Community Managed Hhaynu
Micro Hydropower Plant
Mbulu district - Manyara
Major features of the proposed
Micro-hydropower Plant
 Scheme Location:
Name of the scheme : Hhaynu Micro-hydropower Plant
Source of discharge : Hhaynu River
Location : Nambis and Murray wards
District : Mbulu
Region : Manyara
Beneficiaries : Three (3) Schools
One (1) Health Center/dispensary
Ninety (90) Households
Load Center : Nambis and Murray villages
Route to reach the Site : Arusha – Mbulu – Nambis/Murray
Slide 2
Cont……
 Technical Features:
Net Head : 40 m
Measured Flow : 90 l/s June, 2014
Design Flow : 80 l/s
Electrical Power : 25 kW
Penstock Pipe : 185 m, long, 300mm diameter
Type of Penstock Pipe : Mild Steel, 3.5 mm thick
Intake : Side Intake
Slide 3
Cont…..
 Electrical - Mechanical Features:
Type of Turbine : Cross Flow Turbine
Turbine shaft Power : 31.25 kW (Mechanical)
Mechanical Transmission : Pulley and Belt
Generator : 40 kVA, 50Hz, 400/240V, 1500rpm,
0.8 pf (Synchronous Generator)
ELC : 20 kW
Ballast Load : Industrial Immersion Heater 20 kW
Total length of Distribution line : 3795 m
Slide 4
Cont…..
 Financial Features:
Investment Cost of Scheme : TZS. 273,850,000/=
IRR : 20%
NPV : TZS. 109,363,300/=
B/C Ratio : 1.35
Slide 5
Summary of Scheme Design Data
Scheme
Est.
design
Flow
rate (l/s)
Est.
Head
(m)
Est.
Hydraulic
Power
(kW)
Est.
Electrical
Power
(kW)
System
Efficiency
(%)
Penstock
dia. (mm)
Turbine
Technology
Hhaynu 80 40 31.25 25 80 300 Cross flow
Slide 6
Summary of Sources of Finance
S/N Source Amount
(TZS)
Share
(%)
Remarks
1 REA Grant/Rural
Lighting Competition 232,150,500 84.8 LRTC2014
2 Arusha Technical
College
22,367,132 8.2 Funds anticipated
3 Local Community 9,530,000 3.5 Funds confirmed
4 Revenue Collection
(bills)
9,802,368 3.5 After project
completion
TOTAL 273,850,000 100
Slide 7
PROJECTED INCOME STATEMENT
(Year one)
Slide 8
YEAR ONE YEAR TWO
Revenue
Sale of Goods and Services 9,802,368.00$ -$
Arusha Technicl College (Anticipated) 22,367,132.00$ -$
Local Community (Commited) 9,530,000.00$ -$
Totals 41,699,500.00$ -$
Expenses
Personnel 33,000,000$ -$
Material and Equipment 208,700,000$ -$
Training 10,500,000$ -$
Travel 5,500,000$ -$
Other 5,050,000$ -$
Evaluation/Dissemination 6,500,000$ -$
General/Overhead 4,600,000$ -$
Totals 273,850,000$ -$
Net Gain (Loss) without LRTC2010 Grant (232,150,500)$ -$
LRTC2014 Grant Requested: 232,150,500$
List of end use demand and revenue
(25 kW Scheme Capacity)
S/N
Beneficiary
Qty
Capacity(kW)
Oper
ating
hour
s per
day
Operati
ng days
per
month
Operati
ng
months
per
year
Total
Energy
Consump
tion (kWh)
with pf.
0.8
TariffTZSper
kWh
TotalAnnual
Income(TZS)
1 School 3 2.0 8 25 12 11,520 200 2,304,000
2 Health
Centre 1 4.0 10 30 12 11,520 200 2,304,000
3 Household 90 0.167 8 30 12 34,629.12 150 5,194,368
25.03 kW TOTAL 9,802,368
Slide 9
PROJECT OVERVIEW
 Overall objective:
 Improving community services through establishing a
community micro hydropower plant that will provide
reliable and affordable electricity for lighting in schools,
health center and household
 Project Purpose:
 Public facilities and households at Nambis/Murray
Community to have reliable and affordable electricity for
lighting, comfort and any potential livelihood before the
end of 2015
Slide 10
Site Location
Slide 11
Major System Components
Slide 12
Diversion Weir and Intake:
 The diversion weir :
 A barrier built across the river
used to divert water through an
opening in the riverside (the
‘Intake’ opening) into a settling
basin.
 Settling Basin
 The settling basin is used to
trap sand or suspended silt
from the water before
entering the penstock. It may
be built at the intake or at the
forebay.
Slide 13
Cont….
 Headrace
 A channel leading water to a
forebay or turbine. The
headrace follows the contour of
the hillside so as to preserve the
elevation of the diverted water.
 Headtank
 Pond at the top of a penstock or
pipeline; serves as final settling
basin, provides submergence of
penstock inlet and
accommodation of trash rack
and overflow/spillway
arrangement. Slide 14
Cont….
 Penstock
 A close conduit or pressure pipe for
supplying water under pressure to a
turbine.
 Water Turbine and Generator
 A water turbine is a machine to directly
convert the kinetic energy of the
flowing water into a useful rotational
energy while a generator is a device
used to convert mechanical energy
into electrical energy
Slide 15
THANK YOU
Slide 16

More Related Content

Similar to Hhaynu Micro Hydropower Plant - Mbulu, Tanzania

06 Hydro.ppt
06 Hydro.ppt06 Hydro.ppt
06 Hydro.ppt
VenkataChennaiah2
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
dashdeepak33
 
Presentation(Hydro Power Plant) (1).pptx
Presentation(Hydro Power Plant) (1).pptxPresentation(Hydro Power Plant) (1).pptx
Presentation(Hydro Power Plant) (1).pptx
RajeshKumar590762
 
Baglihar hydro electric power plant
Baglihar hydro electric power plantBaglihar hydro electric power plant
Baglihar hydro electric power plant
Raja Katoch
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
Shadab Khan
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
Samir9064
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
Samir9064
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
IJSRD
 
Final
FinalFinal
eco friendly power generation through Speed breaker using water pressure
  eco friendly power generation through Speed breaker using water pressure  eco friendly power generation through Speed breaker using water pressure
eco friendly power generation through Speed breaker using water pressure
Samir9064
 
Design and Construction of Pedal Operated Water Pump
Design and Construction of Pedal Operated Water PumpDesign and Construction of Pedal Operated Water Pump
Design and Construction of Pedal Operated Water Pump
ijtsrd
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
Shubham Yadav
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
Suresh Rathore
 
Overview-Of-Ghana-Power-System-NITS1-1.pptx
Overview-Of-Ghana-Power-System-NITS1-1.pptxOverview-Of-Ghana-Power-System-NITS1-1.pptx
Overview-Of-Ghana-Power-System-NITS1-1.pptx
leefelix611
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
AbhishekKumar408309
 
Km61 pedal power water pumping (wecompress)
Km61 pedal power water pumping (wecompress)Km61 pedal power water pumping (wecompress)
Km61 pedal power water pumping (wecompress)
1000kv technologies
 
Vortex Micro hydro powerplant
Vortex Micro hydro powerplantVortex Micro hydro powerplant
Vortex Micro hydro powerplant
Rajesh Kadam
 
Design and implementation of micro hydro turbine for power generation and its...
Design and implementation of micro hydro turbine for power generation and its...Design and implementation of micro hydro turbine for power generation and its...
Design and implementation of micro hydro turbine for power generation and its...
IRJET Journal
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
Girish Gupta
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supply
amaljo joju e
 

Similar to Hhaynu Micro Hydropower Plant - Mbulu, Tanzania (20)

06 Hydro.ppt
06 Hydro.ppt06 Hydro.ppt
06 Hydro.ppt
 
ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
 
Presentation(Hydro Power Plant) (1).pptx
Presentation(Hydro Power Plant) (1).pptxPresentation(Hydro Power Plant) (1).pptx
Presentation(Hydro Power Plant) (1).pptx
 
Baglihar hydro electric power plant
Baglihar hydro electric power plantBaglihar hydro electric power plant
Baglihar hydro electric power plant
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
 
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine BladeDesign, Modeling & Analysis of Pelton Wheel Turbine Blade
Design, Modeling & Analysis of Pelton Wheel Turbine Blade
 
Final
FinalFinal
Final
 
eco friendly power generation through Speed breaker using water pressure
  eco friendly power generation through Speed breaker using water pressure  eco friendly power generation through Speed breaker using water pressure
eco friendly power generation through Speed breaker using water pressure
 
Design and Construction of Pedal Operated Water Pump
Design and Construction of Pedal Operated Water PumpDesign and Construction of Pedal Operated Water Pump
Design and Construction of Pedal Operated Water Pump
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Overview-Of-Ghana-Power-System-NITS1-1.pptx
Overview-Of-Ghana-Power-System-NITS1-1.pptxOverview-Of-Ghana-Power-System-NITS1-1.pptx
Overview-Of-Ghana-Power-System-NITS1-1.pptx
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
 
Km61 pedal power water pumping (wecompress)
Km61 pedal power water pumping (wecompress)Km61 pedal power water pumping (wecompress)
Km61 pedal power water pumping (wecompress)
 
Vortex Micro hydro powerplant
Vortex Micro hydro powerplantVortex Micro hydro powerplant
Vortex Micro hydro powerplant
 
Design and implementation of micro hydro turbine for power generation and its...
Design and implementation of micro hydro turbine for power generation and its...Design and implementation of micro hydro turbine for power generation and its...
Design and implementation of micro hydro turbine for power generation and its...
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supply
 

Recently uploaded

CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 

Recently uploaded (20)

CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 

Hhaynu Micro Hydropower Plant - Mbulu, Tanzania

  • 1. Community Managed Hhaynu Micro Hydropower Plant Mbulu district - Manyara
  • 2. Major features of the proposed Micro-hydropower Plant  Scheme Location: Name of the scheme : Hhaynu Micro-hydropower Plant Source of discharge : Hhaynu River Location : Nambis and Murray wards District : Mbulu Region : Manyara Beneficiaries : Three (3) Schools One (1) Health Center/dispensary Ninety (90) Households Load Center : Nambis and Murray villages Route to reach the Site : Arusha – Mbulu – Nambis/Murray Slide 2
  • 3. Cont……  Technical Features: Net Head : 40 m Measured Flow : 90 l/s June, 2014 Design Flow : 80 l/s Electrical Power : 25 kW Penstock Pipe : 185 m, long, 300mm diameter Type of Penstock Pipe : Mild Steel, 3.5 mm thick Intake : Side Intake Slide 3
  • 4. Cont…..  Electrical - Mechanical Features: Type of Turbine : Cross Flow Turbine Turbine shaft Power : 31.25 kW (Mechanical) Mechanical Transmission : Pulley and Belt Generator : 40 kVA, 50Hz, 400/240V, 1500rpm, 0.8 pf (Synchronous Generator) ELC : 20 kW Ballast Load : Industrial Immersion Heater 20 kW Total length of Distribution line : 3795 m Slide 4
  • 5. Cont…..  Financial Features: Investment Cost of Scheme : TZS. 273,850,000/= IRR : 20% NPV : TZS. 109,363,300/= B/C Ratio : 1.35 Slide 5
  • 6. Summary of Scheme Design Data Scheme Est. design Flow rate (l/s) Est. Head (m) Est. Hydraulic Power (kW) Est. Electrical Power (kW) System Efficiency (%) Penstock dia. (mm) Turbine Technology Hhaynu 80 40 31.25 25 80 300 Cross flow Slide 6
  • 7. Summary of Sources of Finance S/N Source Amount (TZS) Share (%) Remarks 1 REA Grant/Rural Lighting Competition 232,150,500 84.8 LRTC2014 2 Arusha Technical College 22,367,132 8.2 Funds anticipated 3 Local Community 9,530,000 3.5 Funds confirmed 4 Revenue Collection (bills) 9,802,368 3.5 After project completion TOTAL 273,850,000 100 Slide 7
  • 8. PROJECTED INCOME STATEMENT (Year one) Slide 8 YEAR ONE YEAR TWO Revenue Sale of Goods and Services 9,802,368.00$ -$ Arusha Technicl College (Anticipated) 22,367,132.00$ -$ Local Community (Commited) 9,530,000.00$ -$ Totals 41,699,500.00$ -$ Expenses Personnel 33,000,000$ -$ Material and Equipment 208,700,000$ -$ Training 10,500,000$ -$ Travel 5,500,000$ -$ Other 5,050,000$ -$ Evaluation/Dissemination 6,500,000$ -$ General/Overhead 4,600,000$ -$ Totals 273,850,000$ -$ Net Gain (Loss) without LRTC2010 Grant (232,150,500)$ -$ LRTC2014 Grant Requested: 232,150,500$
  • 9. List of end use demand and revenue (25 kW Scheme Capacity) S/N Beneficiary Qty Capacity(kW) Oper ating hour s per day Operati ng days per month Operati ng months per year Total Energy Consump tion (kWh) with pf. 0.8 TariffTZSper kWh TotalAnnual Income(TZS) 1 School 3 2.0 8 25 12 11,520 200 2,304,000 2 Health Centre 1 4.0 10 30 12 11,520 200 2,304,000 3 Household 90 0.167 8 30 12 34,629.12 150 5,194,368 25.03 kW TOTAL 9,802,368 Slide 9
  • 10. PROJECT OVERVIEW  Overall objective:  Improving community services through establishing a community micro hydropower plant that will provide reliable and affordable electricity for lighting in schools, health center and household  Project Purpose:  Public facilities and households at Nambis/Murray Community to have reliable and affordable electricity for lighting, comfort and any potential livelihood before the end of 2015 Slide 10
  • 13. Diversion Weir and Intake:  The diversion weir :  A barrier built across the river used to divert water through an opening in the riverside (the ‘Intake’ opening) into a settling basin.  Settling Basin  The settling basin is used to trap sand or suspended silt from the water before entering the penstock. It may be built at the intake or at the forebay. Slide 13
  • 14. Cont….  Headrace  A channel leading water to a forebay or turbine. The headrace follows the contour of the hillside so as to preserve the elevation of the diverted water.  Headtank  Pond at the top of a penstock or pipeline; serves as final settling basin, provides submergence of penstock inlet and accommodation of trash rack and overflow/spillway arrangement. Slide 14
  • 15. Cont….  Penstock  A close conduit or pressure pipe for supplying water under pressure to a turbine.  Water Turbine and Generator  A water turbine is a machine to directly convert the kinetic energy of the flowing water into a useful rotational energy while a generator is a device used to convert mechanical energy into electrical energy Slide 15