Factors Driving MarketFactors Driving Market
PotentialPotential
►Aging T&D system averages 40Aging T&D system averages 40
years.years.
►Competitive markets drivingCompetitive markets driving
maintenance –vs- newmaintenance –vs- new
expenditures.expenditures.
►Renewed emphasis onRenewed emphasis on
maintenance to ensuremaintenance to ensure systemsystem
reliability.reliability.
Market SizeMarket Size
►Ameren UEAmeren UE
►325 Substations325 Substations
►1000 Power Transformers1000 Power Transformers
►3000 Circuit Breakers3000 Circuit Breakers
►Alabama PowerAlabama Power
►4000 Power Transformers4000 Power Transformers
►10,000 Circuit Breakers10,000 Circuit Breakers
SUBSTATION APPARATUSSUBSTATION APPARATUS
►TransformersTransformers
►Circuit BreakersCircuit Breakers
►Voltage RegulatorsVoltage Regulators
►Structural SteelStructural Steel
►Control BuildingsControl Buildings
WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION
PAINTING UNIQUE?PAINTING UNIQUE?
► SURFACE PREPARATIONSURFACE PREPARATION
► FLOW COATINGFLOW COATING
►Maintain viscosityMaintain viscosity
►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire
length of radiatorlength of radiator
► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE
ENVIRONMENTENVIRONMENT
Surface PreparationSurface Preparation
All prices are for total cost to clean, blast, and paint on a per square foot basis.All prices are for total cost to clean, blast, and paint on a per square foot basis.
Before painting equipment, customer and contractor will make field inspections to determine condition ofBefore painting equipment, customer and contractor will make field inspections to determine condition of
equipment and square footage.equipment and square footage.
DEFINITIONS GENERAL PAINT SCOPEDEFINITIONS GENERAL PAINT SCOPE
Good: Less than 25% surface rust spot blast, spot prime, 2 coatsGood: Less than 25% surface rust spot blast, spot prime, 2 coats
Fair: 25% to 50% surface rust spot blast, spot prime, 2 coatsFair: 25% to 50% surface rust spot blast, spot prime, 2 coats
Poor: greater than 50% surface rust full blast, 3 coatsPoor: greater than 50% surface rust full blast, 3 coats
Equipment Type Condition of EquipmentEquipment Type Condition of Equipment
Good Fair PoorGood Fair Poor
Transformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55Transformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55
+36% +82%+36% +82%
Radiators ( flo-coating) .85 1.05 1.45Radiators ( flo-coating) .85 1.05 1.45
+24% +71%+24% +71%
230 KV Breakers 3.45 4.25 6.10230 KV Breakers 3.45 4.25 6.10
+23% +77%+23% +77%
7.2 KV Regulators 4.80 5.35 6.007.2 KV Regulators 4.80 5.35 6.00
+11% +25%+11% +25%
Approximate price for a 40 MVA TransformerApproximate price for a 40 MVA Transformer
Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00
Radiators: 4158 square feet:Radiators: 4158 square feet:
WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION
PAINTING UNIQUE?PAINTING UNIQUE?
► SURFACE PREPSURFACE PREP
► FLOW COATINGFLOW COATING
►Maintain viscosityMaintain viscosity
►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire
length of radiatorlength of radiator
► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE
ENVIRONMENTENVIRONMENT
► COATING SELECTIONCOATING SELECTION
WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION
PAINTING UNIQUE?PAINTING UNIQUE?
►SURFACESURFACE PREPARATIONPREPARATION
► FLOW COATINGFLOW COATING
►Maintain viscosityMaintain viscosity
►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire
length of radiatorlength of radiator
► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE
ENVIRONMENTENVIRONMENT
► COATING SELECTIONCOATING SELECTION
Safe Working DistancesSafe Working Distances
VOLTAGE MINIMUM
DISTANCE
50 - 1,000 Avoid Contact
1,100 - 15,000 2’ 2”
15,100 - 36,000 2’ 7”
36,100 - 46,000 2’ 10”
46,100 - 72,500 3’ 6”
72,600 - 121,000 4’ 3”
138,000 - 145,000 4’ 11”
161,000 - 169,000 5’ 8”
230,000 - 242,000 7’ 6”
345,000 - 362,000 12’ 6”
500,000 - 550,000 18’ 1”
OSHA Standards (29 CFR 1910.269)
WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION
PAINTING UNIQUE?PAINTING UNIQUE?
► SURFACE PREPSURFACE PREP
► FLOW COATINGFLOW COATING
►Maintain viscosityMaintain viscosity
►Apply uniform 2.5-3.0 mils DFT along entireApply uniform 2.5-3.0 mils DFT along entire
length of radiatorlength of radiator
► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE
ENVIRONMENTENVIRONMENT
► COATING SELECTIONCOATING SELECTION
SUBSTATION STRUCTURALSUBSTATION STRUCTURAL
STEEL & FENCESTEEL & FENCE
►One coat of Induron’sOne coat of Induron’s
Induraguard 9200 Tower PaintInduraguard 9200 Tower Paint
@ 8 to 12 mils DFT.@ 8 to 12 mils DFT.
►Single Component (no pot life).Single Component (no pot life).
►Easy application by brush orEasy application by brush or
mittmitt
►20 year service life.20 year service life.
SUBSTATION EQUIPMENTSUBSTATION EQUIPMENT
COATING SYSTEMCOATING SYSTEM
►Full prime BodyFull prime Body
Induron’s P-30 Primer RedInduron’s P-30 Primer Red
►Full Intermediate CoatFull Intermediate Coat
Induron’s P-30 Primer TanInduron’s P-30 Primer Tan
►Full Finish CoatFull Finish Coat
Induron’s Indurasil Silicone EnamelInduron’s Indurasil Silicone Enamel
BIGGEST MAINTENANCEBIGGEST MAINTENANCE
PROBLEM IS TRANSFORMERSPROBLEM IS TRANSFORMERS
►Most expensive ($1,000,000Most expensive ($1,000,000
plus)plus)
►Hardest to replace (6 monthHardest to replace (6 month
lead time)lead time)
►Most critical for system loadMost critical for system load
and reliability.and reliability.
Transformer Coating SystemTransformer Coating System
► Full prime BodyFull prime Body
Induron’s Induramastic 85 orInduron’s Induramastic 85 or
Induron’s P-30 Primer RedInduron’s P-30 Primer Red
► Full prime RadiatorsFull prime Radiators
Induron’s P-30 Primer RedInduron’s P-30 Primer Red
► Full Intermediate CoatFull Intermediate Coat
Induron’s P-30 Primer TanInduron’s P-30 Primer Tan
► Full Finish CoatFull Finish Coat
Induron’s Indurasil Sky GrayInduron’s Indurasil Sky Gray
General Electric 40 MVAGeneral Electric 40 MVA
TransformerTransformer
► Tank Surface Area = 1008 sq. ft.Tank Surface Area = 1008 sq. ft.
► Radiator Surface Area = 4158 sq. ft.Radiator Surface Area = 4158 sq. ft.
Westinghouse 120 MVA TransformerWestinghouse 120 MVA Transformer
► Tank surface area = 1862 sq. ft.Tank surface area = 1862 sq. ft.
► Radiator surface area = 18,630 sq. ft.Radiator surface area = 18,630 sq. ft.
ABB 400 MVA SINGLE PHASEABB 400 MVA SINGLE PHASE
TRANSFORMERSTRANSFORMERS
► Tank Surface Area = 4006 sq. ft.Tank Surface Area = 4006 sq. ft.
► Radiator Surface Area = 77,600 sq. ft.Radiator Surface Area = 77,600 sq. ft.
(each)(each)
► 95% of surface area in the radiators95% of surface area in the radiators
MAINTENANCMAINTENANC
EE
PLANNINGPLANNING
PROGRAMPROGRAM
MAINTENANCE PLANNINGMAINTENANCE PLANNING
PROGRAMPROGRAM
► Physical survey of all substations.Physical survey of all substations.
► Rank items in order of priority.Rank items in order of priority.
► Photograph of high priority items.Photograph of high priority items.
► Test for lead in coatings.Test for lead in coatings.
► Survey 7-10 subs per day.Survey 7-10 subs per day.
► Typical Cost: $1200 per day of survey timeTypical Cost: $1200 per day of survey time
plus travel expenses.plus travel expenses.
PAINTING SPECIFICATIONS
BY
UTILITY SERVICE & MAINTENANCE, INC.
for
SOUTHERN ILLINOIS POWER COOPERATIVE
ELIZABETHTOWN SUBSTATION
ITEM 1 PRIORITY
1
TRANSFORMER, GENERAL ELECTRIC
30/40/56 MVA
161,000-69,000 VOLTS
Serial Number: L252271
Company Number: TR#2
REMOVE FANS, CLEAN, PRIME, BODY AND FINISH COAT, REPLACE ON TRANSFORMER AND TOUCH UP AFTER
REMOUNTING.
HIGH PRESSURE WASH TANK, ACCESSORIES AND RADIATORS TO REMOVE GLOSS/CHALK AND TO NEUTRALIZE.
REMOVE RUST AND/OR LOOSE PAINT FROM ALL TANK AREAS (HAND SAND, POWER SAND, SCRAPE, SPOT BLAST OR
WATER BLAST).
SPOT PRIME ALL BARE METAL AREAS.
FULL BODY COAT TANK AND ACCESSORIES.
FULL BODY COAT RADIATOR TUBES (FLOW COAT).
FULL SPRAY FINISH COAT TANK AND ACCESSORIES.
FINISH COAT RADIATOR TUBES (FLOW COAT).
NOTE:
SIPCOOP TO PROVIDE WATER AT SITE.
SPOT PRIME BOLT HEADS. COVER ALUMINUM FAN BLADES.
SIPCOOP TO PROVIDE GROUNDING.
USM TO REMOVE AND REPLACE FANS.
MATERIALS
PRIMER -- INDURON INDURAMASTIC 85 EPOXY MASTIC
BODY COAT -- INDURON P-30 PRIMER, TAN
FINISH COAT –- INDURON INDURASIL SILICONE ALKYD, SKY GRAY, ANSI 70
PRICE --------------------------$18,484.53
MAINTENANCE PLANNINGMAINTENANCE PLANNING
PROGRAMPROGRAM
Benefits to CustomerBenefits to Customer
► Provides individual specifications forProvides individual specifications for
each itemeach item
► Prepares budgetPrepares budget
►By substationBy substation
►For entire systemFor entire system
► Prioritizes all painting needsPrioritizes all painting needs
► Report with photos for Top Priority itemsReport with photos for Top Priority items
Lead in Paint
 Generator/Owner responsible for lead paint chips
“cradle to grave”.
 Most states require contractor to be licensed by the
state in lead removal.
 Always contact your Environmental Department,
different states have different rules.
 Some states require “chain of custody” forms for test
samples.
 Two governmental agencies with lead requirements:
EPA – Environmental
OSHA – Worker Safety
EPA
 Generator – Any person, by site, whose act or process produces
hazardous waste identified or listed in 40 CFR Part 261 or whose
act first causes a hazardous waste to become subject to
regulation.
 Sampling of debris the responsibility of the generator. 40 CFR Part
262.11
 TCLP – Toxicity Characteristics Leaching Procedures, if waste
tested has a leachable lead concentration of greater than 5 ppm it
is considered hazardous under the RCRA Act.( Resource
Conservation and Recovery Act )
 One 55 gallon drum = approximately 200 kg, less than 100 kg per
month you are considered a conditionally exempt small quantity
generator.
 Storage times of 180 days or will be considered “operators of a
hazardous waste storage facility”.
Lead In Paint
 OSHA Definition: any coating containing
ANY amount of lead triggers the
standard, then the exposure levels
determine the level of
implementations/worker protection.
OSHA
 1993 - Lead Exposure in Construction Standard 29 CFR 1926.62
 Worker safety responsibility of the contractor.
 Must have a written compliance program.
 Employee training is triggered when employee exposures equal or
exceed the Action Level on any one day.
 Action Level: 30 micrograms per cubic meter, 8 hour time
weighted average.
 PEL – Permissible Exposure Limit: 50 micrograms per cubic meter
8 hour TWA.
 Competent Person –must be able to identify existing and
predictable lead hazards in the work area and have the authority
to take prompt measures to eliminate such problems

More Related Content

What's hot

4B Drop Forged Conveyor Chain
4B Drop Forged Conveyor Chain4B Drop Forged Conveyor Chain
4B Drop Forged Conveyor Chain
4B Braime Components
 
Robotic suction sweepers
Robotic suction sweepersRobotic suction sweepers
Robotic suction sweepers
waterexsds
 
Red Rooster air hoist catalogue
Red Rooster air hoist catalogueRed Rooster air hoist catalogue
Red Rooster air hoist catalogue
John Evans
 
Cbg6395 en-contiflex-vulkan
Cbg6395 en-contiflex-vulkanCbg6395 en-contiflex-vulkan
Cbg6395 en-contiflex-vulkan
Guglielmo Cancelli
 
Lindapter Girder-Clamp connections portfolio
Lindapter Girder-Clamp connections portfolioLindapter Girder-Clamp connections portfolio
Lindapter Girder-Clamp connections portfolio
Miguel Cardenas
 
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth BarsFurse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
Thorne & Derrick International
 
Micro e systems_hs30_datasheet
Micro e systems_hs30_datasheetMicro e systems_hs30_datasheet
Micro e systems_hs30_datasheet
Electromate
 
Htr india-products-surface-mount-hrw-english.pdf
Htr india-products-surface-mount-hrw-english.pdfHtr india-products-surface-mount-hrw-english.pdf
Htr india-products-surface-mount-hrw-english.pdf
htrindia
 
Ant atr451607-1085-001 datasheet 6 port uwb
Ant atr451607-1085-001 datasheet 6 port uwbAnt atr451607-1085-001 datasheet 6 port uwb
Ant atr451607-1085-001 datasheet 6 port uwb
Shivendra Kr. Singh
 
Rajant spec sheet-kma_2400_5-092617
Rajant spec sheet-kma_2400_5-092617Rajant spec sheet-kma_2400_5-092617
Rajant spec sheet-kma_2400_5-092617
Alex Hastomo
 
Kollmorgen nema23 special_purpose_specsheet
Kollmorgen nema23 special_purpose_specsheetKollmorgen nema23 special_purpose_specsheet
Kollmorgen nema23 special_purpose_specsheet
Electromate
 

What's hot (12)

4B Drop Forged Conveyor Chain
4B Drop Forged Conveyor Chain4B Drop Forged Conveyor Chain
4B Drop Forged Conveyor Chain
 
Robotic suction sweepers
Robotic suction sweepersRobotic suction sweepers
Robotic suction sweepers
 
Red Rooster air hoist catalogue
Red Rooster air hoist catalogueRed Rooster air hoist catalogue
Red Rooster air hoist catalogue
 
Cbg6395 en-contiflex-vulkan
Cbg6395 en-contiflex-vulkanCbg6395 en-contiflex-vulkan
Cbg6395 en-contiflex-vulkan
 
Sri garuda implements
Sri garuda implementsSri garuda implements
Sri garuda implements
 
Lindapter Girder-Clamp connections portfolio
Lindapter Girder-Clamp connections portfolioLindapter Girder-Clamp connections portfolio
Lindapter Girder-Clamp connections portfolio
 
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth BarsFurse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
Furse Earth Bars - Standard, Single & Twin Disconnection Copper Earth Bars
 
Micro e systems_hs30_datasheet
Micro e systems_hs30_datasheetMicro e systems_hs30_datasheet
Micro e systems_hs30_datasheet
 
Htr india-products-surface-mount-hrw-english.pdf
Htr india-products-surface-mount-hrw-english.pdfHtr india-products-surface-mount-hrw-english.pdf
Htr india-products-surface-mount-hrw-english.pdf
 
Ant atr451607-1085-001 datasheet 6 port uwb
Ant atr451607-1085-001 datasheet 6 port uwbAnt atr451607-1085-001 datasheet 6 port uwb
Ant atr451607-1085-001 datasheet 6 port uwb
 
Rajant spec sheet-kma_2400_5-092617
Rajant spec sheet-kma_2400_5-092617Rajant spec sheet-kma_2400_5-092617
Rajant spec sheet-kma_2400_5-092617
 
Kollmorgen nema23 special_purpose_specsheet
Kollmorgen nema23 special_purpose_specsheetKollmorgen nema23 special_purpose_specsheet
Kollmorgen nema23 special_purpose_specsheet
 

Viewers also liked

ppt
pptppt
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
PT Access Networks Showcase Sites 1st Quarter 2012
PT Access Networks Showcase Sites 1st Quarter 2012PT Access Networks Showcase Sites 1st Quarter 2012
PT Access Networks Showcase Sites 1st Quarter 2012
David Hargrove
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 

Viewers also liked (8)

ppt
pptppt
ppt
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
PT Access Networks Showcase Sites 1st Quarter 2012
PT Access Networks Showcase Sites 1st Quarter 2012PT Access Networks Showcase Sites 1st Quarter 2012
PT Access Networks Showcase Sites 1st Quarter 2012
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 

Similar to Induron new substation powerpoint rev1

Induron's New Substation T&D Presentation
Induron's New Substation T&D PresentationInduron's New Substation T&D Presentation
Induron's New Substation T&D Presentation
Intermark Group
 
Yash- Brief Presentation.pptx HV bushings
Yash- Brief Presentation.pptx HV bushingsYash- Brief Presentation.pptx HV bushings
Yash- Brief Presentation.pptx HV bushings
ShivamPatel812148
 
Trafo/ Transformator
Trafo/ TransformatorTrafo/ Transformator
Trafo/ Transformator
BENRY APRIANTO HUTAPEA
 
Transformers
TransformersTransformers
Transformers
michaeljmack
 
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdf
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdfAllwin21 Product Brochures-AWgage Metrology-2024.5.pdf
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdf
Peter Chen
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
Thabang3
 
New Star Plasma Brochure
New Star Plasma BrochureNew Star Plasma Brochure
New Star Plasma BrochurePaul Mutch
 
An introduction to Zeversolar inverters
An introduction to Zeversolar invertersAn introduction to Zeversolar inverters
An introduction to Zeversolar inverters
Alternergy
 
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering EquipmentN. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
IndiaMART InterMESH Limited
 
Powering Every House, Powering Every Industry
Powering Every House, Powering Every IndustryPowering Every House, Powering Every Industry
Powering Every House, Powering Every Industry
Akil Siddiqui
 
Npm stepper catalog
Npm stepper catalogNpm stepper catalog
Npm stepper catalog
Electromate
 
hv bushing yash make Presentation - NTPC.pptx
hv bushing yash make  Presentation - NTPC.pptxhv bushing yash make  Presentation - NTPC.pptx
hv bushing yash make Presentation - NTPC.pptx
ShivamPatel812148
 
Shimpo able vrs_brochure
Shimpo able vrs_brochureShimpo able vrs_brochure
Shimpo able vrs_brochure
Electromate
 
KEMET Webinar - KEMET Electrolytic ALC70 and ALC80 series
KEMET Webinar -  KEMET Electrolytic ALC70 and ALC80 seriesKEMET Webinar -  KEMET Electrolytic ALC70 and ALC80 series
KEMET Webinar - KEMET Electrolytic ALC70 and ALC80 series
Ivana Ivanovska
 
Helical Gear Box Dealer
Helical Gear Box DealerHelical Gear Box Dealer
Helical Gear Box Dealer
atulmittalseo
 
Aw 90xer plasma etcher rie
Aw 90xer plasma etcher rieAw 90xer plasma etcher rie
Aw 90xer plasma etcher rie
Peter Chen
 
Product Catlogue
Product CatlogueProduct Catlogue
Product Catlogue
GLOBAL POWER CORPORATION
 

Similar to Induron new substation powerpoint rev1 (20)

1 sv
1 sv1 sv
1 sv
 
Induron's New Substation T&D Presentation
Induron's New Substation T&D PresentationInduron's New Substation T&D Presentation
Induron's New Substation T&D Presentation
 
Yash- Brief Presentation.pptx HV bushings
Yash- Brief Presentation.pptx HV bushingsYash- Brief Presentation.pptx HV bushings
Yash- Brief Presentation.pptx HV bushings
 
Trafo/ Transformator
Trafo/ TransformatorTrafo/ Transformator
Trafo/ Transformator
 
Transformers
TransformersTransformers
Transformers
 
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdf
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdfAllwin21 Product Brochures-AWgage Metrology-2024.5.pdf
Allwin21 Product Brochures-AWgage Metrology-2024.5.pdf
 
ACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdfACTOM Distribution Transformers.pdf
ACTOM Distribution Transformers.pdf
 
New Star Plasma Brochure
New Star Plasma BrochureNew Star Plasma Brochure
New Star Plasma Brochure
 
An introduction to Zeversolar inverters
An introduction to Zeversolar invertersAn introduction to Zeversolar inverters
An introduction to Zeversolar inverters
 
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering EquipmentN. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
N. S. Terbo Pvt. Ltd., Ghaziabad, Heavy Engineering Equipment
 
Powering Every House, Powering Every Industry
Powering Every House, Powering Every IndustryPowering Every House, Powering Every Industry
Powering Every House, Powering Every Industry
 
Npm stepper catalog
Npm stepper catalogNpm stepper catalog
Npm stepper catalog
 
hv bushing yash make Presentation - NTPC.pptx
hv bushing yash make  Presentation - NTPC.pptxhv bushing yash make  Presentation - NTPC.pptx
hv bushing yash make Presentation - NTPC.pptx
 
Shimpo able vrs_brochure
Shimpo able vrs_brochureShimpo able vrs_brochure
Shimpo able vrs_brochure
 
KEMET Webinar - KEMET Electrolytic ALC70 and ALC80 series
KEMET Webinar -  KEMET Electrolytic ALC70 and ALC80 seriesKEMET Webinar -  KEMET Electrolytic ALC70 and ALC80 series
KEMET Webinar - KEMET Electrolytic ALC70 and ALC80 series
 
Helical Gear Box Dealer
Helical Gear Box DealerHelical Gear Box Dealer
Helical Gear Box Dealer
 
ATS-Catalogue-Latest
ATS-Catalogue-LatestATS-Catalogue-Latest
ATS-Catalogue-Latest
 
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATSCatalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
 
Aw 90xer plasma etcher rie
Aw 90xer plasma etcher rieAw 90xer plasma etcher rie
Aw 90xer plasma etcher rie
 
Product Catlogue
Product CatlogueProduct Catlogue
Product Catlogue
 

More from Kendall Smith

Induron coatings services
Induron coatings servicesInduron coatings services
Induron coatings services
Kendall Smith
 
Induron coatings t&d
Induron coatings t&dInduron coatings t&d
Induron coatings t&d
Kendall Smith
 
T&d coatings
T&d coatingsT&d coatings
T&d coatings
Kendall Smith
 

More from Kendall Smith (6)

Indura plan t&d
Indura plan t&dIndura plan t&d
Indura plan t&d
 
Juan pics 2015
Juan pics 2015Juan pics 2015
Juan pics 2015
 
Juan 2015
Juan 2015Juan 2015
Juan 2015
 
Induron coatings services
Induron coatings servicesInduron coatings services
Induron coatings services
 
Induron coatings t&d
Induron coatings t&dInduron coatings t&d
Induron coatings t&d
 
T&d coatings
T&d coatingsT&d coatings
T&d coatings
 

Recently uploaded

-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 

Recently uploaded (20)

-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 

Induron new substation powerpoint rev1

  • 1.
  • 2.
  • 3.
  • 4. Factors Driving MarketFactors Driving Market PotentialPotential ►Aging T&D system averages 40Aging T&D system averages 40 years.years. ►Competitive markets drivingCompetitive markets driving maintenance –vs- newmaintenance –vs- new expenditures.expenditures. ►Renewed emphasis onRenewed emphasis on maintenance to ensuremaintenance to ensure systemsystem reliability.reliability.
  • 5. Market SizeMarket Size ►Ameren UEAmeren UE ►325 Substations325 Substations ►1000 Power Transformers1000 Power Transformers ►3000 Circuit Breakers3000 Circuit Breakers ►Alabama PowerAlabama Power ►4000 Power Transformers4000 Power Transformers ►10,000 Circuit Breakers10,000 Circuit Breakers
  • 6. SUBSTATION APPARATUSSUBSTATION APPARATUS ►TransformersTransformers ►Circuit BreakersCircuit Breakers ►Voltage RegulatorsVoltage Regulators ►Structural SteelStructural Steel ►Control BuildingsControl Buildings
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE? ► SURFACE PREPARATIONSURFACE PREPARATION ► FLOW COATINGFLOW COATING ►Maintain viscosityMaintain viscosity ►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire length of radiatorlength of radiator ► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT
  • 13. Surface PreparationSurface Preparation All prices are for total cost to clean, blast, and paint on a per square foot basis.All prices are for total cost to clean, blast, and paint on a per square foot basis. Before painting equipment, customer and contractor will make field inspections to determine condition ofBefore painting equipment, customer and contractor will make field inspections to determine condition of equipment and square footage.equipment and square footage. DEFINITIONS GENERAL PAINT SCOPEDEFINITIONS GENERAL PAINT SCOPE Good: Less than 25% surface rust spot blast, spot prime, 2 coatsGood: Less than 25% surface rust spot blast, spot prime, 2 coats Fair: 25% to 50% surface rust spot blast, spot prime, 2 coatsFair: 25% to 50% surface rust spot blast, spot prime, 2 coats Poor: greater than 50% surface rust full blast, 3 coatsPoor: greater than 50% surface rust full blast, 3 coats Equipment Type Condition of EquipmentEquipment Type Condition of Equipment Good Fair PoorGood Fair Poor Transformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55Transformer Tanks – Medium- 15 to 40 MVA 4.15 5.65 7.55 +36% +82%+36% +82% Radiators ( flo-coating) .85 1.05 1.45Radiators ( flo-coating) .85 1.05 1.45 +24% +71%+24% +71% 230 KV Breakers 3.45 4.25 6.10230 KV Breakers 3.45 4.25 6.10 +23% +77%+23% +77% 7.2 KV Regulators 4.80 5.35 6.007.2 KV Regulators 4.80 5.35 6.00 +11% +25%+11% +25% Approximate price for a 40 MVA TransformerApproximate price for a 40 MVA Transformer Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00Tank: 1008 square feet: $7717.00 $10,060.00 $13,639.00 Radiators: 4158 square feet:Radiators: 4158 square feet:
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE? ► SURFACE PREPSURFACE PREP ► FLOW COATINGFLOW COATING ►Maintain viscosityMaintain viscosity ►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire length of radiatorlength of radiator ► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT ► COATING SELECTIONCOATING SELECTION
  • 20.
  • 21.
  • 22.
  • 23. WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE? ►SURFACESURFACE PREPARATIONPREPARATION ► FLOW COATINGFLOW COATING ►Maintain viscosityMaintain viscosity ►Apply uniform 2.5-3.0 mils dft along entireApply uniform 2.5-3.0 mils dft along entire length of radiatorlength of radiator ► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT ► COATING SELECTIONCOATING SELECTION
  • 24. Safe Working DistancesSafe Working Distances VOLTAGE MINIMUM DISTANCE 50 - 1,000 Avoid Contact 1,100 - 15,000 2’ 2” 15,100 - 36,000 2’ 7” 36,100 - 46,000 2’ 10” 46,100 - 72,500 3’ 6” 72,600 - 121,000 4’ 3” 138,000 - 145,000 4’ 11” 161,000 - 169,000 5’ 8” 230,000 - 242,000 7’ 6” 345,000 - 362,000 12’ 6” 500,000 - 550,000 18’ 1” OSHA Standards (29 CFR 1910.269)
  • 25.
  • 26.
  • 27. WHAT MAKES SUBSTATIONWHAT MAKES SUBSTATION PAINTING UNIQUE?PAINTING UNIQUE? ► SURFACE PREPSURFACE PREP ► FLOW COATINGFLOW COATING ►Maintain viscosityMaintain viscosity ►Apply uniform 2.5-3.0 mils DFT along entireApply uniform 2.5-3.0 mils DFT along entire length of radiatorlength of radiator ► SAFETY IN A HIGH VOLTAGESAFETY IN A HIGH VOLTAGE ENVIRONMENTENVIRONMENT ► COATING SELECTIONCOATING SELECTION
  • 28. SUBSTATION STRUCTURALSUBSTATION STRUCTURAL STEEL & FENCESTEEL & FENCE ►One coat of Induron’sOne coat of Induron’s Induraguard 9200 Tower PaintInduraguard 9200 Tower Paint @ 8 to 12 mils DFT.@ 8 to 12 mils DFT. ►Single Component (no pot life).Single Component (no pot life). ►Easy application by brush orEasy application by brush or mittmitt ►20 year service life.20 year service life.
  • 29. SUBSTATION EQUIPMENTSUBSTATION EQUIPMENT COATING SYSTEMCOATING SYSTEM ►Full prime BodyFull prime Body Induron’s P-30 Primer RedInduron’s P-30 Primer Red ►Full Intermediate CoatFull Intermediate Coat Induron’s P-30 Primer TanInduron’s P-30 Primer Tan ►Full Finish CoatFull Finish Coat Induron’s Indurasil Silicone EnamelInduron’s Indurasil Silicone Enamel
  • 30.
  • 31.
  • 32. BIGGEST MAINTENANCEBIGGEST MAINTENANCE PROBLEM IS TRANSFORMERSPROBLEM IS TRANSFORMERS ►Most expensive ($1,000,000Most expensive ($1,000,000 plus)plus) ►Hardest to replace (6 monthHardest to replace (6 month lead time)lead time) ►Most critical for system loadMost critical for system load and reliability.and reliability.
  • 33. Transformer Coating SystemTransformer Coating System ► Full prime BodyFull prime Body Induron’s Induramastic 85 orInduron’s Induramastic 85 or Induron’s P-30 Primer RedInduron’s P-30 Primer Red ► Full prime RadiatorsFull prime Radiators Induron’s P-30 Primer RedInduron’s P-30 Primer Red ► Full Intermediate CoatFull Intermediate Coat Induron’s P-30 Primer TanInduron’s P-30 Primer Tan ► Full Finish CoatFull Finish Coat Induron’s Indurasil Sky GrayInduron’s Indurasil Sky Gray
  • 34. General Electric 40 MVAGeneral Electric 40 MVA TransformerTransformer ► Tank Surface Area = 1008 sq. ft.Tank Surface Area = 1008 sq. ft. ► Radiator Surface Area = 4158 sq. ft.Radiator Surface Area = 4158 sq. ft.
  • 35. Westinghouse 120 MVA TransformerWestinghouse 120 MVA Transformer ► Tank surface area = 1862 sq. ft.Tank surface area = 1862 sq. ft. ► Radiator surface area = 18,630 sq. ft.Radiator surface area = 18,630 sq. ft.
  • 36. ABB 400 MVA SINGLE PHASEABB 400 MVA SINGLE PHASE TRANSFORMERSTRANSFORMERS ► Tank Surface Area = 4006 sq. ft.Tank Surface Area = 4006 sq. ft. ► Radiator Surface Area = 77,600 sq. ft.Radiator Surface Area = 77,600 sq. ft. (each)(each) ► 95% of surface area in the radiators95% of surface area in the radiators
  • 38. MAINTENANCE PLANNINGMAINTENANCE PLANNING PROGRAMPROGRAM ► Physical survey of all substations.Physical survey of all substations. ► Rank items in order of priority.Rank items in order of priority. ► Photograph of high priority items.Photograph of high priority items. ► Test for lead in coatings.Test for lead in coatings. ► Survey 7-10 subs per day.Survey 7-10 subs per day. ► Typical Cost: $1200 per day of survey timeTypical Cost: $1200 per day of survey time plus travel expenses.plus travel expenses.
  • 39.
  • 40. PAINTING SPECIFICATIONS BY UTILITY SERVICE & MAINTENANCE, INC. for SOUTHERN ILLINOIS POWER COOPERATIVE ELIZABETHTOWN SUBSTATION ITEM 1 PRIORITY 1 TRANSFORMER, GENERAL ELECTRIC 30/40/56 MVA 161,000-69,000 VOLTS Serial Number: L252271 Company Number: TR#2 REMOVE FANS, CLEAN, PRIME, BODY AND FINISH COAT, REPLACE ON TRANSFORMER AND TOUCH UP AFTER REMOUNTING. HIGH PRESSURE WASH TANK, ACCESSORIES AND RADIATORS TO REMOVE GLOSS/CHALK AND TO NEUTRALIZE. REMOVE RUST AND/OR LOOSE PAINT FROM ALL TANK AREAS (HAND SAND, POWER SAND, SCRAPE, SPOT BLAST OR WATER BLAST). SPOT PRIME ALL BARE METAL AREAS. FULL BODY COAT TANK AND ACCESSORIES. FULL BODY COAT RADIATOR TUBES (FLOW COAT). FULL SPRAY FINISH COAT TANK AND ACCESSORIES. FINISH COAT RADIATOR TUBES (FLOW COAT). NOTE: SIPCOOP TO PROVIDE WATER AT SITE. SPOT PRIME BOLT HEADS. COVER ALUMINUM FAN BLADES. SIPCOOP TO PROVIDE GROUNDING. USM TO REMOVE AND REPLACE FANS. MATERIALS PRIMER -- INDURON INDURAMASTIC 85 EPOXY MASTIC BODY COAT -- INDURON P-30 PRIMER, TAN FINISH COAT –- INDURON INDURASIL SILICONE ALKYD, SKY GRAY, ANSI 70 PRICE --------------------------$18,484.53
  • 41. MAINTENANCE PLANNINGMAINTENANCE PLANNING PROGRAMPROGRAM Benefits to CustomerBenefits to Customer ► Provides individual specifications forProvides individual specifications for each itemeach item ► Prepares budgetPrepares budget ►By substationBy substation ►For entire systemFor entire system ► Prioritizes all painting needsPrioritizes all painting needs ► Report with photos for Top Priority itemsReport with photos for Top Priority items
  • 42. Lead in Paint  Generator/Owner responsible for lead paint chips “cradle to grave”.  Most states require contractor to be licensed by the state in lead removal.  Always contact your Environmental Department, different states have different rules.  Some states require “chain of custody” forms for test samples.  Two governmental agencies with lead requirements: EPA – Environmental OSHA – Worker Safety
  • 43. EPA  Generator – Any person, by site, whose act or process produces hazardous waste identified or listed in 40 CFR Part 261 or whose act first causes a hazardous waste to become subject to regulation.  Sampling of debris the responsibility of the generator. 40 CFR Part 262.11  TCLP – Toxicity Characteristics Leaching Procedures, if waste tested has a leachable lead concentration of greater than 5 ppm it is considered hazardous under the RCRA Act.( Resource Conservation and Recovery Act )  One 55 gallon drum = approximately 200 kg, less than 100 kg per month you are considered a conditionally exempt small quantity generator.  Storage times of 180 days or will be considered “operators of a hazardous waste storage facility”.
  • 44. Lead In Paint  OSHA Definition: any coating containing ANY amount of lead triggers the standard, then the exposure levels determine the level of implementations/worker protection.
  • 45. OSHA  1993 - Lead Exposure in Construction Standard 29 CFR 1926.62  Worker safety responsibility of the contractor.  Must have a written compliance program.  Employee training is triggered when employee exposures equal or exceed the Action Level on any one day.  Action Level: 30 micrograms per cubic meter, 8 hour time weighted average.  PEL – Permissible Exposure Limit: 50 micrograms per cubic meter 8 hour TWA.  Competent Person –must be able to identify existing and predictable lead hazards in the work area and have the authority to take prompt measures to eliminate such problems