1. LAKHDEEP SINGH
Mobile: +91-9463734294, 9464369897.
E-Mail: luckysandhu12@yahoo.com
To build a long-term promising career with a good firm, this encourages professional growth through a
wide range of challenging assignments, which would use my skills Entry level assignments Project
Management with organisations.
PROFESSIONAL SNAPSHOT
A result-oriented professional with over 4 years of experience in R-APDRP and Electrical distribution
Projects.
-Project Management -Service Delivery Managements -Process Enhancement
-Erection & Commissioning - Client Relationship
ô Presently working with Shreem Electric Ltd., as a Sr. Engineer-Distribution (R-APDRP) Mohali
(PB).
ô Strong relationship management, communication skills with the ability to network with Client, Project
Members, Consultants, Vendors with consummate ease.
ô Managing a wide spectrum of HT/LT Network, equipment & utilities; while curtailing the operational costs &
expenses.
ô Possessing significant leadership experience resulting in better performance and enhanced systems for higher
performance of the team.
ô Preparation of Comparative statements BOQ Vs Actual and Material reconciliation.
ô A keen planner and strategist with skills in troubleshooting and team building capability.
ô Area of Specializations in Survey, Execution, and Design of Distribution System.
CORE COMPETENCIES
Project Management
ô Conceptualising detailed 11 K.V. Sub Station, RAPDRP project reports and project execution plans after
thorough discussion with clients, selection of sites, project evaluation in terms of outlays and profits attached.
ô Establishing time span for project execution as per client specifics.
ô Monitoring project status during the course of periodic project review meetings & ensuring compliance with
quality, time parameters specified, and completion with in specified timeframe
ô Completing feeder & sub-station Data with Drawing, Assets, and HT< Survey.
ô Evaluating 11K.V.lines Designs and BOQ also coordinate with Consultants and Sub Contractors for changes
in the same.
ô Analysis of Single Line Diagram (SLD) of each 11KV network (feeder) & its LT Distribution network,
indicating the originating 11KV Sub-Station, length of the network (feeder).
ô Valuating proposed system by G-schedule i.e. Bill of Quantity (BOQ) & by Bill of Material (BOM) for work
execution. The Voltage regulation and losses for present and modified system have been determined as
indicator to benefits of the new system.
ô Involved in billing of erection and supply.
ô Monitoring daily progress on feeder material management as well as coordinating with Addl .S.E. / X.En.
&SDO of Department.
ô Formulating maintenance budgets and conducting variance analysis to determine difference between projected
& actual results and implementing corrective actions.
2. ô Managing activities pertaining to operations & maintenance of a wide range of electrical network.
ô Executing cost saving techniques/ measures and modifications to achieve substantial reduction in installation
expenditures.
Safety & Site Management
ô Co-ordinating for all site visiting activities including providing technical inputs for methodologies of
coordination with site management activities.
ô Arranging safety classes for vendor’s labour and company’s person.
ô Undertaking regular inspections to ensure adherence to safety norms and prevent accidents; inspecting site
and penalizing vendor in case of violation of safety rules.
People Management
ô Recruiting, leading, delegating and motivating workforce; imparting continuous on job training for
accomplishing greater operational effectiveness/ efficiency.
ô Resolving interpersonal issues & working towards building a harmonious work environment.
EMPLOYMENT SCAN
• August 2015- Dec 2015
Fedders Lloyd Corporation Limited (UPCL) Dehradun.
R-APDRP.
Project Executed: Preparation of Base-line data for the project area covering HT Line & LT Line Survey &
Execution, Consumer Indexing, Metering of Distribution Transformers and Feeders.
The Accountabilities:
o Installation of metering on transformers.
o Preparation of BOQ for RAPDRP Part B.
o Survey of HT/LT lines.
o Design & Engineering of Distribution System & Preparation of land base, Digitization, integration of
electrical entities on land base, preparation of Feasibility report.
o Coordinate with the Client for Project related activities, Co-operation and reporting to client about project.
o Data management and Quality Checks.
• May.2013- August 2015
ACCURATE Logistics (Larsen & Toubro Ltd. –Ludhiana, Punjab)
R-APDRP.
Project Executed: Preparation of Base-line data for the project area covering HT Line & LT Line Survey &
Execution, Consumer Indexing, Metering of Distribution Transformers and Feeders.
• June.2012- April.2013
System & Switchgears.
Testing of power control panels, machine control panels, distribution panels and panels of distribution
transformers.
3. ACADEMIC CREDENTIALS
o B.Tech from Punjabi University, Patiala (PUNJAB).
o Class XII from Multipurpose Sr. Sec. School, Patiala (PUNJAB) in 2008
o Class X from SAS Academy , Ropar (PUNJAB) in 2006
IT FORTE
o Well versed with Windows, Office and Internet Applications.
o C, C++
TRAINING ATTENDED
o 6 Week Industrial Training at UCoE, on Testing of Electronic Devices and Equipments.
o 6 Months Industrial Training at JBL Electronics, in Television and Liquid Cristal Display Assembly.
PERSONAL DETAILS
Father’s Name : Gajjan Singh
Date of Birth : 10th
May, 1990
Residential Address : H.no-138 Anand Nagar (A) Tripuri town Patiala (PUNJAB).
Marital Status : Unmarried
Linguistic Abilities : English, Hindi
LAKHDEEP SINGH.