Fehran AR
#1A Amarnithiyar St, Shakizhar Ngr, Kundrathur, Chennai, India 600069
Mobile: +919003009667, +919789058598|Email:fehran_ar@hotmail.com
A highly motivated, dynamic and focused, analytical and quick thinking Mechanical
Engineering professional with strong communication skills & offer experience in:
performing autonomously and/or collaboratively in a rapid-paced, high-pressured
environment and specialized in quality control & quality assurance and seeking
innovative and challenging career in the professionally managed and dynamic
organization which enables me to utilize my analytical abilities and provide
opportunities for development and responsibilities to contribute and lead productive
teams and exceed Organization’s objectives.
Leadership …. | Team Commitment …. | Superlative Quality Acumen …
Professional Summary
 An astute professional with an overall solid experience of 4 years in the areas of Quality Management
System, Production Planning & design which gave in-depth understanding for handling various domain
areas in Mechanical Engineering.
 Experienced in various engineering processes and tools. Develop, coordinate, and monitor all aspects of
production, including selection of manufacturing methods, fabrication, and operation of product designs.
 Handled various critical and challenging projects from design stage to implementation stage and ensured
that the projects gets implemented as per specification in stipulated time with quality.
 Ensuring adherence to quality standards, implementing stringent quality control systems and reduce
rejection level & rework.
 Strategic planning to meet the production & quality targets, Manpower handling, Manpower balancing, Line
balancing, Root cause analysis of production, quality problems & rejection, Production monitoring, obtaining
& presentation of quality trends, corrective & preventive action taken, Updating quality & production
documentation.
 Consummate professional who follows a disciplined approach to development in the Project Management.
 To involve in developing systems to ensure products or services are designed and produced to meet or
exceed customer requirement and expectations.
 To cover all of these activities like design, development, production, installation, servicing and
documentation.
 Adept in managing & leading teams for running successful process operations & developed result oriented
projects in coordination with all verticals for the service standards of business excellence.
 Demonstrated prowess of working long hours in the execution, monitoring and control phases of project
Management.
 Demonstrated capabilities in motivating, taking initiatives, delegating work.
 All Production design work was carried out in accordance with authority guidelines and regulations within
the project Management schedule.
 Using research, analytical, conceptual and production planning skills, particularly mathematical modeling
and computer-aided design.
 Discussing & solving complex problems with manufacturing departments, sub-contractors, suppliers and
customers.
 A result-oriented professional with good communication, leadership, team management, analytical &
Coordination skills.
Key Skills and Expertise
• Strategic & Tactical Planning • Problem solving • Organizational skills
• Competitor Intelligence •Team Building & Leadership • Key Account Management
• Communication Skills • Training & Development • Mentoring
• Client / Vendor Relations • Counseling • Policy/Procedure Formulation
Organizational Contour
Gayath Industries Chennai July 2012 to Present
Designation: QA / QC Engineer
Key Tasks Handled
 To provide strategic support in all facets of the Project Management.
 To responsible for the complete inspection as required by the existing company standard codes & Specifications.
 Preparation of Quality Assurance Plan and getting it approved by Third party inspection agencies/Client.
 To coordinate with other Departments for any services and facilities need in operation & Taking preventive and primary
actions against non-conformance.
 Quality checking of the received materials by cross checking with Mill Test certificate or Lab Test certificate
 Studying the ITP, PO and approved Drawing of the Clients and listing the testing and inspection requirements.
 Planning for the final testing, inspection and co-coordinating TPI witnessing.
 Read and interpret blueprints, technical drawings, schematics, and computer-generated reports & involved in preparing
Inspection Documents and testing reports as per ISO procedures.
 Material incoming report preparation, Minimum wastage material planning, Making material requisition as per the
approved drawings as per standards & Preparation
 Providing the dispatch clearance once it is cleared with all the testing and visual inspection and confirming the Clients
requirement and standards. Maintenance of all the instruments and up gradation of Calibration status.
 Attended meetings with senior engineer in negotiation of price and delivery of products.
 Carrying out NDT tests to the castings and forgings received i.e. RT, PT and UT and accepting with respect to ASME std.
 Practicing 5s concepts at workplace and also updating SQDC board i.e. Safety, Quality, Delivery and Cost within the
organization.
Accomplishments
 Acknowledged as a proven performer in challenging production QA / QC environments, outperforming goals in every
position and twice achieved awards. /Received the “Star of the month” Awards.
 Designed and executed new quality control processes with regards to production planning & design which in turn
reduced the turnaround time for production.
.
Academic Credentials
 BE Mechanical Engineering @ Shri Andal Alagar College of engineering - CGPA=6.29/10 - 2008-2012
 HSSLC @ Nav Bharath Vidhyalaya Mat. Hr. Sec. School - Chennai - 62.70 % - 2007-2008
 SSLC @ Nav Bharath Vidhyalaya Mat. Hr. Sec. School - Chennai - 53 % - 2005-2006
Project Contour
 Main Project: Dual Rotor Power Generation System
Description: As we know that the relative speed of two rotating member is sum of their speeds. In ordinary
generator rotor is rotating member and stator is stationary one, why we need to fix stator if we able to rotate
the stator in opposite direction to rotor means we will get more power, while rotating in opposite direction
with each other the flux cutting also increases.
So we designed the generator with rotating stator and applied in power generation using Pelton Wheel. For
same discharge we got 60% more power than ordinary generator.
 Mini Project: Design and fabrication of QUICK LIFTING JACK by using Slotted and Lever Mechanism.
Description: In most of the garages the vehicles are lifted by using screw jack. This needs high man power In
order to avoid such a disadvantage.
In this project, this motorized hydraulic jack has been designed in such a way that it can be used to lift the
vehicle by using the slotted & lever mechanism very smoothly without any impact force.
This operation is made be simple that even an unskilled labor can handled, by just demonstrating the
working of the slotted & lever motorized hydraulic jack once.
IT Credentials
 Operating System : WINDOWS 95, 98, 2000, XP | AUTOCAD
 Office Automation Tools: MS-Office / MS Project
 Software’s: CATIA V5,PRO-E 2007, UG NX, Delcam Powershape, Adobe Photoshop
Training & Development
Self-Development Trainings
 Leadership skills / Communication skills /Personal effectiveness / Physical disciples
 Presentation skills / Negotiation Skills /Managerial effectiveness / Time management
 Assertiveness skills / Relaxation Techniques / Handling conflicts / SWOT analysis
 Attended training program on Art of Life Saving skills.
 Vocational training @ Rane TRW Limited (Seat belt division) & Rane NSK Steering Systems Limited with
respect to Quality Assurance.
Interest & Hobbies
 Participated in CAD modeling event in various colleges
 Being a student treasure of the SIFE INDIA in our college team
 Participate in auto quiz event in SAE INDIA mini convention 2009
 Won gold medal in ball badminton inter zone level 2009
Interest & Hobbies
 Sharing of Knowledge / Driving
 Reading Books / Photography
Personal Dossier
Date of Birth : 12th
November 1990
Marital Status : Married
Father Name : Mr. Abdul Rehman FM
Passport Number : L2299595 valid till 08th
July 2023
Languages Known : English, Tamil, Hindi (Speak, Read & Write)
References : Available upon request.

CV Fehran 2014 ver 1.0 - Copy (1)

  • 1.
    Fehran AR #1A AmarnithiyarSt, Shakizhar Ngr, Kundrathur, Chennai, India 600069 Mobile: +919003009667, +919789058598|Email:fehran_ar@hotmail.com A highly motivated, dynamic and focused, analytical and quick thinking Mechanical Engineering professional with strong communication skills & offer experience in: performing autonomously and/or collaboratively in a rapid-paced, high-pressured environment and specialized in quality control & quality assurance and seeking innovative and challenging career in the professionally managed and dynamic organization which enables me to utilize my analytical abilities and provide opportunities for development and responsibilities to contribute and lead productive teams and exceed Organization’s objectives. Leadership …. | Team Commitment …. | Superlative Quality Acumen … Professional Summary  An astute professional with an overall solid experience of 4 years in the areas of Quality Management System, Production Planning & design which gave in-depth understanding for handling various domain areas in Mechanical Engineering.  Experienced in various engineering processes and tools. Develop, coordinate, and monitor all aspects of production, including selection of manufacturing methods, fabrication, and operation of product designs.  Handled various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time with quality.  Ensuring adherence to quality standards, implementing stringent quality control systems and reduce rejection level & rework.  Strategic planning to meet the production & quality targets, Manpower handling, Manpower balancing, Line balancing, Root cause analysis of production, quality problems & rejection, Production monitoring, obtaining & presentation of quality trends, corrective & preventive action taken, Updating quality & production documentation.  Consummate professional who follows a disciplined approach to development in the Project Management.  To involve in developing systems to ensure products or services are designed and produced to meet or exceed customer requirement and expectations.  To cover all of these activities like design, development, production, installation, servicing and documentation.  Adept in managing & leading teams for running successful process operations & developed result oriented projects in coordination with all verticals for the service standards of business excellence.  Demonstrated prowess of working long hours in the execution, monitoring and control phases of project Management.  Demonstrated capabilities in motivating, taking initiatives, delegating work.  All Production design work was carried out in accordance with authority guidelines and regulations within the project Management schedule.  Using research, analytical, conceptual and production planning skills, particularly mathematical modeling and computer-aided design.  Discussing & solving complex problems with manufacturing departments, sub-contractors, suppliers and customers.  A result-oriented professional with good communication, leadership, team management, analytical & Coordination skills. Key Skills and Expertise • Strategic & Tactical Planning • Problem solving • Organizational skills • Competitor Intelligence •Team Building & Leadership • Key Account Management
  • 2.
    • Communication Skills• Training & Development • Mentoring • Client / Vendor Relations • Counseling • Policy/Procedure Formulation Organizational Contour Gayath Industries Chennai July 2012 to Present Designation: QA / QC Engineer Key Tasks Handled  To provide strategic support in all facets of the Project Management.  To responsible for the complete inspection as required by the existing company standard codes & Specifications.  Preparation of Quality Assurance Plan and getting it approved by Third party inspection agencies/Client.  To coordinate with other Departments for any services and facilities need in operation & Taking preventive and primary actions against non-conformance.  Quality checking of the received materials by cross checking with Mill Test certificate or Lab Test certificate  Studying the ITP, PO and approved Drawing of the Clients and listing the testing and inspection requirements.  Planning for the final testing, inspection and co-coordinating TPI witnessing.  Read and interpret blueprints, technical drawings, schematics, and computer-generated reports & involved in preparing Inspection Documents and testing reports as per ISO procedures.  Material incoming report preparation, Minimum wastage material planning, Making material requisition as per the approved drawings as per standards & Preparation  Providing the dispatch clearance once it is cleared with all the testing and visual inspection and confirming the Clients requirement and standards. Maintenance of all the instruments and up gradation of Calibration status.  Attended meetings with senior engineer in negotiation of price and delivery of products.  Carrying out NDT tests to the castings and forgings received i.e. RT, PT and UT and accepting with respect to ASME std.  Practicing 5s concepts at workplace and also updating SQDC board i.e. Safety, Quality, Delivery and Cost within the organization. Accomplishments  Acknowledged as a proven performer in challenging production QA / QC environments, outperforming goals in every position and twice achieved awards. /Received the “Star of the month” Awards.  Designed and executed new quality control processes with regards to production planning & design which in turn reduced the turnaround time for production. . Academic Credentials  BE Mechanical Engineering @ Shri Andal Alagar College of engineering - CGPA=6.29/10 - 2008-2012  HSSLC @ Nav Bharath Vidhyalaya Mat. Hr. Sec. School - Chennai - 62.70 % - 2007-2008  SSLC @ Nav Bharath Vidhyalaya Mat. Hr. Sec. School - Chennai - 53 % - 2005-2006 Project Contour  Main Project: Dual Rotor Power Generation System Description: As we know that the relative speed of two rotating member is sum of their speeds. In ordinary generator rotor is rotating member and stator is stationary one, why we need to fix stator if we able to rotate the stator in opposite direction to rotor means we will get more power, while rotating in opposite direction with each other the flux cutting also increases. So we designed the generator with rotating stator and applied in power generation using Pelton Wheel. For same discharge we got 60% more power than ordinary generator.  Mini Project: Design and fabrication of QUICK LIFTING JACK by using Slotted and Lever Mechanism. Description: In most of the garages the vehicles are lifted by using screw jack. This needs high man power In order to avoid such a disadvantage.
  • 3.
    In this project,this motorized hydraulic jack has been designed in such a way that it can be used to lift the vehicle by using the slotted & lever mechanism very smoothly without any impact force. This operation is made be simple that even an unskilled labor can handled, by just demonstrating the working of the slotted & lever motorized hydraulic jack once. IT Credentials  Operating System : WINDOWS 95, 98, 2000, XP | AUTOCAD  Office Automation Tools: MS-Office / MS Project  Software’s: CATIA V5,PRO-E 2007, UG NX, Delcam Powershape, Adobe Photoshop Training & Development Self-Development Trainings  Leadership skills / Communication skills /Personal effectiveness / Physical disciples  Presentation skills / Negotiation Skills /Managerial effectiveness / Time management  Assertiveness skills / Relaxation Techniques / Handling conflicts / SWOT analysis  Attended training program on Art of Life Saving skills.  Vocational training @ Rane TRW Limited (Seat belt division) & Rane NSK Steering Systems Limited with respect to Quality Assurance. Interest & Hobbies  Participated in CAD modeling event in various colleges  Being a student treasure of the SIFE INDIA in our college team  Participate in auto quiz event in SAE INDIA mini convention 2009  Won gold medal in ball badminton inter zone level 2009 Interest & Hobbies  Sharing of Knowledge / Driving  Reading Books / Photography Personal Dossier Date of Birth : 12th November 1990 Marital Status : Married Father Name : Mr. Abdul Rehman FM Passport Number : L2299595 valid till 08th July 2023 Languages Known : English, Tamil, Hindi (Speak, Read & Write) References : Available upon request.