COMPANY BACKGROUND
FCI is a leading connector manufacturer with global operations (Americas,
Europe and Asia)
specialize on the design and produce a variety of products ranging from the
most basic to the most complex connectors, such as smartphones or high-density
connectors for mobile phone or laptop.
Started Operations on June 1997
Main Process : Final Assemble & Molding
24-hours, 5 days / week operations
Manpower – 1,126 Employees
PRODUCT
SAS RCEP SATA RCEP
SAS PLUG SATA PLUG
SCA
Compression
SLWHLWOPU HFWSFW
SFV
ZipLine
Xcede
AirMax VS
CrossBow
STORAGE
MINIATURE (FFC/FPC)
VLKVLL
HIGHSPEED
SFVL
AirMax VSe
PowerSignal
DEPARTMENT
1. STORAGE
2. HIGH SPEED
 XCEDE
 AIRMAX
3. MINIATURE
4. MOULDING
 VERTICAL MOULDING
 HORIZONTAL MOULDING
 HIGH SPEED MOULDING
5. QA
DUTIES & WORK EXPERIENCE
LEAN Workshop
Preventive Maintenance
Design
Daily Task
LEAN WORKSHOP
Quick Response Quality Control (QRQC)
aiming to improve responsiveness and efficiency in problem-solving activity.
QRQC is open if there any critical problem regarding the final product (defect)
PROBLEM: Missing Hipot test
TARGET: Zero Missing Hipot Test
Possible root causes of problem: Lack of 5s and no self checking
Data collection and analysis
Implement: set proper 5s and operator training
Tracking to target.
LEAN WORKSHOP
Total Productive Maintenance (TPM)
aiming to increase OEE by eradicating machine and tool causes of technical downtime
(Breakdowns and Micro-stops).
PREVENTIVE MAINTENANCE
Periodic maintenance to prevent machine from breakdown
Dissemble the Machine
Change Wear or Defect Bearing
Clean Dirty parts
Grease/Lubricate
Assemble
DESIGN
Terminal Mini Rack
purpose to tidy up the new sample room at the High speed department Office
the terminal is measured using the meter tape to estimate the
dimension of the rack.
By using the pipe and joint, we managed to finish mini rack in
one day
DESIGN
Part Modification
Based on the first drawing revision, the design can cause the terminal waste clogging and
machine jam.
As a preventive action, the drawing is modified.
The drawing is modified using AutoCAD
The new drawing then sent to the vendor to fabricate
DAILY TASK
Machine daily KPI
construct a table for the machine reject consist of total of
machine breakdown, total output, Total reject part and total machine OEE.
to monitored the machine reject daily by the machine at the
production line
CONCLUSION
3 Main engineering aspect that I’ve gain:
1. Lean Methodology in problem solving skill
2. Data collection and data analysis
3. Preventive Maintenance and hands-on
THANK YOU!!
Q & A

More Related Content

What's hot

INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTshone john
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaSyafiqah Najib
 
Internship Log Book.pdf
Internship Log Book.pdfInternship Log Book.pdf
Internship Log Book.pdfmandymapepa
 
Industrial Internship Presentation
Industrial Internship PresentationIndustrial Internship Presentation
Industrial Internship PresentationPankaj Dogra
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportChanaka Sudheera
 
KKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportKKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportBeng Leong Toh
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Rahul Banerjee
 
Resume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamResume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamATIQAH HANI
 
Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6CikBeyla Nabiella
 
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIPPRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIPSyarel Saz
 
Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.Tarun Sharma
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMshridharthecyberdude
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance TechnicianMoazzam Chougle
 

What's hot (20)

INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
Internship Log Book.pdf
Internship Log Book.pdfInternship Log Book.pdf
Internship Log Book.pdf
 
latihan industri
latihan industrilatihan industri
latihan industri
 
Industrial Internship Presentation
Industrial Internship PresentationIndustrial Internship Presentation
Industrial Internship Presentation
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
KKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportKKEK3192 Industrial Training Report
KKEK3192 Industrial Training Report
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)
 
Resume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd AhsamResume Atiqah Hani binti Mohd Ahsam
Resume Atiqah Hani binti Mohd Ahsam
 
training report
training reporttraining report
training report
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6
 
Industrial Training Report-1
Industrial Training Report-1Industrial Training Report-1
Industrial Training Report-1
 
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIPPRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
 
Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 

Similar to Industrial Training PRESENTATION

Raghu _CV_07012017docx
Raghu _CV_07012017docxRaghu _CV_07012017docx
Raghu _CV_07012017docxRaghu Vutukuru
 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdMalay Nasit
 
Implementing Digital Twins of Smart Factories with Interval Algebra
Implementing Digital Twins of Smart Factories with Interval AlgebraImplementing Digital Twins of Smart Factories with Interval Algebra
Implementing Digital Twins of Smart Factories with Interval AlgebraPiotr Dziurzanski
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERAkshay Deshpande
 
Cv modifeid final version
Cv modifeid final versionCv modifeid final version
Cv modifeid final versionNajeeb Rehman
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...IRJET Journal
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
Who we are & How we can facilitate you ?
Who we are & How we can facilitate you ? Who we are & How we can facilitate you ?
Who we are & How we can facilitate you ? shakeel shahzad
 
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTOR
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTORMESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTOR
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTORMessung Workplace Technology
 

Similar to Industrial Training PRESENTATION (20)

Resume
ResumeResume
Resume
 
Raghu _CV_07012017docx
Raghu _CV_07012017docxRaghu _CV_07012017docx
Raghu _CV_07012017docx
 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt Ltd
 
Implementing Digital Twins of Smart Factories with Interval Algebra
Implementing Digital Twins of Smart Factories with Interval AlgebraImplementing Digital Twins of Smart Factories with Interval Algebra
Implementing Digital Twins of Smart Factories with Interval Algebra
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
 
Cv modifeid final version
Cv modifeid final versionCv modifeid final version
Cv modifeid final version
 
SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016SENTHILKUMAR_resume12-11-2016
SENTHILKUMAR_resume12-11-2016
 
Ahmed shawky-automation engineer
Ahmed shawky-automation engineerAhmed shawky-automation engineer
Ahmed shawky-automation engineer
 
ajmer_malik
ajmer_malikajmer_malik
ajmer_malik
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
 
Fpso fso automation
Fpso fso automationFpso fso automation
Fpso fso automation
 
Raghu _CV18102015
Raghu _CV18102015Raghu _CV18102015
Raghu _CV18102015
 
Production Technology
Production TechnologyProduction Technology
Production Technology
 
Ajay
AjayAjay
Ajay
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
Who we are & How we can facilitate you ?
Who we are & How we can facilitate you ? Who we are & How we can facilitate you ?
Who we are & How we can facilitate you ?
 
Mohamed Hamed'cv
Mohamed Hamed'cvMohamed Hamed'cv
Mohamed Hamed'cv
 
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTOR
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTORMESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTOR
MESSUNG MACHINE AUTOMATION FOR THE AUTOMOTIVE SECTOR
 
Gerardo 2016
Gerardo 2016Gerardo 2016
Gerardo 2016
 
AKS
AKSAKS
AKS
 

Industrial Training PRESENTATION

  • 1. Industrial Training FCI CONNECTORS MALAYSIA SDN. BHD. MOHAMMAD MUAZ BIN SADINI 31120
  • 2. FCI CONNECTORS MALAYSIA SDN. BHD. 205 Jalan Cyber 14, Senai Industrial Estate IV 81400 Senai, Johor, Malaysia
  • 3. COMPANY BACKGROUND FCI is a leading connector manufacturer with global operations (Americas, Europe and Asia) specialize on the design and produce a variety of products ranging from the most basic to the most complex connectors, such as smartphones or high-density connectors for mobile phone or laptop. Started Operations on June 1997 Main Process : Final Assemble & Molding 24-hours, 5 days / week operations Manpower – 1,126 Employees
  • 4. PRODUCT SAS RCEP SATA RCEP SAS PLUG SATA PLUG SCA Compression SLWHLWOPU HFWSFW SFV ZipLine Xcede AirMax VS CrossBow STORAGE MINIATURE (FFC/FPC) VLKVLL HIGHSPEED SFVL AirMax VSe PowerSignal
  • 5. DEPARTMENT 1. STORAGE 2. HIGH SPEED  XCEDE  AIRMAX 3. MINIATURE 4. MOULDING  VERTICAL MOULDING  HORIZONTAL MOULDING  HIGH SPEED MOULDING 5. QA
  • 6. DUTIES & WORK EXPERIENCE LEAN Workshop Preventive Maintenance Design Daily Task
  • 7. LEAN WORKSHOP Quick Response Quality Control (QRQC) aiming to improve responsiveness and efficiency in problem-solving activity. QRQC is open if there any critical problem regarding the final product (defect) PROBLEM: Missing Hipot test TARGET: Zero Missing Hipot Test Possible root causes of problem: Lack of 5s and no self checking Data collection and analysis Implement: set proper 5s and operator training Tracking to target.
  • 8. LEAN WORKSHOP Total Productive Maintenance (TPM) aiming to increase OEE by eradicating machine and tool causes of technical downtime (Breakdowns and Micro-stops).
  • 9. PREVENTIVE MAINTENANCE Periodic maintenance to prevent machine from breakdown Dissemble the Machine Change Wear or Defect Bearing Clean Dirty parts Grease/Lubricate Assemble
  • 10. DESIGN Terminal Mini Rack purpose to tidy up the new sample room at the High speed department Office the terminal is measured using the meter tape to estimate the dimension of the rack. By using the pipe and joint, we managed to finish mini rack in one day
  • 11. DESIGN Part Modification Based on the first drawing revision, the design can cause the terminal waste clogging and machine jam. As a preventive action, the drawing is modified. The drawing is modified using AutoCAD The new drawing then sent to the vendor to fabricate
  • 12. DAILY TASK Machine daily KPI construct a table for the machine reject consist of total of machine breakdown, total output, Total reject part and total machine OEE. to monitored the machine reject daily by the machine at the production line
  • 13. CONCLUSION 3 Main engineering aspect that I’ve gain: 1. Lean Methodology in problem solving skill 2. Data collection and data analysis 3. Preventive Maintenance and hands-on