This document provides information about Worldwide Spark Erosion Service, a division of KSB Service that specializes in removing bolts, studs, and other items using spark erosion. It details the company's history and facilities, describes how spark erosion works and the equipment used, and provides case studies and testimonials from customers in industries like oil and gas, energy, and marine. Contact information is provided for Paul Eccles, the sales manager based in Glasgow, Scotland.
This document provides information on KSB Energy Saving's retrofit services for pumps. It introduces KSB as a pump manufacturer and discusses their retrofit process which involves assessing the existing pump system, selecting appropriate retrofit components like hydraulic couplings or variable speed drives, and installing the retrofit solution. The document includes theories on pump performance curves and operating points. It also shows photos from a boiler feed pump retrofit project where KSB replaced the motor and installed a Voith hydraulic coupling. The retrofit reduced energy costs by improving efficiency.
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
KAUST engaged Maritime Survey Australia to act as a project manager to oversee a major refit of the vessel, RV Thuwal which involved wiring upgrades, installation of new navigational equipment, a new galley, a scientific survey room and a vessel upgrade of the hydraulics, heating, ventilation and cooling systems.
This document summarizes the commercialization of Velocys' advanced Fischer-Tropsch synthesis technology. Key points include:
Velocys has 15+ years of experience and over $300 million invested in developing their microchannel reactor technology. Their pilot plant demonstrates stable long-term operation with excellent catalyst regenerability and lifetime. Their process is designed for modular scalability.
Velocys works with world-class partners and has commercial rollout underway, with resources including technical centers and a permanent pilot plant. Their technology offers advantages including isothermal behavior, robustness, economy, and high productivity.
Experimental design and validation ensure the catalyst and process meet commercial requirements for stability, performance, and tolerance to variations
This document summarizes a workover operation in the Upper Assam Basin in India. It discusses the reasons for workovers including production and water issues. Different workover operations are described such as installing artificial lifts, water shutoffs, and well abandonment. The history of one particular well is provided, noting its increasing water cut issues over time in two separate zones. Problems encountered with the well including failed squeeze cementing jobs are outlined. The workover plan and squeeze cementing process are reviewed as options to address the water production from the well. Site visits to rigs and fields are also discussed. Suggestions and conclusions on addressing the well issues are proposed.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
The document describes a case study of performance improvements to the wet flue gas desulfurization (FGD) system at the B.L. England Unit 2 coal power plant using ALRD® technology. The plant was facing new, stricter emissions limits and considered various upgrade options before choosing to install two levels of ALRD plates during scheduled outages. The installation was completed successfully within budget and on schedule. After the upgrade, the FGD system was able to achieve over 97% SO2 removal and meet the new emission limit of 0.15 lbs SO2/MMBtu, demonstrating the effectiveness of the ALRD technology.
The aging ash handling system at Tutuka Power Station needed refurbishment. AEG Construction was hired to supply and install a new 2.3 mile long control system for the ash conveyor belts, which is the longest at Eskom. The conveyors require water to be doused at intervals to prevent ash from blowing away, but too much water can cause the ash to stick or congeal. The 12-month refurbishment project was completed during AEG's transition to AGE Engineering and included project management, PLC engineering, installation, and commissioning using 78 man-months of effort. The client was pleased with the efficiency of the new system, requiring little repair work for the control system.
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
The document summarizes a horizontal directional drilling (HDD) project to install sewer pipelines in the Upper Blue Mountains region of New South Wales, Australia. The project aims to improve public health and protect the local environment by connecting new sewer lines to an existing treatment plant using HDD to bore under sensitive areas like Cascade Creek. It involved drilling two pipelines totaling over 4,700 meters in length, using HDPE pipe, with drilling occurring 24/7 to minimize costs and completion time. Productivity averaged over 75 meters per day for the smaller pipe and over 125 meters per day for the larger pipe. The total cost was $14.4 million including indirects or $10.3 million for direct costs only,
This document provides information about Worldwide Spark Erosion Service, a division of KSB Service that specializes in removing bolts, studs, and other items using spark erosion. It details the company's history and facilities, describes how spark erosion works and the equipment used, and provides case studies and testimonials from customers in industries like oil and gas, energy, and marine. Contact information is provided for Paul Eccles, the sales manager based in Glasgow, Scotland.
This document provides information on KSB Energy Saving's retrofit services for pumps. It introduces KSB as a pump manufacturer and discusses their retrofit process which involves assessing the existing pump system, selecting appropriate retrofit components like hydraulic couplings or variable speed drives, and installing the retrofit solution. The document includes theories on pump performance curves and operating points. It also shows photos from a boiler feed pump retrofit project where KSB replaced the motor and installed a Voith hydraulic coupling. The retrofit reduced energy costs by improving efficiency.
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
KAUST engaged Maritime Survey Australia to act as a project manager to oversee a major refit of the vessel, RV Thuwal which involved wiring upgrades, installation of new navigational equipment, a new galley, a scientific survey room and a vessel upgrade of the hydraulics, heating, ventilation and cooling systems.
This document summarizes the commercialization of Velocys' advanced Fischer-Tropsch synthesis technology. Key points include:
Velocys has 15+ years of experience and over $300 million invested in developing their microchannel reactor technology. Their pilot plant demonstrates stable long-term operation with excellent catalyst regenerability and lifetime. Their process is designed for modular scalability.
Velocys works with world-class partners and has commercial rollout underway, with resources including technical centers and a permanent pilot plant. Their technology offers advantages including isothermal behavior, robustness, economy, and high productivity.
Experimental design and validation ensure the catalyst and process meet commercial requirements for stability, performance, and tolerance to variations
This document summarizes a workover operation in the Upper Assam Basin in India. It discusses the reasons for workovers including production and water issues. Different workover operations are described such as installing artificial lifts, water shutoffs, and well abandonment. The history of one particular well is provided, noting its increasing water cut issues over time in two separate zones. Problems encountered with the well including failed squeeze cementing jobs are outlined. The workover plan and squeeze cementing process are reviewed as options to address the water production from the well. Site visits to rigs and fields are also discussed. Suggestions and conclusions on addressing the well issues are proposed.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
The document describes a case study of performance improvements to the wet flue gas desulfurization (FGD) system at the B.L. England Unit 2 coal power plant using ALRD® technology. The plant was facing new, stricter emissions limits and considered various upgrade options before choosing to install two levels of ALRD plates during scheduled outages. The installation was completed successfully within budget and on schedule. After the upgrade, the FGD system was able to achieve over 97% SO2 removal and meet the new emission limit of 0.15 lbs SO2/MMBtu, demonstrating the effectiveness of the ALRD technology.
The aging ash handling system at Tutuka Power Station needed refurbishment. AEG Construction was hired to supply and install a new 2.3 mile long control system for the ash conveyor belts, which is the longest at Eskom. The conveyors require water to be doused at intervals to prevent ash from blowing away, but too much water can cause the ash to stick or congeal. The 12-month refurbishment project was completed during AEG's transition to AGE Engineering and included project management, PLC engineering, installation, and commissioning using 78 man-months of effort. The client was pleased with the efficiency of the new system, requiring little repair work for the control system.
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
The document summarizes a horizontal directional drilling (HDD) project to install sewer pipelines in the Upper Blue Mountains region of New South Wales, Australia. The project aims to improve public health and protect the local environment by connecting new sewer lines to an existing treatment plant using HDD to bore under sensitive areas like Cascade Creek. It involved drilling two pipelines totaling over 4,700 meters in length, using HDPE pipe, with drilling occurring 24/7 to minimize costs and completion time. Productivity averaged over 75 meters per day for the smaller pipe and over 125 meters per day for the larger pipe. The total cost was $14.4 million including indirects or $10.3 million for direct costs only,
McKenney's replaced nine chilled water coils in air handling units located in an operations center for a public service company. The project had to be completed during limited weekend windows to avoid downtime. New custom drain pans were also fabricated to fit inside the existing pans and support the replacement coils. The project was finished on time and on budget, allowing the air handling units to now run more efficiently and save energy costs.
This document discusses Velocys' smaller-scale Fischer-Tropsch technology for biomass-to-liquids applications. Key points include:
- Velocys has developed smaller-scale FT technology that is more economical than large-scale FT plants and enables the use of biomass and waste feedstocks.
- Their technology is being deployed in two commercial biomass-to-liquids plants in the US and UK, as well as two commercial gas-to-liquids plants.
- Their first commercial plant using municipal solid waste is under construction in Oklahoma City with major partners.
- Velocys' FT technology has been demonstrated on gasified wood at a pilot plant in Austria, showing
The document summarizes several projects completed as a consulting engineer, including environmental impact surveys of gas compression stations, design of a natural gas compression station, rectification of an underperforming cooling tower, bringing an incinerator up to safe operating standards, mechanical design for an offshore substructure, an expert witness report on a boiler collapse, refurbishing mechanical services for a dry dock, testing a gas turbine installation, design of a steam system for a brewery, delivery of a clinical waste incinerator, and conducting energy surveys to identify opportunities to reduce clients' energy consumption. The roles included lead engineer, project leader, mechanical engineer, and energy specialist.
• Fourteen (14) years solid experience in different facets of Power Plant industry.
• Strong understanding with different EPC philosophies in power generations and transmissions.
• Well-exposed and experienced in the installation and operation of the following;
• GE Frame 7FA Gas Turbine-Generator Units
• GE Frame 9E Gas Turbine-Generator Units
• Ansaldo Energia Gas Turbine-Generator Units
• Rotating Equipment Maintenance & Operation
Sarah Moore has over 15 years of experience in building engineering projects focused on energy efficiency and renewable energy systems. She has managed a variety of projects including CHP feasibility studies, biomass boiler installations, and district heating schemes. Her experience includes roles in project engineering, management, and operations management.
Hi-Tech was contracted to provide shop drawings for a boiler supporting structure in the UAE. They modeled the structure in Tekla after receiving the initial Staad model from the client's design firm. This required adjusting member locations and dealing with revisions as design progressed. The 55m tall tower structure with a boiler mass at the top presented stability challenges under earthquake loads. Hi-Tech delivered general arrangement, assembly, and part drawings over 5 months to help expedite installation. They employed quality processes including self-checks, peer reviews, and audits to deliver the project outputs on time.
This document discusses Stantec's experience providing engineering, procurement, and construction management services for gas turbine power generation projects. It summarizes over 13,000 MW of experience on gas turbine projects ranging from 240 MW to over 1,000 MW. It provides examples of projects Stantec has worked on, including new builds, repowering existing plants, and performance optimization studies. Stantec touts its ability to tailor its services to suit clients' business needs and objectives.
The document discusses EST (eni Slurry Technology), a hydrocracking process developed by eni to upgrade heavy feedstocks into transportation fuels. Some key points:
- EST uses a slurry bubble column reactor and dispersed catalyst to achieve high conversion of vacuum residues with few limitations.
- A demonstration plant was built in 2005 and the first industrial plant opened in 2013, proving the technology at scale.
- EST can process a wide range of feedstocks and achieve over 97% conversion, addressing refineries' need to process heavier crudes.
- The technology has potential applications in both upstream and downstream industries for upgrading heavy/extra heavy oils and residues.
This document discusses Santos' approach to well integrity from construction through abandonment and rehabilitation. It emphasizes the importance of well design, execution excellence, operating practices, monitoring, and feedback to ensure well integrity is maintained throughout the lifecycle. Upon abandonment, Santos' process involves approved plugging and cementing of the wellbore from total depth to surface, followed by site rehabilitation including revegetation and sign-off by the regulator.
Think outside the box (culvert): How creativity sells more precastHamilton_Kent
Highlighting three important projects that are creating opportunities for producers of box sections, simply by utilizing an existing product in new ways and with new requirements.
This project aimed to modify an existing projection welding machine to weld fins onto tubes that were 7 meters long, compared to the previous maximum length of 4.5 meters. The team designed new fixtures to accommodate the longer tubes, relocated the servo motor, and modified the PLC program. As a result, they were able to weld fins onto 7 meter tubes using the same machine, eliminating the need for additional butt joints and reducing cycle time. Over 3,700 butt joints were eliminated, improving efficiency. Going forward, further modifications may allow even longer tube lengths to be processed.
The expansion of NCIG's coal export terminal at the Port of Newcastle from 30mtpa to 53mtpa (Stage 2AA) was completed successfully by Aurecon Hatch. Key aspects included:
1) Stage 2AA was delivered under schedule and budget with over 7 million work hours and no lost time incidents.
2) Innovations in materials handling technologies and civil works improved efficiency.
3) Lessons learned from Stage 1 were applied to the design and construction, and continuity of expertise ensured knowledge transfer.
4) Extensive planning minimized disruption to ongoing terminal operations during construction.
Over 20 years of experience in mechanical engineering and power plant projects including design, construction management, commissioning, and operations. Past roles include project manager for a 9.9 MWe rice husk power plant and 18 MWe tri-generation plant, engineering manager for compressor packages, and advising on pipeline and cogeneration plant projects. Currently a project and engineering manager for waste heat recovery and gas compression facilities.
The Wanlip STW Sludge Project will provide a new sludge digestion facility to replace the existing aging plant. The £32 million project is being delivered by Costain-MWH and includes importing and indigenous sludge screening, thickening, blending, acid phase and gas phase digestion, biogas handling, and dewatering. Collaboration between Severn Trent Water and the contractors standardized designs across multiple sludge projects, improving efficiency. The project utilizes existing infrastructure where possible and incorporates innovative solutions like steel digesters.
Best practices at (aditya cement works site) n ewPraveen Rathore
This document provides an overview of best practices at Aditya Cements Works site in Chittaurgarh, Rajasthan, India. It discusses safety practices like arranging safety nets around preheaters and using walkie-talkies between crane operators and signal men. It also highlights production practices such as quantities used in jump form construction, repair methodology, and quality control steps like curing tank temperature control and displaying approved samples. Pictures show various areas of the cement production facility like the preheater, kiln, clinker storage silo, and truck loading.
This document contains the resume of Julene Zak Adams, an experienced critical care nurse with over 15 years of experience. She has worked in various roles including as a staff nurse in critical care units, a cath lab recovery nurse, and as a supervisor at an acute care hospital. She has extensive skills in caring for complex patients, educating others, and collaborating as part of an interdisciplinary team. She is currently pursuing her BSN through the University of Texas at Arlington and maintains high academic achievement and involvement in professional organizations. The resume provides details of her education and qualifications for nursing positions requiring critical care experience and leadership abilities.
El documento presenta tres ejercicios sobre análisis exploratorio de datos utilizando el conjunto de datos "activossalud.RData". El primer ejercicio pide describir dos variables cualitativas mediante tablas de frecuencias e interpretar los resultados. El segundo ejercicio compara dos variables cuantitativas usando medidas de tendencia central y dispersión. El tercer ejercicio realiza al menos un gráfico de cada tipo (sectores, barras, histograma, caja) con variables seleccionadas del conjunto de datos e interpreta los resultados.
The Little Red Brocket, known as Mazama rufina, is classified as vulnerable according to international studies. It is a small deer found in the mountainous regions of Colombia that is facing declining populations and loss of habitat due to human activities like urban expansion, agriculture, hunting, and mining. While the species exists in small communities across the country, there is limited data on their actual numbers and distribution. Efforts are needed to research and protect the Little Red Brocket to prevent its disappearance from the ecosystems where it lives.
McKenney's replaced nine chilled water coils in air handling units located in an operations center for a public service company. The project had to be completed during limited weekend windows to avoid downtime. New custom drain pans were also fabricated to fit inside the existing pans and support the replacement coils. The project was finished on time and on budget, allowing the air handling units to now run more efficiently and save energy costs.
This document discusses Velocys' smaller-scale Fischer-Tropsch technology for biomass-to-liquids applications. Key points include:
- Velocys has developed smaller-scale FT technology that is more economical than large-scale FT plants and enables the use of biomass and waste feedstocks.
- Their technology is being deployed in two commercial biomass-to-liquids plants in the US and UK, as well as two commercial gas-to-liquids plants.
- Their first commercial plant using municipal solid waste is under construction in Oklahoma City with major partners.
- Velocys' FT technology has been demonstrated on gasified wood at a pilot plant in Austria, showing
The document summarizes several projects completed as a consulting engineer, including environmental impact surveys of gas compression stations, design of a natural gas compression station, rectification of an underperforming cooling tower, bringing an incinerator up to safe operating standards, mechanical design for an offshore substructure, an expert witness report on a boiler collapse, refurbishing mechanical services for a dry dock, testing a gas turbine installation, design of a steam system for a brewery, delivery of a clinical waste incinerator, and conducting energy surveys to identify opportunities to reduce clients' energy consumption. The roles included lead engineer, project leader, mechanical engineer, and energy specialist.
• Fourteen (14) years solid experience in different facets of Power Plant industry.
• Strong understanding with different EPC philosophies in power generations and transmissions.
• Well-exposed and experienced in the installation and operation of the following;
• GE Frame 7FA Gas Turbine-Generator Units
• GE Frame 9E Gas Turbine-Generator Units
• Ansaldo Energia Gas Turbine-Generator Units
• Rotating Equipment Maintenance & Operation
Sarah Moore has over 15 years of experience in building engineering projects focused on energy efficiency and renewable energy systems. She has managed a variety of projects including CHP feasibility studies, biomass boiler installations, and district heating schemes. Her experience includes roles in project engineering, management, and operations management.
Hi-Tech was contracted to provide shop drawings for a boiler supporting structure in the UAE. They modeled the structure in Tekla after receiving the initial Staad model from the client's design firm. This required adjusting member locations and dealing with revisions as design progressed. The 55m tall tower structure with a boiler mass at the top presented stability challenges under earthquake loads. Hi-Tech delivered general arrangement, assembly, and part drawings over 5 months to help expedite installation. They employed quality processes including self-checks, peer reviews, and audits to deliver the project outputs on time.
This document discusses Stantec's experience providing engineering, procurement, and construction management services for gas turbine power generation projects. It summarizes over 13,000 MW of experience on gas turbine projects ranging from 240 MW to over 1,000 MW. It provides examples of projects Stantec has worked on, including new builds, repowering existing plants, and performance optimization studies. Stantec touts its ability to tailor its services to suit clients' business needs and objectives.
The document discusses EST (eni Slurry Technology), a hydrocracking process developed by eni to upgrade heavy feedstocks into transportation fuels. Some key points:
- EST uses a slurry bubble column reactor and dispersed catalyst to achieve high conversion of vacuum residues with few limitations.
- A demonstration plant was built in 2005 and the first industrial plant opened in 2013, proving the technology at scale.
- EST can process a wide range of feedstocks and achieve over 97% conversion, addressing refineries' need to process heavier crudes.
- The technology has potential applications in both upstream and downstream industries for upgrading heavy/extra heavy oils and residues.
This document discusses Santos' approach to well integrity from construction through abandonment and rehabilitation. It emphasizes the importance of well design, execution excellence, operating practices, monitoring, and feedback to ensure well integrity is maintained throughout the lifecycle. Upon abandonment, Santos' process involves approved plugging and cementing of the wellbore from total depth to surface, followed by site rehabilitation including revegetation and sign-off by the regulator.
Think outside the box (culvert): How creativity sells more precastHamilton_Kent
Highlighting three important projects that are creating opportunities for producers of box sections, simply by utilizing an existing product in new ways and with new requirements.
This project aimed to modify an existing projection welding machine to weld fins onto tubes that were 7 meters long, compared to the previous maximum length of 4.5 meters. The team designed new fixtures to accommodate the longer tubes, relocated the servo motor, and modified the PLC program. As a result, they were able to weld fins onto 7 meter tubes using the same machine, eliminating the need for additional butt joints and reducing cycle time. Over 3,700 butt joints were eliminated, improving efficiency. Going forward, further modifications may allow even longer tube lengths to be processed.
The expansion of NCIG's coal export terminal at the Port of Newcastle from 30mtpa to 53mtpa (Stage 2AA) was completed successfully by Aurecon Hatch. Key aspects included:
1) Stage 2AA was delivered under schedule and budget with over 7 million work hours and no lost time incidents.
2) Innovations in materials handling technologies and civil works improved efficiency.
3) Lessons learned from Stage 1 were applied to the design and construction, and continuity of expertise ensured knowledge transfer.
4) Extensive planning minimized disruption to ongoing terminal operations during construction.
Over 20 years of experience in mechanical engineering and power plant projects including design, construction management, commissioning, and operations. Past roles include project manager for a 9.9 MWe rice husk power plant and 18 MWe tri-generation plant, engineering manager for compressor packages, and advising on pipeline and cogeneration plant projects. Currently a project and engineering manager for waste heat recovery and gas compression facilities.
The Wanlip STW Sludge Project will provide a new sludge digestion facility to replace the existing aging plant. The £32 million project is being delivered by Costain-MWH and includes importing and indigenous sludge screening, thickening, blending, acid phase and gas phase digestion, biogas handling, and dewatering. Collaboration between Severn Trent Water and the contractors standardized designs across multiple sludge projects, improving efficiency. The project utilizes existing infrastructure where possible and incorporates innovative solutions like steel digesters.
Best practices at (aditya cement works site) n ewPraveen Rathore
This document provides an overview of best practices at Aditya Cements Works site in Chittaurgarh, Rajasthan, India. It discusses safety practices like arranging safety nets around preheaters and using walkie-talkies between crane operators and signal men. It also highlights production practices such as quantities used in jump form construction, repair methodology, and quality control steps like curing tank temperature control and displaying approved samples. Pictures show various areas of the cement production facility like the preheater, kiln, clinker storage silo, and truck loading.
This document contains the resume of Julene Zak Adams, an experienced critical care nurse with over 15 years of experience. She has worked in various roles including as a staff nurse in critical care units, a cath lab recovery nurse, and as a supervisor at an acute care hospital. She has extensive skills in caring for complex patients, educating others, and collaborating as part of an interdisciplinary team. She is currently pursuing her BSN through the University of Texas at Arlington and maintains high academic achievement and involvement in professional organizations. The resume provides details of her education and qualifications for nursing positions requiring critical care experience and leadership abilities.
El documento presenta tres ejercicios sobre análisis exploratorio de datos utilizando el conjunto de datos "activossalud.RData". El primer ejercicio pide describir dos variables cualitativas mediante tablas de frecuencias e interpretar los resultados. El segundo ejercicio compara dos variables cuantitativas usando medidas de tendencia central y dispersión. El tercer ejercicio realiza al menos un gráfico de cada tipo (sectores, barras, histograma, caja) con variables seleccionadas del conjunto de datos e interpreta los resultados.
The Little Red Brocket, known as Mazama rufina, is classified as vulnerable according to international studies. It is a small deer found in the mountainous regions of Colombia that is facing declining populations and loss of habitat due to human activities like urban expansion, agriculture, hunting, and mining. While the species exists in small communities across the country, there is limited data on their actual numbers and distribution. Efforts are needed to research and protect the Little Red Brocket to prevent its disappearance from the ecosystems where it lives.
Este documento describe las clases sociales, su origen y evolución. Explica que las clases surgieron debido al desarrollo de la división del trabajo y la propiedad privada sobre los medios de producción. Identifica las principales clases en las sociedades esclavista, feudal y capitalista. También analiza las clases sociales modernas, dividiéndolas en clase alta, media y baja. Finalmente, presenta conceptos clave de la teoría social como cambio social.
This document discusses magnetite iron ore projects in Australia and why some new projects have faced problems. It provides an overview of several major magnetite projects in Australia, including Savage River, Project Magnet, Sino Iron, and Karara. While established projects like Savage River have been successful, newer greenfield projects have struggled due to high capital and operating costs, difficulties developing infrastructure, and low iron ore prices squeezing margins. Overall, magnetite processing remains challenging in Australia compared to direct shipping ore deposits.
This document discusses ChapDrive, a company established in 2006 that is developing a hydraulic transmission system for wind turbines as an alternative to traditional gearbox systems. It provides an overview of ChapDrive's management team and shareholders. Key points are that the hydraulic system aims to reduce top turbine weights by 50% compared to standard designs and improve reliability by eliminating gearboxes and their failure risks. The document outlines ChapDrive's development progress from early lab testing to field tests of 225kW and 900kW systems and plans to test a 5MW design in 2009-2010 with the goal of supplying hydraulic transmissions to enable larger, more cost-effective wind turbines.
Altra Industrial Motion provides drivetrain products for oil and gas applications including clutches, brakes, couplings, gearing, and air motors. They are committed to the oil and gas market and ensure component compatibility and optimized performance. Major OEMs rely on Altra's application knowledge and ability to analyze customer needs and apply new technologies.
The document discusses Velocys' microchannel Fischer-Tropsch technology for smaller scale gas-to-liquids (GTL) projects. Their high activity catalyst is 10 times more productive than conventional catalysts. Microchannel reactors provide enhanced mass and heat transfer allowing for high conversion rates. Velocys has developed manufacturing methods to produce reactors at scale for modular GTL facilities between 1,500 to 15,000 barrels per day. Pilot plant results demonstrate the stable performance of their catalyst and reactor design. Case studies highlight several commercial GTL projects utilizing Velocys technology that are enabled by factors like low cost feedstocks and existing infrastructure integration.
This document provides details on the author's extensive experience in offshore oil and gas projects, including management roles in engineering, design, manufacturing, installation, and commissioning of subsea systems and equipment. Some key experiences mentioned include management of pipeline and umbilical installations, wind farm cable installations, decommissioning projects, and design of specialized launch and connection systems for subsea infrastructure.
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...Neil Woodward
Over the last 10 years Statoil has developed subsea remote hot tap technology. The first use of the remote hot tap technology was the Tampen Link hot tap in 2008. The hot tap cutting operation itself was performed without the use of divers; however, the preparatory works including hyperbaric welding of the hot tap tee was performed with saturation divers. The world’s deepest hot tap operations on a pressurized pipeline were performed on the Ormen Lange field in the Norwegian Sea in August 2009. Two Hot Taps were conducted in a water depth of 860 meters on pre-installed tees. The development of the Pipeline Repair System Remote Hot Tap equipment is the result of targeted research and development effort and extensive qualification work over many years. The Retrofit Tee remote installation, welding and cutting equipment has now been employed as part of a production installation: the Åsgard Subsea Compression project to extend the Åsgard gas-field lifetime.
This paper describes the dry hyperbaric GMA weld procedure development and qualification performed in the laboratory, using the Corrosion Resistant Alloy consumable filler material Alloy 59, for the Remote Hot Tapping application using the Retrofit Tee. Specific attention was paid to areas of concern prior to performing the formal Weld Procedure Qualification work, particularly with regard to the effects of moisture and temperature upon the resultant weld quality. Weld procedures developed in the laboratory were successfully tested subsea in representative environments using the Remote Tee Welding Tool (RTWT) equipment in the Sognefjord, Norway, with offshore tests performed at 265 and 350msw in 2011. Further tests were performed in 2012 at 265msw and in the Retrofit Tee itself at 316msw in the Nedstrandfjord.
The hyperbaric GMA weld procedures have now been applied for the production application for the Åsgard Subsea Compression project, with the installation of a Retrofit Tee, associated valve module and gooseneck spool to enable a cost-effective modification to the existing pipeline network without interfering with ongoing production. The Retrofit Tee will be connected with a Subsea Compressor station to extend the gas-field lifetime.
This milestone represents the world’s first application of diverless dry hyperbaric GMA welding for a subsea production application.
March 2012 - Michigan Energy Forum - Carmen BenderAnnArborSPARK
Wind farms are growing in many parts of Michigan as the price to generate electricity by turbines drops. Once the decision is made to move forward with wind, what happens next?
Join us as we discuss answers to the questions below:
· What are the steps followed to site a wind farm?
· How are the locations determined?
· How are the turbines selected?
· Who does the construction?
· How is financing handled?
· What are the long term maintenance issues?
The companies of Altra Industrial Motion offer many critical drivetrain products utilized in renewable energy applications including brakes, power packs, geared motors, couplings, shaft locking devices and linear actuators.
Mark Fayle has over 14 years of experience in industrial engineering projects focusing on water and power industries. He has held roles as an estimator, project engineer, procurement manager, and estimating manager. Some of his key achievements include successfully sourcing fabrication in China for multi-million dollar projects and managing the estimating for a $60 million contract to upgrade a power station's water treatment plant. He has a proven track record in estimating, procurement, and contract management.
The document discusses structural integrity challenges in India's nuclear energy sector and proposed solutions. It covers (1) research and development facilities that promote structural integrity of nuclear plant components; (2) use of remote tooling for inspections and repairs; (3) benefits of indigenization in manufacturing critical materials; (4) how modular construction can enhance quality and integrity; and (5) challenges like ensuring economic viability of plants and timely resolution of issues during construction that impact delays. Potential engineering approaches are proposed to address challenges and ensure structural integrity of upcoming 700MWe pressurized heavy water reactors.
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nick Vukovich
Nippon Dragon Resources Inc. Hard rock revolution has arrived! Nippon Dragon Resources Inc. is without a doubt one of the most innovative junior mining companies operating today. The Company’s patented “thermal fragmentation” process is ideal for high grade precious/base metal vein deposits. The exploitation of high-grade precious/base metal veins with its exclusive thermal fragmentation process coupled with conventional mining methods will lead the Company in becoming a mid-size gold producer.
Nippon Dragon’s growth strategy is to focus on the development of quality assets that will significantly enhance shareholder value. The acquisition, development and future exploration activities at the Rocmec 1 (Abitibi, Qc, Canada) property is an excellent example of this strategy.
The companies of Altra Industrial Motion offer many critical drivetrain products utilized in cement and asphalt applications including brakes, clutches, gearing and geared motors.
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...DEGIMA SA
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval & Civil engineering at North of Spain
WAVE ENERGY DEVICES Since 2006 we have been manufacturing different Power Buoys and Underwater Substation Pod, among other different structures and ancillary products.
OFFSHORE WIND DEVICES
Other than the wave energy devices, Degima has been manufacturing Offshore Wind Masts and Offshore Weather Masts (floating steel platforms).
- Green Energy Geothermal provides modular geothermal wellhead power plants that are faster and lower cost to develop than traditional large-scale geothermal power plants.
- An independent case study found that developing the same 110MW project using GEG's modular wellhead plants requiring $100M less equity, could generate power 1.5 years earlier, and provide a 6.4% higher investor return than the conventional approach.
- GEG has successfully commissioned 15 geothermal wellhead plants totaling 81.1MW in Kenya and provides turnkey solutions globally.
Maskell Productions Ltd is a New Zealand industrial fibreglass fabricator that has been in business for over 40 years. They manufacture fibreglass pipes, tanks, air pollution systems and other equipment for industries such as power plants. Maskell has extensive experience providing fibreglass piping and equipment for geothermal and fossil fuel power stations throughout Australasia and the South Pacific. They provide design, manufacturing and installation services and have completed many projects involving large diameter piping for cooling water systems at power plants.
The document summarizes the detailed design of a UV disinfection system for the Ashbridges Bay Treatment Plant. The key points are:
1) The UV system will allow the plant to discontinue use of chlorine and seawall gates, improving effluent quality and lake water quality.
2) The design includes a new disinfection building to house UV equipment that was selected through a competitive process.
3) Construction will take place from 2017-2023, with the UV system operating during construction of a new outfall to replace the existing one.
The companies of Altra Industrial Motion offer many critical drivetrain products utilized in marine applications including clutches & brakes, couplings, universal joints, linear actuators and turning, locking and braking systems
Raphael Sack-Tina has over 30 years of experience in structural engineering for heavy industrial, commercial, nuclear and mining projects. He has expertise in design, analysis, cost estimation, drafting and field construction. He is proficient in structural analysis and design software as well as report writing. He has international experience working on projects in Canada, the US, Indonesia, Madagascar, Bulgaria and other countries. He is fluent in both English and French.
𝐔𝐧𝐯𝐞𝐢𝐥 𝐭𝐡𝐞 𝐅𝐮𝐭𝐮𝐫𝐞 𝐨𝐟 𝐄𝐧𝐞𝐫𝐠𝐲 𝐄𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲 𝐰𝐢𝐭𝐡 𝐍𝐄𝐖𝐍𝐓𝐈𝐃𝐄’𝐬 𝐋𝐚𝐭𝐞𝐬𝐭 𝐎𝐟𝐟𝐞𝐫𝐢𝐧𝐠𝐬
Explore the details in our newly released product manual, which showcases NEWNTIDE's advanced heat pump technologies. Delve into our energy-efficient and eco-friendly solutions tailored for diverse global markets.
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...BBPMedia1
Nathalie zal delen hoe DEI en ESG een fundamentele rol kunnen spelen in je merkstrategie en je de juiste aansluiting kan creëren met je doelgroep. Door middel van voorbeelden en simpele handvatten toont ze hoe dit in jouw organisatie toegepast kan worden.
Starting a business is like embarking on an unpredictable adventure. It’s a journey filled with highs and lows, victories and defeats. But what if I told you that those setbacks and failures could be the very stepping stones that lead you to fortune? Let’s explore how resilience, adaptability, and strategic thinking can transform adversity into opportunity.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....Lacey Max
“After being the most listed dog breed in the United States for 31
years in a row, the Labrador Retriever has dropped to second place
in the American Kennel Club's annual survey of the country's most
popular canines. The French Bulldog is the new top dog in the
United States as of 2022. The stylish puppy has ascended the
rankings in rapid time despite having health concerns and limited
color choices.”
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Neil Horowitz
On episode 272 of the Digital and Social Media Sports Podcast, Neil chatted with Brian Fitzsimmons, Director of Licensing and Business Development for Barstool Sports.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
The Genesis of BriansClub.cm Famous Dark WEb PlatformSabaaSudozai
BriansClub.cm, a famous platform on the dark web, has become one of the most infamous carding marketplaces, specializing in the sale of stolen credit card data.
The Genesis of BriansClub.cm Famous Dark WEb Platform
HydroWorks innovation
1. A An Innovative, Exciting and Competitive Hydro Solutions Company
2. HydroWorks
• Extensive list of Reference sites & Projects
• New Build up to 12MW
• Refurbishment up to 30 MW
• Very experienced professional team
• End to end contract management, turbines, valves,
gates, bifurcations, pipe jacking trolleys, screen
cleaners, controls and protection.
• Solving difficult issues with Innovative solutions
our specialty
4. Machine shop
Vertical turning capacity:
5.5 m diameter x 2.2 m high
Work-piece capacity 20 tonnes
Tekapo B Francis runner, 80MW
Tekapo A Kaplan runner, 33 MW
6. Hydro Refurbishment Projects
Tekapo ‘B’ 82 MW
Francis
Refurbished seal ring
Tekapo ‘A’ 33 MW
Kaplan
Refurbished hub
and blade seal and
bearing surfaces
Manapouri 100 MW
Head cover
refurbishment
10. CFD
CFD for analysis
Use commercial CFD package….e.g. Ansys CFX or Star CD
Can only analyse…….….NOT design
11. Highbank - Bifurcation
• Bifurcation required to pump water back
up into RDR
• 3m Diameter
• Design & manufacturing support
12. CFD
CFD for design
Exclusive licence of the “Huntsman” CFD code for turbine design
and 20 years experience in developing and using this code
New HydroWorks
designed blade
Original blade
Runner
Francis turbine
Who has this capability?
1st tier manufacturers such
as Andritz, Toshiba, Alstom....
………and HydroWorks
13. Transients analysis
• Key Element of safe Hydro design and operation
• Underpins design of Turbine, Penstock and controls
• Hydraulic transients and governing simulation
• (in house and commercial code)
• Design and commissioning experience across extensive
range of sites
• Recently identified a serious safety concern at an
existing customer site
14. Model Testing
Hydraulic Model Testing
• HydroWorks have our own Pelton test rig
• Measures to within +/- 0.05% for efficiency
• Fully complies with international test codes and
instrument test certification.
• Validates innovative designs before delivery
15. • New Build
• Refurbishment
• Consultancy services
• Maintenance contracts
• Climate Defender range of products
– Irrigation
– Municipal
Hydro Solutions
17. Cobb - TrustPower
• 2 x 12 MW Pelton turbine refurbishment
• Effectively new turbines
• Integration with original embedded components
• 600 m head (highest in NZ)
• Model testing on our Hydraulic Test Facility
• Full mechanical analysis including FEA
•Design life Runner lifetime of 1010 cycles
• Thermodynamic Testing –
– Efficiency gain of 2.5% at the operating point.
18. • The first 6-jet Pelton in New Zealand – 7.7MW
• 418m Head (2nd highest in NZ behind Cobb)
• Uses deflector governing to maintain grid
stability
• From the Westpower website;
– “This turbine was designed and constructed in New Zealand and is
of a very high quality with efficiency figures as good as anything
available in the world today…”
Amethyst - Westpower
19. • Tasmanian Irrigation – Scheme Owner
• 6 MW 4 Jet Pelton (650m Head)
• 33 km long penstock, has to operate in
islanded mode.
– Deflector governing
• Conveyance of Irrigation water is the priority
– Fitted with a bypass system and a device to
dissipate 6MW of energy.
Midlands Hydro Scheme - Tasmania
20. • Private Scheme
• 1.5 MW - 2 Jet Pelton
• Design, Manufacture, Install and Commission
• Started Generating Dec ‘15
Inchbonnie – West Coast NZ
21. Fraser Dam – Pioneer Generation
• Refurbishment project – Central Otago
•245m head, 1.8m3/s flow
• New Pelton Turbine & Generator (3.3MW)
•Another example of ‘end to end’ service
capability (mechanical)
•Design, manufacture, supply, install & comm
22.
23.
24. Marama Nui - Tahiti
Titavaari 1A - Refurbishment
• New Shaft, base-plate and Bearing arrangement
• Old design – resulting in premature bearing failure and through
shaft arrangement resulting in poor efficiency
• Design Study up front
• Manufacture contract
• Installed and commissioned late 2015
• Currently manufacturing for Vaihiria 1
25.
26. Waipori 1A
A good example of our Innovation and Point of Difference
• 10 MW Kaplan in Otago
• Critical failure required immediate response
• Manufacturing supported by professional engineering
• Designed a stand to facilitate rapid but safe repair
– Recognized the urgency
– Earthquake risk
• Technically challenging disassembly
• Responsive Design
– Original plan was to replace “like for like”
– Late decision made to redesign crank arms
27.
28.
29. Somerset Dam Brisbane
• SEQ Water, QLD
– Water Authority, SOE
– Core function is water and wastewater
• Flood damaged station
–Out of service since Jan 2011
• Contract executed in Sep 2015
• Effectively new turbine (~4MW), new generator, new controls
& protection, transmission connection and minor civil work.
• Principle/Lead Contractor - Design, Manufacture, Supply,
Installation, commission
• Managing international sub-contractors
30.
31.
32.
33. Melbourne Water – Mini Hydro’s
• Design, Manufacture, Install and Commission.
• 5 Separate sites (65-300kW)
– 3 PaT’s
– 1 Francis
– 1 Pelton
• Fully containerized solutions
• Tight noise limits
• Contract signed in Dec, 18 month program
34.
35. If you think we can assist you or your company with any of
your current hydro equipment challenges or have any
interest in knowing more please contact me in the first
instance :
Ian Mc Innes – ian.mcinnes@hydroworks.co.nz