Mohammed Haneef G.
Primary Expertise:
• Product development
• Concept Design & Sketching
• Design of Secondary structures harness brackets
• Standards Process and Tools
• Project Management and Business development
• Aerospace Interiors
Profile
• Having 10+ years of experience in Aerospace design industry in Interior concept Design, Structure
design, 3D Modeling, Drafting, and GD&T using ENOVIA PLM, VPM and Catia V5, V6, Smart team,
Team center.
• Working on Secondary Structure - Brackets Design A350XWB-900 & -1000, executed for Sec13-14
cargo floor and door surroundings, upper, lower shell.
• Managed complex Interior Design projects such as, Bombardier Global, Challenger 605NG
business aircraft interior monument and Boeing 737/767 galley designs from concept through
completion of the mock-up and production drawing creation.
• Working on Aircraft Interior Monuments like Galley, Mid cabin bulkhead, Aft Vanity, Divan and End
cabinets, Side Ledge, Dado, PSU, Sidewall, Aft Wardrobe, Workstation, Low Cabinet, Credenza.
• Working on Engineering standards and process tools, Technical design activities for Bombardier
Global series.
• Expertise in creation of Part, Assembly, Black box and Drawings using ENOVIA PLM, VPM,PDM,
VPM,Smart team software.
• Expertise in configuration management and product structure management and process tools like
KPI, delivery tracking CDR (critical design review) etc.
• Worked on project management and Business development team for Bombardier Global program.
• Worked on Exterior Painting and markings project for Bombardier Global program.
• Worked on Nomenclature project for Bombardier Global program to standardize Standard
Parts and implement E-BOM for the same.
• Worked on flammability project for FAR25.853 and airworthiness certification.
• Worked on Enovia, Smart team PLM support, maintenance and development between Bombardier
And IBM for Bombardier Global program.
• Knowledge in Catia V4 in creation External surface painting and markings, Design, flat Pattern
Creation for production.
• Worked on material and process (methods) engineer for Interior Completion center of Bombardier
Page 1 of 6
Curriculum Vitae of Mohammed Haneef G.
Lakshmi Nivaas 12/4, Room Number: 5.
Ananad Reddy layout, Electronic City Phase-2
Bangalore-560100
Email : hani1.407@gmail.com
Mobile: +91 9980879193.
Global Aircraft.
• Worked on Enovia Matrix, ERP, SAP, Supply chain management.
• Design of tooling and fixtures to support sub-component performance and vibration testing.
• Analysis of dimensional and GD&T for manufacturing capabilities and assemblies as per ASME Y-
14.5 1994
Specialties &Skills:-
• Experience in building and handling offshore and onsite teams for Engineering Services.
• Competency Development: Interior design, structure Design & Engineering Change
Management
• Project Management :Governance, Process Development, People Management
• Middle level Leadership positions in Bombardier Offshore Engineering Center.
• Project coordination and project management offshore / onsite locations.
• Responsible for business unit P/L and growth.
• Technical unit management - delivery responsible for projects in interior aero structures,
• ODC process development, quality certifications, governance, project metrics.
• Interface for customer relations, business development.
Cad packages : Catia V6, V5-R19, R23, Catia V4, Pro-e, Ansys, Auto-cad2000-
2010, Image Rendering photo studio.
PLM packages : Enovia PLM, PDM, VPM, Mx-Pro, EnoviaV6 and Citrix, Smart team, Team
Center.
Operating Systems : MS Windows XP/2000, Windows 7, UNIX.
Languages : C and VB.
Microsoft tools : Microsoft Word, MS Access, power point, XL with macro writing skill.
System Administration: Software installation and system configuration.
Accomplishments
Product Improvement
• Liaised with Configuration management team to modify and improve overall product
performance.
• Eliminated cycle time in document process flow.
Quality Control
• Saved 8% on supply costs by working closely with suppliers to ensure components met
department quality standards.
CADD Training
• Supervised and trained associate drafters.
• Organized and delegated projects according to co-workers abilities
Page 2 of 6
Curriculum Vitae of Mohammed Haneef G.
Professional Experience
Projects:
1. Title: Design and drafting of Galley G1, G2, G7, G4B for Boeing 737.
Name of the Company : AxisCades Ltd (Cades tech) Bangalore.
Client : Boeing aerospace (Zodiac Aerospace)
Products Manufactured : Aircrafts.
Designation : Lead Design Engineer
Duration : July 2014 – Till date 2 + years
Programme : Boeing 737, 767
Project title : Interior Galley design
Location : Los Angeles, USA
Project Description:
• Managed and coordinated onsite & offshore teams and smooth transition of onsite work to offshore
from various customer locations –Huntington Beach, USA.
• Design and drafting of Boeing Galleys G1, G2, G7, and G4B as per customer requirement
document STCM and design matrix data.
• Having exposure in interior structural design, development, assembly processes and sheet metal
design and flat drawing pattern creation.
• Attending CDR (Critical design review) meeting, taking action plan with all integrators for infra
drawing updates in smart team product structure.
• Exposure to Aerospace Interior Design full project life cycle and project methodologies.
2. Title : Interior Completion Engineer for Interiors of Bombardier Global
Aircraft.
Client : Bombardier Aerospace, Global XRS, 5000
Organisation : Mahindra Satyam.
Duration : July 2011 to July 2014. 3 years
Location : India, Bangalore
Project Description:
• Create 3D detail design and provide drawing with working instructions and BOM to supply the line.
• Continuously provide engineering support.
• Create and integrate 3D models as per manufacturability.
• Update model to encompass changes.
• Responsible to match customer definition package.
• Create 2D drawing with integrated working instructions.
• Update drawing to encompass changes.
• Support Report of Nonconformance (RNC) process (Depending on the areas).
• Interface control drawings for any new cabinet and periphery requests impacting interfaces
(mechanical installation, water/waste/oxygen system installation, and aircraft level systems
installation).
3. Title: Configuration Management and Product structure management, Project
management.
Client : Bombardier Aerospace. Global XRS, 5000
Organisation : Tech Mahindra (Mahindra Satyam)
Duration : June 2010 to July 2011. 1.1 years
Location : Montréal, Canada
Project Description:
Page 3 of 6
Curriculum Vitae of Mohammed Haneef G.
• CM function is responsible for planning, co-coordinating and implementing project CM activities.
• Specifically they are responsible for identifying changes to the project and ensuring that changes
to the project are carefully managed.
• Releasing all drawing packages in to DTS as per master plan.
• Lead internal cross-functional teams in defining/optimizing fully integrated Product Lifecycle
Management processes (PLM Processes).
• Engineering change management process (ECR, ECO) and execution of changes through Enovia-
V6 PLM tool.
• Update CPS tracking sheet and CPS Matrix Sheet, Monitoring & follow up of CPS sheet, Keep CPS
Matrix sheet live in E-Room.
• Attending CDR (Critical design review) meeting, taking action plan with all integrators for infra
drawing updates in Enovia product structure.
4. Title : Material and process engineer for Interior Completion centre Interiors
of Bombardier Global Aircraft.
Client : Bombardier Aerospace.
Organisation : Mahindra Satyam.
Duration : May 2009 to July 2010. 1.2 years
Location : Montréal, Canada
Project Description:
It involves Checking of all Material specifications on engineering, Assembly and part drawings for
process notes, BAPS, BAMS to make sure all notes are fallowed by BA methodology, and Provide
guidance, such as drawing and BAPS interpretation, to operations personnel, interaction between
design, stress, methods, production and suppliers of Bombardier, create test plans and test reports for
certifications for the same. Evaluate materials and develop machinery and processes to manufacture
materials for use in products that must meet specialized design and performance specifications.
Develop new uses for known materials. Includes those working with composite materials or
specializing in one type of material, such as graphite, metal and metal alloys, ceramics and glass,
plastics and polymers,paints,coatings, and naturally occurring materials.
5. Title : Flammability engineering for Interiors of Bombardier Global XRS Aircraft.
Client : Bombardier Aerospace.
Organisation : Tech Mahindra (Mahindra Satyam).
Duration : Dec 2007 to May 2009. . 1.5 years
Location : Montreal, Canada
Project Description:
This project involves design of flame coupons for testing in standard flame methodology as per FAR
25.853, for fire safety and preventions purpose, it includes the flame design of monuments (2D and
3D model), all Aircraft Interior Monuments like Mid cabin bulkhead, Aft Vanity, Divan and End
cabinets, Side Ledge, Dado, PSU, Sidewall, Aft Wardrobe, Workstation, Low Cabinet, Credenza.
6. Title : Generator components of G.E TRANSPORTATION SYSTEM.
Client : G.E TRANSPORTATION SYSTEM.
Organization : M/S Pitti laminations ltd Ancillary Unit
S.V.D Technologies, Hyderabad
Duration : Nov 2005 to Nov 2006. 1 year
Designation : Junior Design engineer
Location : India, Hyderabad
Project Description:
Company Involved in Manufacturing of special purpose machines, Railway Generator components, like
rotor pole end casting, stator bodies & rotor components, it was the Major Project of G.E
TRANSPORTATION SYSTEM.
Page 4 of 6
Curriculum Vitae of Mohammed Haneef G.
Education and Training
0 Graduate in Mechanical Engineering(BE)
2007, Malnad College of Engineering Hassan, VT university Karnataka.
0 Diploma in Mechanical Engineer (DME)
2003, GPT Raichur, Board of Technical Examinations, Karnataka.
1 Secondary School Certificate (SSLC)
1999, KEB School Raichur, Board of Public Examinations, Karnataka
Academic Projects:
Diploma Final Year: Heat transferred by conduction through Composite Walls.
• Description: This project involves the testing of heat transferred by conduction through composite
walls with different conducting materials.
B. E. Final Year : Fiber Testing Machine.
• Description: Fiber testing machine is a device, which is used for testing the tensile strength of a
different fibers like jute, composite jute, coir, coconut fiber, textile fibers etc.
Trainings
• Aircraft external painting training, in Mahindra satyam for 200 hours.
• Auto cad Training, in kanthanavar training centre-Raichur, for 60 hours.
• Catia V5 training, in M/S Ramayya advanced training centre-Bangalore for 200 Hours.
• GD&T Training, in M/S Ramayya advanced training centre-Bangalore for 100 Hours.
• SIX Sigma and QMS training, in Mahindra satyam learning world, for 40 hours
• French Course, in Global Steps new BEL road -Bangalore –for 60 hours level 1.
Affiliations and Certifications
Certified for aerospace advanced module course from prestigious INDIAN INSTITUTE OF SCINCE-
Bangalore for 2 months regular course.
Personal Details:
Name : Mohammed Haneef Gubbla
Date of Birth : 05th
Apr 1983
Father’s Name : Krishna Murthy Gubbla
Religion : Hindu
Nationality : Indian
Martial Status : Married
Hobbies and interest: listening music, Playing volley ball, watching movies.
Language Known : English, French (level 1), Hindi, Kannada and Telugu.
Page 5 of 6
Curriculum Vitae of Mohammed Haneef G.
Passport no : G3907950. Valid till 28-06-2017
Visa/Work permit : USA B1/B2 Valid Till 2024,
USA H1B work permit valid till 01-10-2018
Declaration:
I hereby declare that the information furnished above is true to the best of my knowledge.
Mohammed Haneef G.
Page 6 of 6
Curriculum Vitae of Mohammed Haneef G.
Passport no : G3907950. Valid till 28-06-2017
Visa/Work permit : USA B1/B2 Valid Till 2024,
USA H1B work permit valid till 01-10-2018
Declaration:
I hereby declare that the information furnished above is true to the best of my knowledge.
Mohammed Haneef G.
Page 6 of 6
Curriculum Vitae of Mohammed Haneef G.

CV_Haneef_Aerospace Engineer

  • 1.
    Mohammed Haneef G. PrimaryExpertise: • Product development • Concept Design & Sketching • Design of Secondary structures harness brackets • Standards Process and Tools • Project Management and Business development • Aerospace Interiors Profile • Having 10+ years of experience in Aerospace design industry in Interior concept Design, Structure design, 3D Modeling, Drafting, and GD&T using ENOVIA PLM, VPM and Catia V5, V6, Smart team, Team center. • Working on Secondary Structure - Brackets Design A350XWB-900 & -1000, executed for Sec13-14 cargo floor and door surroundings, upper, lower shell. • Managed complex Interior Design projects such as, Bombardier Global, Challenger 605NG business aircraft interior monument and Boeing 737/767 galley designs from concept through completion of the mock-up and production drawing creation. • Working on Aircraft Interior Monuments like Galley, Mid cabin bulkhead, Aft Vanity, Divan and End cabinets, Side Ledge, Dado, PSU, Sidewall, Aft Wardrobe, Workstation, Low Cabinet, Credenza. • Working on Engineering standards and process tools, Technical design activities for Bombardier Global series. • Expertise in creation of Part, Assembly, Black box and Drawings using ENOVIA PLM, VPM,PDM, VPM,Smart team software. • Expertise in configuration management and product structure management and process tools like KPI, delivery tracking CDR (critical design review) etc. • Worked on project management and Business development team for Bombardier Global program. • Worked on Exterior Painting and markings project for Bombardier Global program. • Worked on Nomenclature project for Bombardier Global program to standardize Standard Parts and implement E-BOM for the same. • Worked on flammability project for FAR25.853 and airworthiness certification. • Worked on Enovia, Smart team PLM support, maintenance and development between Bombardier And IBM for Bombardier Global program. • Knowledge in Catia V4 in creation External surface painting and markings, Design, flat Pattern Creation for production. • Worked on material and process (methods) engineer for Interior Completion center of Bombardier Page 1 of 6 Curriculum Vitae of Mohammed Haneef G. Lakshmi Nivaas 12/4, Room Number: 5. Ananad Reddy layout, Electronic City Phase-2 Bangalore-560100 Email : hani1.407@gmail.com Mobile: +91 9980879193.
  • 2.
    Global Aircraft. • Workedon Enovia Matrix, ERP, SAP, Supply chain management. • Design of tooling and fixtures to support sub-component performance and vibration testing. • Analysis of dimensional and GD&T for manufacturing capabilities and assemblies as per ASME Y- 14.5 1994 Specialties &Skills:- • Experience in building and handling offshore and onsite teams for Engineering Services. • Competency Development: Interior design, structure Design & Engineering Change Management • Project Management :Governance, Process Development, People Management • Middle level Leadership positions in Bombardier Offshore Engineering Center. • Project coordination and project management offshore / onsite locations. • Responsible for business unit P/L and growth. • Technical unit management - delivery responsible for projects in interior aero structures, • ODC process development, quality certifications, governance, project metrics. • Interface for customer relations, business development. Cad packages : Catia V6, V5-R19, R23, Catia V4, Pro-e, Ansys, Auto-cad2000- 2010, Image Rendering photo studio. PLM packages : Enovia PLM, PDM, VPM, Mx-Pro, EnoviaV6 and Citrix, Smart team, Team Center. Operating Systems : MS Windows XP/2000, Windows 7, UNIX. Languages : C and VB. Microsoft tools : Microsoft Word, MS Access, power point, XL with macro writing skill. System Administration: Software installation and system configuration. Accomplishments Product Improvement • Liaised with Configuration management team to modify and improve overall product performance. • Eliminated cycle time in document process flow. Quality Control • Saved 8% on supply costs by working closely with suppliers to ensure components met department quality standards. CADD Training • Supervised and trained associate drafters. • Organized and delegated projects according to co-workers abilities Page 2 of 6 Curriculum Vitae of Mohammed Haneef G.
  • 3.
    Professional Experience Projects: 1. Title:Design and drafting of Galley G1, G2, G7, G4B for Boeing 737. Name of the Company : AxisCades Ltd (Cades tech) Bangalore. Client : Boeing aerospace (Zodiac Aerospace) Products Manufactured : Aircrafts. Designation : Lead Design Engineer Duration : July 2014 – Till date 2 + years Programme : Boeing 737, 767 Project title : Interior Galley design Location : Los Angeles, USA Project Description: • Managed and coordinated onsite & offshore teams and smooth transition of onsite work to offshore from various customer locations –Huntington Beach, USA. • Design and drafting of Boeing Galleys G1, G2, G7, and G4B as per customer requirement document STCM and design matrix data. • Having exposure in interior structural design, development, assembly processes and sheet metal design and flat drawing pattern creation. • Attending CDR (Critical design review) meeting, taking action plan with all integrators for infra drawing updates in smart team product structure. • Exposure to Aerospace Interior Design full project life cycle and project methodologies. 2. Title : Interior Completion Engineer for Interiors of Bombardier Global Aircraft. Client : Bombardier Aerospace, Global XRS, 5000 Organisation : Mahindra Satyam. Duration : July 2011 to July 2014. 3 years Location : India, Bangalore Project Description: • Create 3D detail design and provide drawing with working instructions and BOM to supply the line. • Continuously provide engineering support. • Create and integrate 3D models as per manufacturability. • Update model to encompass changes. • Responsible to match customer definition package. • Create 2D drawing with integrated working instructions. • Update drawing to encompass changes. • Support Report of Nonconformance (RNC) process (Depending on the areas). • Interface control drawings for any new cabinet and periphery requests impacting interfaces (mechanical installation, water/waste/oxygen system installation, and aircraft level systems installation). 3. Title: Configuration Management and Product structure management, Project management. Client : Bombardier Aerospace. Global XRS, 5000 Organisation : Tech Mahindra (Mahindra Satyam) Duration : June 2010 to July 2011. 1.1 years Location : Montréal, Canada Project Description: Page 3 of 6 Curriculum Vitae of Mohammed Haneef G.
  • 4.
    • CM functionis responsible for planning, co-coordinating and implementing project CM activities. • Specifically they are responsible for identifying changes to the project and ensuring that changes to the project are carefully managed. • Releasing all drawing packages in to DTS as per master plan. • Lead internal cross-functional teams in defining/optimizing fully integrated Product Lifecycle Management processes (PLM Processes). • Engineering change management process (ECR, ECO) and execution of changes through Enovia- V6 PLM tool. • Update CPS tracking sheet and CPS Matrix Sheet, Monitoring & follow up of CPS sheet, Keep CPS Matrix sheet live in E-Room. • Attending CDR (Critical design review) meeting, taking action plan with all integrators for infra drawing updates in Enovia product structure. 4. Title : Material and process engineer for Interior Completion centre Interiors of Bombardier Global Aircraft. Client : Bombardier Aerospace. Organisation : Mahindra Satyam. Duration : May 2009 to July 2010. 1.2 years Location : Montréal, Canada Project Description: It involves Checking of all Material specifications on engineering, Assembly and part drawings for process notes, BAPS, BAMS to make sure all notes are fallowed by BA methodology, and Provide guidance, such as drawing and BAPS interpretation, to operations personnel, interaction between design, stress, methods, production and suppliers of Bombardier, create test plans and test reports for certifications for the same. Evaluate materials and develop machinery and processes to manufacture materials for use in products that must meet specialized design and performance specifications. Develop new uses for known materials. Includes those working with composite materials or specializing in one type of material, such as graphite, metal and metal alloys, ceramics and glass, plastics and polymers,paints,coatings, and naturally occurring materials. 5. Title : Flammability engineering for Interiors of Bombardier Global XRS Aircraft. Client : Bombardier Aerospace. Organisation : Tech Mahindra (Mahindra Satyam). Duration : Dec 2007 to May 2009. . 1.5 years Location : Montreal, Canada Project Description: This project involves design of flame coupons for testing in standard flame methodology as per FAR 25.853, for fire safety and preventions purpose, it includes the flame design of monuments (2D and 3D model), all Aircraft Interior Monuments like Mid cabin bulkhead, Aft Vanity, Divan and End cabinets, Side Ledge, Dado, PSU, Sidewall, Aft Wardrobe, Workstation, Low Cabinet, Credenza. 6. Title : Generator components of G.E TRANSPORTATION SYSTEM. Client : G.E TRANSPORTATION SYSTEM. Organization : M/S Pitti laminations ltd Ancillary Unit S.V.D Technologies, Hyderabad Duration : Nov 2005 to Nov 2006. 1 year Designation : Junior Design engineer Location : India, Hyderabad Project Description: Company Involved in Manufacturing of special purpose machines, Railway Generator components, like rotor pole end casting, stator bodies & rotor components, it was the Major Project of G.E TRANSPORTATION SYSTEM. Page 4 of 6 Curriculum Vitae of Mohammed Haneef G.
  • 5.
    Education and Training 0Graduate in Mechanical Engineering(BE) 2007, Malnad College of Engineering Hassan, VT university Karnataka. 0 Diploma in Mechanical Engineer (DME) 2003, GPT Raichur, Board of Technical Examinations, Karnataka. 1 Secondary School Certificate (SSLC) 1999, KEB School Raichur, Board of Public Examinations, Karnataka Academic Projects: Diploma Final Year: Heat transferred by conduction through Composite Walls. • Description: This project involves the testing of heat transferred by conduction through composite walls with different conducting materials. B. E. Final Year : Fiber Testing Machine. • Description: Fiber testing machine is a device, which is used for testing the tensile strength of a different fibers like jute, composite jute, coir, coconut fiber, textile fibers etc. Trainings • Aircraft external painting training, in Mahindra satyam for 200 hours. • Auto cad Training, in kanthanavar training centre-Raichur, for 60 hours. • Catia V5 training, in M/S Ramayya advanced training centre-Bangalore for 200 Hours. • GD&T Training, in M/S Ramayya advanced training centre-Bangalore for 100 Hours. • SIX Sigma and QMS training, in Mahindra satyam learning world, for 40 hours • French Course, in Global Steps new BEL road -Bangalore –for 60 hours level 1. Affiliations and Certifications Certified for aerospace advanced module course from prestigious INDIAN INSTITUTE OF SCINCE- Bangalore for 2 months regular course. Personal Details: Name : Mohammed Haneef Gubbla Date of Birth : 05th Apr 1983 Father’s Name : Krishna Murthy Gubbla Religion : Hindu Nationality : Indian Martial Status : Married Hobbies and interest: listening music, Playing volley ball, watching movies. Language Known : English, French (level 1), Hindi, Kannada and Telugu. Page 5 of 6 Curriculum Vitae of Mohammed Haneef G.
  • 6.
    Passport no :G3907950. Valid till 28-06-2017 Visa/Work permit : USA B1/B2 Valid Till 2024, USA H1B work permit valid till 01-10-2018 Declaration: I hereby declare that the information furnished above is true to the best of my knowledge. Mohammed Haneef G. Page 6 of 6 Curriculum Vitae of Mohammed Haneef G.
  • 7.
    Passport no :G3907950. Valid till 28-06-2017 Visa/Work permit : USA B1/B2 Valid Till 2024, USA H1B work permit valid till 01-10-2018 Declaration: I hereby declare that the information furnished above is true to the best of my knowledge. Mohammed Haneef G. Page 6 of 6 Curriculum Vitae of Mohammed Haneef G.