Industrial Engineer
Mecanical & Organization
Francisco García Gutiérrez
Movile Phone :+34 639 58 01 00
Email: kikolondres@hotmail.com
Skype: kikolondres2
URL: http://lnkd.in/GKAj4N
What do I offer?
1. Lean Manufacturing
2. Shopfloor Management
3. Target Achievement
1. Lean Manufacturing
• Autonomous maintenance
• Planned maintenance
• Early equipment management
• Reengineering and Spare Parts
Management
• Complete FPY recording
• Field failure analysis
• Quality feedback loops
• Analysis of returns
• Evaluation and development
dialogue
• Qualification Matrix
• Grow Leaders from within
• Process planning
• Factory planning
• Location planning
• Ergonomics and safety
• Work place organization (5S)
• Standard operating sheet
Standardized work
• KPI management
• Problem solving techniques
• Improvement workshops
• Loss cost analysis
Visual management
CIP
Avoiding waste
• Variant introduction
• Resource and time planning
• Risk and escalation
management
• PEP
Project management
Product development
process
Phase-in / phase-out
management
Robust product phase-in
/ phase-out
• ABC/XYZ – Analysis
• JIT/JIS
• Kanban / Supermarket
• Milk run
• Vendor Managed Inventory
Pull-principle
• Production smoothing and
leveling (heijunka)
• Quick changeover- SMED
• Value stream mapping /design
Customer takt
Demand oriented
production
• Make or Buy
• Supplier selection and
development
• Supplier integration
• Supplier management
• Tool management
• Supply logistics
• Crossfuntional Teams - Kaizen
• Employee participation
• Comunication development
• Human relations barometer
• Team briefing
• Meile
Team work
Employee qualification and
development
Challenging and fostering
our people
• FMEA
• Poka Yoke
• SPC
• Production oriented product
design - Prokon
Defect prevention
6 SIGMA
• Jidoka
• Product audit
• Andon Systems
• Worker self check
Defect analysis /
correction
Defect detection /
test planning
Avoiding defects (zero-
defects)
Leveled Production (Heijunka), Stable and Standarized Processes,
Visual Management, Toyota Way Philosophy
Best Quality, Lowest Cost, Shortest Lead Time, Best Safety, High Morale
Planning guideline
• Continuous Improvement Ideas
Total Productive
Maintenance (TPM)
Employee initiative
Procurement
management
Toyota Production System
First live the Philosophy ,then the Tools
2. Shopfloor Management
Tools Used/Implemented
VSM/VSD improvements 5S Implantation KPI Design
TPM Implantation 6σ Improvement
New Assy Line
Definition
10% Lead Time reduction in preassembly areas More than five years implementing 5S’s Standard KPI Definition building & cross analizing in
production area
TPM Implantation in Assembly lines CTS & CTQ process correction and Stability 8% productivity, 12% lead Time, Secuenced feeding
and liberating space
1,056
1,050
1,044
1,038
1,032
1,026
1,020
LEI LES
LEI 1,02
O bjetiv o *
LES 1,06
Media de la muestra 1,0408
Número de muestra 120
Desv .Est. (Dentro) 0,00465603
Desv .Est. (General) 0,00486494
Procesar datos
C p 1,43
C PL 1,49
C PU 1,37
C pk 1,37
Pp 1,37
PPL 1,42
PPU 1,32
Ppk 1,32
C pm *
C apacidad general
C apacidad (dentro) del potencial
PPM < LEI 0,00
PPM > LES 0,00
PPM Total 0,00
Desempeño observ ado
PPM < LEI 3,97
PPM > LES 18,59
PPM Total 22,56
Exp. Dentro del rendimiento
PPM < LEI 9,56
PPM > LES 39,53
PPM Total 49,10
Exp. Rendimiento general
Dentro de
General
Capacidad de proceso de Diametro interno
SMEDISO 9001 / TS 16949 / VDA
Method, Tools,
Purchasing
Quality Management Supermarket/Kamban
Tools Used/Implemented
Layout Redefinition
More than 200 hrs auditing TS 16949, also
procedure making, instructions, registrys
50 % decreased time in changeover in assembly
lines
New tools , methots testing and implementing
Quality management and improvement up to 3% Implementation and coordination with
engineering department
Freeing space and organizing logistics in production
areas .Gainning space up to 30%.
Shopfloor Processes/Experience
Semi Automated Processes Mechanizing by Metal Shaving
Automotive Die Punching
Welding
Degreasing
Roll Forming
Glueing
Serigraphy
Stamping
Ennameling Painting
Fitting
Folding and Shearing
Other Processes
Other Areas of experience
Warehouse
Optimization & Agility
Supliers Negotiation &
Purchasing
Industrial Design
Triple of inventory turns, 50.000 euros from 400.000 stock
liberated, billing lists, SAP data-Cross fullfillled, obsolete studio35.000 euros/year ratio; from 250 to 100 supliers
More than 2000 hours on Industrial drawing and
layout interpretation
International Teams
Experience working in England, USA and UE
3. Target Achievement
The basis
Team Breafing & Comunication Kaizen/6 Sigma
Productivity Improvement
Teamwork
Target Achievement
Cont.Improvement
Up to 35% One year OEE
• Resilient
• Negotiation
• Proactive
• Coaching
…
• Self/Continuous Learner
About me:
References:

Industrial Engineer

  • 1.
    Industrial Engineer Mecanical &Organization Francisco García Gutiérrez Movile Phone :+34 639 58 01 00 Email: kikolondres@hotmail.com Skype: kikolondres2 URL: http://lnkd.in/GKAj4N
  • 2.
    What do Ioffer?
  • 3.
    1. Lean Manufacturing 2.Shopfloor Management 3. Target Achievement
  • 4.
  • 5.
    • Autonomous maintenance •Planned maintenance • Early equipment management • Reengineering and Spare Parts Management • Complete FPY recording • Field failure analysis • Quality feedback loops • Analysis of returns • Evaluation and development dialogue • Qualification Matrix • Grow Leaders from within • Process planning • Factory planning • Location planning • Ergonomics and safety • Work place organization (5S) • Standard operating sheet Standardized work • KPI management • Problem solving techniques • Improvement workshops • Loss cost analysis Visual management CIP Avoiding waste • Variant introduction • Resource and time planning • Risk and escalation management • PEP Project management Product development process Phase-in / phase-out management Robust product phase-in / phase-out • ABC/XYZ – Analysis • JIT/JIS • Kanban / Supermarket • Milk run • Vendor Managed Inventory Pull-principle • Production smoothing and leveling (heijunka) • Quick changeover- SMED • Value stream mapping /design Customer takt Demand oriented production • Make or Buy • Supplier selection and development • Supplier integration • Supplier management • Tool management • Supply logistics • Crossfuntional Teams - Kaizen • Employee participation • Comunication development • Human relations barometer • Team briefing • Meile Team work Employee qualification and development Challenging and fostering our people • FMEA • Poka Yoke • SPC • Production oriented product design - Prokon Defect prevention 6 SIGMA • Jidoka • Product audit • Andon Systems • Worker self check Defect analysis / correction Defect detection / test planning Avoiding defects (zero- defects) Leveled Production (Heijunka), Stable and Standarized Processes, Visual Management, Toyota Way Philosophy Best Quality, Lowest Cost, Shortest Lead Time, Best Safety, High Morale Planning guideline • Continuous Improvement Ideas Total Productive Maintenance (TPM) Employee initiative Procurement management Toyota Production System First live the Philosophy ,then the Tools
  • 6.
  • 7.
    Tools Used/Implemented VSM/VSD improvements5S Implantation KPI Design TPM Implantation 6σ Improvement New Assy Line Definition 10% Lead Time reduction in preassembly areas More than five years implementing 5S’s Standard KPI Definition building & cross analizing in production area TPM Implantation in Assembly lines CTS & CTQ process correction and Stability 8% productivity, 12% lead Time, Secuenced feeding and liberating space 1,056 1,050 1,044 1,038 1,032 1,026 1,020 LEI LES LEI 1,02 O bjetiv o * LES 1,06 Media de la muestra 1,0408 Número de muestra 120 Desv .Est. (Dentro) 0,00465603 Desv .Est. (General) 0,00486494 Procesar datos C p 1,43 C PL 1,49 C PU 1,37 C pk 1,37 Pp 1,37 PPL 1,42 PPU 1,32 Ppk 1,32 C pm * C apacidad general C apacidad (dentro) del potencial PPM < LEI 0,00 PPM > LES 0,00 PPM Total 0,00 Desempeño observ ado PPM < LEI 3,97 PPM > LES 18,59 PPM Total 22,56 Exp. Dentro del rendimiento PPM < LEI 9,56 PPM > LES 39,53 PPM Total 49,10 Exp. Rendimiento general Dentro de General Capacidad de proceso de Diametro interno
  • 8.
    SMEDISO 9001 /TS 16949 / VDA Method, Tools, Purchasing Quality Management Supermarket/Kamban Tools Used/Implemented Layout Redefinition More than 200 hrs auditing TS 16949, also procedure making, instructions, registrys 50 % decreased time in changeover in assembly lines New tools , methots testing and implementing Quality management and improvement up to 3% Implementation and coordination with engineering department Freeing space and organizing logistics in production areas .Gainning space up to 30%.
  • 9.
    Shopfloor Processes/Experience Semi AutomatedProcesses Mechanizing by Metal Shaving Automotive Die Punching Welding Degreasing Roll Forming Glueing Serigraphy Stamping Ennameling Painting Fitting Folding and Shearing Other Processes
  • 10.
    Other Areas ofexperience Warehouse Optimization & Agility Supliers Negotiation & Purchasing Industrial Design Triple of inventory turns, 50.000 euros from 400.000 stock liberated, billing lists, SAP data-Cross fullfillled, obsolete studio35.000 euros/year ratio; from 250 to 100 supliers More than 2000 hours on Industrial drawing and layout interpretation International Teams Experience working in England, USA and UE
  • 11.
  • 12.
    The basis Team Breafing& Comunication Kaizen/6 Sigma Productivity Improvement Teamwork Target Achievement Cont.Improvement Up to 35% One year OEE
  • 13.
    • Resilient • Negotiation •Proactive • Coaching … • Self/Continuous Learner About me:
  • 15.