www.ignousolvedassignmentsmba.blogspot.in
MS-01
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS- 01: Management Functions and Behaviour
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
ASSIGNMENT
Course Code : MS-01
Course Title : Management Functions and Behaviour
Assignment Code : MS- 01/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30t h
April, 2018 to
the coordinator of your study center.
1. Briefly describe the Management processes. Explain any one of them with respect to
its significance and importance in organisational performance and efficiency. Explain
with your organisational experience. Briefly describe the organisation, you are
referring to.
2. What are the techniques used in different steps of Decision-making? Based on
your organisational experience, discuss the importance and rules of Brainstorming in
the process. Briefly describe the organisation and the situation, you are referring to.
3. What are the major antecedent conditions for change? Based on your
organisational experience, discuss the necessity or otherwise of ‘why all organisations
must change’ in the background of ‘how an organisation grows’. Explain the situation
and organisational settings you are referring to.
4. 4. Base on your organisational experience/exposure critically discuss the role and
impact of formal and informal groups on ‘Management’. Briefly describe the
organsational setting, you are referring to.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 2: Management of Human Resources
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-2
ASSIGNMENT
Course Code : MS - 2
Course Title : Management of Human Resources
Assignement Code : MS-2 /TMA/SEM – I/2018
www.ignousolvedassignmentsmba.blogspot.in
For more detail contact ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the coordinator of your study center.
1. Explain the process of human resource planning. Describe how HR forecast
is carried out in the organisation you are working with or an organisation you
are familiar with.
2. Discuss the concept of ‘performance appraisal’. Explain any two methods of
performance appraisal that you are familiar with citing suitable organisational
examples.
3. Define mentoring and distinguish it from performance coaching. Assume you
are responsible for mentoring of employees in a large organisation. Discuss how
you will make mentoring a strategic function. Illustrate.
4. Discuss the laws covering wages. Analyse the recent amendments and trends in
laws covering wages in India.
5. Critically evaluate the state of workers’ participation in Management in the present
day business scenario. Explain with examples your answer giving due details of
the organizations and the sources you are referring to.
ManagementProgramme
ASSIGNMENT
FIRST SEMESTER
2018
MS -03:Economic and SocialEnvironment
Schoolof Management Studies
INDIRA GANDHINATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI– 110 068
MS-03
ASSIGNMENT
Course Code : MS - 03
Course Title: Economic and SocialEnvironment
Assignment Code: MS-03/TMA/SEM- I/2018
Coverage: All Blocks
Note :Attemptall thequestions and submit this assignment on or before 30th April, 2018 to
the coordinator of your study center.
1. Discuss the critical elements of macro-economic policies.Howeconomic environment
gives a direction to the changesin the economic planning?
2. Differentiate betweenEconomic Growth and Economic Development. Why is
growth and development synonymously used in economic discussion?
3. Discuss the genesis of mixed economy framework inIndia.
4. “An importantfactor which influences theBalance of Payment of an economy is the
exchange rate of its currency vis-à-vis other major currencies”. Explain the statement
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
given above.
5. How the twin objective of equity and justicewas met by theeconomic reforms of 1991?
Explain.
6. Write shortnotes on the following:
(i)Trade Union Movement
(ii) Public Accountability
(iii) Administered prices
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 04: Accounting and Finance for Managers
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068 MS-04
ASSIGNMENT
Course Code : MS-04
Course Title : Accounting and Finance for Managers
Assignment Code : MS-04/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. How is ‘Financial Accounting’ different form ‘Management Accounting’? Discuss the
role
and activities of an Accountant.
2. The Balance Sheets of XYZ Ltd as on 31st December, 2016 and 2017 are as given
below:
Liabilities 2016 2017 Assets 2016 2017
Share Capital
Goodwill
General
Buildings 24,000 24,000
Reserve 2,00,000 2,00,000
Plant 80,000 72,000
Profit and Loss 28,000 36,000
Investments 74,000 72,000
Account 32,000 26,000
Stock 20,000 22,000
Creditors 16,000 10,800
Bills 60,000 46,800
Bills Payable 2,400 1,600
Receivable 4,000 6,400
Provision for 32,000 36,000
Debtors 36,000 38,000
Taxation 800 1,200
Cash and bank 13,200 30,400
Provision for
balances
doubtful debts
3,11,200 3,11,600 3,11,200 3,11,600
Additional Information:-
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
(i) Depreciation provided on plant was 8,000 and on building was Rs. 8,000.
(ii) Provision for taxation made during the year is Rs. 38,000.
(iii) Interim dividend paid during the year is Rs. 16,000.
From the above information, you are required to prepare Schedule of changes in Working
Capital and Funds Flow Statement.
3. What do you understand by CVP Analysis. Explain the effect of Price and Volume on
the
Net Profit, with the help of a suitable illustration.
4. The Management of ABC Ltd. is considering a proposal to purchase an improved
model
of a machine which gives increased output. Its existing machine which has been in
operation for 2 years has current market value of Rs. 1,00,000, its remaining estimated
useful life is 10 years, with no salvage value at the end.
The relevant particulars are as follows:
Existing Machine
Purchase price
Estimated life
Salvage value
Annual Operating hours
Selling price per unit
Output per hour
Material cost per unit
Labour cost per unit
Consumable stores per year
New Machine
Rs. 2,40,000
12 years
-
2,000
Rs. 10
15 units
Rs. 2
20
2,000
Rs. 4,00,000
10 years
-
2,000
Rs. 10
20 units
Rs. 2
40
5,000
Repairs and Maintenance per
year
9,000 6,000
Working Capital 25,000 40,000
The company follows the straight-line method of depreciation and is subject to 50% tax.
Should the existing machine be replaced? Assume that the company’s required rate of
return is 15% and that the loss on sale of Assets is tax deductible.
5. As a Finance Manager how would you determine the Optimal Cash balance that would
be
required by your Organisation? What measures you would take to ensure the smooth and
efficient Management of Cashflows in the Orgnisation?
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 05: Management of Machines and Materials
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-05
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
ASSIGNMENT
Course Code : MS-05
Course Title : Management of Machines and Materials
Assignment No. : MS-05/TMA /SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. It is generally felt that “rural areas are good for locating large plant, semi-urban
areas for
locating medium-sized plants, and urban areas for small-scale plants”. Comment.
2. (a) Define job design. How has management viewed job design since the
industrial revolution?
(b) List the important factors that must be addressed in job design and briefly discuss
the importance of each one.
3. Under what circumstances would you use PERT as opposed to CPM in project
management? Give some example of projects where each would be more applicable
than the other.
4. What do you understand by acceptance sampling? In what situations it is used? Briefly
discuss the sampling plans.
5. “Inventory management for slow moving expensive items should focus more on
lead time reduction than anything else”. Critically examine the statement.
6. Write short notes on any three of the following:
(a) Intermittent flow processes
(b) Uses of work sampling
(c) Helgeson and Birnie Method of line balancing
(d) Benefits of value engineering
(e) Objectives of codification.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 06: Marketing for Managers
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068 MS- 06
ASSIGNMENT
Course Code : MS - 06
Course Title : Marketing for Managers
Assignment Code : MS-06 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. (a) Define the term „Marketing‟ with suitable examples. Discuss the scope and
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
significance of
marketing function in a developing and fast emerging economy like India.
(b) What are the various components/ elements of marketing mix in case of products
and services marketing. Discuss with suitable examples of your choice.
2. (a) Explain the concept of Product Life Cycle by taking an example one each from a
consumer
durable and any service offering of your choice.
(b) Distinguish the concept of market vs the concept of a segment and their relationship
in
marketing, with suitable illustration.
3. (a) Discuss the various steps involved in the marketing research process that help
in decision
making process. Briefly discuss a few application areas of marketing research in the
current
business environment.
(b) Distinguish a Product from a Brand with suitable examples. Explain packaging as a
market
development tool.
4. (a) Why pricing and promotional elements of marketing mix primarily decide
the success of
any brand? Explain. Discuss the strategic and tactical decisions that a manager
should consider
in pricing and promoting the firms offering. Take one product and one service offering
and
discuss their success story.
(b) “Consumer” is the king does this statement still holds good in the era of online/digital
marketing? If yes or no substantiate and justify accordingly.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 07: Information Systems for Managers
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-55: LOGISTICS AND SUPPLY CHAIN MANAGEMENT
MS-07
ASSIGNMENT
Course Code : MS-07
Course Title : Information Systems for Managers
Assignment Code : MS-07/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the coordinator of your study center.
1. Why is the Central Processing Unit (CPU) is called the “Brain” of the Computer?
What are the components of a CPU? What factors affects the speed of a computer?
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
2. Define data and information. What is the difference between the two? What are
the main characteristics of information?
3. What are the types of inventory management systems? Define them and partition
them into further classes. Also, briefly explain each subdivision.
4. How can you use the Web as a data source for your data warehouse? What types of
information can you get from the Web? Explain briefly the steps needed to ensure
that only good quality, reliable data is loaded into the data warehouse from the Web.
5. What are expert systems? Mention the working principles of expert systems.
Also discuss how knowledge can be represented in expert systems.
6. Write short notes on any three of following:
(a) Redundant Array of Independent Disks (RAID)
(b) Polymorphic viruses
(c) Business software solutions firm Microsoft
(d) Features of JAVA.
(e) Online Analytical Processing (OLAP)
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 08: Quantitative Analysis for Managerial Applications
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068 MS-08
ASSIGNMENTS
Course Code : MS 08
Course Title : Quantitative Analysis for Managerial Applications
Assignment No. : MS-08/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. A sample survey of 100 families belonging to the middle income group revealed
the following
distribution according to their annual savings. Find a) average annual sayings, using
the efficient method, b) 5th decile, and c) 90th percentile.
Savings (Rs ‘000) 05-09 09-13 13-17 17-21 21-25 25-30 30-35
Number of Families 07 10 15 23 25 14 06
2. It is known that the number of heavy trucks arriving at a railway station follows the
Poisson distribution. If the average number of truck arrivals during a specified period of
half
an hour is 2, find the probabilities that during a given half an hour a) no heavy truck will
arrive,
b) at least two heavy trucks will arrive, c) at the most 3 heavy trucks will arrive, and
d) between 1 and 3 heavy trucks will arrive.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
3. A sample survey of tax-payers belonging to business class and professional
class yielded the
following results:
Business class Professional class Sample
size n1 = 400 n2 = 420 Defaulters in tax
payment x1 = 80 x2 = 65
Test the hypothesis at α = 0.01 level of significance that
a) defaulter rate is the same for the two classes of tax-payers, and
b) defaulter rate is higher in the business class than in the professional class by 0.03.
4. A set of paired data on X and Y has mean of X as 36, mean of Y as 85, standard
deviation
of X as 11, standard deviation of Y as 8, and coefficient of correlation between X and Y
as
0.66. Obtain a) the two regression equations, and b) value of X when Y= 75.
5. Write short notes on any three of the following:
(a) Absolute value function
(b) Baye’s Theorem
(c) Multistage Sampling
(d) Delphi method of forecasting
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 09: Managerial Economics
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-09
ASSIGNMENT
Course Code : MS-09
Course Title : Managerial Economics
Assignment Code : MS-09/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. Explain the Opportunity Cost Principle? Substantiate with the help of an example
how production possibility reflects opportunity costs?
2. How are Demand, Price Elasticity and Revenue determined? Explain Price Elasticity
with
the help of any particular example of your choice.
3. Discuss Economies and Diseconomies of Scale. How is Economies of Scope
different from Economies of Scale? Explain.
4. Explain “Barriers to Entry” of a firm. Differentiate between legal barriers and
natural barriers with the help of any example of your choice.
5. Trace the chronology of deregulation of Indian Telecom from 1992 to 2003. Explain
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
the
special role played by Telecom Regulatory Authority of India (TRAI).
6. Write short notes on any two of the following:-
(a) Decision under risk
(b) Biometric forecasting
(c) Kinked demand curve
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 10: Organisational Design, Development and Change
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-10
ASSIGNMENT
Course Code : MS - 10
Course Title : Organisational Design, Development and Change
Assignment Code : MS-10/TMA/SEM-I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the coordinator of your study center.
1. Describe the factors that affect organisational design and explain different
approaches in assessing organisational effectiveness with the help of examples.
2. Describe and discuss the trends in the present day work organisations and the role
of management in ‘quality of work life’.
3. What are the different sources of resistance to change? Describe the process of
overcoming resistance to change. Discuss with examples.
4. Enlist the types of organisation structure. Discuss few organisational structures
and identify their type.
5. Explain the concept of workplace and architectural ergonomics with the help
of examples.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS-11: Strategic Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-11
ASSIGNMENT
Course Code : MS-11
Course Title : Strategic Management
Assignment No. : MS-11/TMA/SEM-I/2018
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Coverage : All Blocks
Note: There are five questions in this assignment. Attempt all the questions and send
them on or
before 30th April, 2018 to the Coordinator of the Study Centre you are attached with.
1. Discuss in what sense the top management takes decisions for a company and in what
sense it does not takes the strategic decisions for a company alone? Illustrate with
suitable examples.
2. Explain any two of the growth strategies you have studied and highlight the
conditions under which each is the most appropriate. Illustrate your answer with the help
of examples.
3. Identify two companies that have recently merged. Read the published information
on both the companies. Based on the study, identify the issues and challenges the two
companies are currently facing in combining their respective organizational cultures.
4. Select an organization of your choice which has adopted focus strategy. Analyze as
to how the focus strategy has been useful for the organization to build its competitive
advantage.
5. Describe different styles of leadership for Top Management with the help of real
world examples.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 21: Social Processes and Behavioral Issues
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-21
ASSIGNMENT
Course Code : MS - 21
Course Title : Social Processes and Behavioral Issues
Assignment Code : MS-21/TMA/SEM - 01 /2018
Coverage : All Blocks
Note: a. There are two sets of assignments. Set A is for the students who have
registered for MS-21
prior to January 2018. Set B is for students who have registered for MS-21 in
January, 2018
b. Attempt all the questions and submit this assignment on or before 30th April, 2018
to the
coordinator of your study center.
SET A
1. Describe the emerging scenario of organizations. Explain the steps to be taken by
management into
bring in the mindset of employees conducive to changing reality of business in
an organization you
are aware of. Briefly describe the organization you are referring to.
2. Explain the relevance of behaviour modification in organizations and briefly discuss
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
the role of
ethics in behaviour modification.
3. Briefly discuss how organizational culture can be developed and describe the
attributes of work
culture and their relevance.
4. Describe the process of perception. How behaviour is influenced by perception?
Explain with the
help of examples
5. Roles and norms are control mechanisms of groups. Discuss with the help of examples.
SET B
1. Discuss the modern theories of leadership citing relevant examples.
2. Differentiate between counseling, guidance and psychotherapy. Explain various
approaches to
counseling with the help of examples,
3. Explain any two theories of motivation citing relevant examples,
4. What is organisational citizenship behaviour? Discuss different approaches to OCB.
5. Explain the statement, “Words are symbols and meaning exist in mind”. Supplement
with relevant
examples.
MS-22
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS- 22: Human Resource Development
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
ASSIGNMENT
Course Code : MS-22
Course Title : Human Resource Development
Assignment Code : MS- 22/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to
the coordinator of your study center.
1. What is the Concept of Career? In our society people face many career transition in
changing their profession, organisation, and geographic location, to name a few. What
is the role of HRD in dealing with this issue at organisational level? Explain with the
organisational examples you are aware of. Briefly describe the situation and the
organisation, you are referring to.
2. What are the major methods and movements to increase organisational
performance? Explain any one of them based on your organisational experience.
Briefly describe the organisation, you are referring to.
3. What are the basic tenets of Rewarding System? Briefly explain with organisational
examples you have come across. Explain the situation and the organisation, you are
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
referring to.
4. “Managing Diversity is currently enjoying a great deal of support from the world
of business. Proponents of diversity in organisations have emphasized its benefits,
and managing diversity is portrayed as a product of enlightened corporate self
interest.” Elaborate the above statement and discuss the underlying concepts based on
organisational experience, you have or you are aware of. Briefly describe the
organisation, you are referring to.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 23: Human Resource Planning
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-23
ASSIGNMENT
Course Code : MS - 23
Course Title : Human Resource Planning
Assignment Code : MS-23 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. Explain the concept of human resource forecasting. Describe various techniques used
in
forecasting human resource planning.
2. Discuss the objectives of job evaluation. Explain the various job evaluation
methods. Briefly describe the recent developments in job evaluation system.
3. Discuss the aims and objectives of career planning. Describe the benefits of
career planning. What are the factors which go into the shaping of a career?
4. Explain the significance of information system in Human Resource Management.
Describe the various approaches to managing information at the macro and micro level.
5. Explain the concept, need and scope of HR audit. Describe the essential steps being
involved in the Auditing process.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 24: Employment Relations
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-24
ASSIGNMENT
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Course Code : MS - 24
Course Title : Employment Relations
Assignment Code : MS-24 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the coordinator of your study centre.
1. Explain the procedure for registration of a Trade Union under the Trade Unions
Act. Discuss the objects general and political funds are spent under the Trade
Union Act.
2. Describe the present position of Trade Unions in India. What are your suggestions
for strengthening the Trade Unions in India.
3. Explain the meaning and concept of Collective Bargaining. Describe the process
of collective bargaining. Discuss the conditions for success of collective
bargaining.
4. Discuss the aims and objectives of workers participation in Management.
Describe the workers participation, employee involvement practices of any
organisation you are familiar with.
5. Explain various cultural aspects of employment relations. Discuss the
recent developments in employment relations. Discuss the impact of
specialization, centralization and globalisation on new employment relations.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 41: Working Capital Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-41
ASSIGNMENT
Course Code : MS-41
Course Title : Working Capital Management
Assignment No. : MS-41/TMA /SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. The annual figures of Alpha Ltd are as follows:
(i) Sales at home, at 1 month credit Rs. 12,00,000.
(ii) Export at 3 months credit, S.P. 10% below the home price Rs. 5,40,000.
(iii) Materials used, suppliers extend 2 months credit Rs. 4,50,000.
(iv) Wages paid, half month in arreas Rs. 3,60,000.
(v) Manufacturing expenses, paid one month in arreas Rs. 5,40,000.
(vi) Depreciation on fixed assets Rs. 60,000.
(vii) Administrative expenses, paid one month in arrear Rs. 1,20,000.
(viii) Sales promotion expenses, payable quarterly in advance Rs. 60,000.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Alpha Ltd. sells goods in the domestic market on a gross profit of 25%. It keeps one
month stock of raw materials as well as finished product and believes in keeping Rs.
1,00,000 available to it. You are required to calculate the working capital requirement
of the company, assuming 15% safety margin.
2. Give a complete overview of the different marketable securities that are available for
investments.
3. Select any financial Institution/ Organisation of your choice and obtain information
about
the important components of its credit policy and the attributes that they take into
consideration while deciding the credit wortheness about its customers.
4. Describe the creation of Euro Money and Eurocurrency Markets? Discuss the
factors contributing to the growth of the Euromarkets.
5. ‘The Working Captal Module is divided into three additional parts beyond the
investment
information presented in the Capital Investment (CI) module’. Discuss of objectives and
operation sequential operation of the working capital module. Discuss the objectives and
operation of each these three parts.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 42 Capital Investment and Financing Decisions
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-42
ASSIGNMENT
Course Code : MS-42
Course Title : Capital Investment and Financing Decisions
Assignment No. : MS-42/TMA /SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. What is meant by a firm's capital structure? Explain the Modigilian - Miller
(MM) theory
and Traditional approach to capital structure of a firm.
2. Explain the concept of project life cycle? How are the work breakdown structure
and linear responsibility chart prepared?
3. What is Project Risk? Briefly explain the techniques used for the measurement
of project
risk
4. Explain the various instruments through which corporates procure finance both
for long
term and short term. Discuss the circumstances under which they are preferred.
Give reasons for the same.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
5. What is Corporate Restructuring? What factors motivate an enterprise to
undertake restructuring exercise?
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 43: Management Control Systems
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-43
ASSIGNMENT
Course Code : MS-43
Course Title : Management Control Systems
Assignment No. : MS-43/TMA/SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
Coordinator of your study center.
1. Explain the concept of Strategy? Describe the different Models that help in formulating
business unit strategies.
2. Explain the ARM’s length principle and discuss its application.
3. Discuss in detail the three organisational Incentives systems viz the Scanlon plan, the
Kaiser-United Steel Workers plan and profit sharing and explain their applicability.
4. Select any Bank/ Insurance company of your choice and discuss the
management control
system, that is prevalent, in that Institution.
5. Study the ‘Christian Medical College and Hospital, Vellore’ case and answer the
questions given at the end of the case.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 51: Operations Research
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-51
ASSIGNMENT
Course Code :MS - 51
Course Title : Operations Research
Assignment Code : MS-51/TMA/SEM - I /2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
1. Solve graphically:
Minimize Z=6x1 + 14x2
Subject to
5x1 + 4x2 ≥ 60
3x1 + 7x2 ≤84
x1 + 2x2 ≥ 18
x1, x2 ≥ 0
2. Five employees of a company are to be assigned to five jobs, which can be done
by any
of them. The workers get different wages per hour. These are: Rs 5 per hour for A, B, and C
each, and Rs 3 per hour for D and E each. The amount of time taken by each employee to do
a given job is given in the following table. Determine the assignment pattern that
(a) minimizes the total time taken, and (b) minimizes the total cost, of getting five units
of work done.
Employee
Job A B C D E
1 7 9 3 3 2
2 6 1 6 6 5
3 3 4 9 10 7
4 1 5 2 2 4
5 6 6 9 4 2
3. What is the importance of integer programming models in supporting managerial
decisions? Describe the rationale behind Cutting Plane Method used for solving
integer programming models.
4. A wholesaler supplies 30 stuffed dolls each day to various shops. Dolls are purchased
from the manufacturer in lots of 120 each at Rs. 1200 per lot. Every order incurs a handling
charge of Rs 60 plus a freight charge of Rs 250 per lot. Multiple and fractional lots can also
be ordered, and all orders are met the next day. The incremental cost is Rs
0.60 per year to store a doll in inventory. The wholesaler finances inventory investments
by paying its holding company 2% monthly for borrowed funds.
How many dolls should be ordered at a time in order to minimize the total annual
inventory cost? Assume that there are 250 week-days in a year. How frequently should
he order?
5. What is simulation? Describe the simulation process. State the major two reasons for
using simulation to solve a problem. What are the advantages and limitations of
simulation?
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 52: Project Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
MS-52
ASSIGNMENT
Course Code :MS - 52
Course Title : ProjectManagement
Assignment Code : MS-52/TMA/SEM - I /2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to
the coordinator of your study center.
1. What are the phases of a project development cycle? Give the salient tasks under each
phase. What are the outlines of opportunity studies in project management? How do there
impact upon project feasibility studies?
2. “Doubled Project Report (DPR) forms the foundation on which the entire
superstructure of
the project is built – if it is weak, project cannot weather the turbulent times ahead.”
Bring
out the do‟s and don‟ts of a good DPR.
3. “Meticulous Management of activities on the critical path is crucial to completing
projects
on time.” How can we „beat‟ the critical path and improve our on-time performance?
4. A good tem-work speed up project implementation justify. Developing self directed
project
teams is the key to improving effectiveness in project management. Elucidate.
5. Explain the importance of „project review‟ in the context of control of a project. How
are
cybernetics concepts applied to project management?
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 53: Production/Operations Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-53
ASSIGNMENT
Course Code : MS - 53
Course Title : Production/Operations Management
Assignment Code : MS-53/TMA/SEM - I /2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. Over the years many variations on classical Delphi have been forwarded. Discuss these
variants.
2. Capacity will be modified in response to demand. Demand will be modified in
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
response to
capacity. Which of these two statement is correct? Why?
3. (a) What is Line-Balancing of assembly operations? Illustrate with examples.
(b) What approach would you suggest for increasing throughput rate of assembly
lines and why?
4. Inventory of materials provides operational flexibility. But, many flexible operational
systems
need little inventory. Explain this seeming contradiction.
5. Discuss preventive maintenance. In what ways is preventive maintenance
absolutely necessary in
JIT/ kanban/ pull manufacturing as opposed to push manufacturing.
6. Write short notes on any three of the following:
(a) Quality and profitability relationship.
(b) Stopwatch Time Study method.
(c) The KANBAN System
(d) Manufacturing Resource Planning (MRP II)
(c) Classification of manufacturing technology.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 54: Management Information Systems
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-54
ASSIGNMENT
Course Code :MS - 54
Course Title : Management Information Systems
Assignment Code : MS-54/TMA/SEM - I /2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th
April, 2018 to the coordinator of your study center.
1. How the functional areas can be separated from MIS point of view. List down
major subsystems and the typical generated within the functional area in your
organization.
2. How much importance should be accorded to implementation phase as part of the
total MIS development activity? Explain. Briefly discuss the various
implementation strategies. Under what circumstances are they suitable?
3. What are expert systems and how do they help in decision-making? Can you give
examples to illustrate the same? What kinds of decisions can be appropriately
programmed on expert systems? Give examples.
4. Outline the basic sequence of steps to acquiring a DMBS. What steps are the
mists important? Why should an organization be careful about placing over
reliance on “benchmark” tests in selecting a DBMS?
5. Differentiate among Trojans, Worms and Viruses. Give one example for each.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
“Computer virus is a major threat to computer security”. Justify the statement.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 61: Consumer Behaviour
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-61
ASSIGNMENT
Course Code : MS - 61
Course Title : Consumer Behaviour
Assignment Code : MS-61 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. What do you understand by the term ‘consumer behaviour’? Explain the scope
of consumer behavior giving suitable examples.
2. With the help of examples discuss the characteristics that distinguish organizational
buying from individual buying.
3. Explain the concept of learning and discuss its marketing implications.
4. What is a reference group? Name two reference groups that are important to you. In
what ways do they influence you in your purchasing behaviour?
5. Explain the concept of culture and subculture. Discuss the relevance of
subcultural segmentation in case of the following products:
(a) Ready to eat food products
(b) Apparels
6. As a marketer of consumer durables like refrigerators, washing machines etc., what
strategies would you adopt for responding to post purchase feelings of your consumers?
Discuss.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS-62: Sales Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS- 62
ASSIGNMENT
Course Code : MS - 62
Course Title : Sales Management
Assignment Code : MS-62 /TMA/SEM - I/2018
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. (a) Discuss the role and responsibilities of a Sales Manager, associated with a fast
moveing
consumer goods firm with pan India operations.
(b) Why is Personal Selling method is still very much in vogue in the current market
environment. Elaborate with suitable examples. Briefly discuss the various situations
conductive for Personal selling other than the list mentioned in the study/ course material.
2. (a) Discuss the AIDAS theory of selling by taking a suitable example of your
choice. What are its
merits and drawbacks of this theory.
(b) What are Selling skills. List out and explain the various types of skills. How does
these skills
help a salesman in effectively discharging the responsibilities assigned to him.
3. (a) As a Sales Manager of a Publishing House what methods would you adopt
in identifying
training needs for the sales force. Discuss briefly the various steps in training process.
(b) What are the basic components of a compensation package? Why and how the
compensation
package differ between the companies selling similar and different types of products?
4. (a) Discuss the importance of Sales planning function in the following
(i) Single Product firm targeting North India Market.
(ii) Multi Product firm targeting all India Market.
What is territory Planning? What are the steps involved in territory Planning and its
importance in achieving the sales objectives. Discuss.
(b) Discuss the meaning and importance of Sales Budgeting. What are the
different methods of
Sales Budgeting that are generally adopted by a firm.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 63: Product Management
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-63
ASSIGNMENT
Course Code : MS - 63
Course Title : Product Management
Assignment Code : MS-63 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
coordinator of your study centre.
1. What is a product? Taking the example of T.V., explain the anatomy of the product i.e.
the
core benefits, tangible specifications, and augmented features.
2. Briefly explain the concept of Product Life Cycle (PLC). Do all the products follow
the bell
shaped curve of PLC? Discuss giving suitable examples.
3. What are the objectives of test marketing? How would you go about test marketing
a new
chocolate? Discuss.
4. Explain the stages involved in new product development process, giving
suitable examples.
5. Indian toothpaste market is witnessing a lot of changes, with many FMCG companies,
Indian as well as MNCs, launching ‘herbal’ toothpastes. This segment is growing fast and
every player wants to corner a significant share of it. You are a product manager-incharge
of
toothpaste category-in a FMCG company which also intends to enter ‘herbal
toothpaste’ segment.
(a) How can you use ‘Attribute Analysis’ to generate new product ideas for the
proposed herbal toothpaste? Discuss.
(b) Suggest alternative basis for positioning of the new product.
(c) Discuss the functions that packaging can perform in marketing of toothpaste.
(d) Suggest a brand name for the new product to be introduced by the
company, giving reasons why your choice is a good one.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 64: International Marketing
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-64
ASSIGNMENT
Course Code : MS - 64
Course Title : International Marketing
Assignment Code : MS-64 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. Describe the differences between ethnocentric, polycentric, regiocentric and
geocentric orientations. How do these orientations affect international marketing
practices? Explain with the
help of examples.
2. Discuss the significance of letter of credit in international marketing. Explain the
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
operations of a
letter of credit.
3. Explain the scope of international marketing research. What are the advantages
and limitations of
online surveys?
4. How does culture influence international marketing decisions? Explain with the help of
suitable
examples.
5. You are the marketing executive in a food processing company producing and
marketing fruit
juices and frozen vegetables in India. The company is exploring the possibilities
of entering
international markets. The management has asked you to prepare a preliminary
report covering the
following five aspects:
(a) Advantages and challenges for the company in entering the international markets;
(b) Different modes of entering international markets and potential difficulties involved
with
each option;
(c) Whether making exercises for product adaptation for different markets is worth it;
(d) Physical distribution implications and
(e) Support the company can receive from the institutional framework for export
available in
India.
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS – 65: Marketing of Services
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-65
ASSIGNMENT
Course Code : MS - 65
Course Title : Marketing of Services
Assignment Code : MS-65 /TMA/SEM - I/2018
Coverage : All Blocks
Note: Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study centre.
1. What are the implications of the services marketing triangle? Explain giving suitable
examples.
2. What are the differences between ‘search’, ‘experience’ and ‘credence’
qualities? Explain
with the help of examples.
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
3. Explain the importance of physical evidence for the following:
(a) A restaurant
(b) An insurance company.
4. As a customer relationship manager of a luxury resort, you have a received a mail from
a
guest who stayed with his family at your resort last week. He has complained that the
quality of food served was not satisfactory. Also, he has criticized the staff members that
they did not listen to his complaint properly. What steps would you take in response to
this letter? Discuss.
5. Explain the role of non-monetary costs in pricing of services by taking the example of
a
service of your choice.
6. Identify and explain the product support services which a washing machine
marketer can
offer for gaining competitive advantage.
ManagementProgramme
ASSIGNMENT
FIRST SEMESTER
2018
MS -91:Advanced Strategic Management
Schoolof Management Studies
INDIRA GANDHINATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI– 110 068
MS-91
ASSIGNMENT
Course Code : MS - 91
Course Title: Advanced Strategic Management
Assignment Code: MS-91/TMA/SEM- I/2018
Coverage: All Blocks
Note :Attemptall thequestions and submit this assignment on or before 30th April, 2018 to
the coordinator of your study center.
1. Explain the role of Strategists in Corporate Management.Discuss with referenceto any
company of your choice.
2. Discuss how good Corporate Governanceas asystem of governanceis essentialfrom all
points of view. Explain withreference toCorporateGovernance atTISCO.
3. Briefly describethe main modes of entering a foreign market.
4. What are Web-based Business Models? Explain the impact of E-Business on
organizations.
5. How do werelatestrategic philanthropy and economic motivations? Discuss.
6. How do Lupin Human Welfareand Research Foundation built up long term
supply arrangements and manufacturing capacity?
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 92: Management of Public Enterprises
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-92
ASSIGNMENT
Course Code : MS - 92
Course Title : Management of Public Enterprises
Assignment Code : MS-92/TMA/SEM - I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. How is Ownership and Management decided for Public Sector Enterprises? Why
is coordination and control an important aspect of Public Enterprises? Explain.
2. Describe the three phases of development of Public Sector Enterprises in
India. Explain in detail
the reasons for disinvestment of Public Sector Undertakings (PSUs) with reference to any
particular PSU of your choice.
3. What are the distinct modes and services of India’s transport system. Explain the role
of
Ministry of Road Transport and Highways in the development of Road Transport and
Highways.
4. “Wage Policy is part of Compensation Management.” Trace the evolution of
Wage Policy in
India from Payment of Wages Act 1936 to Pay Commissions keeping in mind
the institutions
related to compensation for private sector and public sector.
5. What are the oldest and the traditional form of Public Enterprises and how does the
government
undertake and perform various economic and social strategic functions? Cite examples
from any
two of the PSUs.
(a) Hindustan Aeronautics Limited (HAL)
(b) Bharat Earth Movers Limited (BEML)
(c) Bharat Electronics Limited (BEL)
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS- 93: Management of New and Small Enterprises
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068
MS-93
ASSIGNMENT
Course Code : MS - 93
Course Title : Management of New and Small Enterprises
Assignment Code : MS-93/TMA/SEM - I /2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. Define Competence. What are the various components of entrepreneurial competencies?
Explain any particular entrepreneurial competency which is most important for an
entrepreneur.
2. Differentiate between Marketing and Selling? Explain the need for market assessment.
Why is selling more important than marketing explain with reference to air travel?
3. What are the general financing schemes of the banks with respect to MSME? Briefly
explain the financing programmes of SIDBI.
4. How do you explain productivity? Substantiate work measurement and work
measurement techniques.
5. Explain Production Schedule as an evaluation and control tool.
6. Write short notes on any two of the following:-
(a) SEBI
(b) Manpower
(c) Partnership
P
Management Programme
ASSIGNMENT
FIRST SEMESTER
2018
MS - 95: Research Methodology for Management Decisions
School of Management Studies
INDIRA GANDHI NATIONAL OPEN UNIVERSITY
MAIDAN GARHI, NEW DELHI – 110 068 MS-95
ASSIGNMENT
Course Code : MS-95
Course Title : Research Methodology for Management Decisions
Assignment No. : MS-95/TMA /SEM-I/2018
Coverage : All Blocks
Note : Attempt all the questions and submit this assignment on or before 30th April,
2018 to the
coordinator of your study center.
1. How would you distinguish between a management decision problem and a
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com
management
research problem? Do all decision problems require research? Explain and illustrate with
examples.
2. ‘Majority of the researches make use of primary sources of data and secondary
data sources do
not really contribute to a scientific enquiry.’ Do you agree/ disagree with this
statement. Explain.
3. Explain an itemized rating scale. What are the various issues involved in constructing
an
itemized rating scale?
4. A researcher conducts a survey to find out whether the inhabitants of a metro town are
in favour
of capital punishment (F) or against it (A). The sequence of responses to the question
asked is
given below. Use the run test at α = 0.05 to test whether the responses are random.
F F A F F F A A A A A F F A A
A F F A A A A A A F F A A A
A A A F F F A A A F A F F F F
A A A A F F F A A A F F
5. Explain the following concepts.
(a) Null and alternative hypothesis
(b) One and two-tailed test
(c) Type I and type II error
(d) Level of significance
(e) Power of test
www.ignousolvedassignmentsmba.blogspot.in For more detail contact
ignou4you@gmail.com

ignou mba solved assignments 2018

  • 1.
    www.ignousolvedassignmentsmba.blogspot.in MS-01 Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS-01: Management Functions and Behaviour School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 ASSIGNMENT Course Code : MS-01 Course Title : Management Functions and Behaviour Assignment Code : MS- 01/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30t h April, 2018 to the coordinator of your study center. 1. Briefly describe the Management processes. Explain any one of them with respect to its significance and importance in organisational performance and efficiency. Explain with your organisational experience. Briefly describe the organisation, you are referring to. 2. What are the techniques used in different steps of Decision-making? Based on your organisational experience, discuss the importance and rules of Brainstorming in the process. Briefly describe the organisation and the situation, you are referring to. 3. What are the major antecedent conditions for change? Based on your organisational experience, discuss the necessity or otherwise of ‘why all organisations must change’ in the background of ‘how an organisation grows’. Explain the situation and organisational settings you are referring to. 4. 4. Base on your organisational experience/exposure critically discuss the role and impact of formal and informal groups on ‘Management’. Briefly describe the organsational setting, you are referring to. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 2: Management of Human Resources School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-2 ASSIGNMENT Course Code : MS - 2 Course Title : Management of Human Resources Assignement Code : MS-2 /TMA/SEM – I/2018 www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 2.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Explain the process of human resource planning. Describe how HR forecast is carried out in the organisation you are working with or an organisation you are familiar with. 2. Discuss the concept of ‘performance appraisal’. Explain any two methods of performance appraisal that you are familiar with citing suitable organisational examples. 3. Define mentoring and distinguish it from performance coaching. Assume you are responsible for mentoring of employees in a large organisation. Discuss how you will make mentoring a strategic function. Illustrate. 4. Discuss the laws covering wages. Analyse the recent amendments and trends in laws covering wages in India. 5. Critically evaluate the state of workers’ participation in Management in the present day business scenario. Explain with examples your answer giving due details of the organizations and the sources you are referring to. ManagementProgramme ASSIGNMENT FIRST SEMESTER 2018 MS -03:Economic and SocialEnvironment Schoolof Management Studies INDIRA GANDHINATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI– 110 068 MS-03 ASSIGNMENT Course Code : MS - 03 Course Title: Economic and SocialEnvironment Assignment Code: MS-03/TMA/SEM- I/2018 Coverage: All Blocks Note :Attemptall thequestions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Discuss the critical elements of macro-economic policies.Howeconomic environment gives a direction to the changesin the economic planning? 2. Differentiate betweenEconomic Growth and Economic Development. Why is growth and development synonymously used in economic discussion? 3. Discuss the genesis of mixed economy framework inIndia. 4. “An importantfactor which influences theBalance of Payment of an economy is the exchange rate of its currency vis-à-vis other major currencies”. Explain the statement www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 3.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com given above. 5. How the twin objective of equity and justicewas met by theeconomic reforms of 1991? Explain. 6. Write shortnotes on the following: (i)Trade Union Movement (ii) Public Accountability (iii) Administered prices Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 04: Accounting and Finance for Managers School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-04 ASSIGNMENT Course Code : MS-04 Course Title : Accounting and Finance for Managers Assignment Code : MS-04/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. How is ‘Financial Accounting’ different form ‘Management Accounting’? Discuss the role and activities of an Accountant. 2. The Balance Sheets of XYZ Ltd as on 31st December, 2016 and 2017 are as given below: Liabilities 2016 2017 Assets 2016 2017 Share Capital Goodwill General Buildings 24,000 24,000 Reserve 2,00,000 2,00,000 Plant 80,000 72,000 Profit and Loss 28,000 36,000 Investments 74,000 72,000 Account 32,000 26,000 Stock 20,000 22,000 Creditors 16,000 10,800 Bills 60,000 46,800 Bills Payable 2,400 1,600 Receivable 4,000 6,400 Provision for 32,000 36,000 Debtors 36,000 38,000 Taxation 800 1,200 Cash and bank 13,200 30,400 Provision for balances doubtful debts 3,11,200 3,11,600 3,11,200 3,11,600 Additional Information:- www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 4.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com (i) Depreciation provided on plant was 8,000 and on building was Rs. 8,000. (ii) Provision for taxation made during the year is Rs. 38,000. (iii) Interim dividend paid during the year is Rs. 16,000. From the above information, you are required to prepare Schedule of changes in Working Capital and Funds Flow Statement. 3. What do you understand by CVP Analysis. Explain the effect of Price and Volume on the Net Profit, with the help of a suitable illustration. 4. The Management of ABC Ltd. is considering a proposal to purchase an improved model of a machine which gives increased output. Its existing machine which has been in operation for 2 years has current market value of Rs. 1,00,000, its remaining estimated useful life is 10 years, with no salvage value at the end. The relevant particulars are as follows: Existing Machine Purchase price Estimated life Salvage value Annual Operating hours Selling price per unit Output per hour Material cost per unit Labour cost per unit Consumable stores per year New Machine Rs. 2,40,000 12 years - 2,000 Rs. 10 15 units Rs. 2 20 2,000 Rs. 4,00,000 10 years - 2,000 Rs. 10 20 units Rs. 2 40 5,000 Repairs and Maintenance per year 9,000 6,000 Working Capital 25,000 40,000 The company follows the straight-line method of depreciation and is subject to 50% tax. Should the existing machine be replaced? Assume that the company’s required rate of return is 15% and that the loss on sale of Assets is tax deductible. 5. As a Finance Manager how would you determine the Optimal Cash balance that would be required by your Organisation? What measures you would take to ensure the smooth and efficient Management of Cashflows in the Orgnisation? Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 05: Management of Machines and Materials School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-05 www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 5.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com ASSIGNMENT Course Code : MS-05 Course Title : Management of Machines and Materials Assignment No. : MS-05/TMA /SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. It is generally felt that “rural areas are good for locating large plant, semi-urban areas for locating medium-sized plants, and urban areas for small-scale plants”. Comment. 2. (a) Define job design. How has management viewed job design since the industrial revolution? (b) List the important factors that must be addressed in job design and briefly discuss the importance of each one. 3. Under what circumstances would you use PERT as opposed to CPM in project management? Give some example of projects where each would be more applicable than the other. 4. What do you understand by acceptance sampling? In what situations it is used? Briefly discuss the sampling plans. 5. “Inventory management for slow moving expensive items should focus more on lead time reduction than anything else”. Critically examine the statement. 6. Write short notes on any three of the following: (a) Intermittent flow processes (b) Uses of work sampling (c) Helgeson and Birnie Method of line balancing (d) Benefits of value engineering (e) Objectives of codification. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 06: Marketing for Managers School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS- 06 ASSIGNMENT Course Code : MS - 06 Course Title : Marketing for Managers Assignment Code : MS-06 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. (a) Define the term „Marketing‟ with suitable examples. Discuss the scope and www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 6.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com significance of marketing function in a developing and fast emerging economy like India. (b) What are the various components/ elements of marketing mix in case of products and services marketing. Discuss with suitable examples of your choice. 2. (a) Explain the concept of Product Life Cycle by taking an example one each from a consumer durable and any service offering of your choice. (b) Distinguish the concept of market vs the concept of a segment and their relationship in marketing, with suitable illustration. 3. (a) Discuss the various steps involved in the marketing research process that help in decision making process. Briefly discuss a few application areas of marketing research in the current business environment. (b) Distinguish a Product from a Brand with suitable examples. Explain packaging as a market development tool. 4. (a) Why pricing and promotional elements of marketing mix primarily decide the success of any brand? Explain. Discuss the strategic and tactical decisions that a manager should consider in pricing and promoting the firms offering. Take one product and one service offering and discuss their success story. (b) “Consumer” is the king does this statement still holds good in the era of online/digital marketing? If yes or no substantiate and justify accordingly. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 07: Information Systems for Managers School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-55: LOGISTICS AND SUPPLY CHAIN MANAGEMENT MS-07 ASSIGNMENT Course Code : MS-07 Course Title : Information Systems for Managers Assignment Code : MS-07/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Why is the Central Processing Unit (CPU) is called the “Brain” of the Computer? What are the components of a CPU? What factors affects the speed of a computer? www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 7.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com 2. Define data and information. What is the difference between the two? What are the main characteristics of information? 3. What are the types of inventory management systems? Define them and partition them into further classes. Also, briefly explain each subdivision. 4. How can you use the Web as a data source for your data warehouse? What types of information can you get from the Web? Explain briefly the steps needed to ensure that only good quality, reliable data is loaded into the data warehouse from the Web. 5. What are expert systems? Mention the working principles of expert systems. Also discuss how knowledge can be represented in expert systems. 6. Write short notes on any three of following: (a) Redundant Array of Independent Disks (RAID) (b) Polymorphic viruses (c) Business software solutions firm Microsoft (d) Features of JAVA. (e) Online Analytical Processing (OLAP) Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 08: Quantitative Analysis for Managerial Applications School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-08 ASSIGNMENTS Course Code : MS 08 Course Title : Quantitative Analysis for Managerial Applications Assignment No. : MS-08/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. A sample survey of 100 families belonging to the middle income group revealed the following distribution according to their annual savings. Find a) average annual sayings, using the efficient method, b) 5th decile, and c) 90th percentile. Savings (Rs ‘000) 05-09 09-13 13-17 17-21 21-25 25-30 30-35 Number of Families 07 10 15 23 25 14 06 2. It is known that the number of heavy trucks arriving at a railway station follows the Poisson distribution. If the average number of truck arrivals during a specified period of half an hour is 2, find the probabilities that during a given half an hour a) no heavy truck will arrive, b) at least two heavy trucks will arrive, c) at the most 3 heavy trucks will arrive, and d) between 1 and 3 heavy trucks will arrive. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 8.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com 3. A sample survey of tax-payers belonging to business class and professional class yielded the following results: Business class Professional class Sample size n1 = 400 n2 = 420 Defaulters in tax payment x1 = 80 x2 = 65 Test the hypothesis at α = 0.01 level of significance that a) defaulter rate is the same for the two classes of tax-payers, and b) defaulter rate is higher in the business class than in the professional class by 0.03. 4. A set of paired data on X and Y has mean of X as 36, mean of Y as 85, standard deviation of X as 11, standard deviation of Y as 8, and coefficient of correlation between X and Y as 0.66. Obtain a) the two regression equations, and b) value of X when Y= 75. 5. Write short notes on any three of the following: (a) Absolute value function (b) Baye’s Theorem (c) Multistage Sampling (d) Delphi method of forecasting Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 09: Managerial Economics School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-09 ASSIGNMENT Course Code : MS-09 Course Title : Managerial Economics Assignment Code : MS-09/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Explain the Opportunity Cost Principle? Substantiate with the help of an example how production possibility reflects opportunity costs? 2. How are Demand, Price Elasticity and Revenue determined? Explain Price Elasticity with the help of any particular example of your choice. 3. Discuss Economies and Diseconomies of Scale. How is Economies of Scope different from Economies of Scale? Explain. 4. Explain “Barriers to Entry” of a firm. Differentiate between legal barriers and natural barriers with the help of any example of your choice. 5. Trace the chronology of deregulation of Indian Telecom from 1992 to 2003. Explain www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 9.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com the special role played by Telecom Regulatory Authority of India (TRAI). 6. Write short notes on any two of the following:- (a) Decision under risk (b) Biometric forecasting (c) Kinked demand curve Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 10: Organisational Design, Development and Change School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-10 ASSIGNMENT Course Code : MS - 10 Course Title : Organisational Design, Development and Change Assignment Code : MS-10/TMA/SEM-I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Describe the factors that affect organisational design and explain different approaches in assessing organisational effectiveness with the help of examples. 2. Describe and discuss the trends in the present day work organisations and the role of management in ‘quality of work life’. 3. What are the different sources of resistance to change? Describe the process of overcoming resistance to change. Discuss with examples. 4. Enlist the types of organisation structure. Discuss few organisational structures and identify their type. 5. Explain the concept of workplace and architectural ergonomics with the help of examples. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS-11: Strategic Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-11 ASSIGNMENT Course Code : MS-11 Course Title : Strategic Management Assignment No. : MS-11/TMA/SEM-I/2018 www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 10.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Coverage : All Blocks Note: There are five questions in this assignment. Attempt all the questions and send them on or before 30th April, 2018 to the Coordinator of the Study Centre you are attached with. 1. Discuss in what sense the top management takes decisions for a company and in what sense it does not takes the strategic decisions for a company alone? Illustrate with suitable examples. 2. Explain any two of the growth strategies you have studied and highlight the conditions under which each is the most appropriate. Illustrate your answer with the help of examples. 3. Identify two companies that have recently merged. Read the published information on both the companies. Based on the study, identify the issues and challenges the two companies are currently facing in combining their respective organizational cultures. 4. Select an organization of your choice which has adopted focus strategy. Analyze as to how the focus strategy has been useful for the organization to build its competitive advantage. 5. Describe different styles of leadership for Top Management with the help of real world examples. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 21: Social Processes and Behavioral Issues School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-21 ASSIGNMENT Course Code : MS - 21 Course Title : Social Processes and Behavioral Issues Assignment Code : MS-21/TMA/SEM - 01 /2018 Coverage : All Blocks Note: a. There are two sets of assignments. Set A is for the students who have registered for MS-21 prior to January 2018. Set B is for students who have registered for MS-21 in January, 2018 b. Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. SET A 1. Describe the emerging scenario of organizations. Explain the steps to be taken by management into bring in the mindset of employees conducive to changing reality of business in an organization you are aware of. Briefly describe the organization you are referring to. 2. Explain the relevance of behaviour modification in organizations and briefly discuss www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 11.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com the role of ethics in behaviour modification. 3. Briefly discuss how organizational culture can be developed and describe the attributes of work culture and their relevance. 4. Describe the process of perception. How behaviour is influenced by perception? Explain with the help of examples 5. Roles and norms are control mechanisms of groups. Discuss with the help of examples. SET B 1. Discuss the modern theories of leadership citing relevant examples. 2. Differentiate between counseling, guidance and psychotherapy. Explain various approaches to counseling with the help of examples, 3. Explain any two theories of motivation citing relevant examples, 4. What is organisational citizenship behaviour? Discuss different approaches to OCB. 5. Explain the statement, “Words are symbols and meaning exist in mind”. Supplement with relevant examples. MS-22 Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS- 22: Human Resource Development School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 ASSIGNMENT Course Code : MS-22 Course Title : Human Resource Development Assignment Code : MS- 22/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. What is the Concept of Career? In our society people face many career transition in changing their profession, organisation, and geographic location, to name a few. What is the role of HRD in dealing with this issue at organisational level? Explain with the organisational examples you are aware of. Briefly describe the situation and the organisation, you are referring to. 2. What are the major methods and movements to increase organisational performance? Explain any one of them based on your organisational experience. Briefly describe the organisation, you are referring to. 3. What are the basic tenets of Rewarding System? Briefly explain with organisational examples you have come across. Explain the situation and the organisation, you are www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 12.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com referring to. 4. “Managing Diversity is currently enjoying a great deal of support from the world of business. Proponents of diversity in organisations have emphasized its benefits, and managing diversity is portrayed as a product of enlightened corporate self interest.” Elaborate the above statement and discuss the underlying concepts based on organisational experience, you have or you are aware of. Briefly describe the organisation, you are referring to. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 23: Human Resource Planning School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-23 ASSIGNMENT Course Code : MS - 23 Course Title : Human Resource Planning Assignment Code : MS-23 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. Explain the concept of human resource forecasting. Describe various techniques used in forecasting human resource planning. 2. Discuss the objectives of job evaluation. Explain the various job evaluation methods. Briefly describe the recent developments in job evaluation system. 3. Discuss the aims and objectives of career planning. Describe the benefits of career planning. What are the factors which go into the shaping of a career? 4. Explain the significance of information system in Human Resource Management. Describe the various approaches to managing information at the macro and micro level. 5. Explain the concept, need and scope of HR audit. Describe the essential steps being involved in the Auditing process. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 24: Employment Relations School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-24 ASSIGNMENT www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 13.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Course Code : MS - 24 Course Title : Employment Relations Assignment Code : MS-24 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. Explain the procedure for registration of a Trade Union under the Trade Unions Act. Discuss the objects general and political funds are spent under the Trade Union Act. 2. Describe the present position of Trade Unions in India. What are your suggestions for strengthening the Trade Unions in India. 3. Explain the meaning and concept of Collective Bargaining. Describe the process of collective bargaining. Discuss the conditions for success of collective bargaining. 4. Discuss the aims and objectives of workers participation in Management. Describe the workers participation, employee involvement practices of any organisation you are familiar with. 5. Explain various cultural aspects of employment relations. Discuss the recent developments in employment relations. Discuss the impact of specialization, centralization and globalisation on new employment relations. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 41: Working Capital Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-41 ASSIGNMENT Course Code : MS-41 Course Title : Working Capital Management Assignment No. : MS-41/TMA /SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. The annual figures of Alpha Ltd are as follows: (i) Sales at home, at 1 month credit Rs. 12,00,000. (ii) Export at 3 months credit, S.P. 10% below the home price Rs. 5,40,000. (iii) Materials used, suppliers extend 2 months credit Rs. 4,50,000. (iv) Wages paid, half month in arreas Rs. 3,60,000. (v) Manufacturing expenses, paid one month in arreas Rs. 5,40,000. (vi) Depreciation on fixed assets Rs. 60,000. (vii) Administrative expenses, paid one month in arrear Rs. 1,20,000. (viii) Sales promotion expenses, payable quarterly in advance Rs. 60,000. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 14.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Alpha Ltd. sells goods in the domestic market on a gross profit of 25%. It keeps one month stock of raw materials as well as finished product and believes in keeping Rs. 1,00,000 available to it. You are required to calculate the working capital requirement of the company, assuming 15% safety margin. 2. Give a complete overview of the different marketable securities that are available for investments. 3. Select any financial Institution/ Organisation of your choice and obtain information about the important components of its credit policy and the attributes that they take into consideration while deciding the credit wortheness about its customers. 4. Describe the creation of Euro Money and Eurocurrency Markets? Discuss the factors contributing to the growth of the Euromarkets. 5. ‘The Working Captal Module is divided into three additional parts beyond the investment information presented in the Capital Investment (CI) module’. Discuss of objectives and operation sequential operation of the working capital module. Discuss the objectives and operation of each these three parts. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 42 Capital Investment and Financing Decisions School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-42 ASSIGNMENT Course Code : MS-42 Course Title : Capital Investment and Financing Decisions Assignment No. : MS-42/TMA /SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. What is meant by a firm's capital structure? Explain the Modigilian - Miller (MM) theory and Traditional approach to capital structure of a firm. 2. Explain the concept of project life cycle? How are the work breakdown structure and linear responsibility chart prepared? 3. What is Project Risk? Briefly explain the techniques used for the measurement of project risk 4. Explain the various instruments through which corporates procure finance both for long term and short term. Discuss the circumstances under which they are preferred. Give reasons for the same. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 15.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com 5. What is Corporate Restructuring? What factors motivate an enterprise to undertake restructuring exercise? Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 43: Management Control Systems School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-43 ASSIGNMENT Course Code : MS-43 Course Title : Management Control Systems Assignment No. : MS-43/TMA/SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the Coordinator of your study center. 1. Explain the concept of Strategy? Describe the different Models that help in formulating business unit strategies. 2. Explain the ARM’s length principle and discuss its application. 3. Discuss in detail the three organisational Incentives systems viz the Scanlon plan, the Kaiser-United Steel Workers plan and profit sharing and explain their applicability. 4. Select any Bank/ Insurance company of your choice and discuss the management control system, that is prevalent, in that Institution. 5. Study the ‘Christian Medical College and Hospital, Vellore’ case and answer the questions given at the end of the case. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 51: Operations Research School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-51 ASSIGNMENT Course Code :MS - 51 Course Title : Operations Research Assignment Code : MS-51/TMA/SEM - I /2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 16.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com 1. Solve graphically: Minimize Z=6x1 + 14x2 Subject to 5x1 + 4x2 ≥ 60 3x1 + 7x2 ≤84 x1 + 2x2 ≥ 18 x1, x2 ≥ 0 2. Five employees of a company are to be assigned to five jobs, which can be done by any of them. The workers get different wages per hour. These are: Rs 5 per hour for A, B, and C each, and Rs 3 per hour for D and E each. The amount of time taken by each employee to do a given job is given in the following table. Determine the assignment pattern that (a) minimizes the total time taken, and (b) minimizes the total cost, of getting five units of work done. Employee Job A B C D E 1 7 9 3 3 2 2 6 1 6 6 5 3 3 4 9 10 7 4 1 5 2 2 4 5 6 6 9 4 2 3. What is the importance of integer programming models in supporting managerial decisions? Describe the rationale behind Cutting Plane Method used for solving integer programming models. 4. A wholesaler supplies 30 stuffed dolls each day to various shops. Dolls are purchased from the manufacturer in lots of 120 each at Rs. 1200 per lot. Every order incurs a handling charge of Rs 60 plus a freight charge of Rs 250 per lot. Multiple and fractional lots can also be ordered, and all orders are met the next day. The incremental cost is Rs 0.60 per year to store a doll in inventory. The wholesaler finances inventory investments by paying its holding company 2% monthly for borrowed funds. How many dolls should be ordered at a time in order to minimize the total annual inventory cost? Assume that there are 250 week-days in a year. How frequently should he order? 5. What is simulation? Describe the simulation process. State the major two reasons for using simulation to solve a problem. What are the advantages and limitations of simulation? Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 52: Project Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 17.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com MS-52 ASSIGNMENT Course Code :MS - 52 Course Title : ProjectManagement Assignment Code : MS-52/TMA/SEM - I /2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. What are the phases of a project development cycle? Give the salient tasks under each phase. What are the outlines of opportunity studies in project management? How do there impact upon project feasibility studies? 2. “Doubled Project Report (DPR) forms the foundation on which the entire superstructure of the project is built – if it is weak, project cannot weather the turbulent times ahead.” Bring out the do‟s and don‟ts of a good DPR. 3. “Meticulous Management of activities on the critical path is crucial to completing projects on time.” How can we „beat‟ the critical path and improve our on-time performance? 4. A good tem-work speed up project implementation justify. Developing self directed project teams is the key to improving effectiveness in project management. Elucidate. 5. Explain the importance of „project review‟ in the context of control of a project. How are cybernetics concepts applied to project management? Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 53: Production/Operations Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-53 ASSIGNMENT Course Code : MS - 53 Course Title : Production/Operations Management Assignment Code : MS-53/TMA/SEM - I /2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Over the years many variations on classical Delphi have been forwarded. Discuss these variants. 2. Capacity will be modified in response to demand. Demand will be modified in www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 18.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com response to capacity. Which of these two statement is correct? Why? 3. (a) What is Line-Balancing of assembly operations? Illustrate with examples. (b) What approach would you suggest for increasing throughput rate of assembly lines and why? 4. Inventory of materials provides operational flexibility. But, many flexible operational systems need little inventory. Explain this seeming contradiction. 5. Discuss preventive maintenance. In what ways is preventive maintenance absolutely necessary in JIT/ kanban/ pull manufacturing as opposed to push manufacturing. 6. Write short notes on any three of the following: (a) Quality and profitability relationship. (b) Stopwatch Time Study method. (c) The KANBAN System (d) Manufacturing Resource Planning (MRP II) (c) Classification of manufacturing technology. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 54: Management Information Systems School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-54 ASSIGNMENT Course Code :MS - 54 Course Title : Management Information Systems Assignment Code : MS-54/TMA/SEM - I /2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. How the functional areas can be separated from MIS point of view. List down major subsystems and the typical generated within the functional area in your organization. 2. How much importance should be accorded to implementation phase as part of the total MIS development activity? Explain. Briefly discuss the various implementation strategies. Under what circumstances are they suitable? 3. What are expert systems and how do they help in decision-making? Can you give examples to illustrate the same? What kinds of decisions can be appropriately programmed on expert systems? Give examples. 4. Outline the basic sequence of steps to acquiring a DMBS. What steps are the mists important? Why should an organization be careful about placing over reliance on “benchmark” tests in selecting a DBMS? 5. Differentiate among Trojans, Worms and Viruses. Give one example for each. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 19.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com “Computer virus is a major threat to computer security”. Justify the statement. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 61: Consumer Behaviour School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-61 ASSIGNMENT Course Code : MS - 61 Course Title : Consumer Behaviour Assignment Code : MS-61 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. What do you understand by the term ‘consumer behaviour’? Explain the scope of consumer behavior giving suitable examples. 2. With the help of examples discuss the characteristics that distinguish organizational buying from individual buying. 3. Explain the concept of learning and discuss its marketing implications. 4. What is a reference group? Name two reference groups that are important to you. In what ways do they influence you in your purchasing behaviour? 5. Explain the concept of culture and subculture. Discuss the relevance of subcultural segmentation in case of the following products: (a) Ready to eat food products (b) Apparels 6. As a marketer of consumer durables like refrigerators, washing machines etc., what strategies would you adopt for responding to post purchase feelings of your consumers? Discuss. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS-62: Sales Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS- 62 ASSIGNMENT Course Code : MS - 62 Course Title : Sales Management Assignment Code : MS-62 /TMA/SEM - I/2018 www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 20.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. (a) Discuss the role and responsibilities of a Sales Manager, associated with a fast moveing consumer goods firm with pan India operations. (b) Why is Personal Selling method is still very much in vogue in the current market environment. Elaborate with suitable examples. Briefly discuss the various situations conductive for Personal selling other than the list mentioned in the study/ course material. 2. (a) Discuss the AIDAS theory of selling by taking a suitable example of your choice. What are its merits and drawbacks of this theory. (b) What are Selling skills. List out and explain the various types of skills. How does these skills help a salesman in effectively discharging the responsibilities assigned to him. 3. (a) As a Sales Manager of a Publishing House what methods would you adopt in identifying training needs for the sales force. Discuss briefly the various steps in training process. (b) What are the basic components of a compensation package? Why and how the compensation package differ between the companies selling similar and different types of products? 4. (a) Discuss the importance of Sales planning function in the following (i) Single Product firm targeting North India Market. (ii) Multi Product firm targeting all India Market. What is territory Planning? What are the steps involved in territory Planning and its importance in achieving the sales objectives. Discuss. (b) Discuss the meaning and importance of Sales Budgeting. What are the different methods of Sales Budgeting that are generally adopted by a firm. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 63: Product Management School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-63 ASSIGNMENT Course Code : MS - 63 Course Title : Product Management Assignment Code : MS-63 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 21.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com coordinator of your study centre. 1. What is a product? Taking the example of T.V., explain the anatomy of the product i.e. the core benefits, tangible specifications, and augmented features. 2. Briefly explain the concept of Product Life Cycle (PLC). Do all the products follow the bell shaped curve of PLC? Discuss giving suitable examples. 3. What are the objectives of test marketing? How would you go about test marketing a new chocolate? Discuss. 4. Explain the stages involved in new product development process, giving suitable examples. 5. Indian toothpaste market is witnessing a lot of changes, with many FMCG companies, Indian as well as MNCs, launching ‘herbal’ toothpastes. This segment is growing fast and every player wants to corner a significant share of it. You are a product manager-incharge of toothpaste category-in a FMCG company which also intends to enter ‘herbal toothpaste’ segment. (a) How can you use ‘Attribute Analysis’ to generate new product ideas for the proposed herbal toothpaste? Discuss. (b) Suggest alternative basis for positioning of the new product. (c) Discuss the functions that packaging can perform in marketing of toothpaste. (d) Suggest a brand name for the new product to be introduced by the company, giving reasons why your choice is a good one. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 64: International Marketing School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-64 ASSIGNMENT Course Code : MS - 64 Course Title : International Marketing Assignment Code : MS-64 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. Describe the differences between ethnocentric, polycentric, regiocentric and geocentric orientations. How do these orientations affect international marketing practices? Explain with the help of examples. 2. Discuss the significance of letter of credit in international marketing. Explain the www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 22.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com operations of a letter of credit. 3. Explain the scope of international marketing research. What are the advantages and limitations of online surveys? 4. How does culture influence international marketing decisions? Explain with the help of suitable examples. 5. You are the marketing executive in a food processing company producing and marketing fruit juices and frozen vegetables in India. The company is exploring the possibilities of entering international markets. The management has asked you to prepare a preliminary report covering the following five aspects: (a) Advantages and challenges for the company in entering the international markets; (b) Different modes of entering international markets and potential difficulties involved with each option; (c) Whether making exercises for product adaptation for different markets is worth it; (d) Physical distribution implications and (e) Support the company can receive from the institutional framework for export available in India. Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS – 65: Marketing of Services School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-65 ASSIGNMENT Course Code : MS - 65 Course Title : Marketing of Services Assignment Code : MS-65 /TMA/SEM - I/2018 Coverage : All Blocks Note: Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study centre. 1. What are the implications of the services marketing triangle? Explain giving suitable examples. 2. What are the differences between ‘search’, ‘experience’ and ‘credence’ qualities? Explain with the help of examples. www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 23.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com 3. Explain the importance of physical evidence for the following: (a) A restaurant (b) An insurance company. 4. As a customer relationship manager of a luxury resort, you have a received a mail from a guest who stayed with his family at your resort last week. He has complained that the quality of food served was not satisfactory. Also, he has criticized the staff members that they did not listen to his complaint properly. What steps would you take in response to this letter? Discuss. 5. Explain the role of non-monetary costs in pricing of services by taking the example of a service of your choice. 6. Identify and explain the product support services which a washing machine marketer can offer for gaining competitive advantage. ManagementProgramme ASSIGNMENT FIRST SEMESTER 2018 MS -91:Advanced Strategic Management Schoolof Management Studies INDIRA GANDHINATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI– 110 068 MS-91 ASSIGNMENT Course Code : MS - 91 Course Title: Advanced Strategic Management Assignment Code: MS-91/TMA/SEM- I/2018 Coverage: All Blocks Note :Attemptall thequestions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Explain the role of Strategists in Corporate Management.Discuss with referenceto any company of your choice. 2. Discuss how good Corporate Governanceas asystem of governanceis essentialfrom all points of view. Explain withreference toCorporateGovernance atTISCO. 3. Briefly describethe main modes of entering a foreign market. 4. What are Web-based Business Models? Explain the impact of E-Business on organizations. 5. How do werelatestrategic philanthropy and economic motivations? Discuss. 6. How do Lupin Human Welfareand Research Foundation built up long term supply arrangements and manufacturing capacity? www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 24.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 92: Management of Public Enterprises School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-92 ASSIGNMENT Course Code : MS - 92 Course Title : Management of Public Enterprises Assignment Code : MS-92/TMA/SEM - I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. How is Ownership and Management decided for Public Sector Enterprises? Why is coordination and control an important aspect of Public Enterprises? Explain. 2. Describe the three phases of development of Public Sector Enterprises in India. Explain in detail the reasons for disinvestment of Public Sector Undertakings (PSUs) with reference to any particular PSU of your choice. 3. What are the distinct modes and services of India’s transport system. Explain the role of Ministry of Road Transport and Highways in the development of Road Transport and Highways. 4. “Wage Policy is part of Compensation Management.” Trace the evolution of Wage Policy in India from Payment of Wages Act 1936 to Pay Commissions keeping in mind the institutions related to compensation for private sector and public sector. 5. What are the oldest and the traditional form of Public Enterprises and how does the government undertake and perform various economic and social strategic functions? Cite examples from any two of the PSUs. (a) Hindustan Aeronautics Limited (HAL) (b) Bharat Earth Movers Limited (BEML) (c) Bharat Electronics Limited (BEL) Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS- 93: Management of New and Small Enterprises www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 25.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-93 ASSIGNMENT Course Code : MS - 93 Course Title : Management of New and Small Enterprises Assignment Code : MS-93/TMA/SEM - I /2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. Define Competence. What are the various components of entrepreneurial competencies? Explain any particular entrepreneurial competency which is most important for an entrepreneur. 2. Differentiate between Marketing and Selling? Explain the need for market assessment. Why is selling more important than marketing explain with reference to air travel? 3. What are the general financing schemes of the banks with respect to MSME? Briefly explain the financing programmes of SIDBI. 4. How do you explain productivity? Substantiate work measurement and work measurement techniques. 5. Explain Production Schedule as an evaluation and control tool. 6. Write short notes on any two of the following:- (a) SEBI (b) Manpower (c) Partnership P Management Programme ASSIGNMENT FIRST SEMESTER 2018 MS - 95: Research Methodology for Management Decisions School of Management Studies INDIRA GANDHI NATIONAL OPEN UNIVERSITY MAIDAN GARHI, NEW DELHI – 110 068 MS-95 ASSIGNMENT Course Code : MS-95 Course Title : Research Methodology for Management Decisions Assignment No. : MS-95/TMA /SEM-I/2018 Coverage : All Blocks Note : Attempt all the questions and submit this assignment on or before 30th April, 2018 to the coordinator of your study center. 1. How would you distinguish between a management decision problem and a www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com
  • 26.
    www.ignousolvedassignmentsmba.blogspot.in For moredetail contact ignou4you@gmail.com management research problem? Do all decision problems require research? Explain and illustrate with examples. 2. ‘Majority of the researches make use of primary sources of data and secondary data sources do not really contribute to a scientific enquiry.’ Do you agree/ disagree with this statement. Explain. 3. Explain an itemized rating scale. What are the various issues involved in constructing an itemized rating scale? 4. A researcher conducts a survey to find out whether the inhabitants of a metro town are in favour of capital punishment (F) or against it (A). The sequence of responses to the question asked is given below. Use the run test at α = 0.05 to test whether the responses are random. F F A F F F A A A A A F F A A A F F A A A A A A F F A A A A A A F F F A A A F A F F F F A A A A F F F A A A F F 5. Explain the following concepts. (a) Null and alternative hypothesis (b) One and two-tailed test (c) Type I and type II error (d) Level of significance (e) Power of test www.ignousolvedassignmentsmba.blogspot.in For more detail contact ignou4you@gmail.com