 Safety briefing by Mr Nagaraju
 Must SEE, THINK and DO IT RIGHT.
 Must wear proper personal protective equipment (PPE)
 Do not smoke at prohibited areas
 Do not wear metal objects, turn off any power supply and wear appropriate
clothes during inspection works.
 Consists of 3 types which are generator transformer, unit transformer and station transformer.
 Types of alarm for transformers: winding temp, oil temp, Buchholz, Oil Level, Pressure relief, oil flow,
cooler failure, pump failure etc.
16/3/2015
PIC : En Shaffi (Foreman) and En Zulfitri (Technician)
Plant: Generator Transformer Unit 4, CECR
Job: Alarm Test
20/3/2015
PIC: En Nasran (Assistant Foreman)
Plant: Generator Transformer and Unit Transformer (Unit 4)
Job: Stability Test
Aim : To verify and confirm the current transformer (CT) polarity and wiring connection
is correct before and after refurbishment of Generator Protection Relay.
15/4/2015
PIC: MELCO’s supervisor with Mitsubishi Engineer
Plant: Generator Transformer Unit 3
Job: On Load Tap Changer (OLTC) Inspection.
Tap Changing
- Change the number of coils
- Reduce / avoid arcing
OLTC Inspection
Periodical inspection points of
Mitsubishi Type MRT On Load Tap Changer (OLTC)
Diverter switch
Tap Selector
- Spur gear
- Insulation driving shaft
- Insulation supporting shaft
- Sheild ring
- Quick motion mechanism
- Moving contact unit
- Stationary contact
- Current-limiting resistor- Upper mechanism
- Contact assembly
Types of failure
of the major
components
Methods to
overcome the
failure
Generator Transformer
28/4/2015
PIC: En Nasran with Siemens supervisor
Plant: Generator Transformer Unit 3
Job: Bushing Inspection
- Change new bushing from Trench by Germany
23/3/2015
PIC: En Zulfitri (Technician)
Plant: Generator Hydrogen Cooling System Unit 4
Job: Hydrogen Drier Purge with Nitrogen.
NOTES:
H2 to replace CO2 takes 3 hours.
H2 to operate pressure after replacing CO2
completely 100% takes 1 hour.
24/3/2015
PIC: En Nasran (Assistant Foreman) and En Zulfitri (Technician)
Plant: Generator Transformer and Unit Transformer Unit 4
Job: Insulation Resistance (IR) Test
IPB is turned off manually Voltage transformer
(R,Y,B) panels are
rack out
IR and PI test
(1kV/1-10min) conducted
Short circuit and grounding
switch
- Disconnecting neutral
grounding tx
24/4/2015
PIC: Contractor
Plant: Generator and Exciter Unit 3
Job: Bearing Inspection of Exciter
PIC: En Azhari (Technician)
Plant: Battery 220 VDC Unit 4
Job: Testing change over relay
- Learn the drawing
- Learn the battery information
PIC: En Syazali (Technician)
Plant: Battery bank 220 VDC (Unit 3 & Unit 4)
Job: Monthly reading on voltage and temperature.
NOTES:
The battery’s voltage must  1.8V
PIC: Menang Company (Contractor)
Plant: Battery Room 48 VDC
Job: Boost Charge and Battery Discharge Test
OVERVIEW:
-Boost charge the battery bank
1 day before the test conducted
by increasing the charger output
to 62.7V (1.65V per cell)
- Switch off the battery MCCB
- Measure battery voltage,
spesific gravity and electrolyte
temperature of each cell
- Battery discharge test
- Final checking

More Related Content

What's hot

xfr oparation & maintenance
xfr oparation & maintenancexfr oparation & maintenance
xfr oparation & maintenance
Sheikh Nazmul Islam
 
Actuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmissionActuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmission
ZIYAD AMBALANGADAN
 
How to operate Fire Pump
How to operate Fire PumpHow to operate Fire Pump
How to operate Fire Pump
shahidalim
 
Variable speed fire pump controllers
Variable speed fire pump controllersVariable speed fire pump controllers
Variable speed fire pump controllers
michaeljmack
 
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANTFIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
DEEPAK GORAI
 
NFI - Industrial Pneumatics
NFI - Industrial PneumaticsNFI - Industrial Pneumatics

What's hot (6)

xfr oparation & maintenance
xfr oparation & maintenancexfr oparation & maintenance
xfr oparation & maintenance
 
Actuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmissionActuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmission
 
How to operate Fire Pump
How to operate Fire PumpHow to operate Fire Pump
How to operate Fire Pump
 
Variable speed fire pump controllers
Variable speed fire pump controllersVariable speed fire pump controllers
Variable speed fire pump controllers
 
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANTFIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
FIRE WATER PUMP HOUSE EQUIPMENT CAPACITY AND OPERATION AT POWER PLANT
 
NFI - Industrial Pneumatics
NFI - Industrial PneumaticsNFI - Industrial Pneumatics
NFI - Industrial Pneumatics
 

Viewers also liked

Organization Management with speaker notes
Organization Management with speaker notesOrganization Management with speaker notes
Organization Management with speaker notes
Margarita Salgado
 
scce-cep-2017-02-Tuchow
scce-cep-2017-02-Tuchowscce-cep-2017-02-Tuchow
scce-cep-2017-02-Tuchow
Matthew Tuchow
 
Sinergia
SinergiaSinergia
Sinergia
dalyspost
 
Development of a Sleep Education Program for College Students at UD
Development of a Sleep Education Program for College Students at UDDevelopment of a Sleep Education Program for College Students at UD
Development of a Sleep Education Program for College Students at UD
Dana Alexander
 
2016 Kithcart Resume - Clinical Transformation
2016 Kithcart Resume - Clinical Transformation2016 Kithcart Resume - Clinical Transformation
2016 Kithcart Resume - Clinical Transformation
Bobbie Kithcart
 
7 critères pour choisir votre centre de formation
7 critères pour choisir votre centre de formation7 critères pour choisir votre centre de formation
7 critères pour choisir votre centre de formation
Xavier FLEURY
 

Viewers also liked (6)

Organization Management with speaker notes
Organization Management with speaker notesOrganization Management with speaker notes
Organization Management with speaker notes
 
scce-cep-2017-02-Tuchow
scce-cep-2017-02-Tuchowscce-cep-2017-02-Tuchow
scce-cep-2017-02-Tuchow
 
Sinergia
SinergiaSinergia
Sinergia
 
Development of a Sleep Education Program for College Students at UD
Development of a Sleep Education Program for College Students at UDDevelopment of a Sleep Education Program for College Students at UD
Development of a Sleep Education Program for College Students at UD
 
2016 Kithcart Resume - Clinical Transformation
2016 Kithcart Resume - Clinical Transformation2016 Kithcart Resume - Clinical Transformation
2016 Kithcart Resume - Clinical Transformation
 
7 critères pour choisir votre centre de formation
7 critères pour choisir votre centre de formation7 critères pour choisir votre centre de formation
7 critères pour choisir votre centre de formation
 

Similar to INDUSTRIAL TRAINING

POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
Dhiraj Mahajan
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
Dhiraj Mahajan
 
J D J
J D JJ D J
J D J
jjinesh
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
Ankit Chaudhary
 
Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptx
VishalSen33
 
Beebe steam turbines cm apr2016 r1
Beebe steam turbines cm apr2016 r1Beebe steam turbines cm apr2016 r1
Beebe steam turbines cm apr2016 r1
Ray Beebe
 
Muneer GTPS
Muneer GTPSMuneer GTPS
Muneer GTPS
Muneer Ahmed
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi
 
engineering and utilities report
engineering and utilities reportengineering and utilities report
engineering and utilities report
Hassan Bilal
 
PTPS
PTPSPTPS
Introduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptxIntroduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptx
Samir Ahmed Shimul
 
Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Improving reliability thru automation projects r4
Improving reliability thru automation projects r4
Omer Haluk Yılmaz
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
qazi faisal
 
Compressors
CompressorsCompressors
Compressors
Lungisani Miya
 
Steam and gas power plant
Steam and gas power plantSteam and gas power plant
Steam and gas power plant
Amol Kokare
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
chintanraval24
 
our project presentation
our project presentation our project presentation
our project presentation
Muhammad Saleem
 
My gtc presentation
My gtc presentationMy gtc presentation
My gtc presentation
mdosmankabir
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
System Protection
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
kalumutha
 

Similar to INDUSTRIAL TRAINING (20)

POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
J D J
J D JJ D J
J D J
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptx
 
Beebe steam turbines cm apr2016 r1
Beebe steam turbines cm apr2016 r1Beebe steam turbines cm apr2016 r1
Beebe steam turbines cm apr2016 r1
 
Muneer GTPS
Muneer GTPSMuneer GTPS
Muneer GTPS
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
engineering and utilities report
engineering and utilities reportengineering and utilities report
engineering and utilities report
 
PTPS
PTPSPTPS
PTPS
 
Introduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptxIntroduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptx
 
Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Improving reliability thru automation projects r4
Improving reliability thru automation projects r4
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
Compressors
CompressorsCompressors
Compressors
 
Steam and gas power plant
Steam and gas power plantSteam and gas power plant
Steam and gas power plant
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
our project presentation
our project presentation our project presentation
our project presentation
 
My gtc presentation
My gtc presentationMy gtc presentation
My gtc presentation
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
 

INDUSTRIAL TRAINING

  • 1. Haziqah Raihah Binti Hassan EP089926 Lecturer: Dr Muhamad bin Mansur Supervisor: En. Ahmad Kamil Bin Mohd Yusof
  • 2.  Safety briefing by Mr Nagaraju  Must SEE, THINK and DO IT RIGHT.  Must wear proper personal protective equipment (PPE)  Do not smoke at prohibited areas  Do not wear metal objects, turn off any power supply and wear appropriate clothes during inspection works.
  • 3.
  • 4.  Consists of 3 types which are generator transformer, unit transformer and station transformer.  Types of alarm for transformers: winding temp, oil temp, Buchholz, Oil Level, Pressure relief, oil flow, cooler failure, pump failure etc. 16/3/2015 PIC : En Shaffi (Foreman) and En Zulfitri (Technician) Plant: Generator Transformer Unit 4, CECR Job: Alarm Test
  • 5. 20/3/2015 PIC: En Nasran (Assistant Foreman) Plant: Generator Transformer and Unit Transformer (Unit 4) Job: Stability Test Aim : To verify and confirm the current transformer (CT) polarity and wiring connection is correct before and after refurbishment of Generator Protection Relay.
  • 6. 15/4/2015 PIC: MELCO’s supervisor with Mitsubishi Engineer Plant: Generator Transformer Unit 3 Job: On Load Tap Changer (OLTC) Inspection. Tap Changing - Change the number of coils - Reduce / avoid arcing
  • 8. Periodical inspection points of Mitsubishi Type MRT On Load Tap Changer (OLTC) Diverter switch Tap Selector - Spur gear - Insulation driving shaft - Insulation supporting shaft - Sheild ring - Quick motion mechanism - Moving contact unit - Stationary contact - Current-limiting resistor- Upper mechanism - Contact assembly
  • 9. Types of failure of the major components Methods to overcome the failure Generator Transformer
  • 10. 28/4/2015 PIC: En Nasran with Siemens supervisor Plant: Generator Transformer Unit 3 Job: Bushing Inspection - Change new bushing from Trench by Germany
  • 11. 23/3/2015 PIC: En Zulfitri (Technician) Plant: Generator Hydrogen Cooling System Unit 4 Job: Hydrogen Drier Purge with Nitrogen. NOTES: H2 to replace CO2 takes 3 hours. H2 to operate pressure after replacing CO2 completely 100% takes 1 hour.
  • 12. 24/3/2015 PIC: En Nasran (Assistant Foreman) and En Zulfitri (Technician) Plant: Generator Transformer and Unit Transformer Unit 4 Job: Insulation Resistance (IR) Test IPB is turned off manually Voltage transformer (R,Y,B) panels are rack out IR and PI test (1kV/1-10min) conducted Short circuit and grounding switch - Disconnecting neutral grounding tx
  • 13. 24/4/2015 PIC: Contractor Plant: Generator and Exciter Unit 3 Job: Bearing Inspection of Exciter
  • 14. PIC: En Azhari (Technician) Plant: Battery 220 VDC Unit 4 Job: Testing change over relay - Learn the drawing - Learn the battery information
  • 15. PIC: En Syazali (Technician) Plant: Battery bank 220 VDC (Unit 3 & Unit 4) Job: Monthly reading on voltage and temperature. NOTES: The battery’s voltage must  1.8V
  • 16. PIC: Menang Company (Contractor) Plant: Battery Room 48 VDC Job: Boost Charge and Battery Discharge Test OVERVIEW: -Boost charge the battery bank 1 day before the test conducted by increasing the charger output to 62.7V (1.65V per cell) - Switch off the battery MCCB - Measure battery voltage, spesific gravity and electrolyte temperature of each cell - Battery discharge test - Final checking