Lean Manufacturing
Agenda
 Background
 Toyota Production System
 Key Lean Techniques
 Advantages and Disadvantages
 People and Customers
 Economics
 Changes in Lean
 Current Lean Practices
 Case Studies
Definition
 Lean Manufacturing – A way to eliminate waste
and improve efficiency in a manufacturing
environment
 Lean focuses on flow, the value stream and
eliminating muda, the Japanese word for waste
 Lean manufacturing is the production of goods
using less of everything compared to traditional
mass production: less waste, human effort,
manufacturing space, investment in tools,
inventory, and engineering time to develop a new
product
Lean and Just-in-Time
 Lean was generated from the Just-in-time (JIT)
philosophy of continuous and forced problem
solving
 Just-in-time is supplying customers with exactly
what they want when they want it
 With JIT, supplies and components are “pulled”
through a system to arrive where they are needed
when they are needed
What is Waste?
 Waste is anything that
happens to a product
that does not add
value from the
customer’s perspective
 Products being stored,
inspected or delayed,
products waiting in
queues, and defective
products do not add
value
Seven Wastes
 Overproduction – producing more than the customer
orders or producing early. Inventory of any kind is
usually waste.
 Queues – idle time, storage, and waiting are wastes
 Transportation – moving material between plants,
between work centers, and handling more than once
is waste
 Inventory – unnecessary raw material, work-in-
process (WIP), finished goods, and excess operating
supplies
 Motion – movement of equipment or people
 Overprocessing – work performed on product that
adds no value
 Defective product – returns, warranty claims, rework
and scrap
Origins
Lean Manufacturing is
sometimes called the
Toyota Production
System (TPS) because
Toyota Motor
Company’s Eiji Toyoda
and Taiichui Ohno are
given credit for its
approach and
innovations
Underlying Principles to TPS
 Work shall be completely specified as to
content, sequence, timing, and outcome
 Every customer-supplier connection, both
internal and external, must be direct and
specify personnel, methods, timing, and
quantity of goods or services provided
 Product and service flows must be simple and
direct – goods and services are directed to a
specific person or machine
 Any improvement in the system must be made
in accordance with the “scientific method” at
the lowest possible level in the organization
Toyota Production System
 Since the Toyota Production System
requires that activities, connections, and
flow paths have built-in tests to signal
problems automatically, gaps become
immediately evident.
 Results of the TPS are improvements in
reliability, flexibility, safety, and efficiency.
 These lead to increase in market share
and profitability.
Timeline
Key Lean Manufacturing
Techniques
5S
Single Minute Exchange of Dies
Kanban
Cellular Manufacturing
5S
Strategy for creating a well organized, smoothly
flowing manufacturing process
5S Examples
Before After
Benefits of 5S
 Increases organization and efficiency
 Avoids wasted motion
 Increases safety
 Eliminates unnecessary inventory
 Offers improvements at an
inexpensive cost
5S Drawbacks
 If not fully implemented, may result in
“Jive S”
 Store things
 Stick to the rules
 Superficially clean
 Switch to new fixtures
 Serve reluctantly
 Can not be considered an end goal –
must be part of a continuous
improvement movement
Single Minute Exchange of Dies
(SMED)
Method that focuses on the rapid conversion from
manufacturing one product to the next
SMED and Lean
 SMED needs to be treated as a
constant improvement program
 Setup times can not be minimized
overnight
 Continuous evaluation and
exploration of further improvements
is absolutely necessary
09/06/24 18
Simple CNC Example
 New batch of parts arrives

Change over tools for the batch
 Set offsets for new tools

Load NC program
 Validate
 Run parts
 Load part onto machine
 Cycle start and wait
 Unload and visually inspect (adjust if necessary)
External elements of work can be completed while the machine is still running e.g.
get the next tool, get all your clamps, get lifting equipment in place, put equipment
away, etc.
Internal elements of work can only be done while the machine is stopped e.g. change
the tool, adjust the machine depth, sharpen a tool (which requires the machine to be
stopped), etc..
SMED Examples
SMED Examples
SMED Examples
For example:
 A slide clamp reduced the time required to load and unload parts to fixture.
 2 hold-down clamps eliminated the need to tape parts during a glue-up operation.
 Set slide allows quick (temporary) alignment of 2 parts.
SMED Examples
SMED Examples
 Split thread bolts
 Handles
 Toggle clamps
 U-shaped washers
09/06/24 25
Make the tool part of the screw device -- you don’t need a tool,
and this will save time in disassembling and reassembling the
tooling and fixturing!
09/06/24 26
Reduce the
amount of
turns required
in order to
activate the
screw.
09/06/24 27
Reduce the
amount of
screw turns and
eliminate the
tool!
09/06/24 28
09/06/24 29
09/06/24 30
Benefits of SMED
 Increases throughput by reducing setup
times
 Eliminates setup errors
 Increases safety
 Reduces the cost of setups
 Reduces waiting times and inventory buildups
 Decreases the required skill level of the
operators
Kanban
 A system that uses replenishment
signals to simplify inventory
management

Signals (usually cards) hold product details

What to make, when to make it, how much to make, and
where to send it
 Cards stay attached to a bin that holds the product
 When bin is empty, it is returned to the start of the
assembly line for replenishment
 Full bins are returned to the customer, and the
cycle continues
Kanban Example
Supermarket Ordering System
Benefits of Kanban
 Highly visible systems
 Simple, effective, and inexpensive
 Reduces inventory and eliminates
stock-outs
 Improves the quality of service
 Improves lead times
Cellular Manufacturing
Dividing the manufacture of products
into semi-autonomous and multi-
skilled teams known as work cells
Cellular Manufacturing
Example
Functional Layout
Cellular Layout
Benefits of Cellular
Manufacturing
 Simplifies material flow and
management
 Reduces interdepartmental travel
 Reduces throughput time
 Reduces lot sizes
 Simplifies scheduling
Lean Manufacturing
Advantages and Disadvantages
 Advantages:
 Increased overall
productivity
 Reduced amount of
floor space required
 Reduced
manufacturing lead
time
 Improved flexibility to
react to changes
 Improved quality
 Disadvantages:
 Difficulty involved with
changing processes to
implement lean
principals
 Long term commitment
required
 Very risky process -
expect supply chain
issues while changing
over to lean
People
 Transition to Lean is
difficult since a
company must build a
culture where learning
and continuous
improvement are the
norm.
 Success of lean
requires the full
commitment and
involvement of all
employees and of the
company’s suppliers.
How People Benefit from
Lean
Element Traditional Lean Improvement
Communication Slow & Uncertain Fast & Positive Quality &
Coordination
Teamwork Inhibited Enhanced Effective Teams
Motivation Negative, Extrinsic Positive, Intrinsic Strong Motivation
Skill Range Narrow Broad Job Enrichment
Supervision Difficult and
Fragmented
Easy & Localized Fewer Supervisors
How Customer’s Benefit
from Lean
Element Traditional Lean Improvement
Response Weeks Hours 70-90%
Customization Difficult Easy Competitive
Advantage
Delivery Speed Weeks-Months Days 70-90%
Delivery
Reliability
Erratic Consistent & High Up to 90%
Delivery
Quantities
Large Shipments JIT as Required Locks in JIT
Customers
Quality Erratic Consistent & High Delighted
Customers
House of Lean
Economics
 Reduction of Inventory

Less space necessary to hold inventory
 Reduced Waste

Decreased Production Cost
 Increased market share

Able to provide what the customer wants quickly
 Increased competitive advantage

Faster response to the customer

Lower Cost

Higher Quality
Changes in Lean since the
beginning
Inventory Comparison
 Inventory Turnover – annual cost of
goods sold from the income statement
divided by the value of inventory from
the balance sheet
Quality Control
 6 sigma process
 Combination of old and new ideas
 6 ingredients
 Genuine focus on the customer
 Data- and fact-driven management
 Process focus, management, and improvement
 Proactive management

Boundarlyless collaboration
 Drive for perfection, tolerance failure
Lean Maintenance
A Simultaneous Approach
6 Tools for Lean
Maintenance
 Visual Controls
 5S
 Seven Wastes
 Single Minute Exchange of Dies
 Poka-yoke
 Total Productive Maintenance
Other impacts of Lean
 Bell South – service industry
 Management system and operations Control

Process management, work measurement,
management control, and people development
 Combines lean and 6 sigma
 Woburn Safari Parks
 Feed logistics
 Animal Resource Planning
Background
 Poli-film America Inc. a division of a German owned
company.
 Manufactures protective masking that prevents abrasion
and staining of exposed surfaces during manufacturing
and delivery
 Industries Using Material:
 Plastics
 Automotives
 Construction
 Electronics
 Laminates
 Furniture
 Textiles
 High demand product
 24/7 production
Problems
 An enterprise resource planning system that
encompassed an unstable database

The database was untrustworthy account of inventory,
hand counts were necessary to confirm the numbers
counted by computers

Led to many employees spending many hours and led
to low processing and limit of work utilization
 Lack of frequency in supplies and storage –
errors in production and set limits
 Unable to trace items
 Main concern – program’s ability to adapt to
changing processes and production goals while
still maintaining inventory traceability real time
data with multiple distribution sites
Results
 Chose a new program to implement in later 2003
 Greatest impact on company’s inventory flow and order
distribution

Real time traceability allowed him to cut down on the 2 mil
lbs of film and other materials by more than half and
maintain a sufficient safety stock for when its time to reorder
and restock
 Benefits through Lean

Time and money has seen dramatic cuts

Instead of 20 min to fill an order, takes less than 5 min currently

Allowed company to expand for more regional coverage

Been simplified for reports

Reduce time taken to accomplish certain tasks and add more
responsibilities

Lean Manufacturing Ind advanced for factory implement.ppt

  • 1.
  • 2.
    Agenda  Background  ToyotaProduction System  Key Lean Techniques  Advantages and Disadvantages  People and Customers  Economics  Changes in Lean  Current Lean Practices  Case Studies
  • 3.
    Definition  Lean Manufacturing– A way to eliminate waste and improve efficiency in a manufacturing environment  Lean focuses on flow, the value stream and eliminating muda, the Japanese word for waste  Lean manufacturing is the production of goods using less of everything compared to traditional mass production: less waste, human effort, manufacturing space, investment in tools, inventory, and engineering time to develop a new product
  • 4.
    Lean and Just-in-Time Lean was generated from the Just-in-time (JIT) philosophy of continuous and forced problem solving  Just-in-time is supplying customers with exactly what they want when they want it  With JIT, supplies and components are “pulled” through a system to arrive where they are needed when they are needed
  • 5.
    What is Waste? Waste is anything that happens to a product that does not add value from the customer’s perspective  Products being stored, inspected or delayed, products waiting in queues, and defective products do not add value
  • 6.
    Seven Wastes  Overproduction– producing more than the customer orders or producing early. Inventory of any kind is usually waste.  Queues – idle time, storage, and waiting are wastes  Transportation – moving material between plants, between work centers, and handling more than once is waste  Inventory – unnecessary raw material, work-in- process (WIP), finished goods, and excess operating supplies  Motion – movement of equipment or people  Overprocessing – work performed on product that adds no value  Defective product – returns, warranty claims, rework and scrap
  • 7.
    Origins Lean Manufacturing is sometimescalled the Toyota Production System (TPS) because Toyota Motor Company’s Eiji Toyoda and Taiichui Ohno are given credit for its approach and innovations
  • 8.
    Underlying Principles toTPS  Work shall be completely specified as to content, sequence, timing, and outcome  Every customer-supplier connection, both internal and external, must be direct and specify personnel, methods, timing, and quantity of goods or services provided  Product and service flows must be simple and direct – goods and services are directed to a specific person or machine  Any improvement in the system must be made in accordance with the “scientific method” at the lowest possible level in the organization
  • 9.
    Toyota Production System Since the Toyota Production System requires that activities, connections, and flow paths have built-in tests to signal problems automatically, gaps become immediately evident.  Results of the TPS are improvements in reliability, flexibility, safety, and efficiency.  These lead to increase in market share and profitability.
  • 10.
  • 11.
    Key Lean Manufacturing Techniques 5S SingleMinute Exchange of Dies Kanban Cellular Manufacturing
  • 12.
    5S Strategy for creatinga well organized, smoothly flowing manufacturing process
  • 13.
  • 14.
    Benefits of 5S Increases organization and efficiency  Avoids wasted motion  Increases safety  Eliminates unnecessary inventory  Offers improvements at an inexpensive cost
  • 15.
    5S Drawbacks  Ifnot fully implemented, may result in “Jive S”  Store things  Stick to the rules  Superficially clean  Switch to new fixtures  Serve reluctantly  Can not be considered an end goal – must be part of a continuous improvement movement
  • 16.
    Single Minute Exchangeof Dies (SMED) Method that focuses on the rapid conversion from manufacturing one product to the next
  • 17.
    SMED and Lean SMED needs to be treated as a constant improvement program  Setup times can not be minimized overnight  Continuous evaluation and exploration of further improvements is absolutely necessary
  • 18.
    09/06/24 18 Simple CNCExample  New batch of parts arrives  Change over tools for the batch  Set offsets for new tools  Load NC program  Validate  Run parts  Load part onto machine  Cycle start and wait  Unload and visually inspect (adjust if necessary)
  • 19.
    External elements ofwork can be completed while the machine is still running e.g. get the next tool, get all your clamps, get lifting equipment in place, put equipment away, etc. Internal elements of work can only be done while the machine is stopped e.g. change the tool, adjust the machine depth, sharpen a tool (which requires the machine to be stopped), etc..
  • 20.
  • 21.
  • 22.
  • 23.
    For example:  Aslide clamp reduced the time required to load and unload parts to fixture.  2 hold-down clamps eliminated the need to tape parts during a glue-up operation.  Set slide allows quick (temporary) alignment of 2 parts. SMED Examples
  • 24.
    SMED Examples  Splitthread bolts  Handles  Toggle clamps  U-shaped washers
  • 25.
    09/06/24 25 Make thetool part of the screw device -- you don’t need a tool, and this will save time in disassembling and reassembling the tooling and fixturing!
  • 26.
    09/06/24 26 Reduce the amountof turns required in order to activate the screw.
  • 27.
    09/06/24 27 Reduce the amountof screw turns and eliminate the tool!
  • 28.
  • 29.
  • 30.
  • 31.
    Benefits of SMED Increases throughput by reducing setup times  Eliminates setup errors  Increases safety  Reduces the cost of setups  Reduces waiting times and inventory buildups  Decreases the required skill level of the operators
  • 32.
    Kanban  A systemthat uses replenishment signals to simplify inventory management  Signals (usually cards) hold product details  What to make, when to make it, how much to make, and where to send it  Cards stay attached to a bin that holds the product  When bin is empty, it is returned to the start of the assembly line for replenishment  Full bins are returned to the customer, and the cycle continues
  • 33.
  • 34.
    Benefits of Kanban Highly visible systems  Simple, effective, and inexpensive  Reduces inventory and eliminates stock-outs  Improves the quality of service  Improves lead times
  • 35.
    Cellular Manufacturing Dividing themanufacture of products into semi-autonomous and multi- skilled teams known as work cells
  • 36.
  • 37.
    Benefits of Cellular Manufacturing Simplifies material flow and management  Reduces interdepartmental travel  Reduces throughput time  Reduces lot sizes  Simplifies scheduling
  • 38.
    Lean Manufacturing Advantages andDisadvantages  Advantages:  Increased overall productivity  Reduced amount of floor space required  Reduced manufacturing lead time  Improved flexibility to react to changes  Improved quality  Disadvantages:  Difficulty involved with changing processes to implement lean principals  Long term commitment required  Very risky process - expect supply chain issues while changing over to lean
  • 39.
    People  Transition toLean is difficult since a company must build a culture where learning and continuous improvement are the norm.  Success of lean requires the full commitment and involvement of all employees and of the company’s suppliers.
  • 40.
    How People Benefitfrom Lean Element Traditional Lean Improvement Communication Slow & Uncertain Fast & Positive Quality & Coordination Teamwork Inhibited Enhanced Effective Teams Motivation Negative, Extrinsic Positive, Intrinsic Strong Motivation Skill Range Narrow Broad Job Enrichment Supervision Difficult and Fragmented Easy & Localized Fewer Supervisors
  • 41.
    How Customer’s Benefit fromLean Element Traditional Lean Improvement Response Weeks Hours 70-90% Customization Difficult Easy Competitive Advantage Delivery Speed Weeks-Months Days 70-90% Delivery Reliability Erratic Consistent & High Up to 90% Delivery Quantities Large Shipments JIT as Required Locks in JIT Customers Quality Erratic Consistent & High Delighted Customers
  • 42.
  • 43.
    Economics  Reduction ofInventory  Less space necessary to hold inventory  Reduced Waste  Decreased Production Cost  Increased market share  Able to provide what the customer wants quickly  Increased competitive advantage  Faster response to the customer  Lower Cost  Higher Quality
  • 44.
    Changes in Leansince the beginning
  • 45.
    Inventory Comparison  InventoryTurnover – annual cost of goods sold from the income statement divided by the value of inventory from the balance sheet
  • 46.
    Quality Control  6sigma process  Combination of old and new ideas  6 ingredients  Genuine focus on the customer  Data- and fact-driven management  Process focus, management, and improvement  Proactive management  Boundarlyless collaboration  Drive for perfection, tolerance failure
  • 47.
  • 48.
  • 49.
    6 Tools forLean Maintenance  Visual Controls  5S  Seven Wastes  Single Minute Exchange of Dies  Poka-yoke  Total Productive Maintenance
  • 51.
    Other impacts ofLean  Bell South – service industry  Management system and operations Control  Process management, work measurement, management control, and people development  Combines lean and 6 sigma  Woburn Safari Parks  Feed logistics  Animal Resource Planning
  • 52.
    Background  Poli-film AmericaInc. a division of a German owned company.  Manufactures protective masking that prevents abrasion and staining of exposed surfaces during manufacturing and delivery  Industries Using Material:  Plastics  Automotives  Construction  Electronics  Laminates  Furniture  Textiles  High demand product  24/7 production
  • 53.
    Problems  An enterpriseresource planning system that encompassed an unstable database  The database was untrustworthy account of inventory, hand counts were necessary to confirm the numbers counted by computers  Led to many employees spending many hours and led to low processing and limit of work utilization  Lack of frequency in supplies and storage – errors in production and set limits  Unable to trace items  Main concern – program’s ability to adapt to changing processes and production goals while still maintaining inventory traceability real time data with multiple distribution sites
  • 54.
    Results  Chose anew program to implement in later 2003  Greatest impact on company’s inventory flow and order distribution  Real time traceability allowed him to cut down on the 2 mil lbs of film and other materials by more than half and maintain a sufficient safety stock for when its time to reorder and restock  Benefits through Lean  Time and money has seen dramatic cuts  Instead of 20 min to fill an order, takes less than 5 min currently  Allowed company to expand for more regional coverage  Been simplified for reports  Reduce time taken to accomplish certain tasks and add more responsibilities

Editor's Notes

  • #23 INSTRUCTOR NOTES: Summarize what some of the possible improvements that can be made utilizing some of the clamping devices available.
  • #35 Usually moves in a u shape
  • #44 Figure 1 page 27 dec 2005 Best feature (company to company collaboration) Internal collaboration Toyota vs. dell/wal-mart Kanban converting to RFid?
  • #45 Show Figure 2 Toyota still most respected for quality and popularity, inventory results suggest that things are missing from the company's lean tool set Dell has annual improvement
  • #47 Strategies for optimizing asset performance Financial value generated or enabled by physical assets. Physical assets – industrial facilities, manufacturing facilities, and equipment In stead of demanding financial improvements, cut heads and le those figure out, proper way is to find work process improvements to drive improved results and financial
  • #48 Best approach is to focus on lean, maintenance, and reliability improvements simultaneously Stabilize production processes through equipment and process reliability while we challenge WIP , raw material and finished good buffers Process stability - By improving  enable tight alignment btwn takt time and flow times, converted into smaller buffers, smaller overall cycle times and higher machine utilization
  • #49 Visual controls – visible indicators for status, workorder, etc. 5s - Sorting. Refers to the practice of going through all the tools, materials, etc., in the work area and keeping only essential items. Everything else is stored or discarded. Simplifying. Focuses on the need for an orderly workplace. Sweeping, Systematic Cleaning, or Shining Standardizing. This refers to standardized work practices. Sustaining. Refers to maintaining and reviewing standards. Seven Wastes – anything customer won’t pay for is a waste: SMED – Poka-yoke – mistake proofing TPM – preventive maintenance, total QC, employee involvement, task sharing and maintenance
  • #50 Challenged buffers – smaller buffers, fewer defects – process yield will increase creating complementary reduction in mtfg costs. Focus planted in the management of people processes within the maintenance function to eliminate waste and drive process reliability.
  • #53 Unable to maintain the automatic efficiency needed throughout the manufacturing process Inaccuracies in information slowed production time and created inconsistencies for final product Got to a point where couldn’t trust system