WRITING A RESEARCH PROPOSAL
DR.P.SUDHAKARA RAO
PROFESSOR, ECE,VMTW
Dear Sir/Madam,
This power point presentation on Research
proposal will be an excellent resource for
students doing research .
My best wishes
DR.I.SELVARAJ
• Research refers to a search for knowledge
• Research means a scientific and systematic
search for pertinent information on a specific
topic
• In fact, research is an art of scientific
investigation.
• The purpose of research is to discover answers
to questions through the application of
scientific procedures
Type of Research study
• To gain familiarity with a phenomenon or to
achieve new insights into it (Exploratory or
formulative research studies
• To describe accurately the characteristics of a
particular individual, situation or a group
(Descriptive research studies)
• To determine the frequency with which
something occurs or with which it is associated
with something else (Diagnostic research studies)
• To test a hypothesis of a causal relationship
between variables (Hypothesis-testing research
studies).
• Descriptive research includes surveys and fact-finding
enquiries. The main characteristic of this method is that
the researcher has no control over the variables; he can
only report what has happened or what is happening
• In analytical research, on the other hand, the researcher has to
use facts or information already available, and analyze these to make
a critical evaluation of the material.
• Applied research aims at finding a solution for an
immediate problem facing a society or an industrial/business
organisation
• “Gathering knowledge for knowledge’s sake is termed ‘pure’ or
‘basic’ research.”
• Attitude or opinion research i.e., research designed to
find out how people feel or what they think about a
particular subject or institution is also qualitative
research
• Empirical research is data-based research,
experimental type of research. Such research is thus
characterised by the experimenter’s control over the
variables under study and his deliberate manipulation
of one of them to study its effects
• One-time research or longitudinal research
• Field-setting research or laboratory research or
• Simulation research
• Clinical or diagnostic research
• Historical research
• Conclusion-oriented
• and decision-oriented
RESEARCH PROPOSAL
• Any Medical research / Epidemiological
study should have a proper proposal in
written form before it is actually carried
out
• It is like a blue print of a building plan
before the construction starts
•Writing a research proposal is both
science and art
•A good research proposal is based on
scientific facts and on the art of clear
communication
Writing a formal research proposal should
be started by the time one has decided on
the topic for the study
• Objective
• Justification
• Introduction
• Background /Review of literature
• Methodology
• Time frame and work schedule/Gantt chart
• Personnel needed / available
• Facilities needed / available
• Budget
Objectives
• This is a very important and pivotal section
and everything else in the study is centered
around it
• The objective of the proposed study should
be stated very clearly
• The objective stated should be specific,
achievable and measurable
• Too many objectives to be avoided
• Even just one clearly stated relevant objective for a
study would be good enough
• If there is more than one objective the objectives
can be presented in the appropriate order of
importance
Introduction
• The problem proposed to be studied
is introduced in this section
• It should help the reader to acquaint
with the topic
• Introduction should be short about one
or two pages
• The problem should be stated in such a
way that it’s importance and relevance
is realized by any one who reads it
Background
(Review of Literature)
• This section reflects extensive review of literature done by the
investigator
• In this section what is already known about the topic is written
including the lacunae
• Just quoting the literature verbatim will not serve the purpose
• It is important to make it coherent, relevant and easily readable
knowledge
• It helps the investigator to gain good knowledge in that field of
inquiry
• It also helps the investigator to have insight on different
methodologies that could be applied
Research methodology
Research methodology is a way to
systematically solve the research problem. It
may be understood as a science of studying
how research is done scientifically
• It is necessary for the researcher to know not
only the research methods/techniques but also
the methodology.
• Researchers not only need to know how to
develop certain indices or tests and how to
calculate the mean, the mode, the median or
the standard deviation or chi-square etc.,
It is essential to discuss procedures clearly
and completely with considerable amount
of details
• Study design
• Study population / Sampling specifications
• Sample size needed
• Instrumentation
• Specific procedures
Study design
Definition: A study design is a specific plan
or protocol for conducting the study, which
allows the investigator to translate the
conceptual hypothesis into an operational
one.
• The study design should be clearly
stated
• The study design to be used should be
appropriate for achieving the objective
of the study
Study population / Sample specifications
• It is important to describe which would be
the study population
• How study subjects would be selected,
randomization process and other details
should be given
Sample size
It is important to mention in the protocol what
would be the minimum sample required and how
it is arrived
Determination of sample size is a
bargain between precision and the
price (Resources & expenses involved)
Description of process
• Proposal should include the details of all process
to be adopted in the study
• How exposures, outcome variables and other
variables are going to be measured should be described in
detail
• A brief description of how the data will be processed
and use of statistical package if any should be given
• What statistical tests of significance would be used?
Time Frame & Work Schedule
The proposal should include the sequence of
tasks to be performed, the anticipated length
of time required for its completion and the
personnel required
• It can be presented in tabular or graphic
form (Gantt chart)
• Flow charts and other diagrams are often
useful for highlighting the sequencing and
interrelationship of different activities in the
study
Facilities
The proposal should also include the
important facilities required / available
for the study namely computers, laboratories,
special equipment etc
Personnel
• Proposal should include who are the
primary investigators and co- investigators,
their qualifications, research experience etc
• The proposal may also include the Major
roles to be taken up by different investigators
Budget
• The budget translates project activities
into monetary terms
• It is a statement of how much money will
be required to accomplish the various tasks
Budget
Major items
• Salary for staff
• Travel
• Purchase of equipment
• Printing / Xeroxing
• Consultancy charges
• Institutional overheads
Thanking you

How to write a research proposal

  • 1.
    WRITING A RESEARCHPROPOSAL DR.P.SUDHAKARA RAO PROFESSOR, ECE,VMTW
  • 3.
    Dear Sir/Madam, This powerpoint presentation on Research proposal will be an excellent resource for students doing research . My best wishes DR.I.SELVARAJ
  • 4.
    • Research refersto a search for knowledge • Research means a scientific and systematic search for pertinent information on a specific topic • In fact, research is an art of scientific investigation. • The purpose of research is to discover answers to questions through the application of scientific procedures
  • 5.
    Type of Researchstudy • To gain familiarity with a phenomenon or to achieve new insights into it (Exploratory or formulative research studies • To describe accurately the characteristics of a particular individual, situation or a group (Descriptive research studies) • To determine the frequency with which something occurs or with which it is associated with something else (Diagnostic research studies) • To test a hypothesis of a causal relationship between variables (Hypothesis-testing research studies).
  • 6.
    • Descriptive researchincludes surveys and fact-finding enquiries. The main characteristic of this method is that the researcher has no control over the variables; he can only report what has happened or what is happening • In analytical research, on the other hand, the researcher has to use facts or information already available, and analyze these to make a critical evaluation of the material. • Applied research aims at finding a solution for an immediate problem facing a society or an industrial/business organisation • “Gathering knowledge for knowledge’s sake is termed ‘pure’ or ‘basic’ research.”
  • 7.
    • Attitude oropinion research i.e., research designed to find out how people feel or what they think about a particular subject or institution is also qualitative research • Empirical research is data-based research, experimental type of research. Such research is thus characterised by the experimenter’s control over the variables under study and his deliberate manipulation of one of them to study its effects
  • 8.
    • One-time researchor longitudinal research • Field-setting research or laboratory research or • Simulation research • Clinical or diagnostic research • Historical research • Conclusion-oriented • and decision-oriented
  • 9.
    RESEARCH PROPOSAL • AnyMedical research / Epidemiological study should have a proper proposal in written form before it is actually carried out • It is like a blue print of a building plan before the construction starts
  • 10.
    •Writing a researchproposal is both science and art •A good research proposal is based on scientific facts and on the art of clear communication
  • 11.
    Writing a formalresearch proposal should be started by the time one has decided on the topic for the study
  • 12.
    • Objective • Justification •Introduction • Background /Review of literature • Methodology • Time frame and work schedule/Gantt chart • Personnel needed / available • Facilities needed / available • Budget
  • 13.
    Objectives • This isa very important and pivotal section and everything else in the study is centered around it • The objective of the proposed study should be stated very clearly • The objective stated should be specific, achievable and measurable • Too many objectives to be avoided • Even just one clearly stated relevant objective for a study would be good enough • If there is more than one objective the objectives can be presented in the appropriate order of importance
  • 14.
    Introduction • The problemproposed to be studied is introduced in this section • It should help the reader to acquaint with the topic
  • 15.
    • Introduction shouldbe short about one or two pages • The problem should be stated in such a way that it’s importance and relevance is realized by any one who reads it
  • 16.
    Background (Review of Literature) •This section reflects extensive review of literature done by the investigator • In this section what is already known about the topic is written including the lacunae • Just quoting the literature verbatim will not serve the purpose • It is important to make it coherent, relevant and easily readable knowledge • It helps the investigator to gain good knowledge in that field of inquiry • It also helps the investigator to have insight on different methodologies that could be applied
  • 17.
    Research methodology Research methodologyis a way to systematically solve the research problem. It may be understood as a science of studying how research is done scientifically
  • 18.
    • It isnecessary for the researcher to know not only the research methods/techniques but also the methodology. • Researchers not only need to know how to develop certain indices or tests and how to calculate the mean, the mode, the median or the standard deviation or chi-square etc.,
  • 19.
    It is essentialto discuss procedures clearly and completely with considerable amount of details
  • 20.
    • Study design •Study population / Sampling specifications • Sample size needed • Instrumentation • Specific procedures
  • 21.
    Study design Definition: Astudy design is a specific plan or protocol for conducting the study, which allows the investigator to translate the conceptual hypothesis into an operational one.
  • 22.
    • The studydesign should be clearly stated • The study design to be used should be appropriate for achieving the objective of the study
  • 23.
    Study population /Sample specifications • It is important to describe which would be the study population • How study subjects would be selected, randomization process and other details should be given
  • 24.
    Sample size It isimportant to mention in the protocol what would be the minimum sample required and how it is arrived
  • 25.
    Determination of samplesize is a bargain between precision and the price (Resources & expenses involved)
  • 26.
    Description of process •Proposal should include the details of all process to be adopted in the study • How exposures, outcome variables and other variables are going to be measured should be described in detail • A brief description of how the data will be processed and use of statistical package if any should be given • What statistical tests of significance would be used?
  • 27.
    Time Frame &Work Schedule The proposal should include the sequence of tasks to be performed, the anticipated length of time required for its completion and the personnel required
  • 28.
    • It canbe presented in tabular or graphic form (Gantt chart) • Flow charts and other diagrams are often useful for highlighting the sequencing and interrelationship of different activities in the study
  • 29.
    Facilities The proposal shouldalso include the important facilities required / available for the study namely computers, laboratories, special equipment etc
  • 30.
    Personnel • Proposal shouldinclude who are the primary investigators and co- investigators, their qualifications, research experience etc • The proposal may also include the Major roles to be taken up by different investigators
  • 31.
    Budget • The budgettranslates project activities into monetary terms • It is a statement of how much money will be required to accomplish the various tasks
  • 32.
    Budget Major items • Salaryfor staff • Travel • Purchase of equipment • Printing / Xeroxing • Consultancy charges • Institutional overheads
  • 33.