SlideShare a Scribd company logo
IKTIMED PROJECT
Operational Plan for phases coordinator
(To submit to the PMU coordinators)
Number and
Title of the phases
involved:
Coordinating
partner:
Participating
partner:
EXECUTIVE WORK PLAN
Specific and
operative objectives
of the phase:
Output and
expected results
Approach/
Methodology:
Target:
(qualitative and
quantitative
description)
Connections and synergies with other Iktimed phases (list as much as you need)
N. Title of phases:
Describe the type and quality of connection/synergy/integration:
Connections and synergies with other projects activities of Med projects or other (list as much as you need)
N. Title of projects/actions:
Describe the type and quality of connection/synergy/integration:
Role and responsibilities of each involved partners:
(indicate the operative steps to manage for the successful management of the actiosn, collecting all
partners requests)
N. Phase – Task
(Code of task)
Actions
(Please codify)
Due date
(date)
Partners Resp.
(Only one organiz.)
1 1.2.1 1.2.1.1
2
3
4
5
6
7
8
9
10
Please, if previewed/coherent with the phase, describe a first hypothesis of the index/content structure
of the deliverable:
Budget for each phase to fill by the phase coordinator
(Please see 5.1 working plan in the AF for phase total budget
You must respect the total amount insert in the working plan)
Phase Phase Add columns
Total
Name of the
partner
1. Staff costs
2. Durable goods
3.Consumable goods
4. Mission (Travel and
accom.)
5. Services (other
than external exp.)
6. External expertise
7. Promotion, inform.
8. Overheads
9. Other
Total
List of all budget re allocation request
(Please only collect all requests and submit to the PMU)
Partner name
N. Expenditure
origin
Expenditure
destination
Budget to re
allocate
Component
Origin (Phase)
Component
Destination (Phase)
1 Staff Travel 5000 5, 5.2 4, 4.1
PARTNER SECTION
(To fill in by each partner and to submit to the phase coordinator)
Partner Name:
Number and
Title of the phases
involved:
N. Phase – Task
(Code of task)
Actions
(Please codify and describe)
Due date
(date)
Name of the person in charge
(At least one person for each actions)
1 1.2.1 1.2.1.1
2
3
4
5
6
7
8
9
10
Budget for each partner (please see your budget allocation on AF point 5
To complete and to submit to each phase coordinator
COMPONENT 1 COMPONENT 2 "COMPONENT 3" "COMPONENT 4" "COMPONENT 5" Total
Name of the
partner
Phase
1.1
Phase
1.2
Phase
1.3
Phase
2.1
Phase
2.2
Phase
2.3
Phase
2.4
Phase
3.1.
Phase
3.2
Phase
3.3
Phase
4.1
Phase
4.2
Phase
4.3
Phase
5.1
Phase
5.2
Phase
5.3
Phase
5.4
1. Staff costs
2. Durable goods
3.Consumable goods
4. Mission (Travel and
accom.)
5. Services (other
than external exp.)
6. External expertise
7. Promotion, inform.
8. Overheads
9. Other
Total
Budget re-allocation – Proposal
Partner name
N. Expenditure
origin
Expenditure
destination
Budget to re
allocate
Component
Origin (Phase)
Component
Destination (Phase)
1 Staff Travel 5000 5, 5.2 4, 4.1

More Related Content

What's hot (11)

Performance plan-template-1.2
Performance plan-template-1.2Performance plan-template-1.2
Performance plan-template-1.2
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
J.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost management
 
User acceptance-report
User acceptance-reportUser acceptance-report
User acceptance-report
 
Project status-report
Project status-reportProject status-report
Project status-report
 
Project proposal document template
Project proposal document templateProject proposal document template
Project proposal document template
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
Asingment
AsingmentAsingment
Asingment
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
 

Viewers also liked (8)

Cyprus university of technology
Cyprus university of technology Cyprus university of technology
Cyprus university of technology
 
Patras Science park 10 2010 Iktimed
Patras Science park  10 2010 IktimedPatras Science park  10 2010 Iktimed
Patras Science park 10 2010 Iktimed
 
Presentation Iktimed Temi Zammit
Presentation Iktimed Temi ZammitPresentation Iktimed Temi Zammit
Presentation Iktimed Temi Zammit
 
Iktimed minutes inglese
Iktimed minutes ingleseIktimed minutes inglese
Iktimed minutes inglese
 
UAB Research Park presentation
UAB Research Park presentationUAB Research Park presentation
UAB Research Park presentation
 
Maribor umsp presentation iktimed
Maribor umsp presentation iktimedMaribor umsp presentation iktimed
Maribor umsp presentation iktimed
 
Iktimed contacts
Iktimed contacts Iktimed contacts
Iktimed contacts
 
TVT presentation
TVT presentation TVT presentation
TVT presentation
 

Similar to Iktimed operation plan for partner

Project Management Fundamental
Project Management FundamentalProject Management Fundamental
Project Management Fundamental
Andy Pham, PMP
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
AASTHA76
 
EXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
EXECUTION PLAN REVISION HISTORYVersion #Implemented byReEXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
EXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
BetseyCalderon89
 
Annex 1 2 core funding application
Annex 1 2   core funding applicationAnnex 1 2   core funding application
Annex 1 2 core funding application
Corina Koneko
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
Goutama Bachtiar
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
WanBK Leo
 
Business plan workbook 17nov 1
Business plan workbook 17nov 1Business plan workbook 17nov 1
Business plan workbook 17nov 1
Nur Dalila Zamri
 
Srfp consultants 3 technical proposal
Srfp consultants 3   technical proposalSrfp consultants 3   technical proposal
Srfp consultants 3 technical proposal
Joy Irman
 

Similar to Iktimed operation plan for partner (20)

Project Management Fundamental
Project Management FundamentalProject Management Fundamental
Project Management Fundamental
 
EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter
 
Project Proposal Document
Project Proposal DocumentProject Proposal Document
Project Proposal Document
 
CIP Ecoinnovation – how to write a successful proposal
CIP Ecoinnovation – how to write a successful proposalCIP Ecoinnovation – how to write a successful proposal
CIP Ecoinnovation – how to write a successful proposal
 
Managing projects by data
Managing projects by dataManaging projects by data
Managing projects by data
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
STATUS: Strategic Agendas Template
STATUS: Strategic Agendas TemplateSTATUS: Strategic Agendas Template
STATUS: Strategic Agendas Template
 
SEM 3 PM SUMMER 2014 ASSIGNMENTS
SEM 3 PM SUMMER 2014 ASSIGNMENTSSEM 3 PM SUMMER 2014 ASSIGNMENTS
SEM 3 PM SUMMER 2014 ASSIGNMENTS
 
Feasibility studies
Feasibility studiesFeasibility studies
Feasibility studies
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
 
EXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
EXECUTION PLAN REVISION HISTORYVersion #Implemented byReEXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
EXECUTION PLAN REVISION HISTORYVersion #Implemented byRe
 
Annex 1 2 core funding application
Annex 1 2   core funding applicationAnnex 1 2   core funding application
Annex 1 2 core funding application
 
Law management budget_finance nice layout for presentation
Law management budget_finance nice layout for presentationLaw management budget_finance nice layout for presentation
Law management budget_finance nice layout for presentation
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Business plan workbook 17nov 1
Business plan workbook 17nov 1Business plan workbook 17nov 1
Business plan workbook 17nov 1
 
SF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.docSF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.doc
 
Srfp consultants 3 technical proposal
Srfp consultants 3   technical proposalSrfp consultants 3   technical proposal
Srfp consultants 3 technical proposal
 
Re-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders ExpectationsRe-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders Expectations
 
6_Link LFA to Full application
6_Link LFA to Full application6_Link LFA to Full application
6_Link LFA to Full application
 

More from Iktimed Med project - Marche Regional Authority

More from Iktimed Med project - Marche Regional Authority (11)

Gantt iktimed replan
Gantt iktimed replan Gantt iktimed replan
Gantt iktimed replan
 
Letter approval of iktimed project
Letter approval  of iktimed  projectLetter approval  of iktimed  project
Letter approval of iktimed project
 
Iktimed 2 g-med09-152-partnership agreement (1)
Iktimed 2 g-med09-152-partnership agreement (1)Iktimed 2 g-med09-152-partnership agreement (1)
Iktimed 2 g-med09-152-partnership agreement (1)
 
Iktimed subsidy contract
Iktimed subsidy contract Iktimed subsidy contract
Iktimed subsidy contract
 
Attendance sheet kom_iktimed
Attendance sheet kom_iktimedAttendance sheet kom_iktimed
Attendance sheet kom_iktimed
 
Start up report iktimed
Start up report iktimedStart up report iktimed
Start up report iktimed
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
IAT presentation Octubre 2010
IAT presentation Octubre 2010IAT presentation Octubre 2010
IAT presentation Octubre 2010
 
Presentation ancona Iktimed ancona Chamber of Comm.
Presentation ancona Iktimed ancona Chamber of  Comm.Presentation ancona Iktimed ancona Chamber of  Comm.
Presentation ancona Iktimed ancona Chamber of Comm.
 
Cria Presentation iktimed
Cria Presentation  iktimedCria Presentation  iktimed
Cria Presentation iktimed
 
Iktimed final presentation Marche Reg.
Iktimed final presentation Marche Reg. Iktimed final presentation Marche Reg.
Iktimed final presentation Marche Reg.
 

Recently uploaded

Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 

Recently uploaded (20)

WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
The architecture of Generative AI for enterprises.pdf
The architecture of Generative AI for enterprises.pdfThe architecture of Generative AI for enterprises.pdf
The architecture of Generative AI for enterprises.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Introduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG EvaluationIntroduction to Open Source RAG and RAG Evaluation
Introduction to Open Source RAG and RAG Evaluation
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 

Iktimed operation plan for partner

  • 1. IKTIMED PROJECT Operational Plan for phases coordinator (To submit to the PMU coordinators) Number and Title of the phases involved: Coordinating partner: Participating partner: EXECUTIVE WORK PLAN Specific and operative objectives of the phase: Output and expected results Approach/ Methodology: Target: (qualitative and quantitative description) Connections and synergies with other Iktimed phases (list as much as you need) N. Title of phases: Describe the type and quality of connection/synergy/integration: Connections and synergies with other projects activities of Med projects or other (list as much as you need) N. Title of projects/actions: Describe the type and quality of connection/synergy/integration:
  • 2. Role and responsibilities of each involved partners: (indicate the operative steps to manage for the successful management of the actiosn, collecting all partners requests) N. Phase – Task (Code of task) Actions (Please codify) Due date (date) Partners Resp. (Only one organiz.) 1 1.2.1 1.2.1.1 2 3 4 5 6 7 8 9 10 Please, if previewed/coherent with the phase, describe a first hypothesis of the index/content structure of the deliverable:
  • 3. Budget for each phase to fill by the phase coordinator (Please see 5.1 working plan in the AF for phase total budget You must respect the total amount insert in the working plan) Phase Phase Add columns Total Name of the partner 1. Staff costs 2. Durable goods 3.Consumable goods 4. Mission (Travel and accom.) 5. Services (other than external exp.) 6. External expertise 7. Promotion, inform. 8. Overheads 9. Other Total
  • 4. List of all budget re allocation request (Please only collect all requests and submit to the PMU) Partner name N. Expenditure origin Expenditure destination Budget to re allocate Component Origin (Phase) Component Destination (Phase) 1 Staff Travel 5000 5, 5.2 4, 4.1
  • 5. PARTNER SECTION (To fill in by each partner and to submit to the phase coordinator) Partner Name: Number and Title of the phases involved: N. Phase – Task (Code of task) Actions (Please codify and describe) Due date (date) Name of the person in charge (At least one person for each actions) 1 1.2.1 1.2.1.1 2 3 4 5 6 7 8 9 10
  • 6. Budget for each partner (please see your budget allocation on AF point 5 To complete and to submit to each phase coordinator COMPONENT 1 COMPONENT 2 "COMPONENT 3" "COMPONENT 4" "COMPONENT 5" Total Name of the partner Phase 1.1 Phase 1.2 Phase 1.3 Phase 2.1 Phase 2.2 Phase 2.3 Phase 2.4 Phase 3.1. Phase 3.2 Phase 3.3 Phase 4.1 Phase 4.2 Phase 4.3 Phase 5.1 Phase 5.2 Phase 5.3 Phase 5.4 1. Staff costs 2. Durable goods 3.Consumable goods 4. Mission (Travel and accom.) 5. Services (other than external exp.) 6. External expertise 7. Promotion, inform. 8. Overheads 9. Other Total
  • 7. Budget re-allocation – Proposal Partner name N. Expenditure origin Expenditure destination Budget to re allocate Component Origin (Phase) Component Destination (Phase) 1 Staff Travel 5000 5, 5.2 4, 4.1