SlideShare a Scribd company logo
1 of 21
Download to read offline
Implementation
of
Tariff
Methodology
Bandula S. Tilakasena
Ceylon Electricity Board
Government of Sri Lanka
Ministry of Power and Energy
Public Utilities Commission
of
Sri Lanka
CEB Generation
Licence GL
Consumers
CEB Disribution
Small Power Producers
Independent Power Producers
Lanka Electricity Company PVT Ltd.
DL5
CEB Disribution
CEB Disribution
Licence DL 2
CEB Disribution
CEB Transmission
Licence TL
Licence DL 1
Licence DL 4
Licence DL 3
Licensing
Licensing
GOSL Policy
Directions
Organization of
the Power Sector
Main expectations from the Sri Lanka
Electricity Act 2009 as related to tariff
• Cost-reflective Tariffs & Charges (s. 30)
• Licensees being able to finance the
licensed activities (s. 4)
Corner stones in the Sri Lanka Electricity Act
for Tariff Determination
• Cost Reflective Methodology
Permit relevant licensees to recover all
reasonable costs incurred in carrying out
the authorized activities
• To be in accordance with Government
Policy Guidelines under Section 5
Prerequisites for Tariff Determination in the
legislation
• PUCSL Act : Section 30 (2)(a)
Government compensates Licensees for compliance
with GOSL Policy Directions
• Section 30 (4) of SLEA and S 30(2)(b) of PUCSL
Act
Upon being satisfied of adequacy of funds being
provided by the Treasury to bear the cost of any subsidy
approved by the Government to subsidize Costumers…
• Cross subsidies are recoverable from Customer
categories
Filing of Licensee Revenue Requirements
All Licensees submitted their Revenue
Requirements in August 2010 for the First Tariff
Period.
An Extraordinary Tariff Filing was allowed for
August 2011
Generation Revenue Requirements
• The Transmission Licensee (TL) submitted its
Revenue Requirements on account of
generation costs in a prescribed format for each
power plant, on the basis of the forecast
dispatch schedule.
• The costs of generation are on the basis of
Agreed Values of the respective PPA’s
Transmission Revenue Requirements
• The Transmission Licensee (TL) submitted their
Revenue Requirements for the Transmission
Business and Bulk Supply and Operation
Business (BSOB) as well in August 2010.
• There was no prescribed format, but the TL
submitted this in great detail, up to the level of
respective cost codes of each cost center.
Distribution Revenue Requirements
• The Distribution Licensees (TL) also submitted
their Revenue Requirements for the Distribution
and Retail Supply Businesses in August 2010.
• There was no prescribed format, but the DL too
submitted this in detail, up to the level of
respective cost codes of each cost center.
Decision Document 2011
• The Tariff Decision for the First tariff Period was
announced in January 2011, after following the
statutory requirements
• The Licensees made the Extraordinary Filing as
on the due time
• No decision was announced for the
Extraordinary Filing
Actual Costs
• All Licensees submit their Actual Costs in
December and June each year
• In addition, Transmission Licensee (TL) submits
its forecast Revenue Requirements on account
of generation costs in a prescribed electronic
format for each power plant, on the basis of the
forecast dispatch schedule.
A summary of CEB Operational Costs
Enrich Life through Power
Generation Cost
80%
Personnel
6.1%
Materials
1.7%
Accommodation
0.4%
Transport &
Communication
1.0%
Other costs
1.2%
Finance cost
1.4%
Depreciation
11%
Adjustments to Revenue Requirements
• Adjustments are made to the base allowed
revenues for TL and DL on the basis of SLCPI and
US$
• Bi-annual (BST) compensation to DL and TL are
being made on the basis of actual costs.
• No annual end-user tariff adjustment took place
according to Clause 3.1.4 of the Tariff
Methodology
Uniform National Tariff
• UNT is calculated by PUCSL on the basis of
approved Revenue Requirements of the
Licensees
• Difference between the Approved Revenues and
Revenues generated through UNT are
compensated, albeit some concerns of the
Licensees
Government Policy Directions
Many Regulatory Decisions are taking cover under
GOSL Policy Directions.
However, other than the broad policy as approved
in 2009, none of these “Policy Directions” strictly
fulfilled the statutory requirements of Section 5 of
the SLEA
Bulk Supply Transaction Account
The Licensee has established the Bulk Supply
Transaction Account with approval of the PUCSL
to record the transactions
This depicts the transactions taking place between
the Licensee on actual basis, and submitted to
PUCSL bi-annually
Enrich Life through Power
Thank
You
Enhanced accessibility
all over Sri Lanka…
Electrification Level in
December 2012
Target :
Electrification by end 2013
Enrich Life through Power
93%
100%
60-80%
80-97%
<60%
>97%
Kurunegala
91 %
Moneragala
76%
Kilinochchi
16%
Vavuniya
75 %
Trincomalee
75%
Polonnaruwa
85 %
Kegalle
91%
Batticoloa
64%
Matale
97 %
Kandy
93 %
Nuwaraeliya
97 %
Ratnapura
86%
Galle
99 %
Hambantota
100%
Mullaithivu 18%
Anuradhapura
90 %
Badulla
90%
Puttalam
96 %
Mannar
59%
Ampara
87 %
Matara
98 %
Kalutara
99%
Colombo
100%
Gampaha
100%
Jaffna 80 %
CEB owns and operates
the entire transmission
network that operates at
220 kV and 132 kV
Transmission
2010 2011 2012
220 kV 483 km 483 km 501 km
132 kV 1,755 km 1,774 km 1,840 km
Grid
Substations
55 57 58
Reducing System Loss
Enrich Life through Power
0.0
5.0
10.0
15.0
20.0
25.0
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Percentage(%)
December 2012:
System Losses on Net Generation base = 10.42%
Projected Loss
From 2011 and beyond 2013…
Enrich Life through Power
Year
Loss
Rs Billion
2011 19.27
2012 61.16
2013 43.78
2014 23.27
2015 3.5
2016 (1.4)
Main Assumptions for 2013-2016
• No tariff increase after 2013
• Debt Service commences in 2014
• Nominal price escalation of Oil = 5%
• Price escalation for coal = 5%
• No price escalation for NCRE
• Puttalam Coal Phase 2 (600 MW)
available in October 2013 - April 2014
• Hydro inflow at 63% dry

More Related Content

What's hot

COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGRAVI PAL SINGH
 
Day-4, Mr. MG Raout
Day-4, Mr. MG RaoutDay-4, Mr. MG Raout
Day-4, Mr. MG RaoutIPPAI
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALATahnoon Elahi
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CaseFadi Maalouf, PMP
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?IPPAI
 
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Fadi Maalouf, PMP
 
Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourCutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourSentient Science
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHFadi Maalouf, PMP
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
IPPAI Power Awords 2012
IPPAI Power Awords 2012IPPAI Power Awords 2012
IPPAI Power Awords 2012IPPAI
 
Day2: Mr. Rk sinha dgh presentation ippai goa
Day2: Mr. Rk sinha dgh presentation ippai goaDay2: Mr. Rk sinha dgh presentation ippai goa
Day2: Mr. Rk sinha dgh presentation ippai goaIPPAI
 
Electric vehicles in india
Electric vehicles in indiaElectric vehicles in india
Electric vehicles in indiaJiteshGarg11
 
Day-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. SharanDay-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. SharanIPPAI
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?madhavanvee
 
Day-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASDay-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASIPPAI
 
Day-3, Mr. Alok Roy
Day-3, Mr. Alok RoyDay-3, Mr. Alok Roy
Day-3, Mr. Alok RoyIPPAI
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionIPPAI
 

What's hot (20)

COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
Day-4, Mr. MG Raout
Day-4, Mr. MG RaoutDay-4, Mr. MG Raout
Day-4, Mr. MG Raout
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
White Certificates in Australia
White Certificates in Australia White Certificates in Australia
White Certificates in Australia
 
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6
 
Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourCutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
 
SunBurn Test Presentation
SunBurn Test PresentationSunBurn Test Presentation
SunBurn Test Presentation
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
IPPAI Power Awords 2012
IPPAI Power Awords 2012IPPAI Power Awords 2012
IPPAI Power Awords 2012
 
Day2: Mr. Rk sinha dgh presentation ippai goa
Day2: Mr. Rk sinha dgh presentation ippai goaDay2: Mr. Rk sinha dgh presentation ippai goa
Day2: Mr. Rk sinha dgh presentation ippai goa
 
Thermal power sector
Thermal power sectorThermal power sector
Thermal power sector
 
Electric vehicles in india
Electric vehicles in indiaElectric vehicles in india
Electric vehicles in india
 
Day-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. SharanDay-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. Sharan
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
Day-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASDay-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IAS
 
Day-3, Mr. Alok Roy
Day-3, Mr. Alok RoyDay-3, Mr. Alok Roy
Day-3, Mr. Alok Roy
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 

Viewers also liked

Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...JLanka Technologies (Pvt) Limited
 
Power u ps hip3300 presentation
Power u ps hip3300 presentationPower u ps hip3300 presentation
Power u ps hip3300 presentationrickyhwk
 
Power u ps hip3300 -500 kva
Power u ps hip3300 -500 kvaPower u ps hip3300 -500 kva
Power u ps hip3300 -500 kvarickyhwk
 
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationEco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationSchneider Electric India
 
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS Operation
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS OperationEco-Mode: Benefits and Risks of Energy Saving Modes of UPS Operation
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS OperationSchneider Electric
 
Presentation on Low cost solutions for mass scale renewables
 Presentation on Low cost solutions for mass scale renewables Presentation on Low cost solutions for mass scale renewables
Presentation on Low cost solutions for mass scale renewablesPrivate Consultants
 
Copy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomeCopy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomePrivate Consultants
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusPrivate Consultants
 
The working principle of ups
The working principle of upsThe working principle of ups
The working principle of upsjayonline_4u
 
UPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutionUPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutioniTQAN Maju Resources
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineeringNishkam Dhiman
 

Viewers also liked (20)

Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
Climate Change 2013 : The Physical Science Basis
Climate Change 2013 : The Physical Science BasisClimate Change 2013 : The Physical Science Basis
Climate Change 2013 : The Physical Science Basis
 
How much energy really gets lost from Partial Shading?
 How much energy really gets lost from Partial Shading? How much energy really gets lost from Partial Shading?
How much energy really gets lost from Partial Shading?
 
Power u ps hip3300 presentation
Power u ps hip3300 presentationPower u ps hip3300 presentation
Power u ps hip3300 presentation
 
Power u ps hip3300 -500 kva
Power u ps hip3300 -500 kvaPower u ps hip3300 -500 kva
Power u ps hip3300 -500 kva
 
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationEco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
 
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS Operation
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS OperationEco-Mode: Benefits and Risks of Energy Saving Modes of UPS Operation
Eco-Mode: Benefits and Risks of Energy Saving Modes of UPS Operation
 
Ceylon Electricity Board
Ceylon Electricity BoardCeylon Electricity Board
Ceylon Electricity Board
 
UPS - by Damodaran
UPS - by DamodaranUPS - by Damodaran
UPS - by Damodaran
 
CEB Executive Team 1999
CEB Executive Team 1999CEB Executive Team 1999
CEB Executive Team 1999
 
Presentation on Low cost solutions for mass scale renewables
 Presentation on Low cost solutions for mass scale renewables Presentation on Low cost solutions for mass scale renewables
Presentation on Low cost solutions for mass scale renewables
 
Copy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomeCopy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka Home
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plus
 
Applicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri LankaApplicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri Lanka
 
The working principle of ups
The working principle of upsThe working principle of ups
The working principle of ups
 
Basic of electrical
Basic of electricalBasic of electrical
Basic of electrical
 
UPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutionUPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection Solution
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Basics of electrical engineering
Basics of electrical engineeringBasics of electrical engineering
Basics of electrical engineering
 

Similar to Implementation of Electricity Tariff Methodology in Sri Lanka

Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardIPPAI
 
CBP14_PPT_agoenka@deloitte.com.pdf
CBP14_PPT_agoenka@deloitte.com.pdfCBP14_PPT_agoenka@deloitte.com.pdf
CBP14_PPT_agoenka@deloitte.com.pdfSheelKapar1
 
Existing supporting regulatory framework For Energy Efficiency
Existing supporting regulatory framework For Energy EfficiencyExisting supporting regulatory framework For Energy Efficiency
Existing supporting regulatory framework For Energy EfficiencyACX
 
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentationVENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentationnijamnveloor
 
AER Strategic plan and work program 2009-11
AER Strategic plan and work program 2009-11AER Strategic plan and work program 2009-11
AER Strategic plan and work program 2009-11Alvaro H. Pescador
 
Day2: Mr. Pr ray
Day2: Mr. Pr rayDay2: Mr. Pr ray
Day2: Mr. Pr rayIPPAI
 
Financial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaFinancial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaIPPAI
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...OECD Environment
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementpakistanvisionaryforum
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013Sandeep Melana
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemeshambhupoddar1
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly TechnologyProbodh Mallick
 
Economy and energy security for pakistan
Economy and energy security for pakistanEconomy and energy security for pakistan
Economy and energy security for pakistanFaizan Shabbir
 
Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Faizan Shabbir
 
ESOS Assessment Presentation
ESOS Assessment PresentationESOS Assessment Presentation
ESOS Assessment PresentationSamuel Cutler
 
2016 Brantford Power Rate Card
2016 Brantford Power Rate Card2016 Brantford Power Rate Card
2016 Brantford Power Rate CardArden Redfern
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Gilberto De Martino Jannuzzi
 

Similar to Implementation of Electricity Tariff Methodology in Sri Lanka (20)

Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forward
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
CBP14_PPT_agoenka@deloitte.com.pdf
CBP14_PPT_agoenka@deloitte.com.pdfCBP14_PPT_agoenka@deloitte.com.pdf
CBP14_PPT_agoenka@deloitte.com.pdf
 
Existing supporting regulatory framework For Energy Efficiency
Existing supporting regulatory framework For Energy EfficiencyExisting supporting regulatory framework For Energy Efficiency
Existing supporting regulatory framework For Energy Efficiency
 
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentationVENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
VENTURES_NPTI-EE_ACT_ESCO&DSM.ppt presentation
 
AER Strategic plan and work program 2009-11
AER Strategic plan and work program 2009-11AER Strategic plan and work program 2009-11
AER Strategic plan and work program 2009-11
 
Day2: Mr. Pr ray
Day2: Mr. Pr rayDay2: Mr. Pr ray
Day2: Mr. Pr ray
 
Financial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaFinancial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in India
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013
 
Crc Presentation
Crc PresentationCrc Presentation
Crc Presentation
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat scheme
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly Technology
 
Economy and energy security for pakistan
Economy and energy security for pakistanEconomy and energy security for pakistan
Economy and energy security for pakistan
 
Energy comsats 12_oct13_2
Energy comsats 12_oct13_2Energy comsats 12_oct13_2
Energy comsats 12_oct13_2
 
ESOS Assessment Presentation
ESOS Assessment PresentationESOS Assessment Presentation
ESOS Assessment Presentation
 
2016 Brantford Power Rate Card
2016 Brantford Power Rate Card2016 Brantford Power Rate Card
2016 Brantford Power Rate Card
 
Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...
 

More from JLanka Technologies (Pvt) Limited

Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...
Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...
Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...JLanka Technologies (Pvt) Limited
 
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL Study
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL StudySolarEdge Performance of PV Topologies under Shaded Conditions - NREL Study
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL StudyJLanka Technologies (Pvt) Limited
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...JLanka Technologies (Pvt) Limited
 
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...JLanka Technologies (Pvt) Limited
 
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...JLanka Technologies (Pvt) Limited
 

More from JLanka Technologies (Pvt) Limited (14)

Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...
Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...
Climate Change 2014: Impacts, Adaptation, and Vulnerability - SUMMARY FOR POL...
 
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL Study
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL StudySolarEdge Performance of PV Topologies under Shaded Conditions - NREL Study
SolarEdge Performance of PV Topologies under Shaded Conditions - NREL Study
 
Making Solar PV Panels Smarter - Up to 25% More Energy
Making Solar PV Panels Smarter - Up to 25% More EnergyMaking Solar PV Panels Smarter - Up to 25% More Energy
Making Solar PV Panels Smarter - Up to 25% More Energy
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
 
Solar Thermal Energy an Industry Report
Solar Thermal Energy an Industry ReportSolar Thermal Energy an Industry Report
Solar Thermal Energy an Industry Report
 
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...
Solaredge System Outperforms String And Micro Inverters In NREL-Designed Inde...
 
Importance of sustainable energy
Importance of sustainable energyImportance of sustainable energy
Importance of sustainable energy
 
How the monthly electricity bill is calculated in Sri Lanka
How the monthly electricity bill is calculated in Sri LankaHow the monthly electricity bill is calculated in Sri Lanka
How the monthly electricity bill is calculated in Sri Lanka
 
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...
Problems and Disadvantages in Current Residential & Commercial On-grid PV Sys...
 
World energy-outlook-2012
World energy-outlook-2012World energy-outlook-2012
World energy-outlook-2012
 
SolarEdge_Distributed_Power_Harvesting_System_Overview
SolarEdge_Distributed_Power_Harvesting_System_OverviewSolarEdge_Distributed_Power_Harvesting_System_Overview
SolarEdge_Distributed_Power_Harvesting_System_Overview
 
JLanka-Solar-System-vs-Conventional-Systems
JLanka-Solar-System-vs-Conventional-SystemsJLanka-Solar-System-vs-Conventional-Systems
JLanka-Solar-System-vs-Conventional-Systems
 
JLanka SolarEdge System Overview
JLanka SolarEdge System OverviewJLanka SolarEdge System Overview
JLanka SolarEdge System Overview
 
Benefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri LankaBenefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri Lanka
 

Recently uploaded

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 

Recently uploaded (20)

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 

Implementation of Electricity Tariff Methodology in Sri Lanka

  • 2. Government of Sri Lanka Ministry of Power and Energy Public Utilities Commission of Sri Lanka CEB Generation Licence GL Consumers CEB Disribution Small Power Producers Independent Power Producers Lanka Electricity Company PVT Ltd. DL5 CEB Disribution CEB Disribution Licence DL 2 CEB Disribution CEB Transmission Licence TL Licence DL 1 Licence DL 4 Licence DL 3 Licensing Licensing GOSL Policy Directions Organization of the Power Sector
  • 3. Main expectations from the Sri Lanka Electricity Act 2009 as related to tariff • Cost-reflective Tariffs & Charges (s. 30) • Licensees being able to finance the licensed activities (s. 4)
  • 4. Corner stones in the Sri Lanka Electricity Act for Tariff Determination • Cost Reflective Methodology Permit relevant licensees to recover all reasonable costs incurred in carrying out the authorized activities • To be in accordance with Government Policy Guidelines under Section 5
  • 5. Prerequisites for Tariff Determination in the legislation • PUCSL Act : Section 30 (2)(a) Government compensates Licensees for compliance with GOSL Policy Directions • Section 30 (4) of SLEA and S 30(2)(b) of PUCSL Act Upon being satisfied of adequacy of funds being provided by the Treasury to bear the cost of any subsidy approved by the Government to subsidize Costumers… • Cross subsidies are recoverable from Customer categories
  • 6. Filing of Licensee Revenue Requirements All Licensees submitted their Revenue Requirements in August 2010 for the First Tariff Period. An Extraordinary Tariff Filing was allowed for August 2011
  • 7. Generation Revenue Requirements • The Transmission Licensee (TL) submitted its Revenue Requirements on account of generation costs in a prescribed format for each power plant, on the basis of the forecast dispatch schedule. • The costs of generation are on the basis of Agreed Values of the respective PPA’s
  • 8. Transmission Revenue Requirements • The Transmission Licensee (TL) submitted their Revenue Requirements for the Transmission Business and Bulk Supply and Operation Business (BSOB) as well in August 2010. • There was no prescribed format, but the TL submitted this in great detail, up to the level of respective cost codes of each cost center.
  • 9. Distribution Revenue Requirements • The Distribution Licensees (TL) also submitted their Revenue Requirements for the Distribution and Retail Supply Businesses in August 2010. • There was no prescribed format, but the DL too submitted this in detail, up to the level of respective cost codes of each cost center.
  • 10. Decision Document 2011 • The Tariff Decision for the First tariff Period was announced in January 2011, after following the statutory requirements • The Licensees made the Extraordinary Filing as on the due time • No decision was announced for the Extraordinary Filing
  • 11. Actual Costs • All Licensees submit their Actual Costs in December and June each year • In addition, Transmission Licensee (TL) submits its forecast Revenue Requirements on account of generation costs in a prescribed electronic format for each power plant, on the basis of the forecast dispatch schedule.
  • 12. A summary of CEB Operational Costs Enrich Life through Power Generation Cost 80% Personnel 6.1% Materials 1.7% Accommodation 0.4% Transport & Communication 1.0% Other costs 1.2% Finance cost 1.4% Depreciation 11%
  • 13. Adjustments to Revenue Requirements • Adjustments are made to the base allowed revenues for TL and DL on the basis of SLCPI and US$ • Bi-annual (BST) compensation to DL and TL are being made on the basis of actual costs. • No annual end-user tariff adjustment took place according to Clause 3.1.4 of the Tariff Methodology
  • 14. Uniform National Tariff • UNT is calculated by PUCSL on the basis of approved Revenue Requirements of the Licensees • Difference between the Approved Revenues and Revenues generated through UNT are compensated, albeit some concerns of the Licensees
  • 15. Government Policy Directions Many Regulatory Decisions are taking cover under GOSL Policy Directions. However, other than the broad policy as approved in 2009, none of these “Policy Directions” strictly fulfilled the statutory requirements of Section 5 of the SLEA
  • 16. Bulk Supply Transaction Account The Licensee has established the Bulk Supply Transaction Account with approval of the PUCSL to record the transactions This depicts the transactions taking place between the Licensee on actual basis, and submitted to PUCSL bi-annually
  • 17. Enrich Life through Power Thank You
  • 18. Enhanced accessibility all over Sri Lanka… Electrification Level in December 2012 Target : Electrification by end 2013 Enrich Life through Power 93% 100% 60-80% 80-97% <60% >97% Kurunegala 91 % Moneragala 76% Kilinochchi 16% Vavuniya 75 % Trincomalee 75% Polonnaruwa 85 % Kegalle 91% Batticoloa 64% Matale 97 % Kandy 93 % Nuwaraeliya 97 % Ratnapura 86% Galle 99 % Hambantota 100% Mullaithivu 18% Anuradhapura 90 % Badulla 90% Puttalam 96 % Mannar 59% Ampara 87 % Matara 98 % Kalutara 99% Colombo 100% Gampaha 100% Jaffna 80 %
  • 19. CEB owns and operates the entire transmission network that operates at 220 kV and 132 kV Transmission 2010 2011 2012 220 kV 483 km 483 km 501 km 132 kV 1,755 km 1,774 km 1,840 km Grid Substations 55 57 58
  • 20. Reducing System Loss Enrich Life through Power 0.0 5.0 10.0 15.0 20.0 25.0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Percentage(%) December 2012: System Losses on Net Generation base = 10.42%
  • 21. Projected Loss From 2011 and beyond 2013… Enrich Life through Power Year Loss Rs Billion 2011 19.27 2012 61.16 2013 43.78 2014 23.27 2015 3.5 2016 (1.4) Main Assumptions for 2013-2016 • No tariff increase after 2013 • Debt Service commences in 2014 • Nominal price escalation of Oil = 5% • Price escalation for coal = 5% • No price escalation for NCRE • Puttalam Coal Phase 2 (600 MW) available in October 2013 - April 2014 • Hydro inflow at 63% dry