Having a M2M continuous monitoring system in construction sites would provide relevant
parties including contractors, consultants, engineers and local authorities with real-time
access to reliable monitoring data, and be alerted to any early signs of problem even before it
occurs. M2M monitoring is especially useful in instances where early warning of structural
movements is crucial, like the recent Nicoll Highway tragedy.
Challenges
Currently, construction firms use automatic data loggers to provide reliable and consistent
sensor data from project sites. Remote sites use a GSM wireless monitoring system to collect
and upload data to a central computer at fixed intervals. The system then sends the data to
users at preset time cycles. Although data is captured continuously, it is not economical to
conduct continuous GSM online monitoring of sensor readings as it is very expensive to
maintain the system.
The Solution
SysEng developed the eMonitoring system (eMs), a GPRS-enabled M2M solution to address
the critical need for an effective and cost-efficient continuous monitoring system for the
construction industry.
The eMs is used in deep excavation projects to monitor strut forces in a temporary retaining
system for a cut-and-cover tunnel, such as the on-going Kim Chuan MRT Depot project.
Cross-section of temporary retaining system for a cut
and cover tunnel
The eMs connects to arrays of vibrating-wire (VW) or
resistance based sensors. It records the data at time
intervals. Data acquired is stored and processed in a
data logger and sent immediately to a central server
via GPRS. An automatic computer system at the
central server then uploads the monitored data to
dedicated web pages. Monitored values are
simultaneously compared with pre-set review levels.
SMS alert messages will be sent to users when the
values exceed the trigger threshold within 60
seconds.
The data logger is incorporated into a solar panel
with management controls. Thus countries along the
Case Study: Mission Critical M2M application to prevent
Construction Site Failures
Page 1 of 3
Case Study: Mission Critical M2M application to prevent Construction Site Failures
7/6/2006
http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...
equator such as Singapore can use solar energy to
power the system, making real-time monitoring more cost effective.
Solar Powered GPRS data logger
The Results
The diagram below is a typical history graph of one of the struts monitored at frequency
intervals of 10-minutes. The increase in strut forces due to preloading and further excavation
was accurately captured by the eMs. When the strut forces exceeded the 1st review level of
543kN on a few occasions for a brief 20 minutes, the SMS alert system was triggered and the
designer was notified immediately.
Strut forces measured by eMonitoring System (eMs)
The system enables the designer to have a faster design review if the monitoring data moves
unexpectedly. It has helped the designer to verify any change in loads to co-relate with the
construction site activities. If there is a sudden change in loads, the system automatically
alerts the designer for further investigation works so that potential site failures can be avoided
in time.
Having real-time site data allows site engineers to keep an eye on actual site conditions.
Reliable remote field monitoring systems at construction sites reduce risks by providing
accurate information to the right people, at the right time. Moreover, the GPRS network costs
depends on the amount of data transfer, not on the connection time, allowing the automatic
data logger to always connect to the central server, without incurring high costs. Also, all data
between logger and server are transmitted in real-time, thereby eliminating any connection
time delays.
Company Profile
Country of Incorporation: Singapore, January 1994
Page 2 of 3
Case Study: Mission Critical M2M application to prevent Construction Site Failures
7/6/2006
http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...
SysEng (S) Pte Ltd is a System Engineering company specialising in Developing
Automated Measurements systems. It has developed expertise in instrumentation, wire-
less communications, machine vision, embedded system and lightning protection system
design. With its extensive field experience, it has expanded to be a M2M solution provider.
Local Office: 23 New Industrial Rd, #04-05 Century Industrial Building, S 536209
Contact
Person:
Dr Tan Guan Hong
Tel: (65) 6287 5710
H/P: (65) 9727 1973
Email: syseng@singnet.com.sg
Website: http://www.emonitoring-system.com, http://www.syseng.com.sg
Back to Top
© 2003 IDA Singapore. All Rights Reserved.
Page 3 of 3
Case Study: Mission Critical M2M application to prevent Construction Site Failures
7/6/2006
http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...

More Related Content

Similar to IDA Mission Critical M2M of SysEng.pdf

Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) TechnologyAutomatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
RekaNext Capital
 
Android-Based Secure Monitoring System for Industrial Power Plants
Android-Based Secure Monitoring System for Industrial Power PlantsAndroid-Based Secure Monitoring System for Industrial Power Plants
Android-Based Secure Monitoring System for Industrial Power Plants
IRJESJOURNAL
 
Paper id 24201457
Paper id 24201457Paper id 24201457
Paper id 24201457IJRAT
 
International Journal of Engineering (IJE) Volume (2) Issue (1)
International Journal of Engineering (IJE) Volume (2)  Issue (1)International Journal of Engineering (IJE) Volume (2)  Issue (1)
International Journal of Engineering (IJE) Volume (2) Issue (1)CSCJournals
 
Design and implementation of vehicle tracking system using gps
Design and implementation of vehicle tracking system using gpsDesign and implementation of vehicle tracking system using gps
Design and implementation of vehicle tracking system using gps
Alexander Decker
 
11.design and implementation of vehicle tracking system using gps
11.design and implementation of vehicle tracking system using gps11.design and implementation of vehicle tracking system using gps
11.design and implementation of vehicle tracking system using gpsAlexander Decker
 
An Overview of Traffic Accident Detection System using IoT
An Overview of Traffic Accident Detection System using IoTAn Overview of Traffic Accident Detection System using IoT
An Overview of Traffic Accident Detection System using IoT
IRJET Journal
 
Smart Operations
Smart OperationsSmart Operations
Smart Operations
everis
 
111ei0254ppt8thsem
111ei0254ppt8thsem111ei0254ppt8thsem
111ei0254ppt8thsem
Himansu Pradhan
 
A Smart Image Processing-Based System For Parking Space Vacancy Management
A Smart Image Processing-Based System For Parking Space Vacancy ManagementA Smart Image Processing-Based System For Parking Space Vacancy Management
A Smart Image Processing-Based System For Parking Space Vacancy Management
Mary Calkins
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meterikm104
 
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
IJERA Editor
 
Leveraging smartphone cameras
Leveraging smartphone camerasLeveraging smartphone cameras
Leveraging smartphone cameras
Muthu Samy
 
Leveraging Smartphone Cameras for Collaborative Road Advisories
Leveraging Smartphone Cameras for Collaborative Road AdvisoriesLeveraging Smartphone Cameras for Collaborative Road Advisories
Leveraging Smartphone Cameras for Collaborative Road Advisories
Muthu Samy
 
Leveraging smartphone cameras
Leveraging smartphone camerasLeveraging smartphone cameras
Leveraging smartphone cameras
Muthu Samy
 
IRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational LeapIRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational Leap
IRJET Journal
 
IRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational LeapIRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational Leap
IRJET Journal
 

Similar to IDA Mission Critical M2M of SysEng.pdf (20)

Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) TechnologyAutomatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
 
Android-Based Secure Monitoring System for Industrial Power Plants
Android-Based Secure Monitoring System for Industrial Power PlantsAndroid-Based Secure Monitoring System for Industrial Power Plants
Android-Based Secure Monitoring System for Industrial Power Plants
 
Paper id 24201457
Paper id 24201457Paper id 24201457
Paper id 24201457
 
International Journal of Engineering (IJE) Volume (2) Issue (1)
International Journal of Engineering (IJE) Volume (2)  Issue (1)International Journal of Engineering (IJE) Volume (2)  Issue (1)
International Journal of Engineering (IJE) Volume (2) Issue (1)
 
Design and implementation of vehicle tracking system using gps
Design and implementation of vehicle tracking system using gpsDesign and implementation of vehicle tracking system using gps
Design and implementation of vehicle tracking system using gps
 
11.design and implementation of vehicle tracking system using gps
11.design and implementation of vehicle tracking system using gps11.design and implementation of vehicle tracking system using gps
11.design and implementation of vehicle tracking system using gps
 
An Overview of Traffic Accident Detection System using IoT
An Overview of Traffic Accident Detection System using IoTAn Overview of Traffic Accident Detection System using IoT
An Overview of Traffic Accident Detection System using IoT
 
Smart Operations
Smart OperationsSmart Operations
Smart Operations
 
01362503
0136250301362503
01362503
 
111ei0254ppt8thsem
111ei0254ppt8thsem111ei0254ppt8thsem
111ei0254ppt8thsem
 
A Smart Image Processing-Based System For Parking Space Vacancy Management
A Smart Image Processing-Based System For Parking Space Vacancy ManagementA Smart Image Processing-Based System For Parking Space Vacancy Management
A Smart Image Processing-Based System For Parking Space Vacancy Management
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meter
 
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
 
Leveraging smartphone cameras
Leveraging smartphone camerasLeveraging smartphone cameras
Leveraging smartphone cameras
 
Leveraging Smartphone Cameras for Collaborative Road Advisories
Leveraging Smartphone Cameras for Collaborative Road AdvisoriesLeveraging Smartphone Cameras for Collaborative Road Advisories
Leveraging Smartphone Cameras for Collaborative Road Advisories
 
Leveraging smartphone cameras
Leveraging smartphone camerasLeveraging smartphone cameras
Leveraging smartphone cameras
 
Db24664671
Db24664671Db24664671
Db24664671
 
Repot on gsm based arm
Repot on gsm based armRepot on gsm based arm
Repot on gsm based arm
 
IRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational LeapIRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational Leap
 
IRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational LeapIRJET- Edge Computing the Next Computational Leap
IRJET- Edge Computing the Next Computational Leap
 

More from RekaNext Capital

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to Transformer
RekaNext Capital
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4
RekaNext Capital
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3
RekaNext Capital
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2
RekaNext Capital
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdf
RekaNext Capital
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
RekaNext Capital
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.doc
RekaNext Capital
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab
RekaNext Capital
 
Pre-load results.ppt
Pre-load results.pptPre-load results.ppt
Pre-load results.ppt
RekaNext Capital
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdf
RekaNext Capital
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking System
RekaNext Capital
 
AV Latency Measurement
AV Latency MeasurementAV Latency Measurement
AV Latency Measurement
RekaNext Capital
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FR
RekaNext Capital
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6
RekaNext Capital
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5
RekaNext Capital
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010
RekaNext Capital
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
RekaNext Capital
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental Projects
RekaNext Capital
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison Systems
RekaNext Capital
 
Tunnel Monitoring Conference 28 Nov 2003
Tunnel Monitoring Conference 28 Nov 2003 Tunnel Monitoring Conference 28 Nov 2003
Tunnel Monitoring Conference 28 Nov 2003
RekaNext Capital
 

More from RekaNext Capital (20)

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to Transformer
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdf
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.doc
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab
 
Pre-load results.ppt
Pre-load results.pptPre-load results.ppt
Pre-load results.ppt
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdf
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking System
 
AV Latency Measurement
AV Latency MeasurementAV Latency Measurement
AV Latency Measurement
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FR
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental Projects
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison Systems
 
Tunnel Monitoring Conference 28 Nov 2003
Tunnel Monitoring Conference 28 Nov 2003 Tunnel Monitoring Conference 28 Nov 2003
Tunnel Monitoring Conference 28 Nov 2003
 

Recently uploaded

Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 

Recently uploaded (20)

Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 

IDA Mission Critical M2M of SysEng.pdf

  • 1. IDA Home > Wireless > Case Study: Mission Critical M2M application to prevent Construction Site Failures Having a M2M continuous monitoring system in construction sites would provide relevant parties including contractors, consultants, engineers and local authorities with real-time access to reliable monitoring data, and be alerted to any early signs of problem even before it occurs. M2M monitoring is especially useful in instances where early warning of structural movements is crucial, like the recent Nicoll Highway tragedy. Challenges Currently, construction firms use automatic data loggers to provide reliable and consistent sensor data from project sites. Remote sites use a GSM wireless monitoring system to collect and upload data to a central computer at fixed intervals. The system then sends the data to users at preset time cycles. Although data is captured continuously, it is not economical to conduct continuous GSM online monitoring of sensor readings as it is very expensive to maintain the system. The Solution SysEng developed the eMonitoring system (eMs), a GPRS-enabled M2M solution to address the critical need for an effective and cost-efficient continuous monitoring system for the construction industry. The eMs is used in deep excavation projects to monitor strut forces in a temporary retaining system for a cut-and-cover tunnel, such as the on-going Kim Chuan MRT Depot project. Cross-section of temporary retaining system for a cut and cover tunnel The eMs connects to arrays of vibrating-wire (VW) or resistance based sensors. It records the data at time intervals. Data acquired is stored and processed in a data logger and sent immediately to a central server via GPRS. An automatic computer system at the central server then uploads the monitored data to dedicated web pages. Monitored values are simultaneously compared with pre-set review levels. SMS alert messages will be sent to users when the values exceed the trigger threshold within 60 seconds. The data logger is incorporated into a solar panel with management controls. Thus countries along the Case Study: Mission Critical M2M application to prevent Construction Site Failures Page 1 of 3 Case Study: Mission Critical M2M application to prevent Construction Site Failures 7/6/2006 http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...
  • 2. equator such as Singapore can use solar energy to power the system, making real-time monitoring more cost effective. Solar Powered GPRS data logger The Results The diagram below is a typical history graph of one of the struts monitored at frequency intervals of 10-minutes. The increase in strut forces due to preloading and further excavation was accurately captured by the eMs. When the strut forces exceeded the 1st review level of 543kN on a few occasions for a brief 20 minutes, the SMS alert system was triggered and the designer was notified immediately. Strut forces measured by eMonitoring System (eMs) The system enables the designer to have a faster design review if the monitoring data moves unexpectedly. It has helped the designer to verify any change in loads to co-relate with the construction site activities. If there is a sudden change in loads, the system automatically alerts the designer for further investigation works so that potential site failures can be avoided in time. Having real-time site data allows site engineers to keep an eye on actual site conditions. Reliable remote field monitoring systems at construction sites reduce risks by providing accurate information to the right people, at the right time. Moreover, the GPRS network costs depends on the amount of data transfer, not on the connection time, allowing the automatic data logger to always connect to the central server, without incurring high costs. Also, all data between logger and server are transmitted in real-time, thereby eliminating any connection time delays. Company Profile Country of Incorporation: Singapore, January 1994 Page 2 of 3 Case Study: Mission Critical M2M application to prevent Construction Site Failures 7/6/2006 http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...
  • 3. SysEng (S) Pte Ltd is a System Engineering company specialising in Developing Automated Measurements systems. It has developed expertise in instrumentation, wire- less communications, machine vision, embedded system and lightning protection system design. With its extensive field experience, it has expanded to be a M2M solution provider. Local Office: 23 New Industrial Rd, #04-05 Century Industrial Building, S 536209 Contact Person: Dr Tan Guan Hong Tel: (65) 6287 5710 H/P: (65) 9727 1973 Email: syseng@singnet.com.sg Website: http://www.emonitoring-system.com, http://www.syseng.com.sg Back to Top © 2003 IDA Singapore. All Rights Reserved. Page 3 of 3 Case Study: Mission Critical M2M application to prevent Construction Site Failures 7/6/2006 http://www.ida.gov.sg/idaweb/wireless/infopage.jsp?infopagecategory=articles:wireless&versionid=1&info...