The document provides guidance on implementing a Huawei RTN600 XPIC radio system. Key steps include:
1) Understanding how XPIC systems work and identifying hardware differences like IFX cards
2) Connecting IFX and ODU equipment following labeling standards and ensuring connections match polarizations
3) Performing antenna alignment on the main and standby dishes between sites while tuning the feed horns to separate the polarizations by 30dB
4) Configuring the software including creating a 1+1 protection group and XPIC workgroup while checking the received link IDs are correct.
VPX Profiles To Platforms, SIE Computing Solutionsjillmcolna
The goal of VPX is to provide critical embedded system integrators with a more capable module standard that allows for better exploitation of new technologies, enabling more cost effective end systems. The US Department of Defense and other users are now mandating the implementation of COTS Open Standards like VPX and OpenVPX.
VPX Profiles To Platforms, SIE Computing Solutionsjillmcolna
The goal of VPX is to provide critical embedded system integrators with a more capable module standard that allows for better exploitation of new technologies, enabling more cost effective end systems. The US Department of Defense and other users are now mandating the implementation of COTS Open Standards like VPX and OpenVPX.
Total slides: 109
Light Emitting Diodes
Seven Segment LED
LCD Interfacing
Stepper Motor Interfacing
Digital to Analog Converter
ADC Interfacing
Keyboard Interfacing
An orgianl Apple 1 manual and warranty issued by the Byte Shop in Palo Alto 1976. Sharing this document in respect of the origins of focus on user needs in computing.
Full details of implementation of flying internet balloonANTONY SEBATIAN
This paper fully covers all the details to implement an flying balloon which can provide internet to remote locations which is an good alternative to google's balloon project
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
1. HUAWEI RTN600 XPIC RADIO IMPLEMENTATION
1) INTRODUCTION
In a project in ‘P’ country, Huawei RTN600 XPIC radio is used to serve as an
inter-province backbone for transmission network. None of engineers involved in this project
have experience on this type of radio before and were having hard time in finding source of
reference. Therefore, it is hoped that this article could help by providing reference for other
engineers for implementing Huawei XPIC radio in other projects in future.
2) PREPARATION
First of all, we need to have a good understanding on how XPIC system works. There are
a lot of documents that discuss in theory of how XPIC system works. Therefore, there is no
need to elaborate further on that. Good reference can be easily found in Huawei support
website (http://support.huawei.com).
Secondly, we need to identify the difference in term of hardware of XPIC radio. For start,
XPIC radio does not use IF card. It uses IFX card. Figure below shows an example of IFX
card:
Figure 1: Front Panel of IFX Card
At a glance, it is basically same as IF card except with 2 additional ports (as shown in red
circle) which represent ‘XPIC in’ and ‘XPIC out’. Details of how these ports should be
connected are shown in details in figure below:
Vertical
T
Horizontal
STANDBY MAIN
STANDBY MAIN
IFX (NCD-01-0004) M V I O IFX (NCD-01-0004) S V I O
IFX (NCD-01-0004) M H I O IFX (NCD-01-0004) S H I O
IDU 1
PXC SD1 1 2
PXC SCC
Figure 2: Four IFX boards being used to create one 1+1 HSB XPIC configuration
2. From figure 2 we can see that 4 IFX boards being used to create a 1+1 HSB XPIC links
which provides 2 STM-1 link capacity. IFX board in slot 5 provides the 1st STM-1 while IFX
board in slot 7 provides the 2nd STM-1. These 2 boards go to different polarization at antenna
port. As XPIC system works by cancelling interference produced by opposite polarization, we
need to let these 2 boards communicate. This is where this XPIC port comes into place. As we
can see from Figure 2, ‘XPIC port in’ on IFX in slot 5 is connected to ‘XPIC port out’ on IFX
board in slot 7 and vice versa. This is how to connect the XPIC ports. The connection is made
by using XPIC cable. By standard, 2 pairs of IFX cable should be supplied for each IDU. One is
short cable while the other one is long cable. Short cable is used for XPIC port connection
between slot 5/7 or 6/8 while the longer one can be use for XPIC connection between slot 5/6
or 7/8.
Next are outdoor equipments. For XPIC microwave link, dual polarized antenna is used
instead of single polarized antenna. Dual polarized antenna can be identified from the number
of input port at the back. There will be 2 input ports, one for vertical and one for horizontal.
Arrangement of these ports may be different according to different manufacturer and antenna
specifications. For example, picture 1 and 2 shows the difference in input port arrangement for
Andrew VHLPX series and Andrew HPX series:
Vertical input
Horizontal input
Picture 1: Input Port for Andrew VHLPX series
3. Vertical input
Horizontal input
Picture 2: Input Port for Andrew HPX series
As we can see from both pictures above, there are no clear labels to indicate the direction
of polarization for each input port. Therefore, before deploying installation teams, information
on which input port belongs to which polarization should be clearly relayed to team leaders.
Also, since there will be at least 2 ODU attached to each antenna, clearly there is no
space for direct mount configuration. Therefore, ODU adapter and waveguide are required for
ODU-antenna connection. Picture below shows how the ODU-antenna is made for XPIC radio:
Flexi waveguide
ODU adapter
Picture 3: Example on ODU-Antenna Connection for XPIC Radio
4. 3) IMPLEMENTATION
Implementation steps for RTN600 XPIC system are basically the same as for normal
radio except when it comes to alignment and software configuration. Before starting, it is
generally easy for anyone to make mistakes with IF cable-ODU or ODU-Antenna connection
especially if 1+1 configuration are involved. There is no other way to avoid this except proper
labeling and understanding of the system. Therefore, it is important to stress once again, brief
explanation to installation team and proper labeling guide will help a lot in XPIC radio
installation. Proper labeling should clearly mention polarization and main/standby. Labels
should be placed on IFX board, IF cable, ODU and waveguide.
After all connections physically checked and verified, equipment can be power up and
start with initial configuration before proceed with antenna alignment. As this document will
only focus on XPIC related configuration, all other configurations such as NE and service
configurations are going to be omitted. For details of these configurations, please refer to RTN
configuration guide available from Huawei support website (http://support.huawei.com).
We will use link configuration as shown in Figure 3 as an example. IDU A and B refer to
site A and B respectively. To start with, we need to configure IFX board and ODU. In this stage,
just configure the IFX and ODU with all parameters such as IFX working mode, transmit
frequency, transmit power and TR spacing according to link budget. Don’t create IFX group or
protection group yet. We just need to play around with ODU switch or mute function while
doing the alignment.
5. Vertical Vertical
MAIN MAIN
Horizontal Horizontal
Vertical Vertical
DIVERSITY DIVERSITY
Horizontal Horizontal
IFX (Standby Vertical) I O IFX (Standby Horizontal) I O IFX (Standby Vertical) I O IFX (Standby Horizontal) I O
IFX (Main Vertical) I O IFX (Main Horizontal) I O IFX (Main Vertical) I O IFX (Main Horizontal) I O
IDU A IDU B
PXC SD1 1 2 PXC SD1 1 2
PXC SCC PXC SCC
Figure 3: Sample of Board Arrangement for 1+1 SD XPIC Link
V
H
Figure 4: Vertical and Horizontal Polarization
6. For alignment, there are different opinions whether to start with vertical or horizontal.
Practically, it does not matter because the purpose of initial alignment is just to get dishes from
both sites aligned. In this document, we will choose to start with vertical. There is no specific
reason, just author’s preference. So, we shall start aligning main dish of site A to main dish of
site B. To do this, ODU for standby vertical (IDU slot 7), main horizontal (IDU slot 6) and
standby horizontal (IDU slot 8) should be turned off, on both sites. Then proceed with
alignment as usual.
After both main dishes are aligned, next is aligning standby dish of site B to main dish of
site A. Same thing to do. Only turn on vertical ODU. In this case, it would be IFX board on slot
5 in IDU A and IFX board on slot 7 in IDU B. In SD link, main dish is aligned to main dish on
opposite site while standby dish is also aligned main dish on opposite site. Due to this, leave
the main dish on site A ‘untouched’ and only aligned the standby dish on site B. Next, we can
repeat the same thing with standby dish on site A aligned to main dish of site B.
After alignment is done, we will come to a stage where it is only unique for XPIC system. It
is called ‘feed horn tuning’. To further explain about why we need this ‘feed horn tuning’,
please refer to Figure 4. We need to remember that this is how the wave is coming out from
the antenna. Both waves with different polarization are transmitted at the same time. So,
besides aligning the antenna, we need to align these 2 polarizations as well. What it means by
‘aligning the polarization’ is that we need to ensure that horizontal and vertical waves are
separated by 90º. If not, horizontal wave will introduce interference to vertical wave and vice
versa.
The key of successful feed horn tuning is understanding on how XPIC system works and
good communication between team on top of the tower and team below the tower (with the
laptops). Referring back to our example (Figure 3), we should start with feed horn tuning for
main antenna. To perform feed horn tuning, one site need to transmit only on vertical, and the
other site need to transmit on horizontal. In this case, we will transmit vertically on site A and
transmit horizontally on site B. The respective IFX board to use is IFX board on slot 5 in IDU A
and IFX board on slot 6 in IDU B. The receive level should be differ by -30dB from what we
planned RSL in link budget. For example, if planned RSL is -35dB, we should get -65dB RSL
on each antenna. In voltage conversion, if RSSI during vertical to vertical alignment is 3.8V,
we should get half of it which is 1.9V. 30dB difference denotes half of the value in RSSI voltage
reading. If we cant get the required RSL (with 30dB difference), then the feed horn of the
antenna need to be adjusted. It can be adjusted by loosening the screw that holds the
antenna’s feed horn. This will normally allow fine adjustment around +/- 5º. For example,
Picture 4 and 5 will show which parts in Andrew antenna VHLPX series and HPX series that
needs to be loosen up in order to perform the feed horn adjustment.
By loosening up the screws, minor adjustment to feed horn can be done. By this time,
RSSI and RSL value should be closely monitored until required value is obtained.
Theoretically, the difference in RSL between vertical and horizontal polarization is called
‘Cross Polarization Discrimination’ (XPD). XPD value is usually determined by antenna
specification. Some high XPD antenna has the XPD value up to 40dB. If the required XPD
value can’t be achieved, received signal from opposite polarization will cause interference.
Common symptoms are wrong received link ID and generation of MW-LOF alarm. After feed
horn tuning for main dish on both sites are completed, we can proceed with the standby dish.
7. Rotate +/- 5º adjustment
Screws that hold feed
horns. Loosen up
these screws to allow
feed horn adjustment
Picture 4: Feed Horn Adjustment for Andrew Antenna VHLPX Series
Screws that hold feed
horns. Loosen up
these screws to allow
feed horn adjustment
Picture 5: Feed Horn Adjustment for Andrew Antenna HPX Series
8. Next will be software configuration. The only difference between XPIC radio and normal
radio is that we have to create XPIC workgroup. However, it is advised to configure 1+1
protection group first before configuring XPIC workgroup so that XPIC workgroup only need to
be created for one time. To configure XPIC workgroup, we need to identify which IFX board
belongs to which polarization. By right, this should be determined at the very beginning of the
installation. Nothing complicated with creating XPIC workgroup. It can be found under ‘link
configuration’ menu in Web LCT or T2000. As shown in Figure 5, other information should be
available from link budget. Additional information required is only the corresponding board for
vertical and horizontal polarization. Also note that by default the link ID for vertical is 1 and
horizontal is 2.
After everything are configured, one should go back to ‘link configuration IF/ODU
relation’ and check whether the received link ID matched for every IFX board. Vertical should
receive 1 and horizontal should receive 2. If vertical is receiving 2 or horizontal is receiving 1, it
mostly caused by 2 things. First is low XPD value which requires feed horn to be readjusted.
Most common mistake that usually this is forgetting to tighten up the feed horn screw after feed
horn adjustment. Second is faulty IFX board. However, check and recheck the XPD value
before replacing any IFX board. To check the XPD value, we can play around with
mute/unmute function on ODU or just switch off the ODU of opposite polarization.
Also, we need to monitor the stability of the received link ID for +/- 10 minutes. It should
be stable and not changing from 1 to 2 or otherwise MW-LOF alarm will popped up.
Figure 5: XPIC Software Configuration Example
9. 4) SUMMARY
In summary, all the steps above, to configure link as in Figure 3 for our example, can be
summarized in the table below:
Site A Site B
Check all the cable connection
Configure IF/ODU (without XPIC and 1+1 protection group)
Power on ODU main vertical (IFX slot 5) Power on ODU main vertical (IFX slot 5)
Main to main alignment
Power on ODU main vertical (IFX slot 5) Power on ODU standby vertical (IFX slot 7)
Main to standby alignment (only move standby dish)
Power on ODU standby vertical (IFX slot 7) Power on ODU main vertical (IFX slot 5)
Standby to main alignment (only move standby dish)
Power on ODU main vertical (IFX slot 5) Power on ODU main horizontal (IFX slot 6)
Feed horn tuning for main to main dish
Power on ODU main vertical (IFX slot 5) Power on ODU standby horizontal (IFX slot 8)
Feed horn tuning for main to standby dish (only tune standby dish)
Power on ODU standby vertical (IFX slot 7) Power on ODU main horizontal (IFX slot 6)
Feed horn tuning for standby to main dish (only tune standby dish)
Power on all ODU
Create 1+1 protection group
Create XPIC workgroup
Check all the RSL and received link ID. Also monitor the stability.
Table 1: Summary of Implementation Steps of XPIC Link