Managing risk in programmes webinar
Monday 2 July 2018
Presented by Dr David Hillson
The link to the write up page and resources of this webinar:
https://www.apm.org.uk/news/managing-risk-in-programmes-webinar/
GSK Project Management for the Academy of LogisticsMargaret D.
This was my proposal made to the new Director and new management in Logistics after a re-org (GSK Manufacturing Division). Note: some words were purposely spelled with the UK conventions given that half of the audience was from the UK, e.g. programme, utilisation, etc.
Since this information is outdated, it is no longer sensitive and can be seen publicly.
This presentation was delivered by Jeremy Harrison at a recent APM Risk SIG event entitled Communicating risk across the project portfolio. Further information including slides from other presenters can be viewed here http://www.apm.org.uk/news/communicating-risk-across-project-portfolio
This presentation was given by Andy Murray of Outperform (and Governance SIG committee member) to delegates at the APM Governance SIG's autumn conference entitled "Achieving change successfully - why good governance matters". This conference took place on 1st October 2015 in London.
Enabling Change and Governance Specific Interest Groups (SIG) joint event
Wednesday 14th October 2015, London
Presented by Roger Garrini and Parag Gogate
GSK Project Management for the Academy of LogisticsMargaret D.
This was my proposal made to the new Director and new management in Logistics after a re-org (GSK Manufacturing Division). Note: some words were purposely spelled with the UK conventions given that half of the audience was from the UK, e.g. programme, utilisation, etc.
Since this information is outdated, it is no longer sensitive and can be seen publicly.
This presentation was delivered by Jeremy Harrison at a recent APM Risk SIG event entitled Communicating risk across the project portfolio. Further information including slides from other presenters can be viewed here http://www.apm.org.uk/news/communicating-risk-across-project-portfolio
This presentation was given by Andy Murray of Outperform (and Governance SIG committee member) to delegates at the APM Governance SIG's autumn conference entitled "Achieving change successfully - why good governance matters". This conference took place on 1st October 2015 in London.
Enabling Change and Governance Specific Interest Groups (SIG) joint event
Wednesday 14th October 2015, London
Presented by Roger Garrini and Parag Gogate
Project and Program Risk Management
Reasons to Manage Risks
ISO31000 for Risk Management
Risk Management in Project Lifescycle
Tools to manage Project Risks
These slides are from The Risk Doctor, David Hillson's, section of the presentation at the recent APM Wessex branch afternoon risk workshop. This event was held at the Ageas Bowl in Southampton on Tuesday 1st April 2014.
David Hillson is an honorary fellow of APM and is known globally as 'The Risk Doctor'. David is well-known as an excellent speaker, presenter and trainer. Countless individuals, teams and organisations have benefited from his blend of thought-leadership with practical application, presented in an accessible style that combines clarity with humour. David’s speaking is guided by the Risk Doctor motto: “Understand profoundly so you can explain simply”.
David sat on the panel of experts for this workshop-based event and shared his expertise with delegates who were looking for a learning experience in risk.
What You Will Learn
After this one-hour session, learners will be able to:
Demonstrate to others how the risk management processes in A Guide to the Project Management Body of Knowledge (PMBOK® Guide) apply to your project’s environment
Differentiate between Project and Program Risk Management and understand how they support one another
Speaker
Keith is a Senior Consultant, Trainer and Coach with over 25 years of successful management and consulting experience and business planning. Keith is a leader in Agile training, coach and transitioning to Agile and is well known for his public speaking skills and enthusiasm and has been a welcomed facilitator at numerous fortune 500 corporations, universities, and associations worldwide. He is engaging, energetic, entertaining and informative.
The APM Risk SIG presented a Quantitative Risk Analysis event on 11th February 2016 that provided perspectives across the project stakeholder spectrum, from client decision-makers to risk analysts and consultants. Dr David Hillson, The Risk Doctor, spoke about assessing overall project risk with quantitative risk analysis.
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects Mark Ritchie
Risk Management is one of the most important tools available to the Project Manager to help successfully deliver complex projects. Yet, at the same time, Risk Management can be difficult to understand and, if used without insight and expertise, costly and ineffective.
This guidance has been developed to assist staff who are managing or participating in IT and business change projects. It has been developed by the UCISA Project and Change Management Group and is based on best practice guidance provided by PRINCE2 and experience of delivering major IT and business change projects at the University of Sheffield, University of Edinburgh, Lancaster University and Edinburgh Napier University.
The guidance is relevant for projects being managed and delivered using any methodology and is complementary to the UCISA Major Project Governance Assessment Toolkit.
This toolkit was published by the UCISA Project and Change Management Group in December 2015.
Episode 25 : Project Risk Management
Understand what risk is and the importance of good project risk management.
Discuss the elements involved in risk management planning and the contents of a risk management plan.
List common sources of risks in engineering and information technology projects.
Describe the risk identification process, tools, and techniques to help identify project risks, and the main output of risk identification, a risk register.
SAJJAD KHUDHUR ABBAS
Chemical Engineering , Al-Muthanna University, Iraq
Oil & Gas Safety and Health Professional – OSHACADEMY
Trainer of Trainers (TOT) - Canadian Center of Human
Development
APM webinar hosted by the Scotland Network on 14 May 2024.
Speakers: Chris Drysdale and Peter Huggett
An interactive session discussing how Project Managers can identify mental health symptoms, provide tools to help themselves and others, plus also increase the capabilities of the Project Management function. This webinar was held on 14 May 2024.
The covid-19 pandemic led to concerns about a worsening of mental health & wellbeing across the world and increased awareness in both society and the workplace. This webinar looks to advise the benefits of having a Mental Health First Aid function in the workplace whilst also providing tools and techniques that can be readily used and applied to yourself and colleagues. Additionally, there are wider benefits to Project Management which will be proposed and discussed.
Making communications land - Are they received and understood as intended? webinar
Thursday 2 May 2024
A joint webinar created by the APM Enabling Change and APM People Interest Networks, this is the third of our three part series on Making Communications Land.
presented by
Ian Cribbes, Director, IMC&T Ltd
@cribbesheet
The link to the write up page and resources of this webinar:
https://www.apm.org.uk/news/making-communications-land-are-they-received-and-understood-as-intended-webinar/
Content description:
How do we ensure that what we have communicated was received and understood as we intended and how do we course correct if it has not.
More Related Content
Similar to Managing risk in programmes webinar, 2 July 2018
Project and Program Risk Management
Reasons to Manage Risks
ISO31000 for Risk Management
Risk Management in Project Lifescycle
Tools to manage Project Risks
These slides are from The Risk Doctor, David Hillson's, section of the presentation at the recent APM Wessex branch afternoon risk workshop. This event was held at the Ageas Bowl in Southampton on Tuesday 1st April 2014.
David Hillson is an honorary fellow of APM and is known globally as 'The Risk Doctor'. David is well-known as an excellent speaker, presenter and trainer. Countless individuals, teams and organisations have benefited from his blend of thought-leadership with practical application, presented in an accessible style that combines clarity with humour. David’s speaking is guided by the Risk Doctor motto: “Understand profoundly so you can explain simply”.
David sat on the panel of experts for this workshop-based event and shared his expertise with delegates who were looking for a learning experience in risk.
What You Will Learn
After this one-hour session, learners will be able to:
Demonstrate to others how the risk management processes in A Guide to the Project Management Body of Knowledge (PMBOK® Guide) apply to your project’s environment
Differentiate between Project and Program Risk Management and understand how they support one another
Speaker
Keith is a Senior Consultant, Trainer and Coach with over 25 years of successful management and consulting experience and business planning. Keith is a leader in Agile training, coach and transitioning to Agile and is well known for his public speaking skills and enthusiasm and has been a welcomed facilitator at numerous fortune 500 corporations, universities, and associations worldwide. He is engaging, energetic, entertaining and informative.
The APM Risk SIG presented a Quantitative Risk Analysis event on 11th February 2016 that provided perspectives across the project stakeholder spectrum, from client decision-makers to risk analysts and consultants. Dr David Hillson, The Risk Doctor, spoke about assessing overall project risk with quantitative risk analysis.
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects Mark Ritchie
Risk Management is one of the most important tools available to the Project Manager to help successfully deliver complex projects. Yet, at the same time, Risk Management can be difficult to understand and, if used without insight and expertise, costly and ineffective.
This guidance has been developed to assist staff who are managing or participating in IT and business change projects. It has been developed by the UCISA Project and Change Management Group and is based on best practice guidance provided by PRINCE2 and experience of delivering major IT and business change projects at the University of Sheffield, University of Edinburgh, Lancaster University and Edinburgh Napier University.
The guidance is relevant for projects being managed and delivered using any methodology and is complementary to the UCISA Major Project Governance Assessment Toolkit.
This toolkit was published by the UCISA Project and Change Management Group in December 2015.
Episode 25 : Project Risk Management
Understand what risk is and the importance of good project risk management.
Discuss the elements involved in risk management planning and the contents of a risk management plan.
List common sources of risks in engineering and information technology projects.
Describe the risk identification process, tools, and techniques to help identify project risks, and the main output of risk identification, a risk register.
SAJJAD KHUDHUR ABBAS
Chemical Engineering , Al-Muthanna University, Iraq
Oil & Gas Safety and Health Professional – OSHACADEMY
Trainer of Trainers (TOT) - Canadian Center of Human
Development
APM webinar hosted by the Scotland Network on 14 May 2024.
Speakers: Chris Drysdale and Peter Huggett
An interactive session discussing how Project Managers can identify mental health symptoms, provide tools to help themselves and others, plus also increase the capabilities of the Project Management function. This webinar was held on 14 May 2024.
The covid-19 pandemic led to concerns about a worsening of mental health & wellbeing across the world and increased awareness in both society and the workplace. This webinar looks to advise the benefits of having a Mental Health First Aid function in the workplace whilst also providing tools and techniques that can be readily used and applied to yourself and colleagues. Additionally, there are wider benefits to Project Management which will be proposed and discussed.
Making communications land - Are they received and understood as intended? webinar
Thursday 2 May 2024
A joint webinar created by the APM Enabling Change and APM People Interest Networks, this is the third of our three part series on Making Communications Land.
presented by
Ian Cribbes, Director, IMC&T Ltd
@cribbesheet
The link to the write up page and resources of this webinar:
https://www.apm.org.uk/news/making-communications-land-are-they-received-and-understood-as-intended-webinar/
Content description:
How do we ensure that what we have communicated was received and understood as we intended and how do we course correct if it has not.
APM Welcome
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Professor Adam Boddison OBE, Chief Executive Officer, APM
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
APM welcome from CEO
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Projecting for the Future: Harmonising Energy and Environment
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Graham Winch, Professor of Project Management, Alliance Manchester Business School
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
APM launched Projecting the Future in June 2019 to debate the challenges and opportunities for the profession, building on the 2017 Future of Project Management exercise conducted by Arup and University College London. This presentation provides the initial results from this third phase of reflection on the future of our profession.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
New to Nuclear - Transition into nuclear from other sectors
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Elaine Falconer, Head of Profession for Project Management, Jacobs
and
Karen Williams, Project Manager, Jacobs
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
In this session, Jacobs shared insights and learning from its ‘New to Nuclear’ programme designed to support mid-career and lateral entrants whose existing skills and expertise can be utilised in the nuclear sector.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Tell us what to do, not how to do it
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Alan Livingstone, Project Delivery Lead, UK&I Water Sector, Stantec
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
How the Stantec Project Management Framework provides our PMs with the flexibility to deliver projects of varying complexity, across a variety of different sectors, within a Global Organisation.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
The Future is Fractional
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Karen Frith, Founder & Managing Partner, Greenlight Partners
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
Discovering the transformational impact of working with fractional experts. Learning how businesses and professionals are embracing fractional roles and how they’re redefining work structures for optimal agility and efficiency.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Lessons learned across projects
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Barney Harle, Head of Major Projects, Manchester City Council
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
What are my key takeaways from working on a vast array of projects including the recent 30+ low carbon and decarbonisation schemes at Manchester City Council?
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Agile Adaptability: Navigating Project Management in a Dynamic World
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Nathan Lumb, Partners Project Manager, GEIC
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
This presentation delved into the vital role adaptability plays in modern project management.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Inclusive Practices in Project Management: Leveraging Digital Frameworks for Diverse Minds
Tuesday 30 April 2024
APM North West Network Conference, Synergies Across Sectors
Presented by:
Caroline Keep, PhD researcher Digitization in Education Organisation, University of Central Lancaster
Conference overview:
https://www.apm.org.uk/community/apm-north-west-branch-conference/
Content description:
This talk aimed to provide actionable insights and strategies for embedding inclusivity into the fabric of project management, thereby unlocking the new dimensions of productivity and innovation in the digital sphere.
The main conference objective was to promote the Project Management profession with interaction between project practitioners, APM Corporate members, current project management students, academia and all who have an interest in projects.
Leadership - the project professionals secret weapon
Wednesday 24 April 2024
APM East of England Network
Presented by:
Chris MacLeod
Keep up to date with the APM East of England Network:
https://www.apm.org.uk/community/east-of-england-network/
Content description:
“I’m a Project Manager”.
That’s often what we tell family, friends and peers when asked what we do. But is it really a fair description? It may well be our role title, but it probably doesn’t convey a lot of what we actually do.
This presentation and discussion is about going beyond the frameworks, processes and stereotypes associated with project management and exploring the leadership roles we all in fact perform.
“I provide leadership focused on delivering projects and change for organisations”
APM Project Management Awards - Hints and tips for a winning award entry webinar
Thursday 18 April 2024
The APM Awards overview and the resources of this webinar:
https://www.apm.org.uk/apm-awards/
Content description:
Ahead of the APM Awards 2024, find out from our expert panel what elements make a winning APM Award entry.
Learn how to choose the category best suited to you or your company.
Answers provided to those all-important questions:
-What importance does the criteria hold?
-What are the judging panel looking for?
-How should I structure my entry?
-What additional evidence is acceptable?
-What will give my entry an edge?
X hashtag: #APMawards
The Vyrnwy Aqueduct Modernisation Programme webinar
Wednesday 17 April 2024
APM North West Network
Presented by:
Katie Rowlands
The link to the write up page and resources of this webinar:
https://www.apm.org.uk/news/the-vyrnwy-aqueduct-modernisation-programme-webinar/
Content description:
Spotlight on the Vyrnwy Aqueduct Modernisation Programme and the challenges facing a large project within Cheshire.
The Vyrnwy Aqueduct Modernisation Programme is one of United Utilities largest projects focused on the modernisation of three 42” aqueducts that carry clean drinking water across the North West.
This webinar covered the Vyrnwy project and an insight into the project challenges that face a live project within the Cheshire area.
APM event hosted by the London Network on 10 April 2024.
Speaker: Nick Fewings, MD of Ngagementworks
In March 2022, Nick Fewings, Ngagementworks, MD of Ngagementworks, published Team Lead Succeed, based on his 30+years of both leading operational and project teams, and subsequently facilitating team development around the world.
It has become a best seller, with a 96% 5-star review rating, and has been read on 5 of the 7 continents.
In this interactive session, Nick will share learning from Team Lead Succeed that can be applied immediately and make a positive difference to your teamwork.
Nick will share the importance of knowing both WHO is in your team and also HOW effective your teamwork is.
Only 10% of teams achieve high-performance, with 50% being average and 40% dysfunctional.
In this session, delivered by award-winning conference speaker Nick Fewings, and author of best-seller Team Lead Succeed, Nick will share his 30+ years of leading teams and facilitating team development.
Nick has profiled 1,000 of individuals and worked with 100s of teams.
Those attending will benefit from understanding;
Why many projects fail to achieve their goals.
Not relying on just measuring KPIs.
The importance of knowing WHO is in your team, both from a behavioural and technical skills aspect.
The 16 areas of high-performance teamwork, and their importance.
https://www.apm.org.uk/news/team-lead-succeed-helping-you-and-your-team-achieve-high-performance-teamwork-2/
Currently Knowledge Transfer Subject Matter Expert (Commercial) in the UKDT PMO on the Peru Reconstruction Plan. Stuart has more than 25 years’ track record of commercial and contract management experience working across both public and private sector projects, as well as more than 20 years’ experience in the development and delivery of professional training. As well as working for Gleeds in the UK and Peru, Stuart has also worked in China for Gleeds and has supported people development in Gleeds’ offices in Egypt and Poland. Stuart has been well placed to support the adoption of the NEC and UK Cost Management best practice in Peru – he was Chair of the RICS New Rules of Measurement (NRM) initiative and was heavily involved in the creation of the RICS Black Book Guidance (best practice in cost management).
APM event hosted by the Midlands Network on 11 April 2024.
Speaker: Carole Osterweil
Data is power. AI changes everything.
If the claims about both are true, how can we ensure we use data and AI well? And what does it mean for the very things which make us human - our feelings?
In this workshop Carole will draw on material from her ground-breaking book, Neuroscience for Project Success: why people behave as they do to answer both questions.
“We like to think our decision making is completely rational. However, once there's an element of uncertainty, conscious assessments are only part of the story. Two other inputs, both subconscious and driven by our innate need to survive, have a big impact.
One, automatic reactions driven by cognitive biases, gets plenty of airtime.
The other input, our raw visceral emotions might be scary to talk about and less understood - but that’s not a reason to pretend they don’t exist!”
This interactive workshop will draw on material from Carole’s book, Neuroscience for Project Success: why people behave as they do, published by APM in 2022.
You’ll come away with:
a clear understanding of how the human brain works.
a framework that:
explains ‘why people behave as they do’.
makes it easier to talk about feelings in a matter-of-fact way (so that they become part of your conscious data set)
new insights into yourself and your projects in a world that’s often characterised by stress and disorder.
Act on these insights and you’ll see the impact - on your teams and stakeholders, your decisions about how to use data and AI, and ultimately your project outcomes.
AI in the project profession: examples of current use and roadmaps to adoption webinar
Wednesday 27 March 2024
Association for Project Management
Speaker panel:
Andy Murray, James White, James Garner, Karina Singh and Alex Robertson
The link to the write up page and resources of this webinar:
https://www.apm.org.uk/news/ai-in-the-project-profession-examples-of-current-use-and-roadmaps-to-adoption-webinar/
Content description:
Disruptive technology and accelerating change is the now the norm within business. Advancements that feel relatively recent are already becoming embedded into business-as-usual activity. AI is one such advancement; it is already being used and having real-world impacts across the project profession.
To help P3M professionals understand the implications of this change, APM invited representatives from organisations that have introduced or are preparing to introduce AI into their project workstreams, to explain their approach and share their insight with fellow professionals.
This webinar on explored how AI is currently being used in project and programme management, and how organisations are gearing up for its adoption.
Katharine works for WRAP which is a climate action NGO working in more than 40 countries around the globe to tackle the causes of the climate crisis and give the planet a sustainable future. In this session, you will learn about WRAP’s plastics programme and how sustainability has been incorporated as a core value in delivery of the programme, with the aim of inspiring the audience to take action in their own work.
Kai-Fu Lee predicted that AI would change the world more than anything in the history of humanity – even electricity. It would disrupt how we live and work, how we operate our businesses, the core products and services on offer and the way in which we build technology.
However, in 2024 the impact of AI can no longer be discussed in future tense. With Microsoft copilot now publicly available, the change is already upon us. There is no consultation period or ‘unsubscribe’ button.
Project management professionals are likely to be asked to manage AI projects - and we are expected to skilfully use AI in our daily work lives. While overwhelming, this is not the first time we’ve had to adapt.
Sarah helps her audience sharpen their cutting-edge skills by answering:
What do I need to know about AI right now?
If I’m asked to work on an AI project, what techniques do I need to be successful?
Where do I start my own learning journey to upskill and prepare?
Sarah’s expertise in advanced agile and experience in highly regulated Finance environments give her a unique perspective into balancing governance with technical innovation. She uses her own experience building an AI solution in 2023 to share practical, widely applicable concepts in an “AI for project managers” 101 style session.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.