SlideShare a Scribd company logo
IKBAL HUSAIN
Mobile: 08449431282;09415608364, Email ikbal786husain@gmail.com
Seeking challenging assignments in project management with growth oriented organization where my
multidimensional skills shall be fully utilized
PROFESSIONAL SYNOPSIS
 B. Tech (Electrical & Electronics Engg. ) with 4.0 + year of experience in project management & power
T&D.
 3 years Diploma ( Electrical Engg.) with first division from PMV Polytechnic Mathura(U.P.)
 Intermediate and High School passed in First division from BDDIC Pratapgarh(U.P.)
 Currently employed with UTTAR PRADESH POWER CORPORATION LIMITED(UPPCL) ,as Jr.ENGINEER
 Proficiencies in project management as well as managing operations & maintenance with proven abilities in
reducing downtime and enhancing operational efficiencies.
SKILLS & EXPERIENCE
• Planning, scheduling & monitoring for transmission and distribution of HT & LT network in MS project
• Project planning & scheduling for 11/0.415 KV power system network in MS project
• Maintain the record of load distribution and network drawings.
• Preparation of SLD.
• Commercial activities for HT & LT power distribution.
• Detecting the fault in underground cable (HT & LT) with the help of FLC.
• Supply restoration in HT & LT network system
CAREER HIGHLIGHTS
1) From Febuary’2012 to March 2014 with TORRENT POWER LIMITED, as Executive Engineer
2) From April 2014 to till date with UTTAR PRADESH POWER CORPORATION LIMITED (UPPCL)
as Jr.Engineer
KEY RESULT AREAS
Project Management
 Estimation and projection of load.
 Technical and commercial feasibility verification for new connection.
 Developing the HT & LT network for power supply to industrial, commercial & domestic customers.
 Prepare the scheme for power transmission & distribution with technical as well as commercial aspects.
 Planning and execution of HT & LT power distribution network with HT/LT AB cable.
 Planning, scheduling & monitoring for transmission of HT (132KV, 33KV, 11KV, 440V) overhead as well as U/G.
 Erection of feeder Pillars.
 Load survey for HT consumer and prepare the Estimate for them.
 Making the UG projects in MS–Project for estimation the cost with respect to time of entire project.
Operation & Maintenance
 Analysis of repeated complaints and resolve them.
 Attend HT breakdown and patrolling of HT feeders at the time of feeder breakdown.
 Preventive maintenance of DTCs
 Updating the changes in database for company assets.
 Planning for revamping of Old network for reducing the NPC.
Design Engineering
 Preparations of SLD, sub-station equipment arrangement.
 Coordination with vendor for Drawing & design approval of 11/.440 KV Transmission line.
 Preparation of HT & LT distribution network O/H as well as U/G.
 Preparation for all indoor/outdoor equipment arrangement, review and approve the drawing of vendor.
 Maintain the all drawing records for future references.
Commercial Responsibility
 Preparation of estimate for HT&LT consumer with the help of BOQ & BOM.
 Physical Verification & cross checking the items delivered w.r.t quality & quantity in accordance with the PO.
 Arranging Quotations, purchase orders & billing for new installations as well as for improvement of present
electrical system.
 Verification of the bill raised by the contractor.
Safety Management
 Arrange safety classes and manuals for vendor’s labour.
 Undertaking regular inspections to ensure adherence to safety norms and prevent accidents.
 Inspection of site and penalize the vendor in case of violation of safety rules.
 Arrange safety programs regarding safety awareness.
Interpersonal skills
1. Take charge leadership skills, leading through cooperation, teamwork, and influence.
2. Successfully handle multiple responsibilities, priorities and tasks with minimal supervision.
IT skills
1. Operating Systems: Windows XP / 2000/2007/2008
2. Programming Tools: C++, MAT LAB, Circuit maker
3. Tools: MS Office (Excel, Power point, MS word)
PERSONAL DETAILS
Date of Birth : 15th
July 1986
Current Address : 132KV, Power House Colony, kadipur, Sultanpur (U.P.)
Date: IKBAL HUSAIN
Place: Sultanpur

More Related Content

What's hot

rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.newRahul Dey
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
Engr.Jahangir Ali Ahmed
 
CV kwasi
CV kwasiCV kwasi
GAUTAM JANI RESUME
GAUTAM JANI RESUMEGAUTAM JANI RESUME
GAUTAM JANI RESUMEGautam Jani
 
Resume updated
Resume updatedResume updated
Resume updated
Amruta shinde
 
Ray Singh Rajput
Ray Singh RajputRay Singh Rajput
Ray Singh Rajput
RAY SINGH RAJPUT
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
Enaia Kamel
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpShetteppa Najjarad
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg manzoor ali
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_template
tathanhluan
 
Resume C S Rathaur
Resume C S RathaurResume C S Rathaur
Resume C S Rathaurcsr12345
 
Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhanteSachin Khante
 
waseem cv word document
waseem cv word documentwaseem cv word document
waseem cv word documentwaseem yaqub
 
electrical engineer
electrical engineerelectrical engineer
electrical engineer
bhaskar eithrajulu
 

What's hot (19)

Resume_Altaf
Resume_AltafResume_Altaf
Resume_Altaf
 
rahul.cv.new
rahul.cv.newrahul.cv.new
rahul.cv.new
 
Electrical engineer CV
Electrical engineer CVElectrical engineer CV
Electrical engineer CV
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
CV kwasi
CV kwasiCV kwasi
CV kwasi
 
GAUTAM JANI RESUME
GAUTAM JANI RESUMEGAUTAM JANI RESUME
GAUTAM JANI RESUME
 
Resume updated
Resume updatedResume updated
Resume updated
 
Ray Singh Rajput
Ray Singh RajputRay Singh Rajput
Ray Singh Rajput
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_template
 
Amit cv
Amit cvAmit cv
Amit cv
 
Resume C S Rathaur
Resume C S RathaurResume C S Rathaur
Resume C S Rathaur
 
Mehtab Niazi CV
Mehtab Niazi CVMehtab Niazi CV
Mehtab Niazi CV
 
Anup updated
Anup updatedAnup updated
Anup updated
 
Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin Khante
 
waseem cv word document
waseem cv word documentwaseem cv word document
waseem cv word document
 
electrical engineer
electrical engineerelectrical engineer
electrical engineer
 

Similar to ikbal resume

New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume AjayAjay kumar
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CVlucky singh
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical enggSEIKH RABANI
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
Khalid Eltahir
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
Khalid Eltahir
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif KhanLatif Khan
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
Suvendu Senapati
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1Nitin Rathore
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLBISWAJYOTI SWAIN
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Engr.Arsalan .
 

Similar to ikbal resume (20)

New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CV
 
Resume_Darpan Majumder1
Resume_Darpan Majumder1Resume_Darpan Majumder1
Resume_Darpan Majumder1
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
Udai
UdaiUdai
Udai
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
nabi
nabinabi
nabi
 

ikbal resume

  • 1. IKBAL HUSAIN Mobile: 08449431282;09415608364, Email ikbal786husain@gmail.com Seeking challenging assignments in project management with growth oriented organization where my multidimensional skills shall be fully utilized PROFESSIONAL SYNOPSIS  B. Tech (Electrical & Electronics Engg. ) with 4.0 + year of experience in project management & power T&D.  3 years Diploma ( Electrical Engg.) with first division from PMV Polytechnic Mathura(U.P.)  Intermediate and High School passed in First division from BDDIC Pratapgarh(U.P.)  Currently employed with UTTAR PRADESH POWER CORPORATION LIMITED(UPPCL) ,as Jr.ENGINEER  Proficiencies in project management as well as managing operations & maintenance with proven abilities in reducing downtime and enhancing operational efficiencies. SKILLS & EXPERIENCE • Planning, scheduling & monitoring for transmission and distribution of HT & LT network in MS project • Project planning & scheduling for 11/0.415 KV power system network in MS project • Maintain the record of load distribution and network drawings. • Preparation of SLD. • Commercial activities for HT & LT power distribution. • Detecting the fault in underground cable (HT & LT) with the help of FLC. • Supply restoration in HT & LT network system CAREER HIGHLIGHTS 1) From Febuary’2012 to March 2014 with TORRENT POWER LIMITED, as Executive Engineer 2) From April 2014 to till date with UTTAR PRADESH POWER CORPORATION LIMITED (UPPCL) as Jr.Engineer KEY RESULT AREAS Project Management  Estimation and projection of load.  Technical and commercial feasibility verification for new connection.  Developing the HT & LT network for power supply to industrial, commercial & domestic customers.  Prepare the scheme for power transmission & distribution with technical as well as commercial aspects.  Planning and execution of HT & LT power distribution network with HT/LT AB cable.  Planning, scheduling & monitoring for transmission of HT (132KV, 33KV, 11KV, 440V) overhead as well as U/G.  Erection of feeder Pillars.  Load survey for HT consumer and prepare the Estimate for them.  Making the UG projects in MS–Project for estimation the cost with respect to time of entire project. Operation & Maintenance  Analysis of repeated complaints and resolve them.  Attend HT breakdown and patrolling of HT feeders at the time of feeder breakdown.  Preventive maintenance of DTCs  Updating the changes in database for company assets.  Planning for revamping of Old network for reducing the NPC. Design Engineering  Preparations of SLD, sub-station equipment arrangement.
  • 2.  Coordination with vendor for Drawing & design approval of 11/.440 KV Transmission line.  Preparation of HT & LT distribution network O/H as well as U/G.  Preparation for all indoor/outdoor equipment arrangement, review and approve the drawing of vendor.  Maintain the all drawing records for future references. Commercial Responsibility  Preparation of estimate for HT&LT consumer with the help of BOQ & BOM.  Physical Verification & cross checking the items delivered w.r.t quality & quantity in accordance with the PO.  Arranging Quotations, purchase orders & billing for new installations as well as for improvement of present electrical system.  Verification of the bill raised by the contractor. Safety Management  Arrange safety classes and manuals for vendor’s labour.  Undertaking regular inspections to ensure adherence to safety norms and prevent accidents.  Inspection of site and penalize the vendor in case of violation of safety rules.  Arrange safety programs regarding safety awareness. Interpersonal skills 1. Take charge leadership skills, leading through cooperation, teamwork, and influence. 2. Successfully handle multiple responsibilities, priorities and tasks with minimal supervision. IT skills 1. Operating Systems: Windows XP / 2000/2007/2008 2. Programming Tools: C++, MAT LAB, Circuit maker 3. Tools: MS Office (Excel, Power point, MS word) PERSONAL DETAILS Date of Birth : 15th July 1986 Current Address : 132KV, Power House Colony, kadipur, Sultanpur (U.P.) Date: IKBAL HUSAIN Place: Sultanpur