conditions. Pakistan water and power development authority (WAPDA) is an integrated utility in Pakistan. WAPDA is responsible for the development of hydel power and water sector project in Pakistan. WAPDA operates through-power wing and water wing, it is engaged in the generation, transmission and distribution of power. In addition, it also manages irrigation, water supply and drainage system in the country. Further, it is also responsible for prevention of water logging and reclamation of water logged and saline land. pg. 9
  • 10.
    Northern Power GenerationCompany Limited The Pakistan water and power development authority (WAPDA) was established through an act of parliament in Feb 1958 for integrated and rapid development and maintenance of water and power resource of the country. As per the charter, amended in March 1959 to transfer the existing electricity department from the federating units to it, WAPDA has been assigned the duties of investigation, planning and execution of projects and schemes for: • Generation, transmission and distribution • Irrigation, water supply and drainage • Prevention of water logging and reclamation of saline land, • Food control and inland navigation. Under the later on developments, the “energy policy 1994”, setting up of thermal power generation projects was shifted to the private sector. Now 13 entities are working under WAPDA. These are: • National Transmission and Dispatch Company (NTDC) • Four Thermal Power Generation Companies (GENCOs) • Eight Distribution Companies (Discos) pg. 10
  • 11.
    Northern Power GenerationCompany Limited pg. 11
  • 12.
    Northern Power GenerationCompany Limited Capacity “Capacity is the maximum rate of output for a facility”. The facility can be a workstation or an entire organization. There are two phases working at thermal power station Muzaffargarh. PHASE-1: In phase one there are three units of capacity 210MW. This phase was establish by Russia also called Russia phase. PHASE-2: In phase two there are two units of capacity 210MW and one unit of capacity 320MW. The phase-1 can produce 15120000 units/24 hrs. So the total capacity of both two phase is 48000000 units/24 hrs. But this is situation when all the units are working with their full capacity. But there are little situation When this type of occurrence. But they utilize their capacity according to the requirement. All the decisions about the utilization are done at higher level. NPCC Islamabad gives all the instruction about the utilization. The reason is that all the thermal houses in Pakistan are connected just a ring topology (the term in networking). When sufficient amount of water are available the more concentration are given to produce Hydroelectricity because this source of electricity are much cheap than thermal electricity. Key stats as of June 30, 2015  Installed capacity, MW 1921  Dependable capacity, MW1400  Maximum power dispatch, MW 1169  Unit generated, MWh 564.705  Unit sent out, MWh 507.048  Auxiliaries, % 10.21  Load factor, % 56.60  Plant, % 50.57  FSA, quality & period 180000/month for 15 years  GSA, quality & period under negotiation pg. 12
  • 13.
    Northern Power GenerationCompany Limited pg. 13
  • 14.
    Northern Power GenerationCompany Limited Accounts department Any field of business in this world the accounts department is very necessary for it that maintain its account and show the result that the business goes in profit or loss. So, the accounts department of GENCO-III is also called head quarter. It was establish in 1998 at Muzaffargarh, before its works at WAPDA office Lahore. It maintain the accounts of eight power plants over the Punjab. The hierarchy of accounts department is shown below: There are six sections/formulations in accounts department. These are below: 1. Banking Section. 2. Admin Section. 3. B.T.B Section. 4. General Accounting. 5. Payroll Section. 6. Taxation and pre-audit. Banking Section: In banking section we deal with General Account, impress account, pension account & letter of Credit. Our biggest buyer/customer is NTDC, NTDC transfer the fund in our accounts and our pg. 14
  • 15.
    Northern Power GenerationCompany Limited biggest supplier is PSO, we get oil/Gas from PSO. Transfer the funds in their accounts. In this section we get demand of salaries from other power plants like Nandipur power plant, Shahdara, MEPCO Multan etc. Every section has its own Assistant Manager Accounts the banking section (AMA) is Mr. ZAHID NAWAZ DASTI and its Accounts Officer are i) Mr. AMMAR ii) Mr. HOSHYAR ALI Admin Section: In Admin section, we deal with all documentation and pension of employees. Mr. Athar is the Assistant Manager Accounts of Admin and Mr. Rafiq is Account officer. B.T.B Section: In this section we forecast the budget of next year according to the current year. In budget we forecast the revenue, expanse and production of the next year. Mr. Shokat is the AMA of B.T.B Section and Mr. Azam is the Account officer. Gernal Accounting: pg. 15
  • 16.
    Northern Power GenerationCompany Limited In General Accounting we compile all data from all other section here the accounting cycle is complete and it is also called compilation section. In this section we maintain our ledger book by LPS (Ledger Post Summary) then trial balance are also maintain. Mr. Sharif and Mr. Wallyat are the AMA of this section. Mr. Zeeshan is the Account officer of this section. Payroll Section: This section deal with salaries of the employees their medical bills and T.A/D.A. In this section every employee has its own code and profile. Taxation & Pre-Audit: In this section, we deduct the tax from the salaries of employees and audit the all bills and invoices it’s also called internal audit. Mr. Shahzad is AMA of this Section. pg. 16
  • 17.
    Northern Power GenerationCompany Limited pg. 17
  • 18.
    Northern Power GenerationCompany Limited Strength  The largest Generation Company in public sector  Provision of Dual Fuel Firing  Power Plant are located in the load centers  Availability of land for capital expansion  Road and rail facility for furnace oil supply  Highly qualified skilled labor available  Established infrastructure  Experienced & dedicated engineers available  Correction of the bills  Co-location of XEN & RO offices  Good relation with different department  Restructure of stores to ensure prompt available  Printing a last 12 month history on bills  Mobile customer service facility  Establish a marketing cell  Provide high technology for development and maintenance Weakness  Lack of capital investment  Ineffective performance appraisal system  Delayed decision making  Ineffective material management system  Non availability of gas  They take so much time for processing any project  Lack of communication level between employees  Most of department based on manual system  Lack of loyalty in front of custom  There is still improvement of technology in the GENCO computer  There is no objective/ target of employees  Performance of service center is not too great for satisfaction to customer  People has less trust over company  Dealing to customer not too much efficient Opportunity pg. 18
  • 19.
    Northern Power GenerationCompany Limited  Use of land for expansion  Vicinity of furnace oil refinery  Modification/ rehabilitation of plant in process  Expansion in installed capacity  Establish a new grid station  Extension of existing grid station  Transmission lines  Services easily in market Threats  Influence of oil mafia  Lack of fuel/gas supply  Security lapses  Dishonesty of officials  Low government budget  Not a good support for supplies  Heavy taxes b government  Day by day technology change  Overall performance is decreasing  Politic in employees  Labor union are very awful for company  In future market value will be decrease pg. 19
  • 20.
    Northern Power GenerationCompany Limited Recommendations  The trust of the customer must be retained  The employees must be well trained for customer services issues  Attendance system of the employees must be changes  Give full safety to the employees  The procedure of new connection meter must be reduced staff  The organization hierarchy must be reduced in the organization  Must give the safety precaution to the employees  To increase their productivity  Behavior with customer should be improved  Make better plan for stop the line loses  Offer new training course to the employees  Provide friendly environment  Make some specific plans for internees  Manual accounts are replace with latest accounting software pg. 20